Annexure: A DETAILS OF CONTRACTS PLACED BY OPEN TENDER (For Civil Engg. /Elect. Engg. /S & T/Mech. etc works) (Status for the Month : From APRIL 2011 To MARCH 2012 ) Works Awarded : APRIL 2011 S. N. Tender No. Date of opening Description of Item/ Work LOA No. and date Contractor’s Name and address Quantity (for supply contract)/ Estimated Cost (For Engg./Elect. / S&T/ Mech. etc Works) Rate (for supply contract)/ Tendered Cost (For Engg./Elect. /S&T/Mech. etc Works) Value of Contract Scheduled completion date 1 IRCON/1029 /RCF- RBL/10/TEN DER (Risk & Cost) C&R/11/3/O T/01 Dt. 15.02.2011 09.03.2011 RCF-Raebareli Project: Balance work of construction of RCC Box Culverts and Cement Concrete Roads with related works at Rail Coach Factory, Raebareli at Lalganj (Risk & Cost) IRCON/1029/RCF- RBL/10/TENDER (Risk & Cost) C&R/11/3/OT/01 Dt. 13/15.04.2011 M/s High-tech Competent Builders Pvt. Ltd., G-17, RIICO Industrial Area, Phase-I, Bhiwadi, Distt.- Alwar, Rajasthan Mob:9414012550 ` 7.86 Crores (Basic cost as per DSR 2007) Schedue “A” 29.85 % above the DSR- 2007 schedule “B” `1325/- per m 3 `10,07,52,666/- 05 Months 2 IRCON/CC/ TN/RSVY- BIHAR/10/6 13 dated 06.10.2010 25.10.2011 RSVY in Bihar: Balance work for Improvement/ Upgradation of SH-50 into 2-lane road from Laheriasarai (CH. – 0.000 Km.) to Hanumannagar (CH.–16.471 Km.) of Darbhanga district in the State of Bihar [Package: 1B(ii)-I(A)] IRCON/CC/TN/RSV Y-BIHAR/10/613/275 dated 19.04.2011 M/s Raghav Civcon Pvt. Ltd. Rajkumarganj, P.O.-Lalbagh, District – Darbhanga (Bihar) `1279.66 Lacs `1279.66 Lacs `17,85,00,314.62 18.10.2011
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Annexure: ADETAILS OF CONTRACTS PLACED BY OPEN TENDER
(For Civil Engg. /Elect. Engg. /S & T/Mech. etc works)(Status for the Month : From APRIL 2011 To MARCH 2012)
09.03.2011 RCF-Raebareli Project: Balance work of construction of RCC Box Culverts and Cement Concrete Roads with related works at Rail Coach Factory, Raebareli at Lalganj (Risk & Cost)
25.10.2011 RSVY in Bihar:Balance work for Improvement/ Upgradation of SH-50 into 2-lane road from Laheriasarai (CH. – 0.000 Km.) to Hanumannagar (CH.–16.471 Km.) of Darbhanga district in the State of Bihar [Package: 1B(ii)-I(A)]
17.02.2011 New BG Railway Line Project in Nepal: Construction of Embankment, Side Drains, Retaining Walls and Blanketing work, construction of bridges (minor & major) and other ancillary works on India side of alignment from Km 0+000 to Km 5+445 for new B.G. Rly line from Jogbani to Biratnagar (Nepal)
IRCON/CC/TN/JBNRL-
2051/EMBANK/617/7 Dtd.25.05.2011
M/s APR-VNR (JV), Flat No.: 404, 5th Floor,
Bhanu Enclave, Sundar Nagar,
Erragadda, Hyderabad –
500034 FAX No.: 040-23708788
`1848.59 Lakhs `1848.59 Lakhs `18,03,27,336.46 15-months from the date of issue of
18.04.2011 RCF Raebareli Project: Construction of shell fabrication shop of RCF Raebareli including architectural, structural design, fabrication, supply and erection of Pre-Engineered Steel Buildings
IRCON/Civil/1029/RCF-
RBL/10/Tender/3/OT-16/107
Dtd.02.06.2011
M/s Ram Kripal Singh Construction Pvt. Ltd., Off No.
208 7 309, Suncity Shopping Arcade,
Sector – 54, Gurgaon, Haryana
– 122 002Ph. No.: 0124-
2572879
`5410 Lakhs
17% above `63,29,96,376/- 09-months from the date of issue of
LOA
2 IRCON/1014/J&K-DQ/ Addl. Qtrs,
GRPB, Misc-
Banihal /SQ-3 Dt. 22.03.11
20.04.2011 J&K Rail Link Project – Dharam – Qazigund Section : Construction of Additional Type II & III Quarters and 111 Bedded GRP Barrack and other miscellaneous works at Banihal yard (Package SQ-3)
18.05.2011 Construction of RPF Quarters Type-II, III and IV units at Budgam Railway Station on Qazigund - Baramulla New BG Rail Line Project(J&K)(Package: Q – 7R)
29.04.2011 Detailed Design Consultancy, 3D Monitoring and Construction supervision of Tunnel T-3 (between Km 5+917 & Km 7+174) & Tunnel T-4 (between Km 7+360 & 11+326) in connection with construction of Sivok Rangpo New single line B.G. Railway Project
IRCON/2046/SRRP/DDC/TunnelT3-
T4/526 Dt.26.08.11
M/s AECOM Asia Company Ltd, 9th
Floor, Infinity Tower C, DLF
Cyber City, DLF Phase-II, Gurgaon, Haryana - 122002,
Tel.: 0124-4830100,
FAX: 0124-4830108
`1428 Lakhs `1428 Lakhs USD 21,55,262 and INR
6,60,99,481
36-months from the date of issue of
LOA
Continued...../-
Works Awarded : SEPTEMBER 2011S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and
address
Quantity (for supply contract)/
Estimated Cost (For
Engg./Elect. / S&T/ Mech. etc
Works)
Rate (for supply contract)/
Tendered Cost (For Engg./
Elect. /S&T/Mech. etc
Works)
Value of Contract
Scheduled completion
date
1 IRCON/CC/TN/RSVY-BIHAR/11/631 Dtd.
06.07.2011
21.07.2011 Construction of balance left over works of Box Culverts between Pupri to Benipatti (Ch.39.65 Km to 14.72 Km) of SH-52 in Madhubani district of Bihar State. Est. Cost: `413.99 CroresPackage: 1D(i-a)
29.07.2011 J&K Rail Link Project – Dharam– Qazigund Section. Construction of underground drainage system from collecting chambers to disposal points at various locations with pipe thrusting (trenchless pipe jacking-pipe pushing method) and laying of pipes (1200mm in diameter) in open excavation and other allied works in Zone VI; Package - M – 12R
06.06.2011 Construction of a) Station Buildings, Passenger and Goods Platform, PF Shelter/ sheds, Foot Over Bridge(FOB), tea stall, Goods Circulating Area/ roads works etc., b) Staff Quarters, Guest House, Pump House, Duty Huts, Over Head Water Tank, Garages, Trolley shed, miscellaneous ancillary works including internal sanitary items, pipes etc. and any other items required to complete the above works in connection “Construction of New Broad Gauge Railway Line From Jogbani To Biratnagar (Nepal) in Indian portion from Km0.000 to Km.5.445”
IRCON/2051/JBNRL/LOA/Km0.000 to 5.445/Bldg/139
Dt.30.09.11
M/s Jay Mata Di Construction, Ward
No.: 7/9, Under Araria Municipality,
Araria, Police Station – Araria, District – Araria
Bihar
`1932.56 Lakhs `1930 Lakhs `18,14,30,484.31 15-months from the date of issue of
26.08.2009 Construction/Up-gradation and Maintenance of Rural Road for five years under PMGSY from Majhwakhurd to Bairagitola (4.95 Km) and from Uchakagaon to Harpur (7.95 Km); i.e. Total 12.90 Km in Block: Uchakagaon of Distt.-GOPLAGANJ, BIHARPkgNo: BR/13/27A
IRCON/2035/ PMGSY/ BR-13-
27A/LOA/2284 Dtd. 12.10.2011
M/s Durga Pratap Singh
Vill. - Korara,PO – Bishunpura,
Mairwa,District – Siwan,
Bihar
`590.32 Lacs `6,78,86,694/- `6,78,86,694/- 12-months from the date of issue of
LOA
3 IRCON/ CC/TN/
PMGSY/ 09/570
26.08.2009 Construction and Maintenance of Road for five years under PMGSY in Block Gopalganj from Sidhwol to Zeradai via Bhaiskenal (11.30 Km) Block:Ziradei/ Hussainganj in District-SIWAN, BIHARPackage No.: BR/34/44
IRCON/2035/ PMGSY/ BR-34-
44/LOA/2283 Dtd. 12.10.2011
M/s Binod KumarVill. - Korara,
PO – Bishunpura, Mairwa,
District – Siwan,Bihar
`455.12 `6,37,17,924/- `6,37,17,924/- 12-months from the date of issue of
LOA
Continued...../-
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and
address
Quantity (for supply contract)/ Estimated
Cost (For Engg/Elect /S&T/
Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./Elect. /S&T/Mech. etc
Works)
Value of Contract
Scheduled completion
date
4 IRCON/ CC/TN/
PMGSY/ 10/604
26.08.2010 Construction/Up-gradation and Maintenance of Rural Road for five years under PMGSY in Block Goplaganj from Bhityerwa to Mehdia (4.30 Km); in Block Barauli from Parsa to Balaha (5.25 Km); in Block Manjha from Bhojpurwa to Gausia (5.15 Km); in Block Gopalganj from Gopalganj to Khargauli (15.00 Km); in Block Gopalganj from Baraipattiq to Niranjana (3.70 Km) and in Block Bijaypur from Bijaipur to Bilarwa (4.58 Km) i.e. Total Length = 37.98 Km in District-GOPALGANJ, BIHAR Pkg. No.: BR/13/20
IRCON/2035/ PMGSY/ BR-13-
20/LOA/2285 Dtd. 12.10.2011
M/s Baibhaw Construction Pvt.
Ltd.,Sareya,
Ward No. - 13,Gopalganj,
Bihar
`1687.50 `21,09,38,419/- `21,09,38,419/- 12-months from the date of issue of
LOA
5 Package-74R
21.04.2011 J&K Rail Link Project - Dharam - Quazigund Section. Construction of Tunnel T-74R (between Km 125 & 134) on Dharam - Quazigund Section of Udhampur - Srinagar - Baramula New BG Railway line Project
12.09.2011 Construction of Road Over Bridges (ROB) as per specifications drawing & design, maintaining all quality control standard complete at KM 184/13-14 on LC No. 88-B in Chittaurgarh - Udaipur section of Western Railway near Kumbha Nagar Chittaurgarh in Rajasthan State
28.07.2011 Supply and Erection, Installation and Commissioning of 25 nos. 3 Ton, 25 nos. 5 Ton & 2 nos. 10 Ton Diesel Fork Lift Trucks at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/ 1029/RCF-
RBL-II/Forklift/23 dtd. 23.11.2011
M/s Godrej & Boyce Mfg. Co.
Ltd., Godrej Material Handling,
Pirojshanagar, Vikhroli,
Mumbai-400079.
52 nos. (a) 3 Ton, 25 nos Forklifts cost is `1,75,38,844/- (@`7,01,553.77/ Forklift)
(b) 5 Ton, 25 nos Forklifts cost is ` 3,15,52,784/- (@`12,62,111.36/ Forklift)
(c) 10 Ton, 2 nos Forklifts cost is `42,68,975/-(@`21,34,487.50/ Forklift)
`5,33,60,603/- 28.02.2013
Continued...../-
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and
address
Quantity (for supply contract)/
Estimated Cost (For Engg/Elect
/S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./Elect. /S&T/Mech. etc
Works)
Value of Contract
Scheduled completion
date
3 IRCON/Civil/1029/RCF-RBL/10/tender/3/ OT-
18 dtd. 26.07.11
22.09.2011 Construction of three Sewage Treatment Plants based on SBR technology on turnkey basis at RCF-Raebareli
M/s ENVIRO INFRA Engineers Pvt. Ltd., 206, IInd Floor, RG Complex Community Center Sector-8, Rohini,
Delhi-110089
`487 Lakhs 1a) STP-1-`1,84,30,000/-
1b) STP-2-`2,18,25,000/-
1c) STP-3-`1,06,70,000/-
`540 Lakhs 28.09.2012
4 IRCON/Civil/1029/RCF-RBL/10/tender/3/ OT-
19 dtd. 20.09.2011
01.11.2011 Construction of Wheel shop, Bogie Shop, Paint Shop, Garnet Blasting Shop, Machine Shop, Transport Shop & Shell Store of RCF Raebareli
IRCON/Civil/1029/RCF-RBL/10/
tender/3/ OT-19/ C-155 dtd.
29.11.2011
M/s Era Buidsys Ltd., C-56/41,
Sector 62, Noida-201303
Ph.0120-4145000Fax 0120-4145030
`50.95 Crore `52.55 Crore `52.55 Crore 28.09.2012
5 IRCON/Civil/1029/RCF-RBL/10/tender/3/ OT-
21/ dtd.
26.07.11
02.11.2011 Construction of Officer's Club & Guest House, Supervisor & Worker's Club & Guest House, Senior Sec. & Primary Schools, Technical Trainee & Sports Hostel, Maintenance office (5 nos.), Hospital and Shopping Complex etc., for RCF, Raebareli at Lalganj
01.09.2011 Supply and Erection, Installation & Commissioning of 02 Nos. CNC (under water) Plasma Profile Cutting Machines at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/ 1029/RCF-RBL-II/Under Water
Plasma/14 dtd. 30.11.2011
M/s Soitab Implant s.r.l.,D-22,
Sector - 3, NOIDA (201301)Tel:0120-
4545428,29
02 nos. `8,02,00,680/- `8,02,00,680/- 02.04.2012
7 IRCON/Civil/1029/RCF-RBL/10/tender/3/ OT-
20 dtd. 20.09.2011
20.10.2011 Construction of flooring, foundations and other civil works in wheel shop, bogie shop, paint shop, transport shop and shell store of RCF Raebareli
IRCON/Civil/1029/RCF-RBL/10/
tender/3/ OT-19/ C-156 dtd.
30.11.2011
M/s Sacred Construction Pvt. Ltd., Engineers, Contractors and Fabricators, AN-29-B, Shalimar Bagh, Delhi-88
21.02.2011 Construction of Civil work including Embankment, Side Drains, Retaining Walls, Blanketing, Bridges and other ancillary works in Jaynagar to Osrahi section Km 0+000 to Km 2+975 (Indian side Alignment portion)
IRCON/2050/ BGL.JBB/Embk-Bridge-01(India)/
Tender/1 Dtd. 30.11.2011
M/s Jai Mata Dee Construction,
Chakai Jokihat,Araria,
Bihar PIN: 854 311
Tel.: 06453 – 224 882FAX: 06453 – 224
883
`813.10 Lacs `7,23,65,647.20 `7,23,65,647.20 15 Months from the date of issue
of LOA
Continued...../-
S. N.
Tender No.
Date of opening
Descript ion of Item/ Work
LOA No. and date
Contractor’s Name and
address
Quantity (for supply
contract)/ Estimated Cost (For
Engg/Elect/ S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect./ S&T/Mech. etc
Works)
Value of Contract
Scheduled completion
date
Works Awarded : DECEMBER 2011
1 IRCON/3015/TN/ROB-
RAJ /BIKANER/11/06 Dt.
11.08.2011
12.09.2011 Construction of Road Over Bridges (ROB) as per specifications drawing & design, maintaining all quality control standard complete at Km 322.30 in lieu of LC No. 139 in Lalgarh Bikaner section of N.W. Railway near Choukhuti, Bikaner in Rajasthan State
IRCON/3015/TN/ ROB-
RAJ/BIKANER/11/06/190
Dated: 01.12.2011
M/s Simplex Infrastructures Ltd. Vailunth, 2nd floor,
17.10.2011 Construction of ROB (excluding of Pile Foundation) as per specifications, drawings & design, maintaining all quality control standards complete as LC No. 108 -B at KM 918/1-2 at Kota in Rajasthan State
IRCON/3015/TN/ROB-
RAJ/KOTA/11/11/194 Dated: 01.12.2011
M/s Harish Chandra (India)
Ltd. 113-A, Kamala
Nagar, Delhi - 110017
`2006 Lacs 1% below `19,97,94,069.00 28.02.2013
3 RFP No.: IRCON/ CC/TN/ HSRC/
HDVC/11/ 624Date:
21.04.2011
30.06.2011 Pre-feasibility study for High Speed Rail Corridors between Hyderabad - Doranakal - Vijayawada - Chennai
12.09.2011 Supply, Erection, Testing & Commissioning of Electrical Sub-stations South & North Portal of T-80 Tunnel Consisting of 2x3150KVA Transformer 33KV/11KV, 2x1500KVA Transformer 11KV/0.433KV, 2x250KVA Transformer 11kV/0.433kV, 2X1500KVA Silent DG Set along with GIS Panel, Battery Charger and other accessories at each Sub-Stations, Supply of Mandatory Spares including Annual Comprehensive Maintenance of the Installation on yearly basis after Expiry of Defects Liability Period
LOA No.: IRCON/J&K- Cell/JAT/15/
1014/D-Q/T-80 PSS I&II/1164
dtd. 03.12.2011
M/s Hitech JK Engineers JV, 303, Pragati Chambers,
Ranjit Nagar, Commercial Complex,
New Delhi – 08Tel:011-25702463FAX:011-25709321
`1489.78 Lakhs `15,64,27,129/- `15,64,27,129/- 10 Months from the date of issue
of LOA
5 IRCON/ Civil/1029/RCF-RBL/ 10/
Tender/3/ OT-22 dated 30.09.2011
04.11.2011 Construction of Administrative Building & Technical Training Centre for RCF, Raebareli at Lalganj.
31.05.2011 Detailed Design Consultancy, 3D Monitoring & Supervision of Tunnel T-5 (Between Km 11+671 to Km 13+764) & Tunnel T-6 (Between Km 14+934 to Km18+884) in connection with Construction of Sivok (West Bengal) to Rangpo (Sikkim) new Single line BG Railway Line Project
IRCON/2046/ SRRP/DDC/
Tunnel/T5-T6/23/299
Dtd. 09.12.2011
M/s AECOM Asia Co. Ltd.,
9th Floor, Infinity Tower C, DLF
Cyber City, DLF Phase-II,
Guragon-122 002
`1653 Lakhs - USD 27,06,762 and
INR 6,88,12,861/-
36-months from the date of issue
of LOA
7 IRCON/ELECT /
1029/RCF-RBL/ CSS-
750/22
18.10.2011 Supply, Installation, Testing and Commissioning of 750KVA 11/0.433kV Compact Substations at RCF, Raebareli (Uttar Pradesh)
IRCON/ELECT /1029/RCF-RBL/ CSS-750/22 dtd
16.12.2011
M/s. NKG Infrastructure Limited, 124, Ground Floor, World Trade Centre Road,
Connaught Place, New Delhi-01
`340 Lakhs `312 Lakhs `312 Lakhs 4 months for date of LOA.
8 IRCON/Civil/1029/RCF-RBL/Tender/ASS/7000/
07 Dt. 29.09.2011
20.10.2011
Construction of Auxiliary Sub-Station Buildings in Factory Area in connection with construction of Rail Coach Factory Raebareli, Lalganj, Raebareli(UP)
`564.32 Lakhs Sch- A 2.95% above , and Sch- B 2.95% above basic cost + 43%
`580.98 Lakhs 18.08.2012
Continued...../-
S. N.
Tender No.
Date of opening
Descript ion of Item/ Work
LOA No. and date
Contractor’s Name and
address
Quantity (for supply
contract)/ Estimated Cost (For
Engg/Elect /S&T/ Mech. etc Works)
Rate (for supply contract)/ Tendered Cost (For
Engg./Elect. /S&T/Mech. etc
Works)
Value of Contract
Scheduled completion
date
9 IRCON/ ELECT/1029
/RCF-RBL/Shell Shop/28
08.12.2011 Supply, installation, testing & commissioning of electrical power distribution system including Lighting in Shell Fabrication shop at New Rail Coach Factory, Rae Bareli
ELECT/ 1029/RCF-RBL/Shell Shop/28
dtd 21.12.11
M/s Sterling & Wilson Limited,
C-56/38, Institutional Area,Sector-62, Noida,
PIN - 201307
`1748 Lakhs `1423 Lakhs `1423 Lakhs 12 months form the date of issue
of LOA
10 IRCON/ Civil/1029/ RCF-RBL/
10/Tender/3/OT-23 dated
04.11.2011
30.11.2011 Construction of external Sewerage, Drainage and Water supply works including Overhead Water Tanks for the Rail coach Factory Raebareli complex at Lalganj
`43.63 Crores Schedule A22.8 % above the DSR (2007)
Schedule B At the following
item ratesItem no. 1 @ `1350/-per cum
Item no. 2 @ `230/- per cumItem no. 3 @ `1580/-per cumItem no. 4 @ `2050/-per cumItem no. 5 @ `35/- per sqmItem no. 6 @ `11.5 per sqm
`38.34 Crores 10.01.2013
12 months
Continued...../-
S. N.
Tender No.
Date of opening
Descript ion of Item/ Work
LOA No. and date
Contractor’s Name and
address
Quantity (for supply contract)/
Estimated Cost (For Engg/Elect
/S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./Elect. /S&T/Mech. etc
Works)
Value of Contract
Scheduled completion
date
12 IRCON/ELECT/1029/RCF-RBL/
Misc Shop/35
21.12.2011 Supply, Installation, Testing & Commissioning of Electrical Power Distribution System including Lighting in Bogie, Wheel, Paint, Mill Write & Transport Shops at New Rail Coach Factory, Rae Bareli (U.P.)
IRCON/ELECT/ 1029/RCF-RBL/
Misc Shop/35 dtd 28.12.2012
M/s Sudhir Power Projects Limited, 507, International
Trade Tower, Nehru Place, New
Delhi-110019
`1540 Lakhs `1248 Lakhs `1248 Lakhs 12 months form the date of issue
of LOA
13 IRCON/ MECH/
1029/RCF.RBL-II/ Paint
Plant/26 dtd.
08.09.2011
03.10.2011 Supply and Erection, Installation & Commissioning of Complete Painting System for Railway Passenger Coaches at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
20.12.2011 Construction of Bituminous and concrete roads for the Rail Coach Factory Raebareli complex at Lalganj
IRCON/Civil/1029/RCF-RBL/10/
Tender/3/OT-24 dtd. 11.01.2012
M/s RG Buildwell Engineers Ltd.,
Ghaziabad
`4363.00 Lacs `3834 Lacs `3834 Lacs 10.01.2013
2 IRCON/J&K Cell/ JAT/ 14/1014/ D-Q/Misc.
Works M-17/199
dtd.02.11.11
24.11.2011 Construction of miscellaneous works including rigid pavements, RCC retaining/ breast walls, Sewerage & water Supply System, Drainage Works, Pathways, UG water tanks, Pump House and other related works at Banihal Yard in Dharma-Qazigund section of USBRL project (J&K) (Package-M-17)
IRCON/J&K Cell/ JAT/ 14/1014/
D-Q/Misc. Works M-17/199
dtd.16.01.2012
M/s M. M. Shawl,Chinar
Commercial Complex, The
Bund, Residency Road, Srinagar,
Kashmir – 190004Tel.: 0194 –
2477506, 2400153Fax: 0194 -
2480625
`1211.00 Lacs Schedule – 'A' 68% above BOQ Rates
Schedule – 'B' 79% above BOQ Rates
Schedule – 'C' 72% above BOQ Rates
Schedule – 'D' 40% above BOQ Rates
`11,56,86,820.03 12-months from the date of issue
of LOA
3 IRCON/1008/J&K-Cell/ JAT/ GRP Barracks-
Awantipura/GRP-19R
dtd.03.11.11
25.11.2011 Construction of 111 Bedded GRP Barracks and other miscellaneous works such as Compound wall, Chain Link Fencing etc., at Awantipora Railway station Yard (GRP-19R) on Quazigund – Baramulla New BG Railway Line Project (J&K)
IRCON/1008/J&K-Cell/ JAT/ GRP
Barracks- Awantipora/GRP-19R dtd.16.01.12
M/s Hi-Tech Engineers, 65, East Extension, M.E.T. Road,
12.09.2011 Supply and Erection, Installation & Commissioning of 03 Nos. (50MT) & 04 Nos. (80MT) Traversers Machines. at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
IRCON/MECH/ 1029/RCF-RBL-II/Traverser/007/
739 dated 27.01.12
M/s Unique Industrial Handlers Pvt Ltd, 206-207, Nahar & Sheth
Industrial Estate, Chakala, Andheri(E)
Mumbai-400099Tel.:022-28390071,
28352019FAX: 022-28378226,
28210006
03 Nos. (50MT)&
04 Nos. (80MT)
03 Nos. 50MT = `4,61,03,540/-
04 Nos. 80MT = `7,80,60,999/-
and
Spares = `17,29,000/-
`12,58,93,538/- 20.01.2013
5 IRCON/ ELECT/1029/RCF-RBL/
MRS ELECT/34
Dt.25.11.11
15.12.2011 Design, supply, installation testing and commissioning of all electrical equipment related to 4 sets of standby Diesel Generator Sets of 1010kVA, 11kV with Synchronising control panels, U/ground fuel storage tank, Civil and all associated works at Rail Coach Factory, Rae Bareli (U.P.)
IRCON/ELECT/ 1029/RCF-RBL/
1010 KVA DG/34 dated
31.01.2012
M/s Sterling & Wilson Powergen
Limited, A-7, Sector-6, Noida
`605.00 Lacs `596 Lacs `596 Lacs 6-months from the date of issue
of LOA
6 IRCON/ 1014/J&K.
DQ/ Consultancy
Tunnels Km.110-125/186 dated
09.09.2011
02.11.2011 Detailed Design Consultancy of all structures including Tunnels, bridges /viaducts, Station Yards and associated works and Construction Supervision of Tunnels between km 110 & km 125 in connection with Construction of Dharam-Qazigund Section of Udhampur-Srinagar- Baramulla New BG Railway Line Project.
IRCON/1014/J&K.DQ/Consultancy Tunnels/Km.110-
125/186 dated 31.01.2012
Ms/ Bernard Ingenieure ZT
GmbH, BahnhofstraBe 19, A-6060. Hall in Tirol, Austria
Tel:+43 (0) 5223/ 5840-0
Fax:+43 (0) 5223/ 5840-201
`4878.00 Lacs `4878.00 Lacs EURO48,76,906.79 and INR
`19,17,73,050.40
30.01.2016
Works Awarded : FEBRUARY 2012S. N.
Tender No. Date of opening
Description of Item/ Work LOA No. and date
Contractor’s Name and address
Quanti ty (for supply
contract)/ Estimated Cost (For
Engg/Elect /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./Elect. /S&T/Mech. etc
Works)
Value of Contract Scheduled completion
date
1 IRCON/MECH/1029/ RCF.RBL-II/Bolster
Machining /42 dtd.
08.09.11
11.10.2011 Supply, Erection, Testing and Commissioning of 02 Nos. Bolster Machining Centre at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
` 738.25 Lacs ` 738.25 Lacs Within 120 days from the date of
LC
Continued...../-
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and
address
Quantity (for supply
contract)/ Estimated Cost (For
Engg/Elect /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./Elect. /S&T/Mech. etc
Works)
Value of Contract
Scheduled complet ion
date
4 IRCON/ 1014/J&K-DQ/S&T/ Telecom
Dtd: 29.11.2011
24.01.2012 Design, Manufacture, Supply, Installation, Testing and Commissioning of complete Telecommunication System consisting Emergency Call & Service Telephone, CCTV, Tunnel Radio & PA System in Tunnel T-80 for Dharam- Quazigund New BG Rail Line Project.(J&K)
from the date of issue of letter of acceptance i.e.
23.11.2012
5 IRCON/ J&K-Cell/ JAT/15/
1014/T-80/ Telecontrol
Date: 24.11.2011
02.02.2012 Supply, Erection, Testing & Commissioning of Tele control System i.e. SCADA system for control & Monitoring of complete T-80 Tunnel Ventilation, tunnel illumination, safety system, protection system, Telecommunication system, Tunnel sub stations & Portal sub stations etc. complete in all respect required for Tunnel T-80 Ventilation & safety electro mechanical installations on Dharam-Qazigund section of USBRL Project (Package:SCADA system )
from the date of issue of letter of acceptance i.e.
23.11.2012
Continued...../-
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and
address
Quantity (for supply
contract)/ Estimated Cost (For
Engg/Elect /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./Elect. /S&T/Mech. etc
Works)
Value of Contract
Scheduled complet ion
date
6 IRCON/ J&K-Cell/ JAT/ 15/
1014/ T-80/ Ventilation
Date: 23.11.2011
03.02.2012 Supply, Erection, Testing & Commissioning of Tunnel Ventilation and Control System consisting of 1.6 M diameter Jet Fans, 0.65 M diameter Axial Fans etc. and Air Control & Ventilation Control system and other related equipments etc. complete for the Tunnel T-80 Ventilation System on Dharam- Qazigund Section of USBRL Project (J&K) (Package T-80, Ventilation System)
IRCON/J&K-Cell/JAT/15/ 1014/T-80/ Ventilation System /
from the date of issue of letter of acceptance i.e.
23.11.2012
7 IRCON/ J&K-Cell/ JAT/15/
1014/D-Q/ T-80/E&M
System Date:
30.11.2011
03.02.2012 Supply, Erection, Testing &Commissioning of Electro- Mechanical (E&M) System consisting of LV power supply, emergency power supply, earthing, tunnel lighting & fittings, fire detection, buildingelectrification, HVAC etc. and other related equipments complete in connection with T-80 Tunnel Ventilation & safety system on Dharam-Qazigund Section of USBRL project (J&K) (Package T-80, E&M)
from the date of issue of letter of acceptance i.e.
23.11.2012
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and
address
Quantity (for supply
contract)/ Estimated Cost (For
Engg/Elect /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./Elect. /S&T/Mech. etc
Works)
Value of Contract
Scheduled complet ion
date
8 IRCON/CC/TN/RSVY-BIHAR/646
Dtd.: 19.12.2011
09.01.2012 Balance work of Improvement / Upgradation of State Highways - 56 from Shivnagar Ghat to Kusheshwar Asthan in Darbhanga district of Bihar State (PACKAGE-1C(ii) Road)
02.02.2012 Supply, Erection, Testing & Commissioning of 11 KV Electro Mechanical System consisting of 5 Nos. 11/0.433 KV, 500 KVA Sub-station, switchgears with 11 KV Cables etc. and other related equipments complete in connection with T-80 Tunnel Ventilation system on Dharam-Qazigund Section of USBRL project (J&K) (Package T-80, 11KV)
IRCON/ J&K-Cell/JAT/15/1014/D-Q/T-80/11KV
System dtd. 25.02.2012
M/s ETA Engineering Pvt. Ltd., ETA House, B-13, Sector-63, Noida - 201 301
from the date of issue of letter of acceptance i.e.
24.08.2012
10 IRCON/ ELECT/ 1029/RCF-RBL/MRS ELECT/36
17.01.2012 Supply, Installation, Testing & Commissioning of all the Electrical Equipments related to 132/11kV Main Receiving Substation including all associated works at New Rail Coach Factory, Rae Bareli (U.P.).
LOA No.: IRCON/ELECT/ 1029/RCF-RBL/
132KV MRS ELECT/36
dt.28.02.12
M/s Hitech Erectors Pvt. Ltd.,
303, Pragati Chambers, Commercial
Complex, Rangit Nagar, New Delhi-
110 008
`728.00 Lacs `711.00 Lacs `7.11 Crore 8 months from the date of LOA
Works Awarded : MARCH 2012
S. N.
Tender No.
Date of opening
Description of Item/ Work
LOA No. and date
Contractor’s Name and
address
Quantity (for supply
contract)/ Estimated Cost (For
Engg/Elect /S&T/ Mech. etc Works)
Rate (for supply contract)/
Tendered Cost (For Engg./Elect. /S&T/Mech. etc
Works)
Value of Contract
Scheduled completion
date
1 IRCON/S&T/3014/RRVUNL/367 dated 04.01.2012
27.01.2012 Design, Supply, Installation, Testing and Commissioning of Electronic Interlocking System at Kalisindh Thermal Power Plant Yard, Jhalawar, Rajasthan for RRVUNL
LOA No.: :IRCON/S&T/3014/RRVUNL.TENDER/367/149 dated
07.03.2012
M/s Kiran Infra Engineers Ltd., B-141, Road No. 9-D, Vishwakarma Industrial Area,
07.02.2012 Supply, Installation, Testing & Commissioning of HT/LT Power Distribution Network System including Road cum open space lighting in Township at New Rail Coach Factory, Rae Bareli
LOA No.: :IRCON/ ELECT/ 1029/RCF-RBL/Tonship Light &
Power/39 dated 09.03.2012
M/s Eagle Enterprises, 30,
Nirala Market. I.T. Crossing,
Lucknow (UP) – 226 020
`1456 Lacs `1259 Lacs Completion Period: 08 months from the
date of issue of LOA
3 IRCON/3014/RRVUN.RS/
Tender/ Bridges/ Balance
Work
30.01.2012 Design and Construction of Major and Minor Bridges along the alignment of Railway Track from proposed Jhalawar station to Kalisingh Thermal Power Plant in connection with Railway siding work of Kalisingh Thermal Power Project of RRVUNL.
23.01.2012 Supply, Installation, Testing & Commissioning of Electrical Equipments related to Power Supply Distribution for 08 Nos. 11/0.433KV Auxiliary Substations at New Rail Coach Factory, Rae Bareli
LOA No.: :IRCON/ ELECT/ 1029/RCF-RBL/ASS ELECT/33 dated 12.03.2012
M/s K. V. Prateek Enterprises, 301, Suneja Tower - 1,
District Centre, Janak Puri, New Delhi - 110 058
`923 Lacs `821 Lacs Completion Period: 10 months from the
06.01.2012 Supply, Erection, Testing & Commissioning of Pipelines for Compressed Air Supply System in finishing, furnishing and carpentry shop at Rail Coach Factory at Lalganj, Raebareli, UP-(INDIA)
LOA No.: :IRCON/MECH/ 1029/RCF. RBL-II/Compressed
Air/28Dtd. 14.03.2012
M/s Legris India Pvt. Ltd., Plot No.: 99, Pace City-1,
21.02.2012 Construction of Road Over Bridge (ROB) along with it's approaches, service road & diversion road as per specifications, drawing & design, maintaining all quality control standards complete, in lieu of LC No.: 201-B at Railway Km 136/9-10, in Hindaun City in Rajasthan state
LOA No.: IRCON/3015/TN/RO
B-RAJ/HINDAUN/11/1
7/791 Dtd. 20.03.2012
M/s Naftogaz India Pvt. Ltd., C-125A, Sector-2, NOIDA –
201301, (U.P.)Ph.:0120-47257250
FAX: 0120- 4257250
`4425.00 Lacs `45,12,63,218/- 17-months from the date of issue
10.02.2012 Supply of Underground Railway Jelly Filled 6-Quad Cables of size 0.9 mm diameter for Signaling & Telecom Installations as per RDSO specification No.IRS:TC-30/2005 (Ver.-1) with amend. No. 4 or latest for Sri Lanka Railway