Ohio STBG and KY SNK
Eligibility and Available Funds
Application
Prioritization Process
Questions
Transportation Alternatives
Eligibility and Available Funds
Application
Prioritization Process
Questions
Agenda
2020 OKI STBG/SNK/TA Federal Funds Project SelectionOKI Board of Directors
October 8, 2020
2020 Prioritization Process
• March 10 – Funding Workshop, Applications available
• June 5 – Applications due
• June/July/August – Staff review. Apply approved scoring process and prepare draft scores
• July 30 –Environmental Justice committee review
• September 8 – ICC Prioritization subcommittee review
• October 6 – Recommendation by ICC
Type Funding
Available
Applications
Received
Funding
Requested
Ohio STBG $30 m 13 $49 m
Ohio TA $2.5 m 11 $7 m
Kentucky SNK $7 m 11 $11.8 m
Kentucky TA $800,000 4 $800,000
Ohio STBG – 13 Applications
Cincinnati-Wasson Way Phase 7
• ¾ mile shared use path between MLK Jr. Dr and Blair Ct.
Federal Funds $4,180,000Local $1,045,000Total Estimate $5,225,000
Clermont County-Glen-Este Withamsville Ramps and CD Road
• Grade separated partial interchange at GEW
Federal Funds $6,000,000Local/Other $14,022,387Total Estimate$20,022,387
Deer Park-Blue Ash Road Improvement Phase 2
• Between Duneden Drive and south corp. limits, 2400’
• Pavement restoration/resurfacing
• Improve drainage
• Replace signals, improve
crosswalks
Federal Funds $4,600,000Local $1,150,000Total Estimate $5,750,000
Fairfield-South Gilmore Road Improvements• Mack Road to Planet
Drive
• Add 1 lane SB
• Add sidewalk and upgrade existing substandard sidewalk
Federal Funds $2,730,895Local $682,724Total Estimate $3,413,619
HCEO-Western Hills Viaduct Replacement• Replacement Estimate =
$273m
• Request is for Construction phase
Federal Funds Requested -$6,000,000
Previous Federal Funds Awarded by OKI = $15.7m
Lebanon-US42 and SR123 Improvements• Mill/fill, full-depth
replacement
• Curb, sidewalk and storm sewer replacements
Federal Funds $747,580Local $498,387Total Estimate $1,245,967
Norwood-Norwood Lateral (SR562) Modernization• Lighting and guardrail
replacement
Federal Funds $560,000Local $140,000Total Estimate $700,000
Oxford-Oxford Area Trail Network East-West Connector Phase 5
• 11,824’ between US 27 and SR 732.
• Northern spur to Chestnut St and intermodal hub.
Federal Funds $3,290,521Local $1,548,481Total Estimate $4,839,002
Sharonville-East Kemper Road Improvements• Between Chester and
Mosteller.
• Roadway resurfacing
• Curb/gutter repairs
• Replace and new sidewalks
Federal Funds $845,250Local $362,250Total Estimate $1,207,500
SORTA-Bus Replacements (START) Program• Replace with 15 new
green diesel buses.
Federal Funds $5,920,223Local $2,537,238Total Estimate $8,457,461
Springdale-Northland Blvd Reconstruction• Replace pavement
• Replace mast arm traffic signal
• Add sidewalks and provide ped crossing
• Median bio-swale
Federal Funds $5,934,388Local $1,483,597Total Estimate $7,417,985
Warren Co TID-Escort Drive Corridor Improvements• Roadway realignment
• Roundabout at BardesRoad and Escort Drive
Federal Funds $1,208,000Local $847,000Total Estimate $2,055,000
Warren Co Engineer-Fields Ertel Road Improvement
• Between Snider Road and Wilkens Boulevard
• Widen from two to five lanes
• New sidewalk on north side of Fields Ertel
Federal Funds $6,000,000Local $11,624,083Total Estimate$17,624,083
STB
G F
un
din
g R
eco
mm
en
dat
ion
sLPA Sponsor Project Name
TOTA
L P
OIN
TS
FED
$ R
EQU
ESTE
D
FED
$ R
eco
mm
end
ed
RU
NN
ING
TO
TAL
Cincinnati IR 71 & MLK Drive Interchange SIB loanxx $1,000,000 $1,000,000 $1,000,000
Hamilton County Engineer Western Hills Viaduct Replacement (Construction)
71 $6,000,000 $1,000,000 $2,000,000
Southwest Ohio Regional Transit
Authority (SORTA)
Smart Technologies Advancing Regional
Transportation (START) program 66 $5,920,223 $4,961,704 $6,961,704
Lebanon US 42 and SR 123 Improvements 59 $747,580 $672,822 $7,634,526
Warren County Engineer Fields Ertel Road Improvement Project between
Snider Road and Wilkens Boulevard 59 $6,000,000 $5,400,000 $13,034,526
Clermont County Engineer CLE 32 - 2.33 Glen-Este Withamsville Ramps and
CD Road 53 $6,000,000 $5,400,000 $18,434,526
Cincinnati Wasson Way Phase 7 52 $4,180,000 $3,762,000 $22,196,526
Springdale Northland Boulevard Reconstruction 50 $5,934,388 $5,340,949 $27,537,475
Fairfield South Gilmore Road Improvements - Mack Road to
Planet Drive 49 $2,730,895 $2,457,806 $29,995,281
Warren County TID Escort Drive Corridor Improvements46 $1,208,000 $0 $29,995,281
Oxford Phase 5: East - West Connector 45 $3,290,521 $0 $29,995,281
Norwood Norwood Lateral Infrastructure Modernization43 $560,000 $0 $29,995,281
Sharonville East Kemper Road Improvements 39 $845,250 $0 $29,995,281
Deer Park Blue Ash Road Improvement Phase 2 35 $4,600,000 $0 $29,995,281
Kentucky SNK – 11 Applications
Bellevue-Resurfacing and Sidewalk Improvements• Berry Avenue, Taylor Avenue, Bonnie
Leslie Avenue and Wilson Road Boulevard
• Resurfacing and partial sidewalk replacement
Federal Funds $216,000Local $54,000Total Estimate $270,000
Bellevue-Riverfront Commons• 1,200’ of shared-use path from near
Patchen Drive and Lafayette Avenue
Federal Funds $760,000Local $190,000Total Estimate $950,000
Boone County-KY 20 & Loomis Road Multi-Use Path
• 2.4 mile shared use path from Conner Road to KY 236 (Donaldson Road)
• Segment of CVG Trail
Federal Funds $1,200,000Local $1,200,000Total Estimate $2,400,000
Elsmere-Garvey Road Improvements and Multi-Use Path
• 4,000’ from Florence Court to just past Comanche Trail
• Resurfacing and correct drainage issues
• Replacement of existing MUP
Federal Funds $240,000Local $60,000Total Estimate $300,000
Elsmere-New Buffington Bridge Replacement
• Replace bridge over Norfolk Southern RR.
• Length = 400’
• New sidewalk connection
Federal Funds $672,000Local $168,000Total Estimate $840,000
Fort Thomas-Chesapeake Sidewalk Project
• Construction of new sidewalks
• Length = 2050’
Federal Funds $859,784Local $214,947Total Estimate $1,074,731
KYTC-KY 1303 (Bristow Road) Drainage Improvement
• 2,700’ between Timber Lane Drive and KY 536
• Reconstruct and elevate roadway.
• Drainage improvements
Federal Funds $468,000Local $117,000Total Estimate $585,000
KYTC- KY 9 (AA Highway) J-turns
• Install J-turns to improve safety and mobility
• Vehicles maneuvering onto KY9 contend with a rolling terrain and high speeds resulting in an unsafe situation.
Federal Funds $2,600,000Local $650,000Total Estimate $3,250,000
Newport-Riverfront Commons Trail at Newport Festival Park
• Between Taylor-Southgate Bridge and Southbank Purple People Bridge
• Portion of NKY RiverfontCommons Trail
• SNK & TA portions
Federal Funds $2,428,428Local $607,107Total Estimate $3,035,535
NKU-3 Mile Road Sidewalk and Drainage Improvements
• Between existing roundabouts at Nunn Drive and Norse Blvd.
• Construct new sidewalk on west side of 3 Mile Road
• Curb, gutter and storm inlets.
Federal Funds $692,000Local $173,000Total Estimate $865,000
• assist with the renovation of the facility at 3375 Madison Pike in Ft. Wright.
• Phase 1-B: electrical systems and interior ADA accessibility improvements
TANK – Maintenance & Operations Facility Repair and Renovation
Federal Funds $1,623,517Local $405,879Total Estimate $2,029,396
SNK
Fu
nd
ing
Re
com
me
nd
atio
ns
LPA Sponsor Project Name
TO
TA
L P
OIN
TS
FE
D $
RE
QU
ES
TE
D
FE
D $
AW
AR
DE
D
RU
NN
ING
TO
TA
L
Newport Riverfront Commons Trail at
Newport Festival Park49 2,428,428$ 2,428,428$ 2,428,428$
Bellevue Bellevue Riverfront Commons 46 760,000$ 760,000$ 3,188,428$
Bellevue Bellevue Resurfacing and Sidewalk
Improvements39 216,000$ 216,000$ 3,404,428$
Elsmere New Buffington Bridge
Replacement36 672,000$ 672,000$ 4,076,428$
NKU 3 Mile Road Sidewalk and Drainage
Improvements38 692,000$ 692,000$ 4,768,428$
TANK Maintenance and Operations
Facility Repair and Renovation33 1,623,517$ 1,623,517$ 6,391,945$
Elsmere Garvey Road Resurfacing, Drainage
Improvements, and Multi-use Path
Improvements
32 240,000$ 240,000$ 6,631,945$
Boone County Fiscal
Court
KY 20 & Loomis Road Multi-Use
Path29 1,200,000$ -$ 6,631,945$
Fort Thomas Cheasepeak Sidewalk Project 25 859,784$ -$ 6,631,945$
KYTC Improve safety and mobility along
KY 9 from KY 915 to Shadow Lake
Drive
21 2,600,000$ -$ 6,631,945$
KYTC Improve mobility and drainage
along KY 1303 (Bristow Road)17 468,000$ -$ 6,631,945$
Ohio TA Applications (11)
Anderson – Little Miami Scenic Trail Elstun Road Connector
Multi Use Trail from existing sidewalk termini on Beechmont Avenue near Elstun Road to the Little Miami Scenic Trail Bridge termini.
Federal Funds $750,000Local $623,569Total Estimate $1,373,569
Cincinnati – Kirby Avenue Sidewalk ImprovementNew sidewalks along Kirby Avenue in the Mt. Airy neighborhood that will connect the Sun Valley Apartment Complex to the existing sidewalk infrastructure near North Bend Road. Minor realignment and bump-outs at Kirby and North Bend intersection to improve pedestrian safety.
Federal Funds $620,800Local $155,200Total Estimate $776,000
Colerain – Springdale and Poole Road Sidewalks
5,260 ft of new sidewalk filling in gaps between Springdale and Poole Road connecting to Main Street Trail and will connect Cheviot and Round Top Road.
Federal Funds $494,912Local $123,728Total Estimate $618,640
Deerfield – Irwin Simpson Multi Use Trail
Multi Use trail that will connect the existing trails on Mason Montgomery Road with Duke Boulevard.• Connect two existing
bus stops
Federal Funds $750,000Local $188,000Total Estimate $938,000
Fairfield – Great Miami River Trail Phase 1
Great Miami River Trail extension from its southern terminus at Waterworks Park to the border of Butler and Hamilton Counties
Federal Funds $697,242Local $392,198Total Estimate $1,089,440
Great Parks – Glenwood Gardens to Winton Woods Multi Use Trail Phase 1
Project involves construction of a bus stop connection near the intersection of Glendale Milford Rd and Springfield Pike, a new sidewalk from the bus stop to the existing West Fork Mill Creek Trail and a new signalized crosswalk at the entrance to Glenwood Gardens
Federal Funds $352,697Local $93,755Total Estimate $446,452
Hamilton – Hamilton Beltline North B Street
Conversion of abandoned rail corridor to a 10’ wide asphalt path that goes behind Mill No. 2 of the sports complex to the Great Miami River trailhead.
Federal Funds $720,000Local $180,000Total Estimate $900,000
Loveland – East Loveland Sidewalk
New sidewalk along south side of E. Loveland Avenue across from the Nature Preserve parking lot on the west end extending to 5th
Street on the east end.
Federal Funds $558,870Local $139,717Total Estimate $698,587
Miami Township – Branch Hill New Guinea Sidewalk
New sidewalk from existing sidewalk at intersection of Branch Hill-Guinea Pike and Bridlepath Lane continuing NW along the north side of Branch Hill-Guinea to connect to existing sidewalk at NE corner of Loveland Miamiville Road.
Federal Funds $739,525Local $398,205Total Estimate $1,137,730
Milford – Main Street/Lila Avenue Corridor Improvements
Enhanced mid-block pedestrian crossings with street lighting as well as Rectangular Rapid Flashing Beacons for pedestrian safety and wayfinding signage to readily locate points of attraction and public parking.
Federal Funds $750,000Local $690,250Total Estimate $1,440,250
Sycamore – East Kemper Road SidewalkNew sidewalk segments along sections of East Kemper and New Solzman Road from East Kemper to Clete McDaniels Sports Complex. New ADA crossing at Northlake Drive and East Kemper
Federal Funds $649,194Local $278,225Total Estimate $927,419
Oh
io T
ran
spo
rtat
ion
Alt
ern
ativ
es
Fun
din
g R
eco
mm
en
dat
ion
s
LPA Sponsor Project Name
TOTA
L P
OIN
TS
FED
$ R
EQU
ESTE
D
FED
$ R
ECO
MM
END
ED
RU
NN
ING
TO
TAL
Hamilton The Hamilton Beltline - North B Street 61 $720,000 $720,000 $720,000
Great Parks Glenwood Gardens to Winton Woods Shared Use Trail Ph 1 59 $352,697 $352,697 $1,072,697
Anderson Township Little Miami Scenic Trail Elstun Road Connector 58 $750,000 $750,000 $1,822,697
Deerfield Township Irwin-Simpson Shared Use Path 56 $750,000 $750,000 $2,572,697
Fairfield Great Miami River Trail - Fairfield Extension Phase 1 54 $697,242 $0 $2,572,697
Colerain Twp Springdale Road and Poole Road Sidewalks 51 $494,912 $0 $2,572,697
Milford Main Street/Lila Avenue Corridor Improvements 48 $750,000 $0 $2,572,697
Miami Township Miami Township Pedestrian Connectivity Plan 47 $739,525 $0 $2,572,697
Sycamore Township Kemper Road Sidewalk Project 45 $649,194 $0 $2,572,697
Cincinnati Kirby Avenue Sidewalk Improvement 43 $620,800 $0 $2,572,697
Loveland East Loveland Sidewalk 33 $558,870 $0 $2,572,697
Kentucky TA Applications (4)
Bellevue – Van Voast Pedestrian Bridge
Maintenance of pedestrian bridge that connects two sections of Van Voast that were separated by the railroad. Sanding and painting of truss and replacement of wood decking and stairs.
Federal Funds $124,000Local $31,000Total Estimate $155,000
Boone County Fiscal Court – Sam Neace Sidewalk
New sidewalk along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way to Gateway College.
Federal Funds $420,000Local $105,000Total Estimate $525,000
Elsmere – Garvey Avenue Sidewalk
Replacement of poor sections of sidewalk along Garvey Avenue from Shaw to Florence
Federal Funds $188,000Local $47,000Total Estimate $235,000
Union – Sweet Harmony Sidewalk
New sidewalk along Sweet Harmony from US 42 to entrance of Union Fire Department.
Federal Funds $68,000Local $17,000Total Estimate $85,000
Ke
ntu
cky
Tran
spo
rtat
ion
Alt
ern
ativ
es
Fun
din
g R
eco
mm
en
dat
ion
s
LPA Sponsor Project Name
TOTA
L P
OIN
TS
FED
$ R
EQU
ESTE
D
FED
$ R
ECO
MM
END
ED
RU
NN
ING
TO
TAL
Elsmere Howell Elementary - Replace poor sidewalk on Garvey Avenue 49 $188,000 $188,000 $188,000
Bellevue City of Bellevue Pedestrian Bridge 48 $124,000 $124,000 $312,000
Union Erpenbeck Elementary - Fill in Missing Sidewalk on Sweet Harmony Ln 41 $68,000 $68,000 $380,000
Boone County Fiscal Court Sam Neace Drive Sidewalk 38 $420,000 $420,000 $800,000
STBG/SNK