Ohio STBG and KY SNK Eligibility and Available Funds Application Prioritization Process Questions Transportation Alternatives Eligibility and Available Funds Application Prioritization Process Questions Agenda 2020 OKI STBG/SNK/TA Federal Funds Project Selection OKI Board of Directors October 8, 2020
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Ohio STBG and KY SNK
Eligibility and Available Funds
Application
Prioritization Process
Questions
Transportation Alternatives
Eligibility and Available Funds
Application
Prioritization Process
Questions
Agenda
2020 OKI STBG/SNK/TA Federal Funds Project SelectionOKI Board of Directors
October 8, 2020
2020 Prioritization Process
• March 10 – Funding Workshop, Applications available
• June 5 – Applications due
• June/July/August – Staff review. Apply approved scoring process and prepare draft scores
• July 30 –Environmental Justice committee review
• September 8 – ICC Prioritization subcommittee review
• October 6 – Recommendation by ICC
Type Funding
Available
Applications
Received
Funding
Requested
Ohio STBG $30 m 13 $49 m
Ohio TA $2.5 m 11 $7 m
Kentucky SNK $7 m 11 $11.8 m
Kentucky TA $800,000 4 $800,000
Ohio STBG – 13 Applications
Cincinnati-Wasson Way Phase 7
• ¾ mile shared use path between MLK Jr. Dr and Blair Ct.
Federal Funds $4,180,000Local $1,045,000Total Estimate $5,225,000
Clermont County-Glen-Este Withamsville Ramps and CD Road
• Grade separated partial interchange at GEW
Federal Funds $6,000,000Local/Other $14,022,387Total Estimate$20,022,387
Deer Park-Blue Ash Road Improvement Phase 2
• Between Duneden Drive and south corp. limits, 2400’
• Pavement restoration/resurfacing
• Improve drainage
• Replace signals, improve
crosswalks
Federal Funds $4,600,000Local $1,150,000Total Estimate $5,750,000
Fairfield-South Gilmore Road Improvements• Mack Road to Planet
Drive
• Add 1 lane SB
• Add sidewalk and upgrade existing substandard sidewalk
Federal Funds $2,730,895Local $682,724Total Estimate $3,413,619
Facility Repair and Renovation33 1,623,517$ 1,623,517$ 6,391,945$
Elsmere Garvey Road Resurfacing, Drainage
Improvements, and Multi-use Path
Improvements
32 240,000$ 240,000$ 6,631,945$
Boone County Fiscal
Court
KY 20 & Loomis Road Multi-Use
Path29 1,200,000$ -$ 6,631,945$
Fort Thomas Cheasepeak Sidewalk Project 25 859,784$ -$ 6,631,945$
KYTC Improve safety and mobility along
KY 9 from KY 915 to Shadow Lake
Drive
21 2,600,000$ -$ 6,631,945$
KYTC Improve mobility and drainage
along KY 1303 (Bristow Road)17 468,000$ -$ 6,631,945$
Ohio TA Applications (11)
Anderson – Little Miami Scenic Trail Elstun Road Connector
Multi Use Trail from existing sidewalk termini on Beechmont Avenue near Elstun Road to the Little Miami Scenic Trail Bridge termini.
Federal Funds $750,000Local $623,569Total Estimate $1,373,569
Cincinnati – Kirby Avenue Sidewalk ImprovementNew sidewalks along Kirby Avenue in the Mt. Airy neighborhood that will connect the Sun Valley Apartment Complex to the existing sidewalk infrastructure near North Bend Road. Minor realignment and bump-outs at Kirby and North Bend intersection to improve pedestrian safety.
Federal Funds $620,800Local $155,200Total Estimate $776,000
Colerain – Springdale and Poole Road Sidewalks
5,260 ft of new sidewalk filling in gaps between Springdale and Poole Road connecting to Main Street Trail and will connect Cheviot and Round Top Road.
Federal Funds $494,912Local $123,728Total Estimate $618,640
Deerfield – Irwin Simpson Multi Use Trail
Multi Use trail that will connect the existing trails on Mason Montgomery Road with Duke Boulevard.• Connect two existing
bus stops
Federal Funds $750,000Local $188,000Total Estimate $938,000
Fairfield – Great Miami River Trail Phase 1
Great Miami River Trail extension from its southern terminus at Waterworks Park to the border of Butler and Hamilton Counties
Federal Funds $697,242Local $392,198Total Estimate $1,089,440
Great Parks – Glenwood Gardens to Winton Woods Multi Use Trail Phase 1
Project involves construction of a bus stop connection near the intersection of Glendale Milford Rd and Springfield Pike, a new sidewalk from the bus stop to the existing West Fork Mill Creek Trail and a new signalized crosswalk at the entrance to Glenwood Gardens
Federal Funds $352,697Local $93,755Total Estimate $446,452
Hamilton – Hamilton Beltline North B Street
Conversion of abandoned rail corridor to a 10’ wide asphalt path that goes behind Mill No. 2 of the sports complex to the Great Miami River trailhead.
Federal Funds $720,000Local $180,000Total Estimate $900,000
Loveland – East Loveland Sidewalk
New sidewalk along south side of E. Loveland Avenue across from the Nature Preserve parking lot on the west end extending to 5th
Street on the east end.
Federal Funds $558,870Local $139,717Total Estimate $698,587
Miami Township – Branch Hill New Guinea Sidewalk
New sidewalk from existing sidewalk at intersection of Branch Hill-Guinea Pike and Bridlepath Lane continuing NW along the north side of Branch Hill-Guinea to connect to existing sidewalk at NE corner of Loveland Miamiville Road.
Federal Funds $739,525Local $398,205Total Estimate $1,137,730
Milford – Main Street/Lila Avenue Corridor Improvements
Enhanced mid-block pedestrian crossings with street lighting as well as Rectangular Rapid Flashing Beacons for pedestrian safety and wayfinding signage to readily locate points of attraction and public parking.
Federal Funds $750,000Local $690,250Total Estimate $1,440,250
Sycamore – East Kemper Road SidewalkNew sidewalk segments along sections of East Kemper and New Solzman Road from East Kemper to Clete McDaniels Sports Complex. New ADA crossing at Northlake Drive and East Kemper
Federal Funds $649,194Local $278,225Total Estimate $927,419
Oh
io T
ran
spo
rtat
ion
Alt
ern
ativ
es
Fun
din
g R
eco
mm
en
dat
ion
s
LPA Sponsor Project Name
TOTA
L P
OIN
TS
FED
$ R
EQU
ESTE
D
FED
$ R
ECO
MM
END
ED
RU
NN
ING
TO
TAL
Hamilton The Hamilton Beltline - North B Street 61 $720,000 $720,000 $720,000
Great Parks Glenwood Gardens to Winton Woods Shared Use Trail Ph 1 59 $352,697 $352,697 $1,072,697
Anderson Township Little Miami Scenic Trail Elstun Road Connector 58 $750,000 $750,000 $1,822,697
Deerfield Township Irwin-Simpson Shared Use Path 56 $750,000 $750,000 $2,572,697
Fairfield Great Miami River Trail - Fairfield Extension Phase 1 54 $697,242 $0 $2,572,697
Colerain Twp Springdale Road and Poole Road Sidewalks 51 $494,912 $0 $2,572,697
Milford Main Street/Lila Avenue Corridor Improvements 48 $750,000 $0 $2,572,697
Loveland East Loveland Sidewalk 33 $558,870 $0 $2,572,697
Kentucky TA Applications (4)
Bellevue – Van Voast Pedestrian Bridge
Maintenance of pedestrian bridge that connects two sections of Van Voast that were separated by the railroad. Sanding and painting of truss and replacement of wood decking and stairs.
Federal Funds $124,000Local $31,000Total Estimate $155,000
Boone County Fiscal Court – Sam Neace Sidewalk
New sidewalk along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way to Gateway College.
Federal Funds $420,000Local $105,000Total Estimate $525,000
Elsmere – Garvey Avenue Sidewalk
Replacement of poor sections of sidewalk along Garvey Avenue from Shaw to Florence
Federal Funds $188,000Local $47,000Total Estimate $235,000
Union – Sweet Harmony Sidewalk
New sidewalk along Sweet Harmony from US 42 to entrance of Union Fire Department.
Federal Funds $68,000Local $17,000Total Estimate $85,000