Top Banner
YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng., FEC Director, Engineering Projects
31

YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

Sep 13, 2019

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

YVR Master Plan

2017-2037

BC Construction Roundtable

March 8, 2016

John J. Lenahan, P.Eng., FEC

Director, Engineering Projects

Page 2: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

YVR FACTS AND STATS

Page 3: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

• A private, not-for-profit Authority

• #1 Airport in North America for 6

consecutive years - Skytrax

• Canada’s 2nd busiest airport

Page 4: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

Vancouver Airport Authority & YVR

Page 5: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

• 2015: 20.3M passengers

• 271,772 tonnes cargo

• 316,000+ take-offs & landings

• Employs more than 23,000 people

Page 6: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

56 airline partners

Page 7: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

118+ non-stop destinations

Page 8: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

YVR HISTORY

Page 9: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

1929

Page 10: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

1931

Page 11: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

1968

Page 12: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

1992

Page 13: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

2015

Page 14: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

1950s vs. 2015

Page 15: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

Master Plan

Page 16: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

2027 Master Plan

Page 17: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

Futures and Forecasts

Development of Options

and Evaluation Criteria.

Recommendations and

Draft Plan

Phase 1:

Started May 14, 2015

Phase 2:

Spring 2016

Phase 3:

Summer 2016

The Plan For The Plan

Page 18: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

3 Hours

at Shipper in Richmond

6 Hours

at China Customs

2 Hours

Airport to Seafood Market

Total

27 Hours

5%-10%

mortality

12 Hours

Flight From YVR -China 4 Hours

at YVR

Supply Chains

BC Fresh Crab to China

Page 19: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

Vancouver

Richmond

Densification in Richmond City Centre and South Van

100,000 New Neighbours

Page 20: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

• Higher average temperatures

• More frequent hot days and higher max

temperatures

• More intense rainfall events, more often

• Sea-level rise and storm surge

Climate Change

Page 21: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

Aging Population

Page 22: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

Airside: Runways and Taxiways

Page 23: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

How will people and goods move

around the island?

Ground Access

Page 24: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

Where do we put

the services that

the terminal

displaces?

Terminal Options and Land Allocation

Page 25: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

DTB Seismic Upgrade

Domestic Expansion

Expand

Customs Hall

ITD

Terminal

International Expansion

TB Expansion

Page 26: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

COMPLETED

Transborder HBS

Project

Domestic HBS/Sort

International HBS/Sort

West Bag Hall

Major Baggage System Projects 2016-2020

Pier C Baggage

Page 27: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

RESAs Phase I

Deicing Pads

Expansion

RESAs Phase II

Major Airside Projects 2016-2020

Pavement Rehabilitation

North South Taxiway

Page 28: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

Future Airside Infrastructure

Page 29: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

1. South FEC $9M

2. DTB Seismic $41M

3. Emergency Water Supply $24M

4. Dykes & Pumps $31M

5. Airside Pavement $27.8M

6. IT Systems $48.8M

7. Dinsmore Bridge Seismic Upgrade $25M

8. Electrical Upgrades $35M

9. Templeton Interchange $37M

Major Infrastructure Upgrades 2016-2020

1. District Energy for Terminal

2. Emergency Water Supply

3. Electrical Upgrades

4. Second Parkade

5. Dykes and Pumps

6. IT Systems

Page 30: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

1. South FEC $9M

2. DTB Seismic $41M

3. Emergency Water Supply $24M

4. Dykes & Pumps $31M

5. Airside Pavement $27.8M

6. IT Systems $48.8M

7. Dinsmore Bridge Seismic Upgrade $25M

8. Electrical Upgrades $35M

9. Templeton Interchange $37M

Ground Access Projects

Templeton/Grant McConachie Way Intersection

Improve Russ Baker Way

Replace Dinsmore Bridge

Increase Canada Line Capacity

Replace

Swing

Bridge

More lane capacity to Vancouver for airport traffic

Page 31: YVR Master Plan 2017-2037bccr.net/wp-content/uploads/2016/01/YVR-Master-Plan-2017-2037... · YVR Master Plan 2017-2037 BC Construction Roundtable March 8, 2016 John J. Lenahan, P.Eng.,

Questions?