- - - - 7200 5900 8800 15700 50300 69000 10400 14400 64100 35400 59000 17700 63400 18500 14000 55400 15600 15400 41700 28500 46900 13500 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 DM 2037 - - - - 7800 2800 7900 8400 9100 9500 31100 11000 51000 12700 40500 39300 12600 14100 43000 50900 32200 30000 12900 35500 20900 10000 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 DM 2022 - - - - - 6000 5000 6500 6900 8100 21100 31300 10200 13100 26800 16000 39600 33400 12800 12700 36400 38600 10900 26200 35900 13400 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 BY 2018 ? N © Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.5 1 0.25 Kilometres A96 Dualling Inverness to Nairn (including Nairn Bypass) Scheme Proposals 95 Bothwell Street, Glasgow, G2 7HX, UK. Tel: +44(0)141 243 8000 www.jacobs.com Rev © Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party. Rev. Date Purpose of revision Apprv'd Rev'd Checkd Orig/Dwn Annual Average Daily Traffic (AADT) Flow - to nearest 100 vehicles Client Project Drawing title Scale Drawing number Jacobs No. BIM No. Drawing Status Rev. Proposed Scheme (DMRB Stage 3 design) Do Minimum 2022 Do Minimum 2037 Base Year EIAR Publication