Page 1: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

Wind Energy Trends in Denmark

Aisma Vitina, Ea Energy Analyses

SEAI and IEA Wind Task 26 seminar”The Cost and Value of Wind Energy”

Dublin, May 26, 2014

Page 2: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

On the menu

• The particularities of the Danish (wind power) – Early adoption and high penetration

– TSO’s involvement and cost sharing

– Public access to data – and ownership

– Repowering (*)

• Wind energy project cost drivers

• Cost development over time in Denmark

2

Page 3: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

THE PARTICULARITIES OF THE DANISH WIND POWER

3

Page 4: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

The particularities of the Danish wind power: Early adoption & high penetration (1)

4

33.2%

0%

5%

10%

15%

20%

25%

30%

35%

0

1000

2000

3000

4000

5000

6000

19

80

19

82

19

84

19

86

19

88

19

90

19

92

19

94

19

96

19

98

20

00

20

02

20

04

20

06

20

08

20

10

20

12

Win

d p

ow

er %

in e

lect

rici

ty

gen

erat

ion

Cu

mu

lati

ve w

ind

po

wer

cap

acit

y (M

W)

Onshore capacity [MW] Offshore capacity [MW]

Wind power % in electricity generation

Source: Danish Energy Agency ”Energistatistik 2013”, Energinet.dk

Page 5: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

5

Source: American Wind Energy Association (based on Berkeley Lab estimates, data from Navigant and EIA)

The particularities of the Danish wind power: Early adoption & high penetration (2)

Page 6: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

The particularities of the Danish wind power: TSO’s involvement and cost sharing

6

• The developer only pays for the connection from the turbine to the coupling point– Transformers, substations, grid extension – cost socialized (covered by the grid

company/-ies)

• Also for offshore projects– Exploratory studies (geophysical, geotechnical, metaocean and environmental

assessment) carried out by the TSO

• Impact on overall project risk and costs

Source: IEA Task 26 WP1 Report 2011, Energinet.dk. Photo source for the illustration: http://blog.journals.cambridge.org/, http://meship.com/

Wind power project Existing grid infrastructureNew connection line

Paid for by the Developer

Paid for by the Grid company

Page 7: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

• Individual turbine-level data starting 1978 reported and published

• A regulation stipulating local residents’ ‘right of purchase’ of 20% of the wind power project shares at cost price– Audited share purchase

offers (incl. cost data) are publicly available

– Contributes to high acceptance rate and availability of sites across the country (terrible noise vs ‘the sound of money being made’)

7

The particularities of the Danish wind power: public access to data – and ownership

Interactive map screenshot from http://vindinfo.dk/

Page 8: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

WIND ENERGY PROJECT COST DRIVERS

8

Page 9: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

Wind energy project cost drivers: key factors

• Materials, components, labour– Especially significant in the period leading up to 2008

• Supply-demand dynamics, competitive landscape– Over-supply in the early 2000s, bottle-necks leading

up to 2008

• O&M costs– Increase in turbine size / production, among other

things, decreases per-kWh O&M costs

– More mature technology, higher capacity factors, lower administration and other costs per MW

9

Source: Nielsen, P. ”Vindmøllers Økonomi”

Page 10: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

Wind energy project cost drivers: size

• Continuous turbine size increase over the past 20 years• In 2012 and 2013 in Denmark, the newly-installed turbines were

predominantly 3 MW

10

Source: data from Stamdataregister by the Danish Energy Agency (2004 and 2007 excluded due to limited sample), turbine sizes 100kW+

0

20

40

60

80

100

120

0

500

1000

1500

2000

2500

3000

3500

198

6

198

7

198

8

198

9

199

0

199

1

199

2

199

3

199

4

199

5

199

6

199

7

199

8

199

9

200

0

200

1

200

2

200

3

200

5

200

6

200

8

200

9

201

0

201

1

201

2

201

3

Ro

tor

dia

met

er (

m)

Hu

b h

eig

ht

(m)

Turb

ine

cap

acit

y (k

W)

Average of Capacity (kW) Average of Rotor diameter (m) Average of Hub height (m)

Page 11: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

Wind energy project cost drivers: O&M costs

11

Source: Nielsen, P. ”Vindmøllers Økonomi”. Data covers 1996 – 2008, all onshore turbines of nameplate capacity 600 kW+

• For projects 1996-2008 the average lifetime O&M costs (average for years 6-13) estimated at ca.14.5 EUR/MWh (2012 prices)

• For new projects as of 2010, indications of 12.3 EUR/MWh (2012 prices)– Significant reductions in O&M costs over time

Page 12: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

Wind energy project cost drivers: Repowering as a new cost category

12

Number of turbines by year of establishment

Year of establishment

Number decommissioned

Number existing

Total capacity (kW) by year of establishment

Year of establishment

kW decommissioned

kW existing

Source: Danish Energy Agency, Danish Wind Turbine Owners’ Association

Page 13: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

• Introduction of Scrappage Certificates– To continue deployment of wind resource– To facilitate decommissioning of old and poorly sited turbines

• Turbines of 450 kW or less can be replaced with new and more efficient wind turbines at an additional subsidy– Scrappage certificate -> additional subsidy for the newly installed

capacity– Several subsidy regimes depending on the time period:

• 0.02 EUR / kWh for 12 000 FLH of double the decommissioned capacity (upper limit of market price + subsidy at EUR 0.05 / kWh)

• 0.01 EUR / kWh for 12 000 FLH of double the decommissioned capacity (fixed)

• Total pool of decommissioned capacity: 175 MW• Scheme in force: 2005 – 2012• An example from 2013 project proposal Nørhede-Hjortmose (22 *

3.3 MW): compensation of 0.5 M EUR per turbine

13Source: Danish Energy Agency http://www.ens.dk/undergrund-forsyning/vedvarende-energi/vindkraft-vindmoller/vindmoller-pa-land/skrotningsordningen,

Wind energy project cost drivers: Repowering as a new cost category (2)

Page 14: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

COST DEVELOPMENT OVER TIME

14

Page 15: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

Cost development over time in Denmark (onshore)

15

-

500

1,000

1,500

2,000

2,500

3,000

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

€/kW

(20

13 p

rice

s)

Cost of turnkey onshore wind power projects in Denmark 1981 - 2012

Source: Nielsen, P. ”Vindmøllers Økonomi”

Lower demand than expected; oversupply

Steel / material, wage and EBIT increases

Overall price decrease post-2008 crisis

Page 16: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

16

Cost development over time in Denmark (vis-à-vis other countries): capital cost 2003-2009

Source: Lantz, E., Wiser, R., Hand, M. et al ”IEA Wind Task 26 The Past and Future Cost of Wind Energy”, 2012

Page 17: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

Cost development over time in Denmark (vis-à-vis other countries): LCOE 2008

17

Source: Schwabe, P., Lensink, S., Hand, M. et al ”IEA Wind Task 26 Multi-national Case Study of the Financial Cost of Wind Energy”, 2011

Page 18: Wind Energy trends in Denmark - Aisma vitina, ea energy analyses

Aisma VitinaEa Energy Analyses

Mobile: (+45) 603 917 02E-mail: [email protected]

Frederiksholms Kanal 41220 Copenhagen

Denmarkwww.eaea.dk

Thank you