Selecting and Implementing an ITSM Tool Robin Veit Sr. Manager Client Engineering & Operations Starz Entertainment, LLC
12

Who are the Players? Who is using the current ITSM tool? What are the Requirements? What do we have now? What do we want? Select Tools to Evaluate Scheduled.

Dec 15, 2015

Download

Documents

Dexter Newlove
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Slide 1

Slide 2 Slide 3 Who are the Players? Who is using the current ITSM tool? What are the Requirements? What do we have now? What do we want? Select Tools to Evaluate Scheduled meetings with all possibilities Narrowed it down to three Create Measurement Process Spreadsheet with Requirements Listed Prioritize Select New Tool Which tool comes the closest to requirements needed within budget? Implement Tool Work with vendor to implement tool FAIL Slide 4 Why didnt the pieces come together? Settled for tool that had most of what we needed Lost focus of important requirements Let the project checklist and budget drive project Promised functionality that could not be easily delivered Broken processes Slide 5 Slide 6 Slide 7 HOW TO DECIDE?FIRST ROUND DEMOS Slide 8 Slide 9 Slide 10 Implementation Strong Implementer Project Charter Define the Scope of Phase One Define everyones role Focus on your proven processes Process for capturing scope creep and new requests Communication Weekly Status Meetings with Core Team Monthly Status Meetings with Whole Team Dont forget Training Slide 11 Slide 12 [email protected] 720-852-1017 www.linkedin.com/in/rveit Questions?