West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble- sand-silt bed stream for thalweg realignment & bank stabilization in the area of an exposed high-pressure pipeline overbend.
13

West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.

Jan 05, 2016

Download

Documents

Laureen Sutton
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.

West Fork Beaver River, West Point, OH.

Constructed Sept. 2002

Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for

thalweg realignment & bank stabilization in the area of an exposed

high-pressure pipeline overbend.

Page 2: West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.

Lisbon Inn 40952 State Route 154, Lisbon, OH

Page 3: West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.

Functions of Bendway Weirs on the West Fork Beaver River: Main functions of the BW are to provide bank stabilization within the bend and realign the thalweg through the bend and center the thalweg where the pipeline overbend was exposed by erosion. The pipeline was directly protected with Submar’s patented Articulated Concrete Mattress (ACM) system.

Page 4: West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.

SUB MAR

West Fork of Beaver River

West Point, OH. Pre-project. Looking

US at an eroding outer bank.

Page 5: West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.

SUB MAR

NOTE: We did not build the two upstream Bendway Weirs

Page 6: West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.

SUB MAR

Close-up of Bendway Weirs

Page 7: West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.

Looking DS at three Bendway Weirs, as

constructed Sept 2002

SUB MAR

Pix by derrick 9-2002

Page 8: West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.

SUB MAR

Pix by derrick 9-17-2007

Looking DS at the same 3 Bendway Weirs 5 years after construction. The well graded 18 to 24 inch stone in the BW has

held up well & the outer bank exhibits a flat slope & is stable.

Page 9: West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.

Looking US at two low elevation Bendway Weirs, two years after construction,

05/11/2004. Outer bank is stable

SUB MAR

Page 10: West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.

Five years after construction, 9/17/2007, looking US at the same two

low-elevation Bendway Weirs. Note stable flat sloped vegetated bank.

SUB MAR

Page 11: West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.

SUB MAR

Pix by derrick 9-17-2007Close-up of the DS low-elevation Bendway Weir, five years after installation. Weirs are close to invisible!!

Page 12: West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.

SUB MAR

Great aquatic habitat due to the deep pools created by the Bendway Weirs. These pools

were full of high quality fishes, indicating that water quality is excellent. {5 years after project

completion}

Pix by derrick 9-17-2007

Page 13: West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.

WE ARE DOG TIRED, THIS PROJECT IS DONE !!