CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble- sand-silt bed stream
Jan 05, 2016
CASE STUDY- West Fork Beaver River, West Point, OH.
Constructed Sept. 2002
Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream
Functions of Bendway Weirs on the West Fork Beaver River: Main function is realignment of the thalweg through the bend and also center the thalweg within the channel immediately downstream of the bend where a pipeline was exposed by erosion. The pipeline cover was protected with Articulated Concrete Mattress (ACM). Secondary function was to provide some bank stabilization within the bend.
SUB MAR
West Fork of Beaver River
West Point, OH. Pre-project picture.
Looking US at an eroding outer bank.
SUB MAR
NOTE: We did not build the two upstream Bendway Weirs
SUB MAR
Close-up of Bendway Weirs
Looking DS at three Bendway Weirs,
constructed Sept 2002
SUB MAR
Pix by derrick 9-2002
SUB MAR
Pix by derrick 9-17-2007
Looking DS at the same 3 Bendway Weirs 5 years after construction. Fines in BW’s have washed out, but well
graded 18 to 24 inch stone is stable & bank is stable.
Looking US at two low elevation Bendway Weirs, two years after
construction, 05/11/2004.
SUB MAR
Looking US at the same two low elevation Bendway Weirs, five years after construction, 9/17/2007. Note
stable flat angle, vegetated bank.
SUB MAR
SUB MAR
Pix by derrick 9-17-2007Close-up of the DS low-elevation Bendway Weir, five years after installation.
SUB MAR
Great aquatic habitat due to the deep pools created by the Bendway Weirs. These pools
were full of high quality fishes, indicating that water quality is excellent. {5 years after project
completion}
Pix by derrick 9-17-2007
WE ARE DOG TIRED, THIS PROJECT IS DONE !!