National University Manila College of Engineering INDUSTRY INTERNSHIP TRAINING PROGRAM WEEKLY PROGRESS REPORT Name of Student: John Gerald S. Mallari Age: 20 Sex: Male Course: BS Civil Engineering Name of the Company: SM Engineering Design and Development Corporation Company Address: 9 th Floor Mall of Asia Arena Annex, Mall of Asia Complex, Pasay City Division/Plant/Site Assigned: Special Project/Mall of Asia Complex Field of Training Assigned: Construction Week No: 1 Inclusive Dates of Training: From April 12, 2016 To April 15, 2016 ISO 9001:2008 QUALITY MANAGEMENT SYSTEM CERTIFIED Write summary of all activities accomplished during the week During the first week of the internship program, I was designated to the Mall of Asia complex knowing that different constructions were on going. First task is to check or inspect the cracks along the South Parking of Mall Of Asia includes beams, columns and slabs. The next days we were assigned to estimate the SM Taytay Proposed Cyberzoned and presented our computed values to project engineers also Engr. Liongson explained briefly and discuss on MEFPS (Mechanical, Electrical, Fire Protection & Sanitary Works) of a certain plan, keywords were also elaborated. A tour on ongoing constructions at The Galleon Museum, architectural fit outs at Conrad Mall and Hotel and briefly elaborated the color coordinations of pipes and wirings at the Mall of Asia phase 2 expansion. Lastly, Architectural works were
5

Weekly Progress Report

Jul 08, 2016

Download

Documents

Ojt Weekly progess report
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Weekly Progress Report

National UniversityManila

College of Engineering

INDUSTRY INTERNSHIP TRAINING PROGRAM

WEEKLY PROGRESS REPORT

Name of Student: John Gerald S. Mallari Age: 20 Sex: Male

Course: BS Civil Engineering

Name of the Company: SM Engineering Design and Development Corporation

Company Address: 9th Floor Mall of Asia Arena Annex, Mall of Asia Complex, Pasay City

Division/Plant/Site Assigned: Special Project/Mall of Asia Complex

Field of Training Assigned: Construction

Week No: 1 Inclusive Dates of Training: From April 12, 2016 To April 15, 2016

Verified by:

______________________________ _________________ Signature over Printed Name of Date Technical Training Supervisor

ISO 9001:2008QUALITY MANAGEMENT SYSTEM

CERTIFIED

Write summary of all activities accomplished during the week

During the first week of the internship program, I was designated to the Mall

of Asia complex knowing that different constructions were on going. First task is to

check or inspect the cracks along the South Parking of Mall Of Asia includes

beams, columns and slabs. The next days we were assigned to estimate the SM

Taytay Proposed Cyberzoned and presented our computed values to project

engineers also Engr. Liongson explained briefly and discuss on MEFPS

(Mechanical, Electrical, Fire Protection & Sanitary Works) of a certain plan,

keywords were also elaborated. A tour on ongoing constructions at The Galleon

Museum, architectural fit outs at Conrad Mall and Hotel and briefly elaborated the

color coordinations of pipes and wirings at the Mall of Asia phase 2 expansion.

Lastly, Architectural works were monitored at the The Galleon Musuem.

Page 2: Weekly Progress Report

DOCUMENTATION

The floor plan of SM Taytay Proposed Cyberzone

Estimation of SM TayTay Proposed Cyberzone

On going fit outs at Directors Club, Conrad Mall Construction of Cinema, The Galleon Mall

Electrical and Ductings for Airconditioned were place.

Page 3: Weekly Progress Report

National UniversityManila

Estimation of Stairs for SM Muntinlupa

Inspection of Architectural Works at the The Galleon Mall.

Tenants Partition

ISO 9001:2008QUALITY MANAGEMENT SYSTEM

CERTIFIED

Page 4: Weekly Progress Report

College of Engineering

INDUSTRY INTERNSHIP TRAINING PROGRAM

WEEKLY PROGRESS REPORT

Name of Student: John Gerald S. Mallari Age: 20 Sex: Male

Course: BS Civil Engineering

Name of the Company: SM Engineering Design and Development Corporation

Company Address: 9th Floor Mall of Asia Arena Annex, Mall of Asia Complex, Pasay City

Division/Plant/Site Assigned: Special Project/Mall of Asia Complex

Field of Training Assigned: Construction

Week No: 2 Inclusive Dates of Training: From April 18, 2016 To April 22, 2016

Verified by:

______________________________ _________________ Signature over Printed Name of Date Technical Training Supervisor

Write summary of all activities accomplished during the week

. On the second week of the internship program Billing process were

explained by Engr. Acosta including all the documents needed and the step by step

procedures that need to conduct. Electrical plan was elaborated by Engr. Cloyd and

done a quick tour to MAAX’s AHU and electrical rooms, wirings and other fixtures

were also familiarized. Moreover, Cracks along beams, columns and slabs on the

South Parking of Mall of Asia were inspected for the second time to ensure that all

the cracks were reported. LC Perlins were placed on the phase 2 expansion of Mall

of Asia and also dry walls, drop walls were placed. Demolition of the existing

skylights is on going and board ups around the demolition area were painted.

Lastly, Post construction procedures were explained and discuss which includes the

mobilization, Closed out and Project Turnover.