VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR 1 JOB REFERENCES (UPDATED ON OCTOBER 2008) From the establishing date up to now, we have successfully carried out the hereunder projects: OFFICE BUILDING: SAIGON POST TELECO M BUILDING Location: 45 Le Duan St., Dist.1, HCMC Service: HVAC system Commencement date: 08/1996 Completion date: 12/1996 ERNS T & YO UNG O FFIC E Location: 2A Ton Duc Thang St., Dist.1, HCMC Service: Fire Fighting system Commencement date: 04/1998 Completion date: 05/1998 VSIP OFFICE & AMENITIES BUILDING Location: Vietnam - Singapore Industrial Park, Binh Duong Province Service: HVAC system Commencement date: 04/1998 Completion date: 08/1998 Main contractor: INVESCO C ADIVI JV. C FT O FFIC E Location: Bien Hoa I Industrial Park, Dong Nai Province Service: Electrical, HVAC, Plumbing and Drainage systems Commencement date: 09/1998 Completion date: 12/1998 Main contractor: MIEN DONG CONSTRUCTION CO. SOUTHERN FORTUNE (ZEN PLAZA) Location: 56 Nguyen Trai St., Dist.1, HCMC Service: HVAC, Fire Fighting, Plumbing, Drainage and Utility systems Commencement date: 11/1996 Completion date: 07/1999 Main contractor: SHIMIZU CORP./ TAISEI ONCHO CO. S ANYO O FFIC E Location: 17 F Sunwah Tower – 115 Nguyen Hue St., Dist.1, HCMC. Service: Air-conditioning and Electrical systems Commencement date: 04/1998 Completion date: 08/1999 Main contractor: SHIMIZU CORP.
23
Embed
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED REFERENCES.pdf · · 2016-11-16VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR 2 PETRONAS CARIGALI (VIETNAM) OFFICE
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
1
JOB REFERENCES (UPDATED ON OCTOBER 2008)
From the establishing date up to now, we have successfully carried out the hereunder projects:
OFFICE BUILDING:
SAIGON POST TELECO M BUILDING Location: 45 Le Duan St., Dist.1, HCMC Service: HVAC system Commencement date: 08/1996 Completion date: 12/1996 ERNS T & YO UNG O FFICE Location: 2A Ton Duc Thang St., Dist.1, HCMC Service: Fire Fighting system Commencement date: 04/1998 Completion date: 05/1998 VSIP O FFICE & AMENITIES BUILDING Location: Vietnam - Singapore Industrial Park, Binh Duong Province Service: HVAC system Commencement date: 04/1998 Completion date: 08/1998 Main contractor: INVESCO CADIVI JV. CFT O FFICE Location: Bien Hoa I Industrial Park, Dong Nai Province Service: Electrical, HVAC, Plumbing and Drainage systems Commencement date: 09/1998 Completion date: 12/1998 Main contractor: MIEN DONG CONSTRUCTION CO. SOUTHERN FORTUNE (ZEN PLAZA) Location: 56 Nguyen Trai St., Dist.1, HCMC Service: HVAC, Fire Fighting, Plumbing, Drainage and Utility systems Commencement date: 11/1996 Completion date: 07/1999 Main contractor: SHIMIZU CORP./ TAISEI ONCHO CO. SANYO O FFICE
Location: 17 F Sunwah Tower – 115 Nguyen Hue St., Dist.1, HCMC. Service: Air-conditioning and Electrical systems Commencement date: 04/1998 Completion date: 08/1999
Main contractor: SHIMIZU CORP.
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
2
PETRO NAS CARIGALI (VIETNAM) O FFICE Location: 170 Hai Ba Trung St., Dist.1, HCMC Service: Fire Fighting system Commencement date: 08/1998 Completion date: 09/1998
Main contractor: CHUBB INTERNATIONAL NORFOLK MANSION (OFFICE & APARTMENTS) Location: 17-21 Ly Tu Trong St., Dist.1, HCMC Service: Electrical and HVAC systems Commencement date: 07/1999 Completion date: 10/1999 Main contractor: INVESCO HO CHI MINH CITY POST O FFICE Location: 230 Hai Ba Trung St., Dist.3, HCMC Service: HVAC system Commencement date: 09/1999 Completion date: 01/2000 YAMAHA MO TO R O FFICE
Location: 2 Le Thi Rieng St., Dist. 1, HCMC. Service: Electrical and Mechanical systems Commencement date: 11/1999 Completion date: 01/2000
Main contractor: SHIMIZU CORP.
JAPAN AIRLINES Location: 17 F Sunwah Tower – 115 Nguyen Hue St., Dist.1, HCMC Service: Mechanical and Electrical systems Commencement date: 02/2000 Completion date: 04/2000 Main contractor: SHIMIZU CORP.
COLGATE PALMOLIVE Location: 2 P
ndP Fl. Land Mark – 5B Ton Duc Thang St., Dist. 1, HCMC
Service: Mechanical and Electrical systems Commencement date: 03/2001 Completion date: 05/2001 Main contractor: AA CORP.
RHO NE PO ULENC RO RER VIETNAM Location: 10 Ham Nghi St., Dist.1, HCMC Service: Renovation of Electrical system, Supplying & Installing stand by Generator.
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
3
GLOBAL CYBERSOFT (VIETNAM) Location: 123 Truong Dinh St., Dist.3, HCMC Service: HVAC system Commencement date: 08/2002 Completion date: 09/2002 AAL O FFICE Location: 03 Dang Thi Nhu St., Dist.I, HCMC Service: Electrical and Air Conditioning systems Commencement date: 07/2004 Completion date: 08/2004 Main contractor: AA CORP. DINH TIEN HO ANG HOUSE AND O FFICE Location: 02 Dinh Tien Hoang St., Binh Thanh Dist., HCMC Service: Electrical, Lighting and Alarm Fire systems Commencement date: 07/2004 Completion date: 11/2004 Main contractor: AA CORP.
SONG THAN HOUSE & OFFICE Location: Di An Dist, Binh Duong Province Service: HVAC systems. Commencement date: 03/2005 Completion date: 04/2005 Main contractor: BACH DANG 10 CORP.
GOLDEN TOWER Location: 06 Nguyen Thi Minh Khai St., Dist.1., HCMC Service: MVAC System Commencement date: 06/2007 Completion date: 11/2007 HAVANA OFFICE BUILDING Location: 132 Ham Nghi St., Dist.1, HCMC Service: Electrical System & VO Commencement date: 10/2007 Completion date: 08/2008 SAPPHIRE TOWER OFFICE BUILDING Location: Nguyen Van Troi St., Phu Nhuan Dist., HCMC Service: MVAC System Commencement date: 12/2007 Completion date: 10/2008 Main contractor: SOUTH EAST ASIA TECHNOLOGIES, M&E CO., LTD
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
4
APARTMENT BUILDING
SAIGON CO URT APARTMENT BUILDING Location: Nguyen Dinh Chieu St., Dist.1, HCMC Service: Water treatment system Commencement date: 03/1999 Completion date: 05/1999 Main contractor: SHIMIZU CORP./TAISEI ONCHO CO. SAIGON SKY GARDEN APARTMENT BUILDING Location: Le Thanh Ton St., Dist.1, HCMC Service: Plumbing and Drainage Repairing Works Commencement date: 05/2000 Completion date: 06/2000
Main contractor: FUJITA CORP./TAISEI ONCHO CO. PHU MY HUNG RESIDENTAL PROJECT (R16 – BLOCK 1,2 &4)
Location: Tan Thuan Export Processing Zone, Dist. 7, HCMC. Service: Water Supply and Drainage systems Commencement date: 11/2002 Completion date: 12/2003 Main contractor: COFICO/ KURIHARA THANG LONG J.V CO., LTD.
AN PHU – AN KHANH APARTMENT BUILDING (AN CÖ BUILDING) Location: An Phu-An Khanh, Dist. 2, HCMC. Service: HVAC systems Commencement date: 03/2005 Completion date: 12/2005 Main contractor: CONSTRUCTION ENTERPRISE No.2
MISS AO DAI Location: 21 Nguyen Trung Ngan St., Dist.1, Service: Electrical systems Commencement date: 07/2005 Completion date: 07/2005 Main contractor: VAN LANG G LTD.
VILLA 138 NGUYEN DINH CHIEU., DIST.3 Location: 138 Nguyen Dinh Chieu St., Dist.3., HCMC Service: Mechanical & Electrical systems Commencement date: 07/2005 Completion date: 11/2005 Main contractor: AA CORP.
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
5
AN THINH APARTMENT BUILDING Location: An Phu-An Khanh., Dist.2., HCMC Service: HVAC systems Commencement date: 10/2005 Completion date: 04/2006 AVALON APARTMENT BUILDING Location: 53 Nguyen Thi Minh Khai., Dist.1., HCMC Service: Electrical systems Commencement date: 31/10/2005 Completion date: 15/03/2006 Main contractor: KURIHARA THANG LONG J.V CO., LTD THE MANOR BUILDING (Phase 1) Location: 91 Nguyen Huu Canh St., Binh Thanh Dist., HCMC Service: HVAC System for tenant area Commencement date: 05/2006 Completion date: 12/2006 HUNG VUONG PLAZA (APARTEMENT & COMMERCIAL AREAS) Location: 126 Hung Vuong St., Dist.5., HCMC Service: Supply of manpower Commencement date: 07/2006 Completion date: 05/2007 Main contractor: KURIHARA THANG LONG J.V CO., HOANG KIM APARTMENT BUILDING Location: 573 Huynh Tan Phat St., Dist.7., HCMC Service: M&E System Commencement date: 06/2007 Completion date: 04/2008 SAIGON PEARL – PHASE 2B Location: 92 Nguyen Huu Canh St., Binh Thanh Dist., HCMC. Service: Electrical System Commencement date: 08/2008 Completion date: According to Const. Schedule
CONSULATE GENERAL
BRITISH CONSULATE G ENERAL IN HCMC Location: 25 Le Duan St, Dist.1, HCMC Service: Electrical and HVAC systems
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
6
JAPANESE CO NSULATE G ENERAL IN HCMC Location: Nguyen Hue St., Dist.1, HCMC Service: HVAC and Plumbing systems Commencement date: 06/1999
Completion date: 08/1999 Main contractor: YURTEC CORP. US CONSULATE G ENERAL IN HCMC Location: 51 Nguyen Dinh Chieu St, Dist.3, HCMC Service: Electrical system
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
7
HOTEL CARAVELLE HO TEL Location: Lam Son Square, Dist.1, HCMC Service: Fire Fighting (Foam) system. Commencement date: 09/1997 Completion date: 12/1998 Main contractor: CHUBB HONGKONG INTERNATIONAL. NOVOTEL GARDEN PLAZA HOTEL 9 – 10 Fl. Location: 309-311 Nguyen Van Troi St., Phu Nhuan Dist., HCMC Service: Electrical, MVAC, Fire Fighting and PA systems. Commencement date: 12/1999 Completion date: 11/2000 Main contractor: AA CORP.
NOVOTEL GARDEN PLAZA HOTEL Location: 309-311 Nguyen Van Troi St., Phu Nhuan Dist., HCMC Service: Electrical, MVAC, Drainage, Plumbing, Fire Alarm and Fighting systems. Commencement date: 05/2001 Completion date: 10/2001 Main contractor: AA CORP. NOVOTEL NHA TRANG HOTEL Location: 50 Tran Phu St., Nha Trang Service: Electrical system +VO Commencement date: 04/2006 Completion date: 08/2008 Main contractor: DONG NAM A TECHNOLOGIES, M&E CO.
RECREATION CENTER
DISCO CLUB Location: 129A Nguyen Hue St., Dist.1, HCMC Service: Electrical system. Commencement date: 08/1998 Completion date: 10/1998 BISTRO RESTAURANT Location: 158 Dong Khoi St., Dist.1, HCMC Service: Electrical, HVAC and Drainage systems. Commencement date: 05/2000 Completion date: 08/2000 DONG NAI SUPERBOWL Location: Long Binh Tan Ward, Bien Hoa City, Dong Nai Province. Service: Electrical and HVAC systems. Commencement date: 11/2000 Completion date: 03/2001 Main Contractor: AA CORP.
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
8
DIAMO ND SUPERBOWL Location: 34 Le Duan St., Dist.1, HCMC Service: Electrical, Fire Fighting and Plumbing systems. Commencement date: 12/2000 Completion date: 04/2001 Main Contractor: AA CORP. Q T SPA Location: 26 – 28 Dong Du St., Dist.I, HCMC Service: Electrical and HVAC systems Commencement date: 08/2004 Completion date: 10/2004 Main contractor: AA CORP. JO LLIBEE VIETNAM Location: Coopmart Thu Duc, TP.HCM Service: Mechanical & Electrical systems Commencement date: 07/2005 Completion date: 11/2005 Main contractor: C.D.C CORP.
COMMERCIAL CENTERS:
NEW CONSTRUCTIO N METRO DA NANG Location: Khue Trung Ward, Hai Chau Dist., Da Nang City. Service: Installation of plumbing, Sanitary system &Solar hot water system. Commencement date: 08/2005 Completion date: 11/2005 METRO AN PHU CENTRE Location: An Phu-An Khanh., Dist.2., Ho Chi Minh City Service: Mechanical & Electrical System Commencement date: 12/2005 Completion date: 02/2006 METRO HIEP PHU CENTRE Location: Dist. 12, Ho Chi Minh City Service: Piping & Sanitary System Commencement date: 08/2006 Completion date: 12/2006 METRO HIEP PHU CENTRE Location: Dist. 12, Ho Chi Minh City Service: Heat Recovery System Commencement date: 10/2006 Completion date: 12/2006
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
9
METRO HIEP PHU CENTRE Location: Dist. 12, Ho Chi Minh City Service: Salt Water Tank System Commencement date: 11/2006 Completion date: 12/2006 METRO AN PHU CENTRE Location: An Phu-An Khanh, Dist.2, Ho Chi Minh City Service: Electrical System Commencement date: 11/2006 Completion date: 12/2006 METRO AN PHU CENTRE (WAREHOUSE EXTENSION) Location: An Phu-An Khanh, Dist.2, Ho Chi Minh City Service: Electrical System Commencement date: 02/2007 Completion date: 03/2007 METRO AN PHU CENTRE (O FFICE & CANTEEN EXTENSIO N) Location: An Phu-An Khanh, Dist.2, Ho Chi Minh City Service: Electrical System Commencement date: 05/2007 Completion date: 12/2007
HOSPITAL
COLUMBIA ASIA SAIGON INTERNATIONAL CLINIC (USA) Location: 8 Alexandre De Rhodes St., Dist.1, HCMC Service: Electrical, HVAC, Plumbing and Drainage systems. Commencement date: 08/1999 Completion date: 03/2000
SAIGON INTERNATIO NAL HOSPITAL JO INT STOCK Location: 63 Bui Thi Xuan St., Dist.1, HCMC Service: Electrical, HVAC, MATV, CCTV, Plumbing and Fire Protection Systems.
HANH PHUC HOSPITAL Location: Thuan An Dist., Binh Duong Province Service: Fire Protection System
Commencement date: 09/2007 Completion date: 03/2009 (according to construction schedule)
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
10
PORT FIRST LO GISTIC DEVELO PMENT CO NTAINER PO RT Location: Dist.7, HCMC Service: Electrical and HVAC systems. Commencement date: 02/1998 Completion date: 06/1998 Main contractor: SAMSUNG VINA
KAO (VIETNAM) FACTO RY Location: Amata Industrial Zone, Dong Nai Province Service: Electrical and HVAC systems. Commencement date: 11/1996 Completion date: 11/1997 Main contractor: TAISEI CORP./ YURTEC CORP. KARASAWA (VIETNAM) FACTO RY Location: Tan Thuan Export Processing Zone, Dist.7, HCMC Service: Electrical, HVAC, Fire Protection, Plumbing, Drainage and Utility Systems Commencement date: 02/1997 Completion date: 10/1997 Main contractor: FUJITA CORP./TAISEI ONCHO CO.
PHU MY GAS DISTRIBUTIO N STATIO N Location: Ba Ria – Vung Tau Service: HVAC system Commencement date: 01/1998 Completion date: 01/1998
VIETNAM BREWERY FACTO RY Location: Thoi An Ward, Dist.12, HCMC Service: Electrical and Lighting systems Commencement date: 01/1998 Completion date: 12/2002
ROHTO MENTHO LATUM VN FACTO RY Location: Vietnam-Singapore Industrial Park, Binh Duong Province Service: Clean Room system Commencement date: 03/1998 Completion date: 05/1998 Main contractor: HAMAZA CORP./ TAIKISHA ENGINEERING INC.
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
11
MATAI FLEXIBLE CO NTAINER BAG FACTO RY Location: Tan Thuan Export Processing Zone, Dist. 7, HCMC. Service: HVAC and Clean Room systems Commencement date: 03/1998 Completion date: 12/1998 Main contractor: OHKI CORP./YURTEC CORP. VIETNAM GAS UTILIZATIO N PROJECT Location: Dinh Co, Baria – Vung Tau Province Service: HVAC system Commencement date: 04/1998 Completion date: 08/1998
DELTA JUICE PLANT (USA) Location: Long An Province Service: Fire Alarm system Commencement date: 08/1998 Completion date: 09/1998
Main contractor: CHUBB INTERNATIONAL VIET THAI INDUSTRIAL PLAS TICS FACTO RY Location: Song Than Industrial Park, Binh Duong Province Service: HVAC system Commencement date: 08/1998 Completion date: 11/1998 YKK FACTORY (Stage I) Location: Amata Industrial Zone, Dong Nai Province. Service: Mechanical system. Commencement date: 11/1998 Completion date: 02/1999
Main contractor: FUJITA CORP./YURTEC CORP.
FUJITSU COMPUTER FACTORY (Stage I) Location: Bien Hoa II Industrial Park, Dong Nai Province Service: Mechanical system. Commencement date: 02/1999 Completion date: 09/2000 Main contractor: TAIKISHA ENGINEERING INC./ FUJITA CORP.
WASTE WATER TREATMENT PLANT Location: Bien Hoa I Industrial Park, Dong Nai Province Service: Supplying UPS Commencement date: 04/1999 Completion date: 05/1999 Main contractor: SONADEZI
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
12
OHMI ELECTRIC WIRE FACTORY (Stage I) Location: Tan Thuan Export Processing Zone, Dist.7, HCMC Service: Mechanical system. Commencement date: 04/1999 Completion date: 06/1999 Main contractor: KAJIMA CORP./YURTEC CORP. NIDEC TOSO K FACTO RY Location: Tan Thuan Export Processing Zone, Dist.7, HCMC Service: Air conditioning, Compressed Air and Utility systems. Commencement date: 04/1999 Completion date: 07/2000 Main contractor: TAIKISHA ENGINEERING INC.
MOBILE UNIQ UE (VN) - GAS FACTO RY Location: Go Dau Industrial Park, Dong Nai Province Service: Air conditioning system. Commencement date: 05/1999 Completion date: 07/1999 Main contractor: SEMBAWANG ENGINERRING CO.
NITTO DENKO FACTORY (Stage I) Location: Vietnam – Singapore Industrial Park, Binh Duong Province Service: HVAC, Fire Fighting, Plumbing, Drainage and Utility systems. Commencement date: 05/1999 Completion date: 12/1999 Main contractor: SHIMIZU/TAISEI ONCHO
YAZAKI FACTORY Location: Binh Duong Industrial Park Service: HVAC and Utility systems. Commencement date: 09/1999 Completion date: 10/1999
Main contractor: YURTEC CORP. SANYO HOME APPLIANCES FACTORY Location: Bien Hoa II Industrial Park, Dong Nai Province Service: Electrical and HVAC systems. Commencement date: 12/1999 Completion date: 01/2000 Main contractor: SUMITOMO – DENSETSU CO.
FUJITSU COMPUTER FACTORY (Stage II) Location: Bien Hoa II Industrial Park, Dong Nai Province Service: HVAC, Compressed Air and Utility systems. Commencement date: 01/2000 Completion date: 08/2002 Main contractor: TAIKISHA ENGINEERING INC./ FUJITA CORP.
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
13
NITTO DENKO FACTORY (Stage II) Location: Vietnam – Singapore Industrial Park, Binh Duong Province Service: HVAC, Fire Fighting, Plumbing, Drainage, Utility and Electrical systems. Commencement date: 01/2000 Completion date: 11/2001 Main contractor: SHIMIZU/TAISEI ONCHO MUTO FACTO RY Location: Bien Hoa II Industrial Park, Dong Nai Province Service: Mechanical system. Commencement date: 04/2000 Completion date: 11/2000
NIDEC COPAL FACTO RY Location: Tan Thuan Export Processing Zone, Dist.7, HCMC Service: Compressed Air system. Commencement date: 06/2000 Completion date: 08/2000 Main contractor: TAIKISHA ENGINEERING INC. UCHIYAMA FACTO RY Location: Vietnam-Singapore Industrial Park, Binh Duong Province Service: HVAC and Utility systems. Commencement date: 06/2000 Completion date: 08/2000 Main contractor: FUJITA CORP./ TAISEI ONCHO CO. SHIRASAKI FACTO RY Location: Long Binh Techno Park, Dong Nai Province Service: Mechanical system. Commencement date: 06/2000 Completion date: 08/2000 Main contractor: FUJITA/TAISEI ONCHO CO.
VIETNAM GAS UTILIZATIO N PLANT Location: Dinh Co, An Ngai, Ba Ria - Vung Tau Service: HVAC, Fire Fighting and Utility systems. Commencement date: 06/2000 Completion date: 10/2000 Main contractor: SAMSUNG ENGINEERING CO.
OHMI ELECTRIC WIRE FACTORY (Stage II) Location: Tan Thuan Export Processing Zone, Dist.7, HCMC Service: HVAC and Compressed Air systems. Commencement date: 10/2000 Completion date: 02/2001 Main contractor: KAJIMA CORP./YURTEC CORP.
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
14
HISAMITSU FACTO RY Location: Bien Hoa II Industrial Park, Dong Nai Province Service: Drainage & Mechanical systems. Commencement date: 10/2000 Completion date: 03/2001 Main contractor: SHIMIZU CORP./ TAISEI ONCHO CO. VIETNAM FOREMOST DAIRY (EXTENSION 1) (DUTCH LADY VIETNAM) Location: Thuan An District, Binh Duong Province. Service: Electrical system. Commencement date: 01/2001 Completion date: 05/2001 MTEX (VIETNAM) FACTO RY Location: Tan Thuan Export Processing Zone, Dist.7, HCMC Service: Mechanical, Fire Fighting and Utility systems. Commencement date: 01/2001 Completion date: 12/2001 TEMPEARL FACTO RY Location: Tan Thuan Export Processing Zone, Dist.7, HCMC Service: Ducting Works. Commencement date: 03/2001 Completion date: 06/2001 Main contractor: SUMITOMO – DENSETSU CO. VIETNAM FOREMOST FACTORY - EXT. 2 (DUTCH LADY VIETNAM) Location: Thuan An District, Binh Duong Province. Service: Power Electrical system.
LEVER VIETNAM FAC TO RY Location: 672-673 Kien Thiet Building, Dist.9, HCMC Service: HVAC and Electrical systems. Commencement date: 05/2001 Completion date: 08/2002
ELIDA P/S FACTORY Location: Cu Chi North West Industrial Zone Service: Electrical, HVAC, Plumbing, Fire Alarm and Fighting systems. Commencement date: 06/2001 Completion date: 10/2001
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
15
FUTABA FACTO RY Location: Tan Thuan Export Processing Zone, Dist 7, HCMC Service: HVAC system. Commencement date: 11/2001 Completion date: 02/2002 Main contractor: YURTEC CORP. NHA BE LPG FILLING PLANT (BP PETCO) Location: Nha Be District, HCMC Service: Electrical system. Commencement date: 01/2002 Completion date: 03/2002 Main contractor: JGC CORP. /KURIHARA THANG LONG J.V CO., LTD.
TO BACCO MATERIALS & PACKAGE PRINTING FACTO RY Location: Cat Lai Industrial Park, Dist. 2, HCMC. Service: Electrical system. Commencement date: 01/2002
Completion date: 07/2003
UNILEVER BESTFOODS VIETNAM PHU QUOC FISH SAUCE FACTORY Location: Duong Dong Town, Phu Quoc Dist., Kien Giang Province. Service: Electrical, Lighting and Utility systems. Commencement date: 04/2002 Completion date: 10/2002 Main contractor: UNILEVER BESTFOODS VIETNAM
NIKKISO (VIETNAM) FACTO RY Location: Tan Thuan Export Processing Zone, Dist.7, HCMC Service: Electrical system. Commencement date: 06/2002 Completion date: 12/2002 Main Contractor: FUJITA CORP./VINA-KINDEN CORP.
NIKKISO (VIETNAM) FACTO RY Location: Tan Thuan Export Processing Zone, Dist.7, HCMC Service: Mechanical system. Commencement date: 06/2002 Completion date: 02/2003 Main Contractor: FUJITA CORP./VINA-KINDEN CORP. RHONE POULENC RORER VIETNAM (Stage 2) Location: 123 Nguyen Khoai St., Dist.4, HCMC Service: Electrical and HVAC systems. Commencement date: 09/2002 Completion date: 10/2002
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
16
TSUCHIYA FACTO RY Location: Vietnam-Singapore Industrial Park, Binh Duong Province. Service: Mechanical system. Commencement date: 10/2002 Completion date: 02/2003 Main contractor: YURTEC CORP. SAIGON TOBACCO FACTO RY Location: 152 Tran Phu St., Dist.5, HCMC Service: Electrical system. Commencement date: 11/2002 Completion date: 12/2002
MEIWA FACTO RY Location: Bien Hoa I Industrial Park, Dong Nai Province Service: Mechanical and Electrical systems. Commencement date: 01/2003 Completion date: 12/2003 Main contractor: VINA-KINDEN CORP.
SHIRASAKI FACTO RY Location: Long Binh Techno Park, Dong Nai Province Service: Mechanical system. Commencement date: 03/2003 Completion date: 12/2003 Main contractor: VINA-KINDEN CORP.
YAMATO PROTEC VIETNAM FACTORY Location: Vietnam-Singapore Industrial Park, Binh Duong Province. Service: Mechanical and Electrical systems. Commencement date: 03/2003 Completion date: 12/2003 Main Contractor: VINA-KINDEN CORP.
GS BATTERY
Location: Vietnam-Singapore Industrial Park, Binh Duong Province. Service: Mechanical and Electrical systems. Commencement date: 03/2003 Completion date: 12/2003 Main contractor: OHKI/VINA-KINDEN CORP. PERSTIMA VIETNAM FAC TO RY Location: Vietnam-Singapore Industrial Park, Binh Duong Province. Service: Air conditioning and MVAC systems. Commencement date: 04/2003 Completion date: 06/2003 Main contractor: SHIMIZU CORP./ YURTEC CORP.
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
17
AJI-NGON BUILDING FACTORY (AJINOMOTO) Location: Bien Hoa I Industrial Park, Dong Nai Province. Service: Mechanical system. Commencement date: 04/2003 Completion date: 08/2003 Main contractor: HAZAMA CORP./ VINA-KINDEN CORP. DUTCH LADY VIETNAM (COMBIBLOC EXTENSION) Location: Binh Hoa Commune, Thuan An, Binh Duong Province. Service: Electrical and Mechanical systems. Commencement date: 05/2003 Completion date: 09/2003 Main contractor: VAN LANG G ENGINEERING LTD. TO MIYA FACTO RY Location: Long Binh Techno Park, Bien Hoa City, Dong Nai Province. Service: Mechnical and Electrical systems. Commencement date: 05/2003 Completion date: 12/2003 Main Contractor: OBAYASHI CORP./VINA-KINDEN CORP.
YKK FACTORY (Stage II) Location: Amata Industrial Zone, Dong Nai Province Service: HVAC and Utility systems. Commencement date: 06/2003 Completion date: 11/2003
Main contractor: FUJITA CORP./YURTEC CORP. BRITISH AMERICAN TOBACCO (BAT) Location: Long Binh Techno Park, Bien Hoa, Dong Nai Province. Service: AC, Chilled Water, Condensing Water, Make-up water piping works. Commencement date: 06/2003 Completion date: 02/2004 Main contractor: SHIMIZU CORP./ TAIKISHA ENGINEERING INC. UCHIYAMA VN NEW FACTO RY Location: Vietnam-Singapore Industrial Park, Binh Duong Province Service: HVAC, Plumbing, Drainage, Compressed Air and Chilled Water Piping systems. Commencement date: 07/2003 Completion date: 07/2004 Main contractor: FUJITA CORP./ VINA-KINDEN CORP. TOMBOW VIETNAM PROJECT. Location: Vietnam-Singapore Industrial Park, Binh Duong Province. Service: Mechanical system. Commencement date: 09/2003 Completion date: 01/2004 Main contractor: OHKI CORP./ VINA-KINDEN CORP.
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
18
MEIWA FACTO RY Location: Bien Hoa II Industrial Park, Dong Nai Province Service: Mechanical system Commencement date: 01/2004 Completion date: 09/2004 Main contractor: VINA-KINDEN CORP. MUTO FACTO RY Location: Bien Hoa II Industrial Park, Dong Nai Province Service: HVAC system Commencement date: 02/2004 Completion date: 09/2004 Main contractor: SANYO ENGINEERING & CONSTRUCTION MATAI FAC TO RY Location: Tan Thuan Export Processing Zone, Dist.7, HCMC Service: HVAC and Compressed Air systems Commencement date: 02/2004 Completion date: 08/2004 Main contractor: YURTEC CORP.
FUJITSU FACTO RY Location: Bien Hoa II Industrial Park, Dong Nai Province Service: Mechanical system Commencement date: 25/02/2004 Completion date: 09/2004 Main contractor: TAIKISHA VIETNAM ENGINEERING INC. NIKKISO FACTORY Location: Tan Thuan Export Processing Zone, Dist.7, HCMC Service: Plumbing and Drainage systems Commencement date: 03/2004 Completion date: 06/2004 Main contractor: VINA-KINDEN CORP. SHOWA FACTO RY Location: Vietnam-Singapore Industrial Park, Binh Duong Province Service: HVAC, Plumbing, Drainage and Utility systems Commencement date: 03/2004 Completion date: 12/2004 Main contractor: VINA-KINDEN CORP. KURABE (II) FACTO RY Location: Vietnam-Singapore Industrial Park, Binh Duong Province Service: HVAC and Plumbing systems Commencement date: 04/2004 Completion date: 12/2004 Main contractor: VINA-KINDEN CORP.
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
19
ALLIED TECHNO LOGIES Location: Saigon High Tech Park, Dist. 9, HCMC Service: Electrical system Commencement date: 06/2004 Completion date: 9/2004 Main contractor: VIAN CORP. NITTO DENKO FACTO RY Location: Vietnam-Singapore Industrial Park, Binh Duong Province Service: HVAC, Plumbing and Drainage systems Commencement date: 07/2004 Completion date: 12/2004 Main contractor: VINA-KINDEN CORP. AJINO MO TO FACTO RY Location: Bien Hoa I Industrial Park, Dong Nai Province Service: HVAC, Plumbing and Drainage systems Commencement date: 07/2004 Completion date: 12/2004 Main contractor: VINA-KINDEN CORP. MEIWA VIETNAM FAC TO RY Location: Amata Industrial Park, Dong Nai Province Service: Mechanical systems Commencement date: 06/2004 Completion date: 02/2005 Main contractor: VINA-KINDEN CORP. ASTI ELEC TRO NICS NEW FACTO RY Location: Tan Dong Hiep, Di An, Binh Duong Province Service: HVAC systems. Commencement date: 01/2005 Completion date: 04/2005 Main contractor: VINA-KINDEN CORP. NO K VIETNAM FAC TO RY Location: Amata Industrial Park, Dong Nai Province. Service: Mechanical systems Commencement date: 02/2005 Completion date: 06/2005 Main contractor: SHINRYO CORP. SANYO DI SO LUTIO NS VIETNAM (New Factory Phase 1) Location: Bien Hoa City, Dong Nai Province. Service: Mechanical systems Commencement date: 12/2004 Completion date: 04/2005 Main contractor: TAIKISHA VIETNAM ENGINEERING INC.
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
20
CAT LO I TOBACO MANUFACTURING FACTO RY Location: Cat Lai IZ., Dist.2, HCMC Service: Electrical power for printing system Commencement date: 07/2005 Completion date: 08/2005 CAT LO I TOBACO MANUFACTURING FACTO RY Location: Cat Lai IZ., Dist.2, HCMC Service: upgrading electrical power Commencement date: 08/2005 Completion date: 09/2005 NIKKISO VIETNAM MFG FACTO RY Location: Tan Thuan export processing Zone, Dist.7, HCMC Service: Mechanical systems Commencement date: 05/2005 Completion date: 06/2005 Main contractor: VINA-KINDEN CORP.
UCHIYAMA VIETNAM FAC TO RY Location: VietNam Singapore Industrial Park, Binh Duong Service: Mechanical systems Commencement date: 12/2005 Completion date: 02/2006 Main contractor: VINA-KINDEN CORP-HCM BRANCH
NITTO DENKO VIETNAM FACTO RY Location: Viet Nam Singapore Industrial Park, Binh Duong Service: Mechanical systems Commencement date: 12/2005 Completion date: 02/2006 Main contractor: VINA-KINDEN CORP-HCM BRANCH BRITISH AMERICAN TO BACCO-VINATABA (JV) LTD Location: Are 8, Long Binh Ward, Bien Hoa City, Dong Nai Province. Service: Supply & install Pumps systems Commencement date: 12/2005 Completion date: 03/2006 GS BATTERY VIETNAM FACTO RY Location: VietNam-Singapore Industrial Park, Binh Duong Service: Mechanical systems Commencement date: 12/2005 Completion date: 02/2006 Main contractor: VINA-KINDEN CORPORATION –HCM BRANCH
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
21
SHIRASAKI VIETNAM CO ., LTD Location: Loteco Industrial Park, Dong Nai Province. Service: Mechanical systems Commencement date: 12/2005 Completion date: 02/2006 Main contractor: VINA-KINDEN CORP-HCM BRANCH WATER ENVIRO NMENT IMPRO VEMENT Location: Binh Hung Commune, Binh Chanh Dist, HCMC Service: Mechanical systems Commencement date: 08/2005 Completion date: 10/2005 Main contractor: SANYO ENGINEERING & CONSTRUCTION INC
KO NDO FACTO RY Location: Lot M76, My Phuoc Industrial Park, BenCat Binh Duong. Service: Mechanical systems Commencement date: 10/2005 Completion date: 12/2005 Main contractor: VINA-KINDEN CORPORATION –HCM BRANCH
FUJITSU COMPUTER FACTO RY (EXTENSIO N) Location: Bien Hoa II IZ., Dong Nai Province Service: Mechanical systems Commencement date: 01/2006 Completion date: 06/2006 Main contractor: TAIKISHA/ FUJITA NIDEC SANKYO VIETNAM FACTO RY Location: Industrial high Park, Dist.9, HCMC. Service: Mechanical systems Commencement date: 03/2006 Completion date: 06/2006 Main contractor: TAIKISHA VIETNAM ENGINEERING INC. ELIDA P/S FACTORY (CANTEEN) Location: Taây Baéc Cuû Chi IZ., HCMC Service: Supply and Installation of Mechanical and Electrical System Commencement date: 04/2006 Completion date: 12/2006 NITTO DENKO FACTORY Location: VSIP 1, Binh Duong Province Service: Supply and Installation of Mechanical System Commencement date: 05/2006 Completion date: 06/2006
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
22
NEW DISTRIBUTIO N CENTER – LEVER VIETNAM Location: VSIP, Binh Duong Province Service: Supply and Installation of Mechanical and Electrical System Commencement date: 11/2006 Completion date: 03/2007 WO NDERFUL SAIGO N ELECTRICS FACTO RY Location: VietNam – Singapore Industrial Park Service: Air Conditioning Commencement date: 10/2006 Completion date: 02/2007 Main contractor: TAIKISHA VIETNAM ENGINEERING INC.
UNILEVER VIETNAM FACTORY Location: Taây Baéc Cuû Chi IZ., HCMC Service: Chiller System Commencement date: 04/2007 Completion date: 06/2007 NAM AN PACKAGING FACTORY Location: Hoang Gia IZ., Long An Povince Service: M&E System Commencement date: 04/2007 Completion date: 08/2007 WASTE WATER TREATMENT PLANT OF HCMC. Location: Binh Hung Ward, Binh Chanh Dist., HCMC. Service: Mechanical System Commencement date: 08/2007 Completion date: 08/2008 BLUE STAR FACTORY Location: Song Than 3 IZ., Binh Duong Province Service: Electrical & ACMV System & VO Commencement date: 10/2007 Completion date: 08/2008 COLGATE PALMOLIVE NEW TOOTH BRUSH FACTORY Location: My Phuoc 3 IZ., Binh Duong Province Service: M&E System Commencement date: 06/2008 Completion date: 03/2009 CARGILL FACTORY IN BIEN HOA PROVINCE & HUNG YEN PROVINCE Location: Bien Hoa Province & Hung Yen Province Service: Electrical System Commencement date: 06/2008 Completion date: 12/2008
VAN LANG G ENGINEERING LTD. – ISO CERTIFIED M & E CONTRACTOR
23
UNILEVER VIETNAM Location: Taây Baéc Cuû Chi IZ., HCMC Service: Emergency Evacuation Signaling System Commencement date: 08/2008 Completion date: 09/2008
SHOWROOM:
HO NDA SHOWROOM Location: 18 Cong Hoa St., Dist.Tan Binh. Service: Electrical and Mechanical systems. Commencement date: 21/03/2006 Completion date: 15/06/2006
RADIO & TELEVISION STATIONS:
BARIA-VUNG TAU TV & RADIO BROADCASTING STATIO N Location: Ba Ria Province, Vung Tau City Service: Air Conditioning system Commencement date: 10/2002 Completion date: 06/2003 Main contractor: CONSTRUCTION ENTERPRISE No.2 HO CHI MINH CITY TELEVISIO N Location: 09 Nguyen Thi Minh Khai St., Dist.1, HCMC Service: Supply & Install Mechanical systems Commencement date: 04/2006 Completion date: 10/2006