- Assume everybody here has heard of the project - The broad aim is to give Australia a world class broadband network for generations - NBN is a wholesaler of Ethernet layer two network – many, many retailers - Three different technologies in use: 93% Fibre, 4% Fixed Wireless, 3% Satellite - Look at our webpage – contains news updates well justified with factual data and lots of interesting technical detail.
23
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The NBN Puppet Journey

-  Assume everybody here has heard of the project -  The broad aim is to give Australia a world class broadband network for generations -  NBN is a wholesaler of Ethernet layer two network – many, many retailers -  Three different technologies in use: 93% Fibre, 4% Fixed Wireless, 3% Satellite -  Look at our webpage – contains news updates well justified with factual data and

lots of interesting technical detail.

Page 2: The NBN Puppet Journey

-  Small part of the overall organization (approx 5% - 10%) -  Internal development organizations founded with Agile principles in mind -  Very much a DevOps style shop, responsible for the end to end delivery process

(all the way to PROD)

-  We started with a virtual blank slate -  We had an externally hosted basic website and a payrole system -  Our brief was to build a exciting web presence and all the externally facing

applications needed to accept Orders and Tickets for a Telco -  Build a classic three layer infrastructure with an external hosting provider -  Multiple copies of the environment CI, Dev, Staging, Prod (80 machines) -  Management pressure to build it really fast! -  We felt the direction we where headed was towards ‘snowflake servers’ and we

wanted to avoid it

Page 3: The NBN Puppet Journey

- Puppet to the rescue!

-  I’m going to tell you about our journey with Puppet -  The mistakes we made, the breakthroughs in understanding we had -  This stuff is not an NBN competitive advantage, we’re happy to share and learn

from our mistakes

Page 4: The NBN Puppet Journey

-  Machine population is segregated into groups to provide isolation for your production environment

-  Puppet agent installed as daemon and running with 30 minute period

- Method of segregation was initially by splitting the manifest top level directory per environment

Page 5: The NBN Puppet Journey
Page 6: The NBN Puppet Journey

-  This process was working to a certain definition of ‘working’, but definitely not optimal

-  Not DRY -  A lot of time was spent copying information from one directory to another and

manually repeating processes -  Analysis of what is different across environments using a diff tool

-  Not building snowflake servers, our servers where closely related (fruit) -  But not 100% confident that our lower layer environments closely reflect what’s in

production -  The promotion process is reliant on a lot of manual processes

Page 7: The NBN Puppet Journey

-  We were better than we would have been than cowboying changes straight onto the box with SSH

-  But we are still aren’t a well oiled machine

-  At this point we decided that we needed to be better and kicked off a big refactor of our work

Page 8: The NBN Puppet Journey

-  Our operations team working very closely with our development team -  Lots of exchange of ideas -  Our Dev groups were very keen on implementing Continuous Delivery -  We decided that we’d do this with our virtual machine setup too -  Follow the same patterns as software development

-  Multiple environments Dev, UAT, Staging, Prod -  We were getting divergence between our different environments due to manual

merge processes -  Change from distinct directories per environment to single manifest directory share

by all environments

Page 9: The NBN Puppet Journey

-  This is a big change that we wanted to do safely -  We’ve still got infrastructure changes that need to be made each day -  Need to establish a red/green refactor cycle with good test coverage

-  Make good behaviour for your developers easy -  Fast feedback loop -  Single top level script that runs test suite locally -  Spawns lots of parallel processes running the catalogue compile for every node

Page 10: The NBN Puppet Journey

-  Now using version control system the right way -  Easy traceability of who changed a recipe, when and why -  To change a recipe you don’t have to repeat yourself lots of time and do lots

manual steps

-  Syntax checking is not enough! -  More specific functional testing -  Over time we added more tests to catch the repeated errors we were making -  Extends the safety net so that you fail early (it breaks in Dev not in PROD)

Page 11: The NBN Puppet Journey

-  CI server runs our build system with every check in to source control -  The team learns about a mistake as soon as it is made, not some indeterminate

time later

- Refactor safely completed - Celebration!

Page 12: The NBN Puppet Journey

-  Environment promotion pipeline -  NB: version number is fastest changing in lower environments -  Only ‘good’ versions are available for promotion to higher environments

-  Invert the mode in which the Puppet agent is run -  Instead of polling the Puppet agent is invoked only when instructed -  We use Mcollective for this

Page 13: The NBN Puppet Journey

-  Different environments are pulling different versions of the same manifest directory structure

-  Dev has the newest version, Prod has the oldest version

-  There are class of errors that can only be detected by running directly on the server and testing the result

-  The ‘—noop’ flag is the best way to ‘guessing’ what will really happen when you apply a manifest

Page 14: The NBN Puppet Journey

- An agent to ‘kick’ the puppet daemon and run in –noop mode - Kick the puppet agent for real and run using the environment to which you belong

Page 15: The NBN Puppet Journey
Page 16: The NBN Puppet Journey

-  Give strong visual and immediate feedback on the results of a change -  Green banner == change passed tests -  Provide centralized report that shows ‘what would change if I were to deploy this

version’

-  Give strong visual and immediate feedback on the results of a change -  This one not so good -  Provide Puppet detailed output leading developer directly to the failing node and

failure reason.

Page 17: The NBN Puppet Journey
Page 18: The NBN Puppet Journey
Page 19: The NBN Puppet Journey

- Surprise, the new DC is ready – we need you to move in before Christmas!

Page 20: The NBN Puppet Journey

-  Our process is incrementally changing the machines and it is very good at doing that

-  Incremental consistency is no guarantee that you can rebuild from scratch -  We needed to develop new tools to help with this problem

-  Use virtual machine to impersonate a particular node and build it from scratch

Page 21: The NBN Puppet Journey

-  Vagrant + VirtualBox + Puppet is a great combination for learning! -  Provides new team members a safe environment to learn about the PROD

manifests in detail -  Is an essential part of building great team with knowledge shared broadly across

memebers

Page 22: The NBN Puppet Journey

-  Its your safety net, make sure you use it all the time -  Sometimes ‘urgent’ changes that you think can ‘easily’ be cowboyed straight onto

the box aren’t as easy as you thought

- 5 minutes delay (the time to run through a well configured pipeline) isn’t an inefficiency worth working without a safety net

Page 23: The NBN Puppet Journey