NBN: Rebooted, NBN Co's Matt Dawson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NBN: Rebooted, NBN Co's Matt Dawson
Page 2: NBN: Rebooted, NBN Co's Matt Dawson

PUBLIC | © NBN Co 2014 2UNCLASSIFIED

Enabling the digital economy and closing the digital divide

Matt Dawson

Program Director – Satellite

NBN Co

NBN Re-Booted

Sydney – November 18th 2014

“The contents of this document reflect NBN Co’s current position on the subject matter of this document. It is provided for information purposes and is intended to be a guide only. The contents of

this document should not be relied upon as representing NBN Co’s final position on the subject matter, except where stated otherwise. Any views expressed by NBN Co in this document may

change as a consequence of NBN Co finalising formal technical specifications, or legislative, or policy and regulatory developments. Any dates provided are indicative only, are subject to change and

are dependent upon a number of factors. All prices shown in this document are exclusive of GST.”

Page 3: NBN: Rebooted, NBN Co's Matt Dawson

PUBLIC | © NBN Co 2014 3UNCLASSIFIED

Why Satellite?

Enable the Digital Economy

• Building a National Broadband Network

for ALL Australians

• Using a Multi Technology Mix (MTM) of

technologies to deliver broadband

Close the Digital Divide

• Satellite becomes a cost-effective choice

beyond the economical reach of other

technologies

• Uniform National Pricing to deliver LTS

services at subsidised prices.

Page 4: NBN: Rebooted, NBN Co's Matt Dawson

PUBLIC | © NBN Co 2014 4UNCLASSIFIED

The Satellite Product Journey

4

Australian Broadband Guarantee

(ABG) 2005-2011

Interim Satellite Solution (ISS)

2011-2016

Long-Term Satellite

(LTS)2016-2030

ABG ISS NSS LTS

Design Downlink Speed 512kbps 6 Mbps* 3Mbps* 25 Mbps*

Bitstream ConnectivityLayer 3 (IP) Layer 3 (IP) Layer 3 (IP) Layer 2 (Ethernet)

Network Capacity<10kbps MBHT 40kbps MBHT 150kbps MBHT (AVC)

Target Users ~100,000 48,000 9,000 Estimated 220,000

EligibilityABG “metro –comparable”

ABG “metro –comparable”

No ISS or ABG, No alternative

Outside FW or FTTx or HFC footprint

Industry Model Direct Subsidy to RSPUniform National

Wholesale Price $24/mthAVC

Direct Subsidy to IPStar

Uniform National Wholesale Price $24/mth

AVC

NBN Co

Subsidy

Scheme

(NSS)

2014 -

“* We’re designing the NBN to provide these speeds to our wholesale customers, telephone and internet service providers. End user experience, including the speeds actually achieved over the NBN, depends on the technology over which services are

delivered to your premises and some factors outside our control like equipment quality, software, broadband plans and how the end user’s service provider designs its network.”

Page 5: NBN: Rebooted, NBN Co's Matt Dawson

PUBLIC | © NBN Co 2014 5UNCLASSIFIED

ISS Capacity Upgrades

Upgraded Capacity

• Satellite capacity upgraded

• Re-balanced network with ~1,200 end-user services re-pointed

Agreed New Fair Usage With RSPs

• New WBA & Fair Use rules to access to capacity

• New control mechanisms for breaches

Developed Tools to Monitor & Enforce Fair Usage

• New tools for RSP compliance with Fair Use,

along with end-user experience

• Work with RSPs to help them manage plans, customers and

network configuration – eg. 2% of users consume 20% of capacity

Launched NSS

• Launched to plan 1 August 2014

• Early pulse of customer experience highlighted some teething

issues but overall good satisfaction with the service

Before

After

Space segment congestion largely eliminated

End-user experience improving

Before

After

Page 6: NBN: Rebooted, NBN Co's Matt Dawson

PUBLIC | © NBN Co 2014 6UNCLASSIFIED

The Long Term Satellite (LTS) Program

The LTS is a large, complex program where NBN Co acts as the

integrator across multiple suppliers and specialist functions

Space, TT&C Launch NetworkProduct

DevelopmentGround Stations

Ground Systems

IT Systems Operations SpectrumGovernance,

Security & HSE

We have a $1.8 billion budget, 50,000 scheduled activities, hundreds of design

and specification documents, 1000 major dependencies and 3,000 people.

Page 7: NBN: Rebooted, NBN Co's Matt Dawson

PUBLIC | © NBN Co 2014 7UNCLASSIFIED

LTS: On track for success!

• NBN Co is on track to launch the product

late 2015 or early 2016

• Strategic Review recommendations on some

further risk mitigation also included in plans for

implementation

• The LTS network build continues to

track to budget

• There is no room for complacency:

Building and launching satellites, and the

space industry in general is a

RISKY BUSINESS!

Page 8: NBN: Rebooted, NBN Co's Matt Dawson

PUBLIC | © NBN Co 2014 8UNCLASSIFIED

LTS: Covering Australia….

Unprecedented High-Throughput

Satellite performance in the region

• Ka-Band

• 101 tailored spot beams

• Large geographical coverage

• Aggressive reuse of limited

RF spectrum

• Highly available solution design

• Two satellite system ~

126Gbps aggregate capacity

125 Km radius 325 Km radius

Page 9: NBN: Rebooted, NBN Co's Matt Dawson

PUBLIC | © NBN Co 2014 9UNCLASSIFIED

Ground Stations: Nine done – one to go!

Page 10: NBN: Rebooted, NBN Co's Matt Dawson

PUBLIC | © NBN Co 2014 10UNCLASSIFIED

Space Segment: Progressing Well

• Manufacture of the NBN 1A and 1B spacecraft is

progressing well.

• SS Loral manufacturing both satellites in US.

• Both satellites will be launched by Arianespace

in French Guiana.

• The thermal vacuum testing for NBN 1A has

recently been completed with favourable test

results.

• This is a major milestone for the space segment

of the program with the vibration dynamics,

acoustics and deployment tests remaining.

Page 11: NBN: Rebooted, NBN Co's Matt Dawson

PUBLIC | © NBN Co 2014 11UNCLASSIFIED

Ground Systems: Moving Ahead…..

• The first production versions of the modem are in being tested now in the

US with excellent results (BER, link performance etc).

• The first product launch ready version of the system software is currently

being testing in the Ground System Test Bed at the National Test Facility

• This represents the first ‘production ready’ version of the system software.

• Testing is underway at 9 of the 10 gateways.

VSAT and Modem systems

Data Processing and Network

Management Systems

Ground Systems

The network control systems and end user terminal

development is progressing well

Page 12: NBN: Rebooted, NBN Co's Matt Dawson

PUBLIC | © NBN Co 2014 12UNCLASSIFIED

The Reality: This is a huge project…..

Ariane-5

Launch VehicleNBN Co 1-A and 1B are two of the most advanced broadband

satellites ever designed – and are heavier than a bus!

Page 13: NBN: Rebooted, NBN Co's Matt Dawson