Rencana Pelaksanaan & Monitoring Program Kerja nama Fungsi/Asset Tahun 2015 Information & Communication Technology Place , dd mm yy
15

Template Rencana Kerja Manager Tahun 2015

Apr 12, 2016

Download

Documents

Maya Amrullah

Manager harus menyusun rencana kerja manajer tahunan agar kinerja departemen selaras dengan tujuan perusahaan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Template Rencana Kerja Manager Tahun 2015

Rencana Pelaksanaan & Monitoring Program Kerja nama Fungsi/Asset Tahun 2015

Information & Communication TechnologyPlace , dd mm yy

Page 2: Template Rencana Kerja Manager Tahun 2015

Rencana Pelaksanaan WP & B dan Non WP & B 2015

CIP

Evaluasi Kerja WP & B & Non WP & B 2014

Table of Content

Page 3: Template Rencana Kerja Manager Tahun 2015

WP & B 2015 - Summary

ICT Master Plan Rutin VP Man Asman1047-ICT-2015-803-201 Sewa Lay TWR/Multisite Trunking - Prabu-Pendopo (new) 220,06 BS205410 □ □1047-ICT-2015-803-202 Sewa Lay TWR/Multisite Trunking - Prabu-Pendopo (Bridging 5 bulan) 150,05 BS205410 □ □1047-ICT-2012-802-201 Sewa Layanan Radio Link Asset 2 (Pendopo) 115,55 BS205410 □ □1047-ICT-2012-802-202 Sewa Layanan Radio Link Asset 2 (Prabumulih) 166,91 BS205410 □ □1047-ICT-2015-301-201 Assesment dan Integrasi System Scada Asset 2 15,35 BS205410 □ □1047-ICT-2015-502-201 Kontrak Layanan Internet untuk kantor Asset 2 24,02 BS205410 □ □ □1047-ICT-2015-103-201 Kontrak Printer Asset 2 205,90 BS205410 □ □1047-ICT-2015-103-202 Kontrak Managed Print Service Field Asset 2 54,04 BS205410 □ □1047-ICT-2015-901-201 Kontrak Layanan Service Desk Asset 2 8,71 BS205410 □ □ □1047-ICT-2015-105-201 Pengembangan Ruang Meeting (2 tahun) Asset 2 19,93 BS205410 □ □ □1047-ICT-2014-701-201 Maintenance fasilitas data center Asset 2 5,70 BS205410 □ □ □1047-ICT-2015-701-201 PEMBANGUNAN/PENGEMBANGAN DATA CENTER / Maintenance fasilitas data center Asset 2233,30 BS205410 □ □ □1047-ICT-2015-401-201 Biaya pulsa telepon Asset 2 129,09 BS205410 □ □ □1047-ICT-2015-405-201 Pengadaan material consumable IT (sumbagsel) Asset 2 30,59 BS205410 □ □1047-ICT-2015-504-211 ASSESSMENT 32 TOWER ANTENA RADIO Field Prabumulih 45,74 BS215411 □ □1047-ICT-2014-102-211 KONTRAK PERANGKAT CCTV (Prabumulih) amend 0,48 BS215411 □ □1047-ICT-2015-102-211 KONTRAK PERANGKAT CCTV (Prabumulih) 125,48 BS215411 □ □1047-ICT-2015-403-211 PEMBELIAN MATERIAL KOMUNIKASI Field Prabumulih 17,44 BS215411 □ □1047-ICT-2015-402-211 PEMBELIAN MATERIAL MULTIMEDIA Field Prabumulih 25,72 BS215411 □ □1047-ICT-2015-401-211 BIAYA PULSA PSTN + Selular Field Prabumulih 24,15 BS215411 □ □1047-ICT-2015-104-211 BIAYA LANGGANAN TV BERBAYAR Field Prabumulih 84,33 BS215411 □ □1047-ICT-2012-803-241 Sewa Lay TWR/Multisite Trunking Limau 139,43 BS225411 □ □1047-ICT-2012-802-241 Sewa radio link - Field Limau (Region Sumatera) 14,82 BS225411 □ □1047-ICT-2015-802-242 Sewa radio link - Field Limau 51,46 BS225411 □ □1047-ICT-2015-504-241 Pembuatan Tower Field Limau 40,98 BS225411 □ □1047-ICT-2014-102-241 49,73 BS225411 □ □1047-ICT-2015-403-241 Biaya pemeliharaan perangkat komunikasi - Field Limau 19,09 BS225411 □ □1047-ICT-2015-402-241 Biaya pemeliharaan perangkat multimedia Field Limau 28,41 BS225411 □ □1047-ICT-2015-401-241 21,28 BS225411 □ □1047-ICT-2015-104-241 Biaya langganan TV Berbayar - Field Limau 3,54 BS225411 □ □1047-ICT-2015-405-241 Biaya material consumable IT - Field Limau 88,24 BS225411 □ □1047-ICT-2014-102-222 KONTRAK PERANGKAT CCTV (Pendopo) amend 0,59 BS235412 □ □1047-ICT-2015-102-221 KONTRAK PERANGKAT CCTV (Pendopo) 37,79 BS235412 □ □1047-ICT-2014-105-221 Peremajaan Soundsystem untuk Gd. Arsendora Field Pendopo 26,39 BS235412 □ □1047-ICT-2015-402-221 Pengadaan Perangkat Multimedia Mess Field Pendopo 29,30 BS235412 □ □1047-ICT-2015-401-221 Biaya Pulsa / Abonemen PT. Telkom Field Pendopo 28,21 BS235412 □ □1047-ICT-2015-405-221 61,75 BS235412 □ □1047-ICT-2015-402-221 29,07 BS235412 □ □1047-ICT-2015-402-222 106,92 BS245412 □ □1047-ICT-2012-803-231 Sewa Lay TWR/Multisite Trunking Adera 93,35 BS245412 □ □1047-ICT-2014-102-231 Pengadaan dan kontrak maintenance Perangkat CCTV_Adera 63,80 BS245412 □ □1047-ICT-2015-403-231 IDR_Material komunikasi Field Adera 13,06 BS245412 □ □1047-ICT-2015-402-231 IDR_Material Multimedia Field Adera 4,70 BS245412 □ □1047-ICT-2015-402-232 Pengadaan Perangkat Multimedia Mess Pekerja Field Adera 48,39 BS245412 □ □1047-ICT-2015-402-233 Pengadaan Perangkat Multimedia Perkantoran Field Adera 27,67 BS245412 □ □1047-ICT-2015-401-231 IDR_Biaya pulsa telepon. Field Adera 15,38 BS245412 □ □1047-ICT-2015-405-231 IDR_Material Pendukung (non Standar) Field Adera 2,38 BS245412 □ □

KPI Penanggung JawabKode WP & B Nama Project Nilai (k USD) Cost Center

ICT Project

Page 4: Template Rencana Kerja Manager Tahun 2015

4

1047-ICT-2015-803-201 Sewa Lay TWR/Multisite Trunking - Prabu-Pendopo (new) 220,06 BS205410 □ □1047-ICT-2015-803-202 150,05 BS205410 □ □1047-ICT-2012-802-201 Sewa Layanan Radio Link Asset 2 (Pendopo) 115,55 BS205410 □ □1047-ICT-2012-802-202 Sewa Layanan Radio Link Asset 2 (Prabumulih) 166,91 BS205410 □ □1047-ICT-2015-301-201 Assesment dan Integrasi System Scada Asset 2 15,35 BS205410 □ □1047-ICT-2015-502-201 Kontrak Layanan Internet untuk kantor Asset 2 24,02 BS205410 □ □ □1047-ICT-2015-103-201 Kontrak Printer Asset 2 205,90 BS205410 □ □1047-ICT-2015-103-202 Kontrak Managed Print Service Field Asset 2 54,04 BS205410 □ □1047-ICT-2015-901-201 Kontrak Layanan Service Desk Asset 2 8,71 BS205410 □ □ □1047-ICT-2015-105-201 Pengembangan Ruang Meeting (2 tahun) Asset 2 19,93 BS205410 □ □ □1047-ICT-2014-701-201 Maintenance fasilitas data center Asset 2 5,70 BS205410 □ □ □1047-ICT-2015-701-201 233,30 BS205410 □ □ □1047-ICT-2015-401-201 Biaya pulsa telepon Asset 2 129,09 BS205410 □ □ □1047-ICT-2015-405-201 Pengadaan material consumable IT (sumbagsel) Asset 2 30,59 BS205410 □ □1047-ICT-2015-504-211 ASSESSMENT 32 TOWER ANTENA RADIO Field Prabumulih 45,74 BS215411 □ □1047-ICT-2014-102-211 KONTRAK PERANGKAT CCTV (Prabumulih) amend 0,48 BS215411 □ □1047-ICT-2015-102-211 KONTRAK PERANGKAT CCTV (Prabumulih) 125,48 BS215411 □ □1047-ICT-2015-403-211 PEMBELIAN MATERIAL KOMUNIKASI Field Prabumulih 17,44 BS215411 □ □1047-ICT-2015-402-211 PEMBELIAN MATERIAL MULTIMEDIA Field Prabumulih 25,72 BS215411 □ □1047-ICT-2015-401-211 BIAYA PULSA PSTN + Selular Field Prabumulih 24,15 BS215411 □ □1047-ICT-2015-104-211 BIAYA LANGGANAN TV BERBAYAR Field Prabumulih 84,33 BS215411 □ □1047-ICT-2012-803-241 Sewa Lay TWR/Multisite Trunking Limau 139,43 BS225411 □ □1047-ICT-2012-802-241 Sewa radio link - Field Limau (Region Sumatera) 14,82 BS225411 □ □1047-ICT-2015-802-242 Sewa radio link - Field Limau 51,46 BS225411 □ □1047-ICT-2015-504-241 Pembuatan Tower Field Limau 40,98 BS225411 □ □1047-ICT-2014-102-241 Pekerjaan Security System / CCTV - IT Leasing Services - Field Limau 49,73 BS225411 □ □1047-ICT-2015-403-241 Biaya pemeliharaan perangkat komunikasi - Field Limau 19,09 BS225411 □ □1047-ICT-2015-402-241 Biaya pemeliharaan perangkat multimedia Field Limau 28,41 BS225411 □ □1047-ICT-2015-401-241 Pulsa telepon & fax untuk kantor & rdp managemen - Field Limau 21,28 BS225411 □ □1047-ICT-2015-104-241 Biaya langganan TV Berbayar - Field Limau 3,54 BS225411 □ □1047-ICT-2015-405-241 Biaya material consumable IT - Field Limau 88,24 BS225411 □ □1047-ICT-2014-102-222 KONTRAK PERANGKAT CCTV (Pendopo) amend 0,59 BS235412 □ □1047-ICT-2015-102-221 KONTRAK PERANGKAT CCTV (Pendopo) 37,79 BS235412 □ □1047-ICT-2014-105-221 Peremajaan Soundsystem untuk Gd. Arsendora Field Pendopo 26,39 BS235412 □ □1047-ICT-2015-402-221 Pengadaan Perangkat Multimedia Mess Field Pendopo 29,30 BS235412 □ □1047-ICT-2015-401-221 Biaya Pulsa / Abonemen PT. Telkom Field Pendopo 28,21 BS235412 □ □1047-ICT-2015-405-221 61,75 BS235412 □ □1047-ICT-2015-402-221 29,07 BS235412 □ □1047-ICT-2015-402-222 106,92 BS245412 □ □1047-ICT-2012-803-231 Sewa Lay TWR/Multisite Trunking Adera 93,35 BS245412 □ □1047-ICT-2014-102-231 Pengadaan dan kontrak maintenance Perangkat CCTV_Adera 63,80 BS245412 □ □1047-ICT-2015-403-231 IDR_Material komunikasi Field Adera 13,06 BS245412 □ □1047-ICT-2015-402-231 IDR_Material Multimedia Field Adera 4,70 BS245412 □ □1047-ICT-2015-402-232 Pengadaan Perangkat Multimedia Mess Pekerja Field Adera 48,39 BS245412 □ □1047-ICT-2015-402-233 Pengadaan Perangkat Multimedia Perkantoran Field Adera 27,67 BS245412 □ □1047-ICT-2015-401-231 IDR_Biaya pulsa telepon. Field Adera 15,38 BS245412 □ □1047-ICT-2015-405-231 IDR_Material Pendukung (non Standar) Field Adera 2,38 BS245412 □ □

WP & B 2015 - Summary

Page 5: Template Rencana Kerja Manager Tahun 2015

5

1047-ICT-2015-803-201 Sewa Lay TWR/Multisite Trunking - Prabu-Pendopo (new) 220,06 BS205410 □ □1047-ICT-2015-803-202 150,05 BS205410 □ □1047-ICT-2012-802-201 Sewa Layanan Radio Link Asset 2 (Pendopo) 115,55 BS205410 □ □1047-ICT-2012-802-202 Sewa Layanan Radio Link Asset 2 (Prabumulih) 166,91 BS205410 □ □1047-ICT-2015-301-201 Assesment dan Integrasi System Scada Asset 2 15,35 BS205410 □ □1047-ICT-2015-502-201 Kontrak Layanan Internet untuk kantor Asset 2 24,02 BS205410 □ □ □1047-ICT-2015-103-201 Kontrak Printer Asset 2 205,90 BS205410 □ □1047-ICT-2015-103-202 Kontrak Managed Print Service Field Asset 2 54,04 BS205410 □ □1047-ICT-2015-901-201 Kontrak Layanan Service Desk Asset 2 8,71 BS205410 □ □ □1047-ICT-2015-105-201 Pengembangan Ruang Meeting (2 tahun) Asset 2 19,93 BS205410 □ □ □1047-ICT-2014-701-201 Maintenance fasilitas data center Asset 2 5,70 BS205410 □ □ □1047-ICT-2015-701-201 233,30 BS205410 □ □ □1047-ICT-2015-401-201 Biaya pulsa telepon Asset 2 129,09 BS205410 □ □ □1047-ICT-2015-405-201 Pengadaan material consumable IT (sumbagsel) Asset 2 30,59 BS205410 □ □1047-ICT-2015-504-211 ASSESSMENT 32 TOWER ANTENA RADIO Field Prabumulih 45,74 BS215411 □ □1047-ICT-2014-102-211 KONTRAK PERANGKAT CCTV (Prabumulih) amend 0,48 BS215411 □ □1047-ICT-2015-102-211 KONTRAK PERANGKAT CCTV (Prabumulih) 125,48 BS215411 □ □1047-ICT-2015-403-211 PEMBELIAN MATERIAL KOMUNIKASI Field Prabumulih 17,44 BS215411 □ □1047-ICT-2015-402-211 PEMBELIAN MATERIAL MULTIMEDIA Field Prabumulih 25,72 BS215411 □ □1047-ICT-2015-401-211 BIAYA PULSA PSTN + Selular Field Prabumulih 24,15 BS215411 □ □1047-ICT-2015-104-211 BIAYA LANGGANAN TV BERBAYAR Field Prabumulih 84,33 BS215411 □ □1047-ICT-2012-803-241 Sewa Lay TWR/Multisite Trunking Limau 139,43 BS225411 □ □1047-ICT-2012-802-241 Sewa radio link - Field Limau (Region Sumatera) 14,82 BS225411 □ □1047-ICT-2015-802-242 Sewa radio link - Field Limau 51,46 BS225411 □ □1047-ICT-2015-504-241 Pembuatan Tower Field Limau 40,98 BS225411 □ □1047-ICT-2014-102-241 49,73 BS225411 □ □1047-ICT-2015-403-241 Biaya pemeliharaan perangkat komunikasi - Field Limau 19,09 BS225411 □ □1047-ICT-2015-402-241 Biaya pemeliharaan perangkat multimedia Field Limau 28,41 BS225411 □ □1047-ICT-2015-401-241 21,28 BS225411 □ □1047-ICT-2015-104-241 Biaya langganan TV Berbayar - Field Limau 3,54 BS225411 □ □1047-ICT-2015-405-241 Biaya material consumable IT - Field Limau 88,24 BS225411 □ □1047-ICT-2014-102-222 KONTRAK PERANGKAT CCTV (Pendopo) amend 0,59 BS235412 □ □1047-ICT-2015-102-221 KONTRAK PERANGKAT CCTV (Pendopo) 37,79 BS235412 □ □1047-ICT-2014-105-221 Peremajaan Soundsystem untuk Gd. Arsendora Field Pendopo 26,39 BS235412 □ □1047-ICT-2015-402-221 Pengadaan Perangkat Multimedia Mess Field Pendopo 29,30 BS235412 □ □1047-ICT-2015-401-221 Biaya Pulsa / Abonemen PT. Telkom Field Pendopo 28,21 BS235412 □ □1047-ICT-2015-405-221 Material Perawatan Jaringan Telepon, Material Komunikasi, Material Multimedia & Material Pendukung (Non Standar) Field Pendopo61,75 BS235412 □ □1047-ICT-2015-402-221 Pengadaan Perangkat Multimedia di Perkantoran Field Pendopo 29,07 BS235412 □ □1047-ICT-2015-402-222 Pengadaan Perangkat TI dan Multimedia di Ruang Training HR Field Pendopo106,92 BS245412 □ □1047-ICT-2012-803-231 Sewa Lay TWR/Multisite Trunking Adera 93,35 BS245412 □ □1047-ICT-2014-102-231 Pengadaan dan kontrak maintenance Perangkat CCTV_Adera 63,80 BS245412 □ □1047-ICT-2015-403-231 IDR_Material komunikasi Field Adera 13,06 BS245412 □ □1047-ICT-2015-402-231 IDR_Material Multimedia Field Adera 4,70 BS245412 □ □1047-ICT-2015-402-232 Pengadaan Perangkat Multimedia Mess Pekerja Field Adera 48,39 BS245412 □ □1047-ICT-2015-402-233 Pengadaan Perangkat Multimedia Perkantoran Field Adera 27,67 BS245412 □ □1047-ICT-2015-401-231 IDR_Biaya pulsa telepon. Field Adera 15,38 BS245412 □ □1047-ICT-2015-405-231 IDR_Material Pendukung (non Standar) Field Adera 2,38 BS245412 □ □

WP & B 2015 - Summary

Page 6: Template Rencana Kerja Manager Tahun 2015

Non Budget Project 2015 - Summary

VP Man Asman1 Assessment Jaringan TV Kabel □ □2 Setting Konfigurasi Firewall Asset 2 □ □3 Survey Layanan TV Kabel □ □4 Re-engineering Presence Monitoring □ □5 Re-engineering Incident Management refer to BMC Remedy □ □6 Update Phone Book IPTEL Cisco □ □7 Personal Photo IPTEL Cisco □ □8 Re-engineering SIMKIT □ □9 Daily monitoring laporan produksi □ □

10 Survey Layanan ICT □ □

No Nama ProjectKPI Penanggung Jawab

Page 7: Template Rencana Kerja Manager Tahun 2015

Work Program Detil - 1

JUDUL PROYEK : Renovasi Data Center Asset 2MULAI : Maret 2015SELESAI : Desember 2015

LATAR BELAKANG : Kondisi Data Center Asset 2 saat ini sudah perlu di rekondisi karena sudah tidak sesuai dengan Standar Data Center PT Pertamina EP

TUJUAN :Agar Data Center Asset 2 sesuai dengan Standar yang sudah ditetapkan oleh PT Pertamina EP sehingga dapat mendukung seluruh layanan ICT di Asset 2

RUANG LINGKUP :Melakukan Assessment dan Disain Data CenterMelakukan Rekondisi Data Center Asset 2

Page 8: Template Rencana Kerja Manager Tahun 2015

Work Program Detil - 2

Task Name Duration Start Finish Predecessor BobotPemilihan Konsultan 3 bulan Februari April

Assessment dan Desain DC

3 bulan Mei Juli

Lelang Pekerjaan 3 bulan Juli September

Rekondisi Data Center

6 bulan Oktober Februari 2016

JUDUL PROYEK : Renovasi Data Center Asset 2MULAI : Maret 2015SELESAI : Desember 2015

Page 9: Template Rencana Kerja Manager Tahun 2015

Work Program Detil - 1

JUDUL PROYEK :MULAI :SELESAI :

LATAR BELAKANG :

TUJUAN :

RUANG LINGKUP :

Page 10: Template Rencana Kerja Manager Tahun 2015

Work Program Detil - 2

JUDUL PROYEK :MULAI :SELESAI :

Task Name Duration Start Finish Predecessor Bobot

Page 11: Template Rencana Kerja Manager Tahun 2015

2014 Project Evaluation – WP & B

9.300 VP Man Asman

A1101 Kontrak Layanan Two Way Radio 460,81 4.285.533.000 BS205410 □ □ □ 100 3.737.914.613 Prabu-PendopoKontrak Layanan Two Way Radio 279,61 2.600.373.000 BS205410 □ □ □ 100 1.013.120.000 Adera-Limau, implementasi mulai Bulan Agustus 2014 (telat 7 bulan)

A1103 Kontrak layanan /pemeliharaan radio link 361,43 3.361.299.000 BS205410 □ □ □ 100 3.578.970.591 Kontrak layanan /pemeliharaan radio link 113,81 1.058.433.000 BS225411 □ □ □ 100 882.000.000

A1109 Kontrak Layanan Internet 34,51 320.943.000 BS205410 □ □ □ 100 280.824.000 A1118 Kontrak jaringan kabel telepon / FO (Fiber Optic) 84,30083 783.997.750 BS215411 □ □ □ 100 356.672.200

Kontrak jaringan kabel telepon / FO (Fiber Optic) 73,34 682.062.000 BS225411 □ □ □ 100 - Dialokasikan untuk CCTV LimauA1121 Kontrak rekondisi tower antene radio 20,83 193.750.000 BS215411 □ □ □ 0 - Anggaran terpotong PAGU

Kontrak rekondisi tower antene radio 2,29 21.297.000 BS225411 □ □ □ 0 - Anggaran terpotong PAGUKontrak rekondisi tower antene radio 23,55 219.015.000 BS245412 □ □ □ 0 - Anggaran terpotong PAGU

A2127 Kontrak perangkat CCTV 18,63 173.259.000 BS205410 □ □ □ 100 203.734.920 Kontrak perangkat CCTV 53,97 501.921.000 BS215411 □ □ □ 100 719.813.000 Kontrak perangkat CCTV 26,75 248.775.000 BS225411 □ □ □ 100 730.604.796 Menggunakan anggaran FO LimauKontrak perangkat CCTV 103,43 961.899.000 BS235412 □ □ □ 100 419.580.000

A2128 Kontrak Pengembangan Data Center 71,365 663.694.500 BS205410 □ □ □ 80 9.350.000 Kontrak UPS sudah jadi, kontrak AC in progress, anggaran terpotong PAGUB1001 Pembelian material komunikasi 26,04167 242.187.500 BS215411 □ □ □ 100 541.873.400 Multimedia, komunikasi, non-standard jadi satu

Pembelian material komunikasi 12,61 117.273.000 BS225411 □ □ □ 100 - Pembelian material komunikasi 10,73438 99.829.688 BS245412 □ □ □ 100 285.853.511 Jadi satu dengan Instalasi perangkat multimediaPembelian material komunikasi 1,76371 16.402.507 BS235412 □ □ □ 100 16.603.550

B1002 Pembelian material multimedia 12,5 116.250.000 BS215411 □ □ □ 100 - Pembelian material multimedia 8,93 83.049.000 BS225411 □ □ □ 100 57.340.000 Pembelian material multimedia 24,8 230.640.000 BS235412 □ □ □ 100 105.512.760 Pembelian material multimedia 0,41 3.813.000 BS245412 □ □ □ 100 103.185.292

B1005 Biaya pulsa telepon 200,18 1.861.674.000 BS205410 □ □ □ 100 2.782.459.847 Biaya pulsa telepon 27,31 253.983.000 BS225411 □ □ □ 100 226.500.000

Biaya pulsa telepon 17,19 159.867.000 BS245412 □ □ □ 100 169.900.000 B1007 Sewa layanan TV Berbayar 102,7722 955.781.663 BS215411 □ □ □ 100 864.000.000

Sewa layanan TV Berbayar 5,16 47.988.000 BS225411 □ □ □ 100 34.949.271 B2102 Pembelian material pendukung (Non Standard) 12,23958 113.828.125 BS215411 □ □ □ 100 -

Pembelian material pendukung (Non Standard) 10,13977 94.299.820 BS235412 □ □ □ 100 Anggaran terpotong PAGUW2201X Instalasi Perangkat Multimedia 63,54167 590.937.500 BS215411 □ □ □ 100 -

Instalasi Perangkat Multimedia 45,90484 426.915.047 BS245412 □ □ □ 100 - Jadi satu dengan material komunikasiInstalasi Access Control 96,6381 898.734.330 BS215411 □ □ □ 10 - Anggaran terpotong PAGURekondisi Perangkat Komunikasi 85,96 799.428.000 BS225411 □ □ □ 100 339.829.000 Pembelian consumables

Nilai (IDR) Kode WP & B Nama Project Nilai (k

USD)Cost Center

KPI Penanggung JawabRealisasi

IssueFisik (%) Anggaran

Page 12: Template Rencana Kerja Manager Tahun 2015

2014 Project Evaluation – Non Budget Project

VP Man Asman1 Assessment CCTV di FasProd □2 Demo Upgrade Radio Link (Limau) □3 Assessment MPS oleh MII □4 Assessment MPS oleh Astra Graphia □5 Action Tracking □6 Notifikasi Keuangan □7 Publikasi ICT □

No Nama ProjectKPI Penanggung Jawab

Page 13: Template Rencana Kerja Manager Tahun 2015

CIP

No Jenis CIP Judul CIP Anggota CIP Fungsi yang terlibat

Referensi Bank Tema

1 PKM SIKA Online - Gelar WS- Narma W- Dicky H- Adhi K- Sri D- Erni T- Setyawan

HSSE dan ICT

*Template mengikuti template dari OC & OE

Page 14: Template Rencana Kerja Manager Tahun 2015

ICT Management Support

Diisi hal – hal yang perlu atau dibutuhkan untuk di-support oleh Management ICT

Page 15: Template Rencana Kerja Manager Tahun 2015