Top Banner
Stage 1:Preconstruction - Design– Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out
52

Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Dec 23, 2015

Download

Documents

Opal Dixon
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Topic 6

Chapter 2

Construction Contract Documents

Design

Stage 1 Preconstruction Stage 2: Procurement

Conceptual Planning Stage3: Construction

Stage 4: Project Close-out

Page 2: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Contract Documents

• Agreement

• Conditions of the Contract

• Drawings

• Specifications

• Addenda

• Modifications

Page 3: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Bidding and Contract Documents

Page 4: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Drawings (plans, blueprints)• Physical, quantitative, visual description

• Organized by sequence of construction– General information and site work– Structural – Architectural– Plumbing– Heating, air-conditioning, and ventilation

(HVAC)– Electrical

Page 5: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Drawings (plans, blueprints)

• Sections numbered separately

• Sections begin with list of standard symbols and abbreviations

• Each drawing page shows scale and approval signatures

Page 6: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Specifications

• Includes the following– Title Page– Table of Contents– Addenda– Bidding Requirements

• Invitation to Bid

• Instructions to Bidders

• Information Available to Bidders

Page 7: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Specifications

• Includes the following (cont’d)– Sample forms

• Agreement

• Bid form

• Bid bond

• Performance and Payment Bonds

• Other Sample Forms

Page 8: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 9: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 10: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 11: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 12: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 13: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 14: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 15: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 16: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Specifications

• Includes the following (cont’d)– Conditions of the Contract

• General Conditions

• Supplementary Conditions

– Schedule of Drawings– Technical Specifications (Divisions 1

through 16)

Page 17: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Who needs specifications?

• Contractor/Estimator

• Purchasing agent

• Inspector

• Owner

• Subcontractors

• Materials and equipment manufacturers

Page 18: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

General Conditions (boilerplate)

document establishing the legal rights, responsibilities, and relationships of the parties to the contract. The parties are the owner, owner’s representative, and the contractor

Page 19: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Standard General Conditions Documents

• American Institute of Architects (AIA)

• Associated General Contractors (AGC) and American Society of Civil Engineers (ASCE)

• U.S. government Federal Acquisition Regulation (FAR)

• Engineers Joint Contract Documents Committee (National Society of Professional Engineers (NSPE), American Consulting Engineers Council (ACEC), ASCE, Construction Specifications Institute (CSI))

Page 20: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Value of Standard General Conditions

• Familiar to all parties

• Clearly understood

• Legal interpretation is often known (court-tested)

Page 21: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 22: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 23: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 24: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Supplementary (Special) Conditions

• Number of copies of contract documents to be received by the contractor

• Type of surveying information to be provided by the owner

• Material owner will provide

• Specific information about material substitutions

• Changes in insurance requirements

Page 25: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Supplementary (Special) Conditions

• Requirements concerning the phasing of construction

• Examination of the site

• Start date for construction

• Requirements for project security

• Requirements for temporary facilities

• Specific procedures for submitting shop drawings

Page 26: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Supplementary (Special) Conditions

• Cost-reporting requirements

• Job schedule requirements

• Special cleaning requirements

• Traffic control requirements

• Discovery of artifacts of cultural or historical value

Page 27: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Technical Specifications (specs)

written document that covers the qualitative items of a project as opposed to the quantitative information provided in the drawings. Technical specifications modify or clarify what is shown in the drawings.

Page 28: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Problems Encountered in Specs

• Conflicting information – (1) technical specs govern– (2) architect/engineer (A/E) makes determination

• Omitted information in either drawings or specs– Assumption of “greater value” intended

Page 29: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Format of Technical Specs

Technical specifications are organized according to the general order of the work to be performed, beginning with site work and ending with finish work items. Divisions are defined in such a way as to segregate the work by craft jurisdiction.

Page 30: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Format of Technical Specs

• CSI Masterformat Divisions– Division of bidding requirements, contract

forms, and conditions of the contract

– Division 1: General Requirements

– Division 2: Sitework

– Division 3: Concrete

– Division 4: Masonry

– Division 5: Metals

– Division 6: Wood and Plastics

– Division 7: Thermal and Moisture Protection

Page 31: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Format of Technical Specs• CSI Masterformat Divisions (cont’d)

– Division 8: Doors and Windows

– Division 9: Finishes

– Division 10: Specialties

– Division 11: Equipment

– Division 12: Furnishings

– Division 13: Special Construction

– Division 14: Conveying Systems

– Division 15: Mechanical

– Division 16: Electrical

Page 32: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 33: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 34: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Format of Technical Specs

General contractors sometimes provide the subcontractors only with a copy of the technical section that relates to the work that they are contracting to perform. They neglect to give them copies of the General Conditions, Division 1, Supplementary Conditions, etc. that may also contain information that is relevant to the subcontractor’s portion of the work.

Page 35: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Format of Technical Specs

To alert subcontractors to the possibility of conditions and obligations not explained in the technical section provided to them, a statement such as the following is included at the beginning of each technical section: “Provide work under this section as shown or specified and in accordance with the requirements of the Contract Documents.”

Page 36: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 37: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 38: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Format of Technical Specs• Divisions are subdivided into sections

which include three (3) parts– Part 1 - General: ground rules and scope of

work– Part 2 - Products: descriptions of material,

equipment, fixtures, and the manufacturing process utilized

– Part 3 - Execution: detailed description of workmanship, erection, installation, and application procedures

Page 39: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 40: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Proper use of CSI specifications (divisions, sections/parts)

Page 41: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

TYPES OF SPECIFICATIONS

• Basic Categories– Performance: specifies the end result as

measured by some noted criteria– Prescriptive: specifies the materials and

workmanship

Page 42: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

TYPES OF SPECIFICATIONS

Question: If the technical specification contains both prescriptive and performance instructions, is the contractor required to fulfill both portions of the specification? Explain.

Page 43: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

TYPES OF SPECIFICATIONS

• Other Forms of Specifications– Open Specification– Closed Specification

• permits only a particular item or system in principle, not legal for public work unless at

least three choices are specified can be prescriptive or performance also called base bid (1 choice) or bidder’s choice

(2 options)

Page 44: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

TYPES OF SPECIFICATIONS• Other Forms of Specifications (cont’d)

– Proprietary Specification: closed spec with no alternative

– Or Equal Specifications variation on the proprietary specification should be avoided (Why?-judgement of what is

equal is difficult)

– Or Approved Equal Specifications problematic for bidding approval is not easily given

Page 45: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

TYPES OF SPECIFICATIONS

• Other Forms of Specifications (cont’d)– All-Inclusive Specifications

many questions unanswered phrases like, “as directed by engineer,” or, “to

the approval of the architect” not good for bidding or fair administration of

contract

Page 46: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

TYPES OF SPECIFICATIONS

• Other Forms of Specifications (cont’d)– Reference Specifications - establishes

separate document as part of contract by citation

– Standard Specifications

Page 47: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

SPECIFICATIONWRITING TIPS

• Three Cs

• Clear (organization and coordination)

• Correct (consistency within and with drawings)

• Concise (brief and to the point; not verbose)

• Vocabulary (clearly defined terms, especially abbreviations)

Page 48: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

SPECIFICATIONWRITING TIPS

• Begin at about 50% completion of drawings

• Level of detail appropriate for complexity of project

• Research (especially for prescriptive specifications)

• Be careful of omissions and conflicts due to cutting and pasting

• 4specs.com

Page 49: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

SPECIFICATIONWRITING TIPS

• CSI PARAGRAPH FORMAT

PART

1.1 ARTICLE TITLE

A. Paragraph

1. Subparagraph

a. Subparagraph

1) Subparagraph

Page 50: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 51: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Page 52: Stage 1:Preconstruction - Design – Contract Documents Topic 6 Chapter 2 Construction Contract Documents Design Stage 1 Preconstruction Stage 2: Procurement.

Stage 1:Preconstruction - Design– Contract Documents

Notice of Award

• Notice to the successful bidder to

• Example: geotechnical investigation, topographic and bathymetric surveys:Example of a Notice of Award