Top Banner
FOR MORE INFORMATION Lake Michigan Coastal Program 1600 N 25 E Chesterton, IN 46304 (219) 983-9912 www.in.gov/dnr/lakemich GRANT RECIPIENT C ITY OF H OBART Y EAR 2004 C OUNTY L AKE C ATEGORY L OW C OST C ONSTRUCTION G RANT A WARD $35,000 L OCAL S HARE $35,000 RESULT: Stabilized 550ft of shoreline along Lake George and prevented 320 tons of sedimentation annually. The shoreline along Lake George in Hobart has become a significant source of sedimentation to the lake and Deep River. This problem was identified through the completion of the Deep River/Turkey Creek Watershed Management Plan. Jerry Pavese Park, a popular lakeside park along Lake George, contributed 320 tons of sediment per year into the lake and Deep River. Realizing the need to prevent such erosion, the City of Hobart stabilized 550 ft of eroded shoreline at Jerry Pavese Park. The restoration utilized a variety of bioengineering methods approved by the Department of Natural Resources. Additionally, an engineering feasibility and design study was completed to ensure that the erosion problem would be properly mitigated while also enhancing the ecological integrity of the park. Jerry Pavese Park Shoreline Stabilization Project
1

Stabilization Project - Indiana · 2015. 8. 27. · Pavese Park. The restoration utilized a variety of bioengineering methods approved by the Department of Natural Resources. Additionally,

Sep 02, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Stabilization Project - Indiana · 2015. 8. 27. · Pavese Park. The restoration utilized a variety of bioengineering methods approved by the Department of Natural Resources. Additionally,

FOR MORE INFORMATION Lake Michigan Coastal Program 1600 N 25 E Chesterton, IN 46304 (219) 983-9912 www.in.gov/dnr/lakemich

GRANT RECIPIENT C IT Y OF HO BAR T YEAR 2004 COUNTY LAKE CATEGORY LOW CO ST CON STRU CTI ON GRANT AWARD $35,000 LOCAL SHARE $35,000

RESULT: Stabilized 550ft of shoreline along Lake George and prevented 320 tons of sedimentation annually.

The shoreline along Lake George in Hobart has

become a significant source of sedimentation to the lake

and Deep River. This problem was identified through the

completion of the Deep River/Turkey Creek Watershed

Management Plan. Jerry Pavese Park, a popular lakeside

park along Lake George, contributed 320 tons of sediment

per year into the lake and Deep River.

Realizing the need to prevent such erosion, the City

of Hobart stabilized 550 ft of eroded shoreline at Jerry

Pavese Park. The restoration utilized a variety of

bioengineering methods approved by the Department of

Natural Resources. Additionally, an engineering feasibility

and design study was completed to ensure that the erosion

problem would be properly mitigated while also enhancing

the ecological integrity of the park.

Jerry Pavese Park Shoreline Stabilization Project