Top Banner
Shire of Peppermint Grove 2011/12 Budget Concept Forum 14 th June 2011
29

Shire of Peppermint Grove

Feb 25, 2016

Download

Documents

sinjin

Shire of Peppermint Grove. 2011/12 Budget Concept Forum 14 th June 2011. 2010/11 Budget Outcomes. After beginning 2010/11 with a $193,000 cash deficit Expected break even position at end of year . Status of Reserves. 2010/11 Business Plan Status. Refer Status Report - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Shire of Peppermint Grove

Shire of Peppermint Grove

2011/12 BudgetConcept Forum14th June 2011

Page 2: Shire of Peppermint Grove

After beginning 2010/11 with a $193,000 cash deficit

Expected break even position at end of year

2010/11 Budget Outcomes

Page 3: Shire of Peppermint Grove

Reserve Amount June 2011

Comments

Reserve•Staff leave•Plant replacement•Infrastructure/Building•Sitting Fees (elected members)•Library leave•Library infrastructure•Green Funds•Roads•POS

$888,597 Final project payment still outstanding ($50,000?)

RLCIP $60,000 Grants still to be paid out

Status of Reserves

Page 4: Shire of Peppermint Grove

Refer Status Report Sump Rationalisation Project ($400,000 estimate for under road sump option)

New Integrated Planning Framework see handouts◦ Community Plan◦ Strategic Corporate Plan◦ Town Planning Strategy and Scheme◦ Asset Management Plan ◦ Long Term Financial Plan ◦ Capacity Plan (HR Plan, IT Plan)◦ Annual Business Plan and Budget

Disability Access and Inclusion Plan Customer Management Plan Traffic Management Initiatives

◦ The Esplanade/Lilla Street - $15,000◦ Hurstford Close - $1000 - $10,000◦ Stirling Hwy/Leake St – 5,000◦ McNeil Street/Stirling Hwy - $90,000

2010/11 Business Plan Status

Page 5: Shire of Peppermint Grove

IMPACTS ON 2011/12 BUDGET

Page 6: Shire of Peppermint Grove

Library Budget

Page 7: Shire of Peppermint Grove

Manager Corporate Services to present

Revaluation

Page 8: Shire of Peppermint Grove

Reduced from 5% to 3% from 1 July 2011

No impact on rate setting but will reduce income on interim rates raised on any vacant land during the year

New Rate on Vacant Land

Page 9: Shire of Peppermint Grove

Peppermint Grove staff will be responsible for 75% of the cost of landscaping maintenance –additional $12,500 for materials and contract services.

Utilities increased by 3 times due to increased building size and some tariff price increases.

Cleaning costs increased due to size of building. Maintenance costs increased due to complexity

of building and its systems. Insurance increased by 10%.

New Building

Page 10: Shire of Peppermint Grove

Tariff increased by 29% Increase of approximately $10,000

Street Lighting

Page 11: Shire of Peppermint Grove

WMRC rubbish charge increased by $11 per tonne

Contract day labour 5 people x1day per week

Continue contracted bulk rubbish service $5,000 increase in tipping fees due to quantity

Rubbish Service

Page 12: Shire of Peppermint Grove

Final completion of project

◦ Bore issue◦ Cafe◦ Street furniture◦ On-going maintenance◦ Performance management

Other Impacts

Page 13: Shire of Peppermint Grove

2011/2012 BUDGET INITIATIVES

Page 14: Shire of Peppermint Grove

1 day per week – support for Building and Planning

1 day per week – administration support

Staffing

Page 15: Shire of Peppermint Grove

Asset Management Infringements Purchase Orders Customer Service Website upgrade

IT Software

Page 16: Shire of Peppermint Grove

$49,000 Roads to Recovery grant Hurstford Close entry onto Leake Street

Traffic Management

Page 17: Shire of Peppermint Grove

Cafe redevelopment (No capital funds allocated – consultancy only)

River wall urgent repairs $50,000 (POS Reserve?)

Foreshore Strategy

Page 18: Shire of Peppermint Grove

Bulk Rubbish (Incredible Bulk) $33,000 Use of contract labour for valet weekly

rubbish collection

Rubbish Service

Page 19: Shire of Peppermint Grove

Traffic management $15,000 Integrated Planning $5,000 WESROC projects $20,000 Cafe redevelopment $??? Feasibility Study for Board Walk $40,000 Disability Access and Inclusion Plan $8,000

Consultants

Page 20: Shire of Peppermint Grove

Pontoon Board Walk $40,000 New mower $12,800 (secondhand - reserves)

2 vehicles for changeover (reserves)

Reticulation control box x 2 $16,000 (POS)

Bus Shelter (Leake St) $15,000 Summer Community concert at Manners Hill

$10,000 (grant) Safety barrier upgrade The Esplanade

$17,600

Other Initiatives & Key Expenditure

Page 21: Shire of Peppermint Grove

Election expenses $9,100 Revaluation $9,000 Interest on loan $66,000 Principal on loan $17,000 Playground safety inspections $1,200 Street trees and advice +$8,000 Street sweeping +$15,000 ROW repairs/maintenance $30,000 ROW drainage $15,000 Mosman Park Men’s Shed $5,000

Page 22: Shire of Peppermint Grove

ISSUES FOR CONSIDERATION

Page 23: Shire of Peppermint Grove

Manager Corporate Services to discuss Model to table

Outsourced Valet Service $279,000 – business case to be developed?

Separate Rubbish Charge

Page 24: Shire of Peppermint Grove

Budget for $40,000 Actual 2010/11 $65,000 Encourages early payment – cash flow

benefit Allows for interest earnings Approx 66% of ratepayers take advantage

of discount Manager Corporate Services to discuss

Discount on Rates

Page 25: Shire of Peppermint Grove

RATING OPTIONS

Page 26: Shire of Peppermint Grove

1% = $19,000

Our Rating History

Year Rate Increase2010/11 10%2009/10 9%2008/09 6%2007/08 6%2006/07 5%

Page 27: Shire of Peppermint Grove

LGA % LGA % LGA %Exmouth 4 Melville 4 Irwin 4

Wyalkatchem 4.1 Vincent 4.25

Belmont 4.5

Busselton 4.5 Murray 4.5 Mandurah 4.75

Gosnells 4.9 Dalwalinu 4-5 Joondalup 5

Halls Creek 5 East Fremantle 5 Augusta-MR 5Broome 5 Perth 5.0

5Cockburn 5.5

South Perth 6 Bayswater 6 Swan 6Bassendean 6 Capel 6 Pt Hedland 7Geraldton 7.6 Vic Park 8 Roebourne 5+Mundaring 8.5 East Pilbara 3-5 Donnybrook 7-8

Cottesloe 4.95

Subiaco 8.5 Bunbury 6-7

Claremont5% + 1.25% for WMRC subsidy

6 Nedlands ? Mosman Park ?

Page 28: Shire of Peppermint Grove

Draft Budget Assumptions 10% rate increase Reserves for funding of most capital Sitting fees from reserves Increased non discretionary costs related to new

building CPI March Quarter 2.8% EBA annual increase 3.5% Same income generated irrespective of rubbish charge

method Revaluation will have differing affect on individual

properties but will not impact on overall rate setting to achieve target rate revenue

Retaining rates discount at $40,000 cost

Page 29: Shire of Peppermint Grove

Yacht Club donation $25,000 River Wall construction $205,000 Budgeted funds for reserves (asset

management) $50,000 Landscaping median strip Leake/Stirling

Hwy $10,000 Stirling Highway verge paving $80,000

Initiatives Not Included