Top Banner
8/10/2019 SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR http://slidepdf.com/reader/full/scor-make-element-pharmaceutical-castillo-linares-itesm-make-element-of-scor 1/13 Lámina 1 The MAKE element of SCOR in a pharmaceutical company Ileana Castillo, Ph.D.  Assistant Professor Ing. Juan Linares Master’s Student ITESM Campus Toluca, Mexico Supply Chain World-Latin America 2002 9-10 September, Camino Real México ©2002 by Ileana Castillo
13

SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

Jun 02, 2018

Download

Documents

rsantosh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

8/10/2019 SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

http://slidepdf.com/reader/full/scor-make-element-pharmaceutical-castillo-linares-itesm-make-element-of-scor 1/13

Lámina 1

The MAKE element of SCOR in a

pharmaceutical company

Ileana Castillo, Ph.D. Assistant Professor 

Ing. Juan LinaresMaster’s Student

ITESM Campus Toluca, Mexico

Supply Chain World-Latin America 2002

9-10 September, Camino Real México

©2002 by Ileana Castillo

Page 2: SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

8/10/2019 SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

http://slidepdf.com/reader/full/scor-make-element-pharmaceutical-castillo-linares-itesm-make-element-of-scor 2/13

Lámina 2

Introduction

 – Pharmaceutical Company

 – The company’s manufacturing process is Make-To-Stock

 – The trigger of the production planning process is

the sales forecast – Products are shipped from finished goods or “off 

the shelf”

 – SAP / R3 System

 – Proprietary Cost Accounting System

©2002 by Ileana Castillo

Page 3: SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

8/10/2019 SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

http://slidepdf.com/reader/full/scor-make-element-pharmaceutical-castillo-linares-itesm-make-element-of-scor 3/13

Lámina 3

Introduction

 – Specialized workers. High salaries

 – Workers are organized in an union – Active ingredient comes from parent company

located in Europe, sometimes with a close

expiration date – Only finished products have safety stock. It is

established in days of sales

©2002 by Ileana Castillo

Page 4: SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

8/10/2019 SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

http://slidepdf.com/reader/full/scor-make-element-pharmaceutical-castillo-linares-itesm-make-element-of-scor 4/13

Lámina 4

Description of Line in Study

 – The production line belongs to the packaging area

 – It consists of three cells – 23 products are packaged in these cells. It

includes products of local and government sales,

samples and exports – Two shifts are used for aggregated planning, and

usually three shifts in the daily operations

 – The aggregated capacity utilization is 160 % forthis line

©2002 by Ileana Castillo

Page 5: SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

8/10/2019 SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

http://slidepdf.com/reader/full/scor-make-element-pharmaceutical-castillo-linares-itesm-make-element-of-scor 5/13

Lámina 5

Description of Line in Study

 – Set up times go from 0.5 to 12 hours. It depends

on the mix of products. For a set of 23 productsthere are 23! permutations

©2002 by Ileana Castillo

Page 6: SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

8/10/2019 SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

http://slidepdf.com/reader/full/scor-make-element-pharmaceutical-castillo-linares-itesm-make-element-of-scor 6/13

Lámina 6

Cost Structure

 – Materials

 – Line Costs

• Labor Cost• Machine Cost

• Quality Testing Labor Costs

 – Product Related Cost

©2002 by Ileana Castillo

Page 7: SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

8/10/2019 SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

http://slidepdf.com/reader/full/scor-make-element-pharmaceutical-castillo-linares-itesm-make-element-of-scor 7/13

Lámina 7

Key Performance Indicators(KPI´s)

 – The following KPI´s are just some of the ones

involved in the study:

• Head Count

• Capacity Variance

• Cycle time

• Inventory Value

©2002 by Ileana Castillo

Page 8: SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

8/10/2019 SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

http://slidepdf.com/reader/full/scor-make-element-pharmaceutical-castillo-linares-itesm-make-element-of-scor 8/13

Lámina 8

Solution Proposed

©2002 by Ileana Castillo

S1: Definition

of Product

Families

S2: Flow shop scheduling

!n jobs (products), one machine

!Generalization of SPT (The larger wi the

more important the job. Months before

expiration)

Page 9: SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

8/10/2019 SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

http://slidepdf.com/reader/full/scor-make-element-pharmaceutical-castillo-linares-itesm-make-element-of-scor 9/13

Lámina 9

S3: Analysis:

!Cycle time for a family

!Line cost impact for each product

S4: Flow shop scheduling

!n jobs (families), one machine

!TSP problem

©2002 by Ileana Castillo

Page 10: SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

8/10/2019 SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

http://slidepdf.com/reader/full/scor-make-element-pharmaceutical-castillo-linares-itesm-make-element-of-scor 10/13

Lámina 10©2002 by Ileana Castillo

S5: Analysis:!Global Cycle time

Impact

S6: Family Set up

assignation

Page 11: SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

8/10/2019 SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

http://slidepdf.com/reader/full/scor-make-element-pharmaceutical-castillo-linares-itesm-make-element-of-scor 11/13

Lámina 11

S7:Analysis:

!Line cost impact for each product

!Capacity Variance Impact

!Head Count Impact

!Inventory Value Impact

S8: Conclusions and

recommendations

©2002 by Ileana Castillo

Page 12: SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

8/10/2019 SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

http://slidepdf.com/reader/full/scor-make-element-pharmaceutical-castillo-linares-itesm-make-element-of-scor 12/13

Lámina 12

Benefits and conclusions

 – Cycle time reduction• Comparison of actual production plans versus

time taken by the sequence of the TSP

 – A base rule to assign the real line cost

• Once the set up is assigned to each product,

update the master recipe and determine theimpact in the cost by each element

©2002 by Ileana Castillo

Page 13: SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

8/10/2019 SCOR Make Element Pharmaceutical Castillo Linares ITESM MAKE Element of SCOR

http://slidepdf.com/reader/full/scor-make-element-pharmaceutical-castillo-linares-itesm-make-element-of-scor 13/13

Lámina 13

Benefits and conclusions

(cont.)

 – Capacity variance reduction

• Once the set up is assigned, update the masterrecipe and determine the capacity utilization for

a given MPS

 – Head Count variance reduction

• Once the set up is assigned, update the master

recipe and determine the Head Count (thenumber of operators required for this line in

any period) for a given MPS

©2002 by Ileana Castillo