October 5, 2010 1 REVISED SYSTEM 2A Fort Ord A-Aquifer MODFLOW/MT3DMS Simulations Prelim Results - System 2A - For Discussion Only 1
Feb 22, 2016
October 5, 2010 1
REVISED SYSTEM 2AFort Ord A-Aquifer MODFLOW/MT3DMS Simulations
Prelim Results - System 2A - For Discussion Only 1
October 5, 2010 2
Model Setup• Model layers
– 2 layers within upper sand– 1 layer for silt/clay
• Porosity– Sand layers: 0.25– Silt/clay: 0.35
• MT3DMS Parameters– Advection– Dispersion
• Longitudinal: 0.001• Ratio of transverse to longitudinal: 0.2• Ratio of Vertical to longitudinal: 0.1
– Source/Sinks• Sodium lactate applied via injection wells
Prelim Results - System 2A - For Discussion Only 2
October 5, 2010 3
System 2APrevious Model Schedule
Prelim Results - System 2A - For Discussion Only
Day of Simulation
Sodium Lactate Injection
Injection Wells
Extraction Wells
Notes
0 Start Start Start 196 gpm flow
25 Stop
45 Stop Stop
110 End of Simulation
3
October 5, 2010 4
Injection & Extraction Rates
Prelim Results - System 2A - For Discussion Only 4
-15
28
-17
28
-15 -15
28
-15 -15 -15
28
-13
28
-16 -15
28
-15 -15
28
-15
-6
10.69
-10
10.69
-3 -4
10.69
-4 -4
-10
10.69
-2.6
10.69
-10-6.2
10.69
-5 -4
10.69
-6
-20-15-10
-505
101520253035
140 141 144 137 133 129 134 142 138 135 130 126 128 131 123 125 127 121 122 124
Well ID
Dec-09 Sep-10
October 5, 2010 5
Changes since December 2009Model Runs
Prelim Results - System 2A - For Discussion Only 5
Injection and Extraction Wells indicated by red
symbols
Extraction well rates adjusted
Injection well rates adjusted
Layer elevations and K values updated
October 5, 2010 6
Updated K Zones based on new slug test data
Prelim Results - System 2A - For Discussion Only 6
3 3
0.75 to 9
10
2 to 9.5
Updated K values (ft/day) shown in
yellow
6
October 5, 2010 7
System 2ARevised Schedule
Prelim Results - System 2A - For Discussion Only 7
Day of Simulation
Sodium Lactate Injection
Injection Wells
Extraction Wells
Notes
0 Start Start Start 74.83 gpm flow
60 Stop
85 Stop Stop
110 End of Simulation
October 5, 2010 8
11 days
Prelim Results - System 2A - For Discussion Only 8
October 5, 2010 9
28 days
Prelim Results - System 2A - For Discussion Only 9
October 5, 2010 10
60 days Last day of substrate injection
Prelim Results - System 2A - For Discussion Only 10
October 5, 2010 11
70 days10 Days of Recirculation
Prelim Results - System 2A - For Discussion Only 11
October 5, 2010 12
88 days3 days post recirculation
Prelim Results - System 2A - For Discussion Only 12
October 5, 2010 13
110 days25 days post recirculation
Prelim Results - System 2A - For Discussion Only 13