Top Banner
Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation & Earthworks 1 Cutting down trees and removal from site nr 2,350.00 3,172.50 2 Cutting down Shrubs & undergrowth and remove from site sm 65.00 87.75 3 Excavate top soil av. 150mm deep & rem. From site cm 139.00 188 4 Excavate trench for foundation/column pit n.e 1.00m deep 447.92 605 5 Excavate trench for foundation/column pit n.e 2.0m deep " 537.50 726 6 Return fill and ram selected excavated material aroun foundation. " 268.75 363 7 Level and compact bottom of excavations sm 134.38 181 8 Remove selected excavated material from site cm 167.97 227 9 Approved Laterite filling from local borrow pit cm 2,162.50 2,919 10 Imported Laterite filling from Approved borrow pit cm 2,443.90 3,299 11 Add haulage CM/km for Ditto cm/km 45.00 45 12 Approved Hardcore/rock filling cm 1,740.40 2,350 13 Add haulage CM/km cm/km 45 14 Dieldrex sm 67.19 91 Page 1 price bank -1
44

RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Apr 30, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

RATES SUMMARY Direct Contract rateITEMS UNIT Labour

Site clearance/Excavation & Earthworks1 Cutting down trees and removal from site nr 2,350.00 3,172.50

2

Cutting down Shrubs & undergrowth and

remove from site sm 65.00 87.75

3

Excavate top soil av. 150mm deep & rem. From

site cm 139.00 188

4

Excavate trench for foundation/column pit n.e

1.00m deep 447.92 605

5

Excavate trench for foundation/column pit n.e

2.0m deep " 537.50 726

6

Return fill and ram selected excavated material

aroun foundation. " 268.75 363

7 Level and compact bottom of excavations sm 134.38 181

8 Remove selected excavated material from site cm 167.97 227

9 Approved Laterite filling from local borrow pit cm 2,162.50 2,919

10

Imported Laterite filling from Approved borrow

pit cm 2,443.90 3,299

11 Add haulage CM/km for Ditto cm/km 45.00 45

12 Approved Hardcore/rock filling cm 1,740.40 2,350

13 Add haulage CM/km cm/km 45

14 Dieldrex sm 67.19 91

Page 1 price bank -1

Page 2: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Concrete Works

15

Plain insitu concrete (1:10/20mm aggregates) in

blinding cm 13,305.83 17,963

16

Plain insitu concrete (1:3:6/40mm aggregates) in

foundation trench " 18,348.83 24,771

17

Reinforced insitu concrete (1:2:4/20mm

aggregates) in columns etc. " 23,620.43 31,888

18 Mild steel ton 192,600.00 260,010

19 High yield steel " 135,100.00 182,385

BRC fabric reinforcement

20 Ref. No. A.142 Weighing 2.22kg/sm sm 327.73 442

21 Ref. No. A.193 Weighing 3.022kg/sm sm 502.53 678

22 Sawn formwork/earth work support " 1,304.50 1,761

Block work

23

230mm sandcrete hollow blocks filled solid with

plain insitu concrete sm 4,081.23 5,510 (1:2:4/20mm aggregates)

24 150mm ditto " 3,322.13 4,485 -

25

230mm sandcrete hollow blocks in cement

mortar (1:6) " 2,376.86 3,209

26 150mm ditto " 2,188.00 2,954

27

100mm Screen bricks walling in cement

mortar(1:6) " 3,050.00 4,118

28 225mm Damp proof course " 350.00 473

29 Ditto 150mm " 300.00 405

Page 2 price bank -1

Page 3: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

ROOF COVERING

1

38 guage corrugated zinc roofing

sheets(1800mm long) " 615.39 831

2 35 guage ditto " 600.00 810

3 28 guage ditto(2400mm long) " 700.11 945

4 Extra-over ditto ridge cap 266.61 360

5

Industrial - 5 corrugated plain galvanised iron

roofing sheets(effective). sm 618.53 835

6

Industrial - 5 corrugated coloured galvanised

iron roofing sheets(effective). " 635.00 857

7

Nigerite super seven corrugated asbestos

cement roofing sheets size1800x1095 " 1,115.00 1,505

9 Extra-over ditto ridge cap 734.61 992

10

Three layers of approved bituminous felt

finished with bright alu paint (115)

Coloured long span Aluminium11 0.90mm sm

12 0.70mm " 2,740.00 3,699

13 0.55mm " 2,060.00 2,781

14 0.45mm " 1,800.00 2,430

15 0.40mm " 1,595.00 2,153

16 0.35mm " 1,480.00 1,998

17 0.45mm ridge cap (450mmlong) 855.85 1,155

18 Ditto valley gutter 855.85 1,155

14 Ditto eave flashing 285.18 385

Coloured long span Aluminium(tiles and crimps)

Page 3 price bank -1

Page 4: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

15 0.90mm

16 0.70mm " 3,000.00 4,050

17 0.55mm " 2,350.00 3,173

18 0.45mm " 2,050.00 2,768

19 0.40mm " 1,905.00 2,572

20 0.35mm " 1,785.00 2,410

21 0.45mm ridge cap (450mmlong) 1,222.22 1,650

22 Ditto valley gutter 1,222.22 1,650

Stucco longspan Alluminium23 0.90mm

24 0.70mm " 2,325.00 3,139

25 0.55mm " 1,945.00 2,626

26 0.50mm " 1,840.00 2,484

27 0.45mm " 1,620.00 2,187

28 0.40mm " 1,525.00 2,059

29 0.45mm ridge cap (450mmlong) 778.84 1,051

30 Ditto valley gutter 778.84 1,051

31 Ditto eave flashing 183.70 248

Stucco longspan Alluminium (tiles and crimps)32 0.70mm " 2,510.00 3,389

33 0.55mm " 2,100.00 2,835

34 0.50mm " 1,995.00 2,693

35 0.45mm " 1,850.00 2,498

36 0.40mm " 1,720.00 2,322

Page 4 price bank -1

Page 5: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

37 0.45mm ridge cap (450mmlong) 978.51 1,321

38 Ditto valley gutter 978.51 1,321

Coloured longspan Aluzinc39 0.55mm " 1,825.00 2,464

40 0.45mm " 1,720.00 2,322

41 0.35mm " 1,570.00 2,120

42 0.30mm " 1,500.00 2,025

43 0.45mm ridge cap (450mmlong) 555.55 750

44 Ditto valley gutter 555.55 750

45 Ditto eave flashing 181.48 245

Coloured longspan Aluzinc(tiles and crimps)46 0.55mm " 2,030.00 2,741

47 0.45mm " 1,935.00 2,612

48 0.35mm " 1,780.00 2,403

49 0.30mm " 1,750.00 2,363

50 0.45mm ridge cap (450mmlong) 555.55 749.99

51 Ditto valley gutter 555.55 749.99

52 Ditto eave flashing 181.48 245.00

53 Stone Coated roofing Sheets(Shingles) China " 2,513.97 3,394

54 Ditto Shake 2,513.97 3,394

55 Ditto Bond 2,901.85 3,917

56 Ditto Classic 2,322.96 3,136

57 Ditto Netherland 2,719.62 3,671

58 Ditto Shake 2,719.62 3,671

59 Ditto Bond 2,624.30 3,543

Page 5 price bank -1

Page 6: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

60 Ditto Classic 2,576.25 3,477.94

61 Ditto ridge cap 1,050.06 1,418

62 Ditto Berge board 1,050.06 1,418

63 Ditto Facia 1,050.60 1,418

Sawn treated hard wood cacassing (DOKA,ASHWALE,IRE)

1 50x50mm m 215.00 290

2 50x75mm " 235.00 317

3 50x100mm " 300.00 405

4 50x150mm " 425.00 574

5 25x300mm Facia board " 540.00 729

Sawn treated hard wood cacassing (MAHOGANY,

APARA)

6 50x75mm " 289.38 391

7 50x100mm " 381.54 515

8 50x150mm " 526.71 711

STRUCTURAL STEEL WORKS

1

Stanchion base constructed with 20mm

diameter rod 11,694.45 15,788 -

2 Ditto with 16mm rod 9,884.50 13,344 -

3 12mm thick base plate ( 350mm x 350mm ) 3,490.42 4,712 -

4 Ditto 300mm x 300mm 2,903.91 3,920 -

5 10mm thick base plate ( 350mm x 350mm ) 2,900.73 3,916 -

6 Ditto 300mm x 300mm 2,805.46 3,787 -

7

Universal beam " T " section 457mm x 191mm x

82kg/m 237.20 320 -

Page 6 price bank -1

Page 7: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

8 Ditto 406mm x 178mm x 60kg/m 280.36 378 -

9 Ditto 356mm x 171mm x 45kg/m 318.60 430 -

10 Ditto 306mm x 165mm x 46kg/m 252.81 341 -

11 Ditto 254mm x 146mm x 37kg/m 216.88 293 -

12 Ditto 203mm x 133mm x 30kg/m 237.80 321 -

13

Universal columns " H " section 305mm x

305mm x 158kg/m 367.62 496

14 Ditto 254mm x 254mm x 107kg/m 174.68 236 -

15 Ditto 203mm x 203mm x 60kg/m 197.80 267

16 Ditto 152mm x 152mm x 30kg/m 233.91 316 -

17 150mm x 150mm x 1.5mm Z.- purlin 1,193.36 1,611 -

18 Ditto 1.20mm thick. 991.68 1,339 -

19 Ditto 1.0mm thick 918.36 1,240 -

20

120mm x 120mm x 8mm thick Equal Angle

Rafter/purlin 965.99 1,304 -

21 Ditto 100mm x 100mm x 8mm Thick 667.94 902 -

22 Ditto 90mm x 90mm x 8mm Thick 513.22 693 -

23 Ditto 90mm x 90mm x 6mm Thick 455.74 615 -

24 Ditto 75mm x 75mm x 6mm Thick 347.90 470 -

25 Ditto 75mm x 75mm x 5mm Thick 297.88 402 -

26 Ditto 60mm x 60mm x 6mm Thick 300.47 406 -

27 Ditto 60mm x 60mm x 5mm Thick 243.14 328 -

28 Ditto 50mm x 50mm x 6mm Thick 294.82 398 -

29 Ditto 50mm x 50mm x 5mm Thick 230.94 312 -

Page 7 price bank -1

Page 8: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

30

100mm x 100mm x 8mm thick ( 300mm long

Cleat ) 1,330.86 1,797 -

31 Ditto 90mm x 90mm x 8mm Thick 1,135.00 1,532 -

32 Ditto 90mm x 90mm x 6mm Thick 1,075.54 1,452 -

33 Ditto 75mm x 75mm x 6mm Thick 878.36 1,186 -

34 Ditto 75mm x 75mm x 5mm Thick 706.34 954 -

35 Ditto 60mm x 60mm x 6mm Thick 643.71 869 -

36 Ditto 60mm x 60mm x 5mm Thick 515.45 696 -

37 Ditto 50mm x 50mm x 6mm Thick 572.76 773 -

38 Ditto 50mm x 50mm x 5mm Thick 439.90 594 -

39 560mm x 380mm x 6mm Gusset Plate 1,504.53 2,031 -

40 310mm x 160mm x 6mm thick Parking 377.80 510 -

41 18mm diameter holding down bolt and nut 63.70 86 -

42 15mm diameter ditto 46.57 63 -

43 12mm diameter ditto 42.85 58

Page 8 price bank -1

Page 9: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Wooden doors

1

44mm semi- solid cored flush door plywood

faced nr 5,555.55 7,500

2 ditto but formica faced " 5,874.81 7,931

3 44mm solid flush door plywood faced " 20,097.77 27,132

4 Ditto but imported " 25,900.00 34,965 -

5 Panel door 900mm x 2100mm 22,680.00 30,618 -

6 Ditto 1200mm x 2100mm 28,396.29 38,335 -

7 Ditto 750mm x 2100mm 20,575.93 27,778

8 Bullet proof door complete 900mm x 2100mm 97,777.77 132,000 -

9 Ditto 1200mm x 2100mm 151,851.85 205,000 -

10 Fadex lock set (italy) 2,666.66 3,600 -

11 Cylinder lock set (medium size) 1,074.07 1,450 -

12 Cylinder lock set (large size) 1,611.11 2,175 -

13 Door frame 33mm Diameter 2,755.55 3,720 -

14 Ditto 30mm Diameter 2,059.25 2,780 -

Steel doors -

1 Steel gate size 3900mm x 2100mm high (plain) 101,851.85 137,500 -

2 Ditto Garage door size 3400mm x 2100mm 72,592.59 98,000 -

3 Ditto size 3900mm x 2100mm (charka) 77,777.77 105,000 -

4 Ditto Garage door size 3400mm x 2100mm 88,148.15 119,000 -

5 Roller shutter door 51,333.33 69,300 -

6 Charka Steel door 1500mm x 2100mm 44,148.14 59,600 -

7 Ditto 1200mm x 2100mm 35,703.70 48,200

Page 9 price bank -1

Page 10: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

- 8 Ditto 900mm x 2100mm 23,703.70 32,000

- 9 Ditto 750mm x 2100mm 23,703.70 32,000

- 10 Steel Tropical door size 900mm x 2100mm 15,500.00 20,925

-

11

Crittal-hope steel door with clear glass size

900x2100mm high. 13,031.11 17,592 -

12 Ditto 1200mm x 2100mm 15,740.74 21,250 -

13

Ornamental chinese metal door 1500mm x

2100mm 68,148.15 92,000 -

14 Ditto 1200mm x 2100mm 52,592.59 71,000 -

15 Ditto 900mm x 2100mm 25,555.55 34,500 -

16 Ditto Turkish made size 1500mm x 2100mm 224,444.44 303,000 -

17 Ditto 1200mm x 2100mm 157,037.03 212,000 -

18 Ditto 900mm x 2100mm 93,333.33 126,000

Aluminum Doors

1

Swinging doors Size 1800mm x2100mm

(standard profile) 294,814.81 398,000 "

2 Ditto Size 1500mm x 2100mm high. 247,407.40 334,000 "

3 Ditto Size 1200mm x 2100mm high. 213,333.33 288,000 "

4 Ditto hinged Size 900mm x 2100mm high. 64,444.44 87,000 "

5

Swinging doors Size 1800mm x2100mm

(economy profile) 151,851.85 205,000 "

6 Ditto Size 1500mm x 2100mm high. 127,407.40 172,000 "

7 Ditto Size 1200mm x 2100mm high. 106,666.66 144,000 "

Ditto hinged Size 900mm x 2100mm high. 49,629.62 67,000 -

9

Sliding doors Size 2400mm x2100mm (standard

profile) 296,888.88 400,800 -

Page 10 price bank -1

Page 11: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

10 Ditto Size 1800mm x 2100mm high. 152,888.88 206,400 -

11 Ditto Size 1500mm x 2100mm high. 127,407.40 172,000 -

12

Sliding door Size 2400mm x 2100mm

high(economy profile). 52,148.14 70,400 -

13 Ditto Size 1800mm x2100mm. 39,111.11 52,800 -

14 Ditto Size 1500mm x 1500mm high. 32,592.59 44,000

Metal Windows

1

Crittal-hope window with clear sheet glass size

1200x1200mm high. 8,462.96 11,425 "

2 Ditto size 900mm x 1200mm 6,970.37 9,410 "

3 Ditto size 900mm x 600mm 6,377.77 8,610 "

4 Ditto size 600mm x 600mm 3,422.22 4,620 "

5 Ditto size 600mm x 300mm 2,177.77 2,940 "

6 Tropical steel door size 1200mm x 2100mm high. 10,740.74 14,500

7 Ditto size 900mm x 1200mm 6,962.96 9,400 "

8

Naco- MK-11,152mm steel louvre carrier set of 4-

blades single control 534.22 721

9 Ditto 6-blades single control 749.62 1,012 "

10

Naco- MK-11,152mm steel louvre carrier set of 8-

blades double control 992.29 1,340 "

11 150mm thick plain louver glass size 900mm 259.25 350 "

12 Ditto Size 600mm. 222.22 300

13 Plain glass to metal sashes with linsed oil putty sm 1,270.37 1,715

Page 11 price bank -1

Page 12: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Aluminum Casement Windows (medium) 25,450.00 34,358

1

Size 1800mm x1800mm high including insect/fly

screen net nr 37,500.00 50,625 "

2 Ditto size 1800x1500mm high. 31,250.37 42,188 "

3 Ditto size 1500x1500mm high. 26,041.48 35,156 "

4 Ditto size 1500x1200mm high. 20,833.33 28,125 "

5 Ditto size 1200x1200mm high. 16,666.66 22,500 "

6 Ditto size 900x600mm high. 6,296.29 8,500 "

Ditto size 600x600mm high. 4,296.29 5,800

Aluminum Sliding windows (including insect/fly

screen net)

1

Aluminum Sliding windows size 2400 x 1200mm

(standard profile) nr 33,928.14 45,803

2 1800x1200mm high. " 25,245.18 34,081

3 1500x1200mm high. " 23,232.59 31,364

4 1200x1200mm high. " 17,462.96 23,575

5 900x1200mm high. " 13,108.14 17,696

6 900x900mm high. " 7,839.25 10,583

7 600x600mm high. " 5,949.62 8,032

8

Aluminum Sliding windows size 2400 x 1200mm

(Tower profile) nr 23,974.07 32,365

9 1800x1200mm high. " 18,465.18 24,928

10 1500x1200mm high. " 17,208.88 23,232

11 1200x1200mm high. " 16,296.29 22,000

12 900x1200mm high. " 9,749.62 13,162

13 900x900mm high. " 6,958.51 9,394

14 600x600mm high. " 5,046.66 6,813

Page 12 price bank -1

Page 13: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

15

Aluminum Sliding windows size 2400 x 1200mm

(Economy profile) nr 17,574.07 23,725

16 1800x1200mm high. " 15,048.14 20,315

17 1500x1200mm high. " 12,829.62 17,320

18 1200x1200mm high. " 10,901.48 14,717

19 900x1200mm high. " 8,888.88 12,000

20 900x900mm high. " 8,077.77 10,905

21 600x600mm high. " 5,046.66 6,813

Aluminum Projected Windows1 1200x1200mm high. " 12,962.96 17,500

2 900x1200mm high. " 10,851.85 14,650

3 900x600mm high. " 5,037.03 6,800

4 600x600mm high. " 3,555.55 4,800

1

Approved designed pattern squre pipe(25mm x

25mm) burglar proof ms 4,523.70 6,107

Ditto made of 12-16mm mild steel rod " 4,234.81 5,717 FLOOR FINISHES

1 50mm thick (1:3) floor paving 1,682.53 2,271 -

2 48mm thick bed (1:3) 1,569.16 2,118 -

3 Ditto 44mm thick 1,465.27 1,978 -

4 Ditto 38mm thick 1,288.47 1,739 -

5 Ditto 25mm thick 821.30 1,109 -

6 Ditto 13mm thick 467.48 631 -

7 25mm thick terrazor paving 2,142.59 2,893

8 300mm x 300mm vitrified tile (Italy) 1,746.18 2,357-

9 300mm x 300mm vitrified tile (China) 1,539.87 2,079

Page 13 price bank -1

Page 14: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

- 19 400mm x 400mm vitrified tile (China) 1,289.27 1,741

- 11 400mm x 400mm vitrified tile (Italy) 1,666.34 2,250

- 12 300mm x 600mm Porcelain tile (China) 2,057.33 2,777

- 13 300mm x 600mm Porcelain tile (spain) 2,862.57 3,864

- 14 300mm x 600mm Porcelain tile (Italy) 2,578.36 3,481

- 15 600mm x 600mm Porcelain tile (China) 2,414.58 3,260

- 16 600mm x 600mm Porcelain tile (India) 3,050.44 4,118

- 17 500mm x 500mm Floor tile (spain) 2,051.48 2,770

- 18 400mm x 400mm Floor tile (spain) 2,063.76 2,786

- 19 300mm x 300mm Floor tile (spain) 2,042.90 2,758

- 20 600mm x 600mm verony tile (spain) 2,805.84 3,788

- 21 500mm x 500mm verony tile (China) 2,478.36 3,346

- 22 400mm x 400mm verony tile (China) 1,634.13 2,206

- 23 300mm x 600mm verony tile (China) 2,132.64 2,879

- 24 300mm x 300mm verony tile (China) 1,932.63 2,609

- 25 300mm x 300mm ceramics tile (Nigeria) 1,639.44 2,213

- 26 400mm x 400mm ceramics tile (Nigeria) " 1,668.38 2,252

-

27400mm x 400mm Royal ceramics tile (Nigeria)

1,481.71 2,000 -

28300mm x 500mm Royal ceramics tile (Nigeria)

" 2,115.61 2,856 -

29200mm x 300mm Royal ceramics tile (Nigeria)

1,833.90 2,476 -

30200mm x 200mm Royal ceramics tile (Nigeria)

" 1,935.17 2,612 -

Page 14 price bank -1

Page 15: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

31 300mm x 600mm Roserbeter granite (China) 4,017.54 5,424 -

32 300mm x 600mm Roserbeter granite (India) 4,702.41 6,348 -

33 300mm x 600mm Roserbeter granite (Italy) " 8,107.48 10,945 -

34 300mm x 600mm Blue perl granite (China) 6,526.51 8,811 -

35 300mm x 600mm Blue perl granite (India) 7,399.14 9,989 -

36 300mm x 600mm Blue perl granite (Italy) " 16,469.65 22,234 -

37 300mm x 600mm Tiger skin granite (China) 4,864.49 6,567 -

38 300mm x 600mm Tiger skin granite (India) 6,539.76 8,829 -

39 300mm x 600mm Tiger skin granite (Italy) " 10,411.76 14,056 -

40 300mm x 600mm White granite (Italy) 8,614.16 11,629 -

41 600mm x 600mm White granite (Italy) sm 9,189.64 12,406 -

42 300mm x 600mm Nult granite (Italy) 6,941.39 9,371 -

43 300mm x 300mm PVC plain (Italy) " 957.18 1,292 -

44 300mm x 300mm PVC design 990.64 1,337 -

45600mmthick coloured design Pala Diana marble

" 13,878.70 18,736 -

46600mm thick coloured design Pala Diana marble

7,306.48 9,864 -

47 600mm thick Plain Pala Diana marble " 6,295.37 8,499

Page 15 price bank -1

Page 16: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

WALL FINISHINGS1 15 mm thick rendering/plaster(1:4) 502.22 678

- 2 13 mm thick ditto 467.41 631

- 3 Terrolin Finish 602.96 814

- 4 300 x 150 mm unglazed floor tiles 1,982.96 2,677

- 5 Cladding to wall finish 1,370.37 1,850

CEILING FINISHINGS1 P.V.C / plastic ceiling 1,635.56 2,208

- 2 Celotex ceiling 1,660.74 2,242

- 3 Ditto (Italy/France) 3,277.78 4,425

- 4 Asbestos ceiling board 671.11 906

- 5 Hardboard ceiling (Brazil) 912.59 1,232

- 6 Ditto [Poland] 798.52 1,078

-

7Suspended ceiling board with and including

Aluminum railings 2,593.33 3,501 -

8 Acoustic ditto 1,852.59 2,501 -

9 P.O.P suspended ceiling 3,380.00 4,563 -

PAINTING AND DECORATION -

13 coats emulsion paint on general surfaces

(Dulux or High quality) 388.89 525 -

2 Ditto surfaces not exceeding 300mm girth 114.81 155 -

33 coats of emulsion paint on general surfaces

(Mayer or Medium quality) 266.67 360 -

4 Ditto surfaces not exceeding 300mm girth 80.00 108 -

53 coats of emulsion paint on general surfaces

(Others or low quality) 195.56 264 -

6 Ditto surfaces not exceeding 00mm girth 57.78 78 -

Page 16 price bank -1

Page 17: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

7 1 coats Texcote paint (DULUX) 734.07 991 -

8 Ditto surfaces not exceeding 300mmgirth 219.26 296 -

9 1 coats Texcoat paint (MAYER) 409.63 553 -

10 Ditto surfaces not exceeding 300mm girth 114.07 154 -

11 1 coats Texcoat (OTHERS low quality) 291.11 393 -

12 Ditto surfaces not exceeding 300mm girth 91.11 123 -

13 3 coats gloss paint on metal and wood work 471.11 636 -

14 Ditto surfaces not exceeding 300mm girth 134.81 182 -

PLUMBING AND SANITARY FITTINGS -

1

Amitage shanks or equal approved white

vitreous china sitting type water closet

complete with 9 liters cisterninlet connection

plastic seat and cover (IMPORTED)31,259.26 42,200

- 2 Ditto Squatting type complete (IMPORTED) 19,481.48 26,300

3

Wash hand basin complete with chromium

plated cold water mixer and taps, waste outlet,

chain and plastic stay plug 32mmbottle trap

including fixing to mild steel brackets

( IMPORTED ) 21,111.11 28,500

4 Ditto (small complete) ( IMPORTED ) 16,592.59 22,400

5 Water closet complete (medium standard) 10,370.37 14,000

6 Ditto (lower standard) 8,148.15 11,000

7Wash hand basin complete (medium standard)

10,000.00 13,500

8 Ditto small 5,925.93 8,000

9 Bath tub complete with all accessories 27,733.33 37,440

10Jacuzzi bath set standard complete with

accessories 1,259,259.26 1,700,000

Page 17 price bank -1

Page 18: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

11Stainless steel double bowl kitchen sink

complete with taps, stay and brackets 19,703.70 26,600

12 Ditto single bowl complete 13,555.56 18,300

1345 liters capacity water heater complete with

pillar tap waste plucomplete 20,370.37 27,500

14 Toilet roll holder ( IMPORTED )

2,000.00 2,700

156mm tropicalized silver float glass mirror

standard size complete 4,074.07 5,500

16Standard chromiumplated towel rail wiyh wall

flange plug and screw 2,074.07 2,800 -

17 Non recessed soap holder 1,703.70 2,300 -

18 25mm diameter G.I. pipe 729.63 985 -

19 19mm ditto 581.48 785 -

20 13mm ditto 333.33 450 -

21 100mm diameter pvc pipe 251.85 340 -

22 75mm ditto 192.59 260 -

23 50mm ditto 185.19 250 -

34 25mm ditto 137.04 185 -

25 19mm ditto 103.70 140 -

26 13mm ditto 100.00 135

G.I FITTINGS - 1 13mm Elbow 55.56 75

2 Ditto Tee 55.56 75

3 Ditto Union 144.44 195

4 Ditto Nipple 114.81 155

5 Dittio stop cock 777.78 1,050

Page 18 price bank -1

Page 19: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

6 19mm Elbow 77.78 105

7 Ditto Tee 77.78 105

8 Ditto Union 362.96 490

9 Ditto Nipple 177.78 240

10 Dittio stop cock 851.85 1,150

11 25mm Elbow 100.00 135

12 Ditto Tee 100.00 135

13 Ditto Union 407.41 550

14 Ditto Nipple 222.22 300

15 Dittio stop cock 1,000.00 1,350

P.V.C FITTINGS - 1 13mm Elbow 48.15 65

2 Ditto Tee 48.15 65

3 Ditto Union 185.19 250

4 Ditto Nipple 114.81 155

5 Dittio stop cock 740.74 1,000

6 19mm Elbow 55.56 75

7 Ditto Tee 55.56 75

8 Ditto Union 259.26 350

9 Ditto Nipple 177.78 240

10 Dittio stop cock 814.81 1,100

11 25mm Elbow 62.96 85

12 Ditto Tee 62.96 85

13 Ditto Union 281.48 380

Page 19 price bank -1

Page 20: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

14 Ditto Nipple 222.22 300

15 Dittio stop cock 962.96 1,300

16 50mm Elbow 88.89 120

17 Ditto Tee 88.89 120

18 Ditto Union 325.93 440

19 Ditto Nipple 444.44 600

20 Dittio stop cock 925.93 1,250

21 75mm Elbow 96.30 130

22 Ditto Tee 96.30 130

23 Ditto Union 407.41 550

24 Ditto Nipple 814.81 1,100

25 Dittio stop cock 2,814.81 3,800

26 100mm Elbow 103.70 140

27 Ditto Tee 103.70 140

28 Ditto Union 488.89 660

Page 20 price bank -1

Page 21: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

EXTERNAL WORKS

1Approved pre-cast inter locking tileslaid on

quarry fine sand base (Daltrade) 3,592.59 4,850

2 Ditto (Ordinary standard) 2,374.81 3,206

3Precast concrete grade 20kerbs size

450x100x350mm deep laid on concrete base 1,748.15 2,360

4Ditto 450x100x230 deep covered with in-situ

concrete complete 1,602.22 2,163

5Standard soak away pit completeSize 2500

x2500 x 2000 mm deep 281,571.85 380,122

6 Ditto septic tank 2500x1800x2000mm 170,982.96 230,827

7 Ditto man hole size 700 x 700 x600 mm deep 12,214.81 16,490

8Ditto inspection chamber 600 x 600 x 600mm

deep 9,000.74 12,151

……………………………….AHMED ISAH (MNIQS, RQS)

(COMMITTEE SECRETARY)

MUSA A. MAIDUGU…………………………….

(COMMITTEE CHAIRMAN)

Page 21 price bank -1

Page 22: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 22 price bank -1

Page 23: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 23 price bank -1

Page 24: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 24 price bank -1

Page 25: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 25 price bank -1

Page 26: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 26 price bank -1

Page 27: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 27 price bank -1

Page 28: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 28 price bank -1

Page 29: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 29 price bank -1

Page 30: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 30 price bank -1

Page 31: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 31 price bank -1

Page 32: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 32 price bank -1

Page 33: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 33 price bank -1

Page 34: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 34 price bank -1

Page 35: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 35 price bank -1

Page 36: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 36 price bank -1

Page 37: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 37 price bank -1

Page 38: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 38 price bank -1

Page 39: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 39 price bank -1

Page 40: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 40 price bank -1

Page 41: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 41 price bank -1

Page 42: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 42 price bank -1

Page 43: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 43 price bank -1

Page 44: RATES SUMMARY Direct Contract rate ITEMS UNIT Labour rate computation 2015.… · Basic rate computation RATES SUMMARY Direct Contract rate ITEMS UNIT Labour Site clearance/Excavation

Basic rate computation

Page 44 price bank -1