    Introduction and Key Business Drivers for CTB

  • 7/27/2019 Raghu SAPPHIRE Presentation - 2010

    3/17

  • 7/27/2019 Raghu SAPPHIRE Presentation - 2010

    4/17

    Company Confidential

    Need to ramp up / down to match changing market demand

    4

    Extended Supply Chains

    Implications

    Longer lead times

    Coordinate across

    continents Supplier networks may

    not be able to ramp up

    instantaneously to

    changing Demand

    Pin point exact root

    cause for fulfillment

    issues not easy

    Fluctuating Demand

    Implications

    Difficult to see to what extent

    Customer Demand can be

    fulfilled No easy tool to simulate

    supply plans in an

    outsourced manufacturing

    scenario

    Not sure of which critical

    component need urgent

    attention

    Extending supply chains aimed at reducing costs and to penetrate new markets has resulted in complex

    Supply Networks and reduced agility to match demand swings

  • 7/27/2019 Raghu SAPPHIRE Presentation - 2010

    5/17

    Company Confidential

    S&OP Capabilities - High-Tech Industry Concerns

    5

    Significant gaps in determining trade-offs in Supply chain and Implications of

    a constrained supply plan

  • 7/27/2019 Raghu SAPPHIRE Presentation - 2010

    6/17

    Company Confidential

    Performance Metrics Sample High Tech Company

    Gap to Average

    Gap to Q1

    Potential Benefits:

    Value of Closing the Gap to Peer Group P1

    Performance Results Key Metrics

    Key Observations

    Company could do better demand supply match , material availability management . This would reduce out of stock situations and improve CFR

    On the efficiency front, automating key processes through supplier collaboration may help optimize the FTE allocation and reduce procurement function cost

    Effectiveness

    Efficiency

    (n= 20) (n= 87)

    Efficiency: FTE Saving per billion of total spend

    (in millions)

    First QuartileBetween Average and First QuartileBelow Average OutlierRanking:

    Note: Color commentary based on the Peer Group P1 benchmarks unless benchmarks are not available for Peer P1* Indicates benchmarks not available due to inadequate number of data points for given KPI

    Type Metric Company

    Peer Group P1 Peer Group P2

    Avg. Q1 Avg. Q1

    % Customer Fulfillment Rate Direct 88.0 90.8 96.1 88.2 93.4

    % of Spend Managed

    Strategically

    Direct 70.0 76.2 98.3 68.5 92.9

    Indirect 25.0 32.4 60.0 48.9 77.9

    Services 80.0 42.6 78.6 48.0 82.8

    % of Maverick Spend

    Direct 5.0 4.9 1.1 8.6 1.5

    Indirect 10.0 12.9 1.6 15.5 2.9

    Services 10.0 9.9 3.6 13.4 2.8

    % Spend Sourced via e-

    Auctions

    Direct 15.0 14.5 56.7 6.3 25.4

    Indirect 5.0 6.0 16.7 8.3 33.7

    Services 50.0 * * 6.9 28.3

    FTEs per Billion of Total Spend (Overall) 208.3 147.7 62.1 113.9 34.5

    % of Time Spent on Transactional Activities 40.0 52.6 34.1 54.7 30.3Efficie

    ncy

    Effectiveness

    Effectiveness: CFR Revenue Impact (% increase)

    14.6

    6.1

    8.1

    2.8

    Source -SAP

    Value Engineering

  • 7/27/2019 Raghu SAPPHIRE Presentation - 2010

    7/17

    Company Confidential

    Solution Features

  • 7/27/2019 Raghu SAPPHIRE Presentation - 2010

    8/17

    Company Confidential

    Brand owner

    Ramping up Demand seen in the next few months,

    Can I build to fulfill Demand ?

    A dashboard on Customer demand fulfillment possibilities

    Clear to Build Dashboard Know your Fulfillment Capability

    Components Supplied to

    Manufacturers for Finished

    Goods

    Assembly sites in

    an outsourced

    location

    Need feedback on ability to scale up to

    Demand

  • 7/27/2019 Raghu SAPPHIRE Presentation - 2010

    9/17

    Company Confidential

    Clear to Build Dashboard To what extent can I fulfill

    Dashboard to provide visibility of

    demand versus committed supply

    across entire supply network with

    quickMRP simulation facility

    Quick information on impact of

    demand variation on supply capability

    of CMs/ Suppliers

    Leverage SAP APO CTM engine for

    material constrained planning and

    availability check (MRP Simulation)

    Leverage SAP SNC for component

    stock availability at CM / Supplier

    location

    Detailed visibility of constrained

    components represented

    geographically

    Available in xCelsius and WebDynpro

    formats

    Know your capability to fulfill

    demand in the future

  • 7/27/2019 Raghu SAPPHIRE Presentation - 2010

    10/17

    Company Confidential

    Product Architecture

    ECC

    GUI

    Clear to Build Solution

    Stock

    SNC

    Supply Network Inventory

    Leverages SAPs Supplier Network Collaboration solution

    to view component inventory at CM location

    Integration to SAP APO for running SNP

    simulations

    APO

    Advanced Planning andOptimization

    BOM Demand

    CTM Engine

    Receipts

  • 7/27/2019 Raghu SAPPHIRE Presentation - 2010

    11/17

    Company Confidential

    Understand Current Demand Supply Match

    Double click location product to

    simulate demand change in nextscreen

    Review and Forecast

    and Can- Build data

    Enter Selections

    and select Go

  • 7/27/2019 Raghu SAPPHIRE Presentation - 2010

    12/17

    Company Confidential

    Simulate Quick MRP with revised Demand Data

    1. Modify Demand

    2. Confirm and simulate

    quick CTM results

    Output

  • 7/27/2019 Raghu SAPPHIRE Presentation - 2010

    13/17

  • 7/27/2019 Raghu SAPPHIRE Presentation - 2010

    14/17

  • 7/27/2019 Raghu SAPPHIRE Presentation - 2010

    15/17

    Company Confidential

    Key Benefits of the CTB Solution

    Capability Benefits

    Manage ability to fulfill

    Demand

    Measure ability to fulfill demand of different Finished

    Goods

    Simulate Demand SwingsSimulate the ability to fulfill Demand for Finished Goods

    in the future with different ramp up scenarios.

    Minimize future SC glitchesView potential glitches in the SC Demand ramp up

    capability.

    Reduce lost opportunitiesand stock out penalties

    Reduce possible penalties due to stock outs.

  • 7/27/2019 Raghu SAPPHIRE Presentation - 2010

    16/17

    Company Confidential

    Deployment Road Map

  • 7/27/2019 Raghu SAPPHIRE Presentation - 2010

    17/17

    Company Confidential

    4 Step Approach for Solution Deployment

    Step 1

    Step 2

    Step 3

    Step 4

    Expert Virtual Roundtable : Initial conference with customer tounderstand Network visibility and available to promise needs, current

    landscape and challenges

    Complementary Value Assessment Workshop: Consulting offer toassess a) Inventory process and Functions (b) Potential Immediate cost savings

    opportunities (c) Solution options (d) Cost benefit analysis

    Proof of Concept : Configure Clear to Build Dashboard Solution in Patnissand box system using customer data & scenarios. Review & Signoff of

    detailed deployment road map

    Value Based Implementation: Key features include fixed price DeploymentContract, SCM solution and Integrated Capable to Build