No communications power
supply shall be mounted on
Poles except by permission of
Ut1hty.
Licensee's Attachments on Utility Poles, including metal
attachment clamps and bolts, metal cross arm supports, bolts and
other equipment, must be attached so as to n1aintain the minin1um
separations specified in the
NESC and in these drawings
and specifications.
Street light
NOTES·
Tran sf or mer
f 20" min.
(table 238-2)
12'' Min. at pole
+
C
T o secondary neutral
40" min. or 40" plus 0.4" per kV over 8.7 kV
(table 235-5)
f
~ Upper communication equipment attachment
1. Refer to the attached Utility Construction Standards. or
obtain the applicable construction standards from Utility in
accordance with the affected Utility's requirements .
2. Apply the Utility Construction Standards in coord111ation of
the applicable NESC. NEC or State Statute code requirements.
3. See Drawing 02 for additional notes.
- ....____ Telephone line or communication equipment at lowest
level
Contact Utility for 480 volt installations
A Revised 9/6/0.2
POLE ATTACHMENTS.
OVERHEAD MINIMUM CLEARANCES
Drawing is NOT to scale A-01
-
40" min. or
40" plus 0.4"
per kV over 8 .7 kV
(table 238-1 )
Common Assigned
space
Common space
[] []
I []
40" min.
12" min. at pole
Licensee line or equipment
Lowest possible attachment point--~-~-~
Ground level
Underground electric riser
f 40" n1in.
NOTES
1. Separation between ve1tical runs and any metal ' ' parts or
through bolts of power or communication 'L --'I' equipment shall be
at least 2" in any direction. Bolts
shall have less than 2" exposed thread.
2 . No communications power supply shall be mounted on poles
except by permission of Utility.
3 . The above clearances may have to be increased to a llow for
code clearance requirement in mid span.
4. Licensee's Attachments on Utility" poles, including metal
attachment clamps and bolts, metal cross arm supports. bolts and
other equipment , must be attached so as to maintain the minimum
separations SJ)ecified in the N ESC and in these drawings and
specifications.
Revised 9i6/02
POLE ATTACHMENTS
OVERHEAD MINIMUM CLEARANCES
Drawing is NOT to scale A-02
-
Staples
Communication
ground wire.
(See dwg. 84)
- vertical ground
wire 12"
min.
CATV
Note 1 Tele.
Note 4
Communication pedestal
No communications power supply shall be mounted on Poles except
by permission of Utility.
Licensee's Attachments on Utility Poles, including metal
attachment clamps and bolts, metal cross arm supports, bolts and
other equipment. must be attached so as to maintain the minimum
separations specified in the NESC and in these drawings and
specifications.
See Drav.'ing #5
NOTES·
1. Licensee shall bond to Utility pole ground wherever Utility
has a down ground on the pole. If the ground is under the metal
U-guard, contact Utility to make the ground connection.
2. If no pole ground exists install a pole clown ground on the
pole. Protect the pole ground with a ground wire moulding. Top of
ground rod shall be at least 6 inches below grade.
3. Bond wire shall be #6 bare copper or larger. If bond wire is
unsuppo1ted for more than 12" long, staple to pole.
4. lNhen communication's are underground. the power is overhead
and it is required that the communications ground be interconnected
to the power supply ground. the connection shall be made below
grade.
5. In no case shall Licensee ground be connected to
guys/anchors.
6. If a neutral isolation device is installed on this pole the
attacher must contact Utility for special grounding
instructions.
7. Licensee's messenger cable shall be bonded to Utility's pole
ground wire at each pole that has a ground wire .
A Revised 9/6/02
POLE ATTACHMENTS
GROUNDING CONNECTIONS
Drawing is NOT to scale A-03
-
--
(See note 6)
Supply or neutral conduc tor
12" min. at pole Guy attachment ~
Communication line or equipment
Guy insulator
Guy attachment
[}
To anchor
Staples
Insulated Guy Option To anchor
Contact Utility to determine if guys are to be insulated or
grounded. Grounded Guy Option
NOTES:
1. Licensee shall be responsible for procuring and installing
all anchors and guy wires to support the additional stress placed
on Utili ty's poles oy Licensee's Attachments.
2. Anchors and guy wires must be set on each Utility pole where
there is a turn or angle and on all dead-end Utility poles.
3. Licensee may not place guy wires on the anchors of Utility or
Third Party User w ithout prior written consent of all attaching
entities and anchor owners.
4. No Attachment may be installed on a Utility pole until all
required guys and ancho rs are installed. nor may any Attachment be
modified or relocated in such a way as w ill materially increase
the stress or loading on Utility poles until all required guys and
anchors are installed .
5. Licensee's down guys shall not be bonded to ground or neutral
wires of Utility's pole and shall not provide a current path to
ground from the pole ground or power system neutral. If permitted
or required by the Utility. grounded guys should be installed.
6. On jointly used structures, guvs that pass within 12" of
supply conductors. and also pass within 12" of communication
cables, shall be protected with a suitable insulating covering
where the guy passes the supply conductors, unless the guy is
effectively grounded or insulated with a stra111 insulator at a
point below the lowest supply conductor and above the highest
communication cable .
No communications power supply shall be mounted on poles except
by permission of Utility.
Licensee's Attachments on Utility Poles, including metal
attachment clamps and bolts, metal cross arm supports, bolts and
other equipment. must be attached so as to maintain the minimum
separations specified in the NESC and in these drawings and
specifications.
Revised 9/6/02
-
POLE ATTACHMENTS
GUY WIRE REQUIREMENTS
Drawing is NOT to scale A-04
-
1201240 V secondary
40" min.
Licensee's cable
Note 3
Maximun1 6" n1ax. 30" Note 5Note 9 -+-Ito+
Note 4
Comm. povler supply
Minimum 10'
Note 8
6' NOTES
Must have nonmetallic cover 1. This installation shall comply
with all applicable electrical over ground ,.vire. codes and state,
city, village, town, and Utility requirements.
2. Service entrance conductors shall extend 30" beyond
weatherhead and have 600 volt rated insulation.
3. Communication power supply cable.
4. Communication power supply.
5. 6" maximum between service entrance conduit and
communications cable, if possible.
6. Grounding shall be in accordance with National Electric Code
article 250. Top of rod to be 6" below grade.
7...Location of all Licensee equipment is to be approved by
Ut1hty and shall be relocated by Licensee if incorrect.
8. Proof of compliance shall be appropriately certified. Install
chsconnect and overcurrent protection with meter.
9. All risers on poles w ill be placed in rigid steel or
aluminum metallic conduit on the quarter faces of the pole.
10. This serv ice detail applies to all commercial users
requiring power for pole mounted devices.
No communications power supply shall be mounted on poles except
by permission of Utility.
Licensee's Attachments on Utility Poles, including metal
attachment clamps and bolts, metal cross arm supports, bolts and
other equipment, must be attached so as to maintain the minimum
separations specified in the NESC and in these drawings and
specifications.
See Drawing #3
A Revised 9/6/02
POLE ATTACHMENTS
POWER SERVICE
Drawing is NOT to scale A-05
-
Copies of the NEC (National Electical Code) can be obtained at
the website of http://v.ww.nfp a. o rg
Copies of the NESC (National Electic Safety Code) can be
obtained at the website of http ://standards. ieee. org
40" 1nin. Communications
conductors may not be attached to mast
C rossover separations are
24" minimum 24" n1in.
12" n1in.
Minimum clearance of 18'
See Note 1
Public Roadway
NOTES: (The NESC changes every three years, the clearances noted
below have limiting conditions and may change. Refer to Section 232
of the NESC for latest requirements .)
1. rvlaintain minin1u1n clearance a) Railroads - 24'
b) Interstate - Contact State for spec ific requirements
b) Driveways - 16'
b) Walkways - 12'
2. Reference NESC clearances on same supporting structures a)
Section 235 b) Section 238
3. Reference NESC clearances on different supporting structures
a) Section 233
No communications power supply shall be mounted on poles except
by permission of Utility .
Licensee's Attachments on Utility Poles, including metal
attachment clamps and bolts , metal cross arm supports, bolts and
other equipment, must be attached so as to maintain the minimu 111
separations specified in N ESC and in these drawings and
specifications.
A Revised 9/6/02
POLE ATTACHMENTS
MINIMUM CLEARANCE TO SERVICE AND ROADWAY
Drawing is NOT to scale A-06
-
All separations are 12"
minimum Utility Service
1 All separations
are 12" mini1num
-----------Communication----------
Sag and Mid-Span Clearances:
Licensee will be particularly careful to leave proper sag in its
lines and cables and shall observe the established sag of power
line conductors and other cables so that minimum clearances are (a)
achieved at poles located on both ends of the span; and (b)
retained throughout the span. At mid-span. a minimum of 12" of
separation must be maintained be~.veen any other cables. At the
pole support, a 12" separation must be maintained be~.veen Licensee
and any other connection.
All separations are 12"
minimun,
No commLmications power supply shall be Copies of the NEC
(National Electical Code) mounted on poles except by permission
of
Utility. can be obtained at the website of http://www.nfpa.org
Licensee's Attachments on Utility Poles.
including metal attachment clamps and bolts. metal cross arm
supports, bolts and other equipment, must be attached so as to
Copies of the NESC (National Electic Safety maintain the minimum
separations specified Code) can be obtained at the website of in
the N ESC and in drawings and
specifications. http :/!standards. i eee. o rg
A Revised 9/0602
POLE ATTACHMENTS
MIN. CLEARANCE BETWEEN CIRCUITS
Drawing is NOT to scale A-07
http:http://www.nfpa.org
-
r------, 1 I30" square Transformer ) I safety zone I on this
side
~ ---- -, 1 I
30" square safety zone
11 11
30" square safety zone
1
I
Communication cable
I
1 See Note 3 II
11 See Note 3 I
1 L - - - - - _JL _____ _J
: See Note 3 ~~------------------ --- ----+µ ---------------
NOTES
1. For new cable installations locate cable on the same side of
the pole as Utili ty's lowest conductor.
2. Standoff brackets to mount cable to pole are not allowed
without approval of Utility.
3. Climbing and workspace through the communication space shall
extend from 40" below the lowest communication cable to the top of
the pole.
4. On transformer poles the communication service drops shall be
located so that they originate from the messenger on the side of
the pole opposite the transformer.
5. Minimum clearances for climbing and working space shall be
followed as per NESC section 236.
No communications power supply shall be mounted on poles except
by permission of Utility.
Licensee's Attachments on Utility Poles, including metal
attachment clamps and bolts, metal cross arm supports, bolts and
other equipment. must be attached so as to maintain the minimum
separations specified in the NESC and in these drawings and
specifications.
I A I Revised 9/6/02 POLE ATTACHMENTS
CLIMBING SPACE REQUIREMENTS
Drawing is NOT to scale A-08I
-
iJ
Note ~)r
Note6~
16"
16"
Note/
16"
16"
16"
Note 4
No communications power supply shall be mounted on poles except
by permission of Utilit;'
Licensee·s Attachments on Utility Poles. including metal
attachment clamps and bolts. metal cross arm supports. bolts and
other equipment: must be attached so as to maintain the minimum
seJJarations specified in the Nt:SC and in these drawings and
specifications.
6·6 ··o··o·· o·O:- .. ·o··o·· ·-·o 6- ····o·····O·· -o -··O··
-o····O··:":~-·. : (':.·~ ·.: .;,·~--:"-..~··. : {',;·: ·-:
-
18" minimum for 0-1 20 V phase to ground
Com111unication 24" minimum
for 0-600 Vphase to phase
30" n1inin1u111 601-50.000 V hase to phase
(Table 353-1 ) Supply (secondary voltage)
Supply (primary voltage)
DIRECT BURIED- SEPARATION
NOTES:
1. Communications equipment shall meet requirements of NESC
3540.
2. Communications cables shall be random laid with primary and
secondary cables as specified in NESC 3540.
3. The bonding conductor required in NESC shall be provided as
part of the communications pedestal installation. A communications
bonding conductor clamp of sufficient length for routing into the
supply pedestal/transformer neutral connector shall be
provided.
4. Installation may be by plowing. trenching. or backhoe as
conditions warrant.
Revised 9/6/02
POLE ATTACHMENTS
JOINT CABLE INSTALLATION
Drawing is NOT to scale A-10
-
Not more than 36" from pole centerline
f-...-7
IDangerlH.V.
I I
,--..
-
-
See 11ote on cable tags below
Other 1
Other 2 CATV
Phone
oanger high voltage sign
utility pole I.D. tng (if applicable)
Suggested Method for Designated Poles (Subject to Utility
approval)
Preferred Attachment Identification Tag
Cable Owner
Phone Number
Repeat so information is visible
from all sides on the wrapped tag
Rolled cable tag width to be 5 inches or greater, tag diameter
sized to f it cable. All to be UV resistant material and printing
.
' ' ' ' ' '
LEGEND
• ,..
TAG
- - - R -- -r•
1 I
@
Pole
Dead End Pole
Aerial Cable Route
Buried Cable Route
Cable Tag
Riser Pole
Lateral Pole
Suggested method
• ' ' ' ' ' ' ' ' ' ' '
TAG
' '
TAG
'
TAG (see not note 2)
' ' ' ' '
•
•
for designated poles ---r--..,....~(subject lo utility approval)
. TAG ......,.___
-·--·-·- ·------------·--· \~---------TAG
NOTES:
1. Tags should be installed at lateral and dead-end poles and at
the termination point of underground cable runs.
2. Tags should be installed eve1y 1,000 feet between poles.
, . Buried cable signs should be installed every 1.000 feet
between riser poles as well as on both riser poles.
4. Tag locations shown above are recommended locations: tags may
be installed at additional locations as deemed necessary for
adequate identification.
5. The Licensee shall affix a tag to the poles for each
attachment belt.
A Revised 9/6/02
POLE ATTACHMENTS
POLE TAG REOUIRElvlENTS
Drawing is NOT to scale A-99
undefined: f: i: table 2355: Row1: Row1_2: A Revised 91602:
Drawing is NOT to scale A01: undefined_2: min: 12 min at pole:
undefined_3: Lowest possible attachment point: Grou ncl level: Grou
ncl level_2: Dravcing is NOT to scale A02: A Revised 9602: POLE
ATTACHMENTS: GROUNDING CONNECTIONS: A Revised 91602_2: Drawing is
NOT to scale: Note 4Row1: A Revised 9602_2: min_2: A Revised
9602_3: A06 Drawing is NOT to scale: I All separations:
undefined_4: Communication: Utility Service I All separations are
12 minimum Communication Sag and MidSpan Clearances Licensee will
be particularly careful to leave proper sag in its lines and cables
and shall observe the established sag of povter line conductors and
other cables so that minimum clearances are a achieved at poles
located on both ends of the span and b retained throughout the span
At midspan a minimum of 12 of separation must be maintained
betiiveen any other cables At the pole support a 12 separation must
be maintained betiiveen Licensee and any other connection:
undefined_5: A Revised 90602: POLE ATTACHMENTS_2: MIN CLEARANCE
BETWEEN CIRCUITS: I A I Revfsed 9602: CLIMBING SPACE REQUIREMENTS:
16: 16_2: undefined_6: fill_1: I A I Revised 9602: POLE
ATTACHMENTS_3: POLE STEP REQUIREJvlENTS: A Revised 91602_3: POL
ATTACHMENTS: JOINT CABLE JNSTALLATION: 1: 2: Danger high voltage
sign: Utili pole I D Ing if pplic ble: R Riser Pole: subject t
utilirr apprmr I: TAG: undefined_7: undefined_8: undefined_9: A
Revised 9602_4: POLE ATTACHMENTS_4: Drwing is NOT to scale: