Entire Area Served 1 Sheet No. FOR P. S. C. Ky. No. Original 1 Cancelling P. S. C. Ky. No. Owen County Rural Electric Cooperative Corporation Sheet No. RULES AND REGULATIONS A. B. I POLICY - UNDERGROUND ELECTRIC SERVICE -RESIDENTIAL SUBDIVISIONS APPLICABILITY 1. Extensions of new electric distribution lines within a new residential subdivision, necessary to furnish permanent electric service to all buildings within the sub- division, shall be made underground when requested by an applicant, subject to the following terms and conditions. 2. This policy applies only to residential subdivisions falling within the definitions set out herein. DEFINITIONS THE FOLLOWING WORDS AND TERMS, WHEN USED HEREIN, SHALL HAVE THE MEANING INDICATED: 1. 2. 3. 4. 5. 6. Applicant - Any person, partnership, association, corporation, or governmental agency controlling or responsible for the development of a new residential subdivision and applying for underground electric service in such subdivision. Building - Any permanent structure, within a subdivision, designed for single family occupancy, individua%ly metered and containing only one (1) individual dwelling unit. Multiple Occupancy Building - for two (2) or more dwelling units, each individually metered. Any permanent structure, within a subdivision, designed subdivision - A tract of land which is divided into ten (10) or more contiguous building lots or upon which two (2) or more separate dwelling units are to be located. the Cooperative to extend service to portions of the subdivision not under active development. Nothing in these definitions or terms shall be so interpreted to require Distribution lines or System - conductors, transformers, and ne ing of electric power at primary Builder - Contractor or other ag single br multiple occupancy dwe Electric service facilities consisting of primary ed on the building lots. @ P'TE OF ISSUE
18

P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

May 04, 2018

Download

Documents

lequynh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

Ent i r e Area Served

1

Sheet No.

FOR

P. S. C. Ky. No.

Original 1

Cancelling P. S. C. Ky. No. Owen County Rural E l e c t r i c Cooperative Corporation

Sheet No. RULES AND REGULATIONS

A.

B.

I

POLICY - UNDERGROUND ELECTRIC SERVICE -RESIDENTIAL SUBDIVISIONS

APPLICABILITY

1. Extensions of new e l e c t r i c d i s t r i b u t i o n l i n e s within a new r e s i d e n t i a l subdivis ion, necessary t o furn ish permanent e l e c t r i c s e rv i ce t o a l l bui ldings w i t h i n t h e sub- d iv i s ion , s h a l l be made underground when requested by an appl icant , subjec t t o t h e following terms and conditions.

2. This pol icy app l i e s only t o r e s i d e n t i a l subdivis ions f a l l i n g within t h e de f in i t i ons s e t out here in .

DEFINITIONS

THE FOLLOWING WORDS AND TERMS, WHEN USED HEREIN, SHALL HAVE THE MEANING INDICATED:

1.

2.

3.

4 .

5 .

6 .

Applicant - Any person, par tnersh ip , assoc ia t ion , corporat ion, o r governmental agency con t ro l l i ng o r responsible f o r t h e development of a new r e s i d e n t i a l subdivis ion and applying for underground e l e c t r i c s e rv i ce i n such subdivision.

Building - Any permanent s t r u c t u r e , within a subdivis ion, designed f o r s i n g l e family occupancy, individua%ly metered and containing only one (1) individual dwelling u n i t .

Multiple Occupancy Building - f o r two (2) or more dwelling u n i t s , each ind iv idua l ly metered.

Any permanent s t r u c t u r e , within a subdivis ion, designed

subdivis ion - A t r a c t of land which i s divided i n t o t e n (10) o r more contiguous bui lding l o t s o r upon which two (2) o r more separa te dwelling u n i t s a r e t o be located. t h e Cooperative t o extend se rv ice t o por t ions of t h e subdivision not under a c t i v e development.

Nothing i n these d e f i n i t i o n s o r terms s h a l l be so in t e rp re t ed t o requi re

Dis t r ibu t ion l i n e s o r System - conductors, transformers, and ne ing o f e l e c t r i c power a t primary

Builder - Contractor o r o the r ag s i n g l e b r mul t ip le occupancy dwe

Electric se rv ice f a c i l i t i e s cons is t ing of primary

ed on t h e bui lding l o t s . @

P'TE OF ISSUE

Page 2: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

E n t i r e Area Served FOR

P. S. C. Ky. No. 1

2 Original. Sheet No.

a t i v e Cor porat ion Cancelling P. S. C. Ky. No.

Sheet No. RULES AND REGULATIONS

7 . Owner - Any person, par tnership, associat ion, corporation, governmental agency, o ther than t h e appl icant , who may purchase a bui lding l o t o r l o t s within a sub- d iv is ion f o r t h e purpose of e rec t ing s i n g l e o r mult iple occupancy dwelling u n i t s .

8. Cooperative - S p e c i f i c a l l y Owen County R.E.C.C. , an e l e c t r i c cooperative incorporated i n Kentucky with main o f f i c e a t Owenton, Kentucky 40359.

C. RIGHTS OF WAY AND EASEMENTS

1. The e l e c t r i c cooperative w i l l construct , own, operate and maintain primary d i s t r i - bution l i n e s only along easements, publ ic s t r e e t s , roads and highways which a re by l ega l r i g h t access ib le t o t h e cooperat ive 's equipment and which t h e cooperative has t h e l ega l r i g h t t o occupy, and on publ ic lands and p r i v a t e property across which r i g h t s o f way and easements s a t i s f a c t o r y t o t h e cooperative may be obtained without cos t o r condemnation by t h e u t i l i t y .

2 . Rights o f way easements s u i t a b l e t o the cooperative f o r t he underground d i s t r i b u t i o n faci l i t ies must be furnished by the appl icant i n reasonabLe time t o meet se rv ice requirements. underground d i s t r i b u t i o n f a c i l i t i e s a r e t o be located access ib le t o the cooperative equipment, remove a l l obstruct ions from t h i s area, s take t o show l o t corners o r control po in ts along the cable route as spec i f ied by t h e cooperative, grade t o within four (4) inches of f i n a l grade, and maintain c lear ing and grading during construct ion by the cooperative, all. a t no cos t t o t h e cooperative. s u i t a b l e land r i g h t s be granted t o it obl iga t ing t h e appl icant and subsequent bu i lders and owners t o provide continuing access t o the cooperative f o r operation, maintenance, o r replacement of i t s f a c i l i t i e s and t o prevent any enroachment i n t h e cooperat ive 's easement o r subs t an t i a l changes i n grade o r e levat ion. requir ing pro tec t ion from the cooperat ive 's equipment during i n s t a l l a t i o n and maintenanc o f underground f a c i l i t i e s w i l l be t h e r w i l l a l so be reponsible f o r reseeding t

The cooperative may requi re t h a t t h e appl icant make the a rea i n which t h e

The cooperative may requi re t h a t

Shrubs, t r e e s and grass

i b i l i t y o f t h e appl icant o r owner who nch coker where required.

GENERAL CONDITIONS

1. Where appropriate contractual arrangeme made, t h e Cooperative w i l l i n s t a l l

-_I-

D.

within t h e subdivision an underground p s u f f i c i e n t capaci ty and using s u i t a b l e mater ia ls which, i n i t s judgement, w i l l a ssure t h a t consumers w i l l receive reasonably s a f e and adequate e l e c t r i c se rv ice fo r t he forseeable fu tu re .

e l e c t r i c d i s t r i b u t i o n system o f

r q T E OF ISSUE

Page 3: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

Form fo r f i l l i n g Rate S c h e d u l e s For E N T I R E TERRITORY SERVED

CZASSTFXCATION OF SERVICE

I . B I L L I N G , ACCOUNTING AND COLLECTING PROCEDUR&

THE C O O P E R A T I V E ' S MONTHLY B I L L I N G P E R I O D I S FROM THE 1 2 t h O F ONE MONTH TO D3.E 1 2 t h O F THE NEXT MONTH,

ON OR ABOlJT THE 7 t h OR 8 t h OF EACH MONTH THE COOPERATIVE RENDERS A N E U C T R T C S E R V I C E STATEMENT TO EACH CONSUMER B I L L E D MONTHLY FOR S E R V I C E TO THE 12 th DAY OF THE P R E V I O U S MONTH.

THE CONSUMER SHALL PAY THE NET AMOUNT O F THE E L E C T R I C S E R V I C E EMENT BY THE 15th DAY OF THE MONTH.

THE SECOND N O T I C E WILL BE E4AILED TO OUR DELINQUENT ACCOUNTS ON O R ABOUT THE TWENTIETH OF THE MONTH. ALTHOUGH OUR MINIMUM B I L L I S $3.00 P E R MONTH, THE ACCOUNT WILL HAVE TO EXCEED FTVE DOLLARS BEFORE I T WILL BE C L A S S I F I E D A S A DELINQUENT ACCOUNT.

I F NOT P A I D BY THE 2 5 t h , I T WILL BE TURNED OVER TO OUR S E R V I C E DEPARTMENT F O R COLLECTION ANI) WHEN OUR S E R V I C E DEPARTMENT I S REQUIRED T O MAKE A CALL TO THE MEMBER'S P R E M I S E S FOR TKE PURPOSE O F COLLECTING THE DELINQUENT B I L L , THERE WILL BE A $3 -25 CO FEE ADDED, A S STATED I N THE SECOND N O T I C E .

SHOULD OUR MEMBER BE DISCONNECTED FOR THE NONPAYMENT OF B I L L A THEY REQUEST T O BE RECONNECTED A F T E R REGULAR WORKING HOURS, WHICH C O S T S THE COOP OVERTIME, THERE WILL BE A S P E C I A L CHARGE P U T ON XI? THE AMOUNT O F TEN DOLLARS I N A D D I T I O N T O THE $3.25 S E R V I C E CHARGE F O R MAKING THE F I R S T T R I P ,

DATE EFFECTIV

Page 4: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

FOR En t i r e Area Served

P. S. C. K.y. No. 1

Orig-_inal Sheet No. 3

Cancelling P. S . C. Ky. No, Owen County Rural Electric Cooperative Corporation

Sheet No. RULES AND REGULATIONS

2 .

3 .

4.

5.

6.

7 .

8.

9.

The appl icant , bu i lde r , o r owner s h a l l , i n accordance with appl icable code requi re - ments, furn ish , i n s t a l l , own and maintain t h e underground service cables from t h e transformer t o t h e bui lding entrance and meter. The Cooperative w i l l connect t h e serv ice cable t o i t s d i s t r i b u t i o n system and supply and i n s t a l l t h e KWH meter when t h e consumers wiring i s ready.

A l l primary conductors i n s t a l l e d by t h e Cooperative within t h e Subdivision w i l l be underground. equipment o r meter cabine ts may be i n s t a l l e d above ground.

Electric serv ice t o a l l s i n g l e o r mul t ip le occupancy dwelling u n i t s s h a l l be s i n g l e phase with a separa te meter f o r each dwelling u n i t .

The Cooperative reserves t h e r i g h t t o determine t h e route of a l l underground primary e l ec t r i c l i n e s and t o i n s t a l l t h e number o f primary conductors it determines i s necessary f o r balanced loading, reserve capaci ty o r emergency service.

Equipment o r appurtenances such as transformers, pedes ta l s , switching

The Cooperative s h a l l determine t h e number of meters t o be served from each t r ans - former and how they s h a l l be grouped.

The Cooperative s h a l l determine t h e poin t a t which t h e underground system begins and which w i l l normally be a t t h e boundary o f t h e Subidivision. Subdivision s h a l l - be by mutual agreement between t h e appl icant and t h e Cooperative. Underground l i n e s e x t e r i o r t o t h e Subdivision may be i n s t a l l e d by agreement with t h e Cooperative provided t h e appl icant agrees t o obta in a l l necessary easements and pay t h e d i f fe rence i n cos t between overhead and underground construct ion.

Overhead l i n e s within t h e

The developer s h a l l fu rn i sh t h e required number of p l a t drawings, including a mylar o r o ther reproducible copy, approved by go These drawings s h a l l i nd ica t e t h e loca t bui lding openings and sewer, water, gas

P r i o r t o t h e start o f construct ion, t h e an underground system design showing t h e approximate b l e , and loca t ion of a l l transformers, pedes ta l s , and switching cabinets . After approval by t h e appl icant any changes o r addi t ions requested by t h e appl icant requi r ing addi t iona l engineering o r construct ion cos t s s h a l l be borne by t h e appl icant . The appl icant s h a l l a l s o pay t h e cos t of any r e p a i r s o r replacement t o t h e d i s t r i b u t i o n system r e s u l t i n g from t h e negl igent acts of t h e appl icant , h i s agents , workmen o r cont rac tors .

ing j u r i s d i c t i o n . driveways, parking areas,

--.- r'TE OF ISSUE

ISSUED BY

Page 5: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

FOR Ent i re Area Served

1 P.S .C* Ky. NO.

Original Sheet No. 4

Owen County Rural E l e c t r i c Cooperative CorporationCalicell i n g P, S, C. Ky. 'NO.

Sheet No,

RULES AND REGULATIONS'.

10.

11.

12.

When the Cooperative starts construct ion, t he area s h a l l be c l e a r of a l l o ther construct ion forces and completion of construct ion s h a l l not be in te r rupted by other a c t i v i t i e s .

A nan-refundable payment s h a l l be made by t h e Applicant equal t o the d i f fe rence between t h e cos t of providing underground f a c i l i t i e s and t h a t of providing overhead fac i l i t i es . Average Cost D i f f e ren t i a l f i l e d herewith as Exhibit A, which Average Cost Differen- t i a l s h a l l be updated annually as required by order dated February 2 , 1973, o f t he Public Service Commission of Kentucky i n Administrative Case No. 146. (Three (3) wire secondary and serv ice conductor runs s h a l l be considered as one conductor, i . e . t r i p l e x . ) of construct ion i n s o i l f r e e of rock, sha le o r o ther impairments which increase cos t of construct ion.

The payment t o be made by t h e Applicant s h a l l be determined from t h e

The average cos t d i f f e r e n t i a l per l o t , as s t a t e d , i s representa t ive

The Applicant s h a l l furn ish and i n s t a l l a l l conduit and crossovers required by the Cooperative, including a l l areas where paving i s i n s t a l l e d p r i o r t o t h e i n s t a l l a t i o n of t h e Cooperative's d i s t r i b u t i o n f a c i l i t i e s , and be responsible f o r i n s t a l l i n g and maintaining these crossovers i n accordance with the Cooperative's s p e c i f i c a t i o n s and loca t ion plans u n t i l t h e underground e l e c t r i c l i n e i s completed. A Cooperative inspector must approve a l l crossovers before t h e trenches a r e backf i l led ; and the Applicant s h a l l s take each end of every crossover with a s take marked "ELEC.". The Cooperative s h a l l determine where conduit; and crossovers a r e required.

E. CHARGES - Applicant s h a l l agree t o pay t h e Cooperative:

1.

2 .

3.

4.

Single Family - $1.95 per foo t .

Multiple Occupancy dwelling u n i t s - No charge t o owner o r appl icant .

Where rock, shal.e, o r o ther impairments a re an t ic ipa ted o r encountered i n construct ion, t h e ac tua l increased cos t of trenching and b a c k f i l l i n g s h a l l be borne by the Applicant.

The underground system f o r a s i n g l e dwelling un i t w i l l normally be i n f ron t o r back l o t l i n e . A m routed c l o s e t o t h e bui lding and t h e transforme e d i a t e l y adjacent t o t h e bui lding.

R.E.C.C. , Owenton, Kentucky 40359

Page 6: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

Owen County Rural Electric Cooperative Corporation

12. FARM AND HOME RATES - SCHEDULE I AVAILABILITY:

AVAILABLE TO HOMES AND FARM CONSUMERS

TYPE OF SERVICE:

SINGLE PHASE 60 CYCLES 120/240 VOLTS

RATE : . - . . _ _ -

First Next Next Next Next Next Next All Over

40 KWH 60 KWH 100 KWH 300 KWH 300 KWH 200 KWH

1,000 KWH 2,000 KWH

$-3.45 Minimum 'Bill .OS86 per KWH ,0310 per KWH .0283 per KWI-I .0255 per KWH .0233 per K\VH .0200 per KWH .0189 per KWH

The minimum bill o f $3.45 entitles the user to 40 KWH or less pe month.

The fuel adjustment clause is applicable.

Page 7: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

Form for filing Rate Schedules For

P.S.C, NO. 4 I

SHEET NO. 13 OWEN COUNTY RURAL ELECTRIC COOPERATIVE CORPORATION

hame of I s s u i n g Corporation CANCELLING

2nd Revised S

CLASSIFICATION OF SERVICE

12. FARM AND HOME RATES - SCHEDULE I

AVAILABILITY:

AVAILABLE TO HOMES AIdDFARM CONSIMMERS

TYPE OF SERVICE:

SINGLE PHASE 60 CYCLES 120.240 VOLTS

RATE :

F i r s t Next Next Next Next Next Next A l l Over

40 KWH 60 KWH

100 KWH 300 KWH 300 KWH 200 KWH

1,000 KWH 2,000 KWH

$3.12 Minimum B i l l -0531 p e r KWH .0281 p e r KWH .0256 pe r KWH -0231 p e r KWH ,0211 p e r KWH .0181 p e r KWH .0171 p e r KWH

The minimum b i l l o f $3.12 e n t i t l e s the u s e r t o 40' KWH o r less p e r month.

FUEL ADJUSTMENT CLAUSE

Fuel adjustment appl icable t o above r a t e schedule as approved June 18,19 f o r 2.265 mills. I

TITLE MANAGER

he Public Service Cas Case No. 6 1 7 7 dated

Page 8: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

6th Revised Owen County Rural E l e c t r i c

6. SMALL COMMERCIAL POWER - SCHEDULE I

(A) APPLICABLE TO ENTIRE TERRITORY SERVED.

(B) TYPE OF SERVICE - FARM AND HOME RATE TO BE APPLIED.

1. 2. 3.

Single phase o r t h ree phase where ava i lab le . Motors r a t e d above 10 HP Capacity must be th ree phase. Entrances above ZOO-Amp wi1.l be cl.assed Small Commercial

(C) RATE:

First Next Next Next Next Next Next A l l over

_ _ 40 KWH 60 KWH 100 KWH 300 KWH 300 KWH 200 KWH

1,000 KwIl 2,000 KWH

$3.45 - Minimkw B i 1 1 .OS86 per KWH .0310 per KWH .0283 per KWH .0255 per KWH .0233 per KWH .0200 per KWH .0189 per KWH

The minimum b i l l of $3.45 e n t i t l e s t he user t o 40 KWH o r less p e r month.

ID) The Consumer w i l l pay for a l l i n s t a l l a t i o n of metering equipment i f the Cooperative does the work, or the consumer can have t h e metering equipment i n s t a l l e d and inspected a t h i s cos t .

The f u e l adjustment c lause i s appl icayle . (E) I-. \

I

b

Page 9: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

Ent i r e Te r r i t o ry Served Form f o r filing Rate Schedules For

OWEN COUNTY RURAL ELECTRIC COOPERATIVE CORPORATION

5 th Revised

N N 4 th Revised

I 6. SMALL COMMERCIAL POWER - SCHEDULE I

(a) APPLICABLE

1. APPLICABLE TO ENTIRE TERRITORY SERVED. t (b) TYPE OF SERVICE - FARM AND HOME RATE TO BE APPLIED

1. 2 . 3. 4 . Rate:

Single Phase o r Three Phase where ava i l ab le . Motors r a t e d above 10 HP Capacity must be Three Phase. Entrances above 200-Amp w i l l be c lassed Small Commercial.

First Next Next Next Next Next Next A l l Over

40 KWH 60 KWH

100 KlVH 300 KWH 300 KWH 200 KWH

1,000 KWH 2,000 KWH

$3.12 Minimum B i .OS31 p e r KWH -0281 p e r KWH .0256 p e r KWH .0231 p e r KWH .0211 p e r KWH .0181 p e r KWH .0171 p e s KWH

The minimum b i l l o f $3.12 e n t i t l e s t h e u s e r t o 40 KWH o r less p e r month1

Consumer w i l l pay f o r a l l i n s t a l l a t i o n Cooperative does t h e work, o r t equipment i n s t a l l e d and inspect

FUEL ADJUSTME

Fuel Adjustment app l i cab le t o a June 18, 1974, f o r 2.265 m i l l s .

DATE EFFECT

ITLE MANAGER

e Public Service Case N o . 6177 dated October 3, 1975 e

Page 10: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

Form f o r f i l i n g Rate Schedules For E N T I R E TERRITORY SERVED

SHEET NO. 7

CLASSIFICATION OF SERVICE

7. MINIMUM MONTHLY CHARGE

THE MINIMUM MONTHLY CHARGE UNDER THE ABOVE RATE SHALL BE $3.00 WHEN 5 KVA OR LESS O F TRANSFORMER CAPACITY I S REQUIRED. FOR CONSUMERS REQUIRING MORE THAN 5 KVA OF TRANSFORMER CAPACITY, THE MINIMUM MONTHLY CHARGE SHALL BE INCREASED BY 75c FOR EACH A D D I T I O N A L KVA OR FRACTION THEREOF REQITLKED. WtGN I T I S NECESSARY'TO EXTEND OR

CHARGE MAY BE INCREASED TO ASSURE ADEQUATE COMPENSATION TO THE ADDED F A C I L I T I E S . WHEN THE M I N I m CHARGE I S INCREASED I N ACCORDANCE WITH THE TERMS, ADDITIONAL ENERGY AND DEMAND SHALL

REINFORCE EXISTING DISTRIBUTUION FACILITIES, rm MINIMUM MONTHLY

BE INCI,UDED IN ACCORDANCE wIm THF FOREGOING SCHEDULE.

I

ISSUED B TI[XLE MANAGER

Issued by authority of an 'Order Service Co y . in Case No, 5100 dated

Page 11: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

Form f o r f i l l i n g Rate S c h e d u l e s

_-

For E N T I R E T E R R I T O R Y SERVED

CLASSIFICATION OF SERVICE

- 3 . SEASONAL LOADS - CAMPS C U S S 5 - BARNS CLASS 7

(a) E F F E C T I V E JANUARY 1, 1969, A L L SEASONAL LOADS C L A S S I F I E D A S BARNS AND CAIQS WILL NOT BE DISCONNECTED EACH YEAR.

(b) CAMPS AND BARNS WILL BE SI!B,JECT TO THE RATE 1 SCHEDULE WITH NO PREPAYMENT REQUIRED, 'I'HL: CONSIJbIER WILL BE REQUIRED TO READ H I S OWN METER ALTHOUGH C L A S S I F I E D AS A CAMP OR BARN. CONSUMER WILL BE S U B J E C T TO ANY T A R I F F CHARGES FOR F A I L U R E TO READ THEIR OWN METER.

( e ) I F CONSUMER DEMANDS TO BE DISCONNECTED, HE WILL BE S U B J E C T T O A L L RECONNECTlON CHARGES. THE AMOIJNTS ARE S E T FORTH UNDER HEADING "RECONNECTION CHARGES "

(d) BARNS AND CAMPS WILL BE S U B J E C T TO A L L DELINQUENT CHARGES SET FORTH IN THE BILLING AND COLLECTION PROCEDURE.

(e) CAMP AND SUMMER HOFE RATES WILL BE THE SAME AS FARM AND HOME RATES BUT WITH A GUARANTEED MTNIMIJM O F $36.00 P E R YEAR. P U B L I C S T R E E T L I G H T I N G AND SECIJRITY (YARD) L I G H T S REMAIN THE SAME.

Page 12: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

Owen County Rural Electric Cooperative Corporation

ITORY SERVED

2nd Revised . .

9. LARGE POWER - SCHEDIJLE 11: (A)

(B) Availability of Service:

Applicable to Entire Territory Served

1 . Available for commercial, industrial and three-phase farm service for all uses, including lighting, heating and power.

(C) Type of Service:

1. Three-phase loads metered with KW demand charge. .;

(D) Rates:

All KW demand First 10,000 KWH .0211 per KWH Next 20,000 KWH .0178 per KWH Next 50,000 KWH .0156 per KWH Next 320,000 KWH .0145 per KWH Next 600,000 KWH .0134 per KWH All Over 1,000,000 KWH ,0123 per KWH

$1.75 per f l l of billing den

(E) The fuel adjustment clause is applicable

Page 13: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

Form f o r f i l i n g Rate Schedules For E n t i r e T e r r i t o r y Served Community, Town o r ' C i t y

P,S.C. NO.

OWEN COUNTY RURAL ELECTRIC COOPERATIVE CORPORATION

Name of I s s u i n g Corporation

I 2nd Revised SHEET NO, 9

CANCELLING P.S .6 . NO. 5453

1st Revised s

CLASSIFICATION OF SERVICE I LARGE POWER - SCHEDULE I1

(a)

(b) A v a i l a b i l i t y of Service

Applicable t o E n t i r e T e r r i t o r y Served. I 9 -

1. Avai lable f o r commercial, i n d u s t r i a l and three-phase farm s e r v i c e f o r a l l uses , including l i g h t i n g , hea t ing and power

(c ) Type of Service

1. Three-phase loads metered w?th KW demand charge.

(d) Rates

A l l KW Demand $1.55 p e r KWH F i r s t 10,000 KWH .0191 p e r KWH Next 20,000 KWH .0161 p e r KWH Next 50,000 KWH .0141 p e r KWH Next 320,000 KWH .0131 p e r KWH Next 600,000 KWH .0121 p e r KWH A l l Over 1,000,000 KWH .0111 p e r KWH

The f u e l adjustment c l a u s e i s app l i cab le . -

October 3, 1975 x. ..--/' )ATE OF Ism -l October 3, 1975 / DATE EFFECTIVE

TITLE

he Public Service C Cas@ N o . 6177 dated October 3 , 1975 *

Page 14: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

Owen County Rural Electric Cooperative Corporation

10. SECURITY LIGHTS - SCHEDULE 111

A. A l l s e c u r i t y l i g h t s w i l l be i n s t a l l e d on t h e following bas i s :

1.

2.

3.

4.

5.

Five year c o n t r a c t required.

Rates :

Each KWH $.0254 per KWH

I n s t a l l e d on e x i s t i n g po le h e r e 120 v o l t s are a v a i l a b l e $3.60 One Pole - - 4.15 Two Poles - 5.25 Three Poles 6.35 Four Poles 7.45

If a t any time, an e x t r a s e c u r i t y l i g h t i s needed, it w i l l be added a t t h e appropr i a t e rate.

If a permanent se rv ice , e i t h e r r e s i d e n t i a l , commercial o r l a rge power, i s added t o t h e l i n e during t h e f ive-year c o n t r a c t , t h e balance o f t h e c o n t r a c t w i l l be adjusted accordini

Where t ransformer i s required, t h e r e i s an e x t r a charge of f i f t y cents ($.SO) p e r month.

A

Page 15: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

' Form f o r filing Rate Schedules ENTIRE TERRITORY SERVED FOP

P.S.C. NO. $Bg,pg 2nd Revised s I

OWEN COUNTY RURAL ELECTRIC COOPERATIVE CORPORATION

CANCELLING P.S.C. NO,

1st Revised s Name of I s su ing Corporation

r

10. SECURITY LIGHTS - SCHEDULE I11

(a) A l l Secu r i ty Lights w i l l be i n s t a l l e d on t h e following b a s i s :

3.

4.

5.

Five-year c o n t r a c t required. Rates : Each KWH $ .023 I n s t a l l e d on e x i s t i n g po le where 120 v o l t s are r equ i r ed 3.25 One po le r equ i r ed 3.75 Two po le s r equ i r ed 4.75 Three po le s r equ i r ed 5.75 Four po le s r equ i r ed 6.75

If a t any time, an e x t r a s e c u r i t y l i g h t is needed, i t w i l l be added a t t h e appropr i a t e ra te .

If a permanent s e r v i c e , e i t h e r - r e s i d e n t i a l , commercial o r l a r g e power, i s added t o t h e l i n e during t h e f ive -yea r cont: t h e balance of t h e con t r ac t w i l l be ad jus t ed accordingly.

Where transformer is required, t h e r e i s an e x t r a charge of f i f t y c e n t s ( $ . S O ) p e r month.

C ' t ,

I '4ATE OF I DATE EFFECTIVE October 3 , 1975

ISSUED ]E3 TITL

Issued by author i ty of an Ohder of t h e Public Service Co Case No. 6177 dated

Page 16: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

Form for filing Rate Schedules 1

For ENTIRE TERRITORY SERVED Community, Town o r ' C i t y

P.S.C. NO.

Owen County Rural E l e c t r i c First Revised SKEET NO, 11 Cooperative Corporation

CANCELLING P.S,C. NO. 23 Name of I s s u i n g Corporation

Original SKEET NO.11

CLASSIFICATION OF SERVICE

TRAILERS

A l l mobile homes, r e g a r d l e s s o f . d i s t a n c e from t h e n e a r e s t f a c i l i t y , s h a l l be r equ i r ed t o pay a $10.00 membership f e e . The membership f e i s refundable upon disconnection o f s e r v i c e , a f t e r a l l b i l l s aga ins t t h e account are pa id .

A l l mobile homes, r e g a r d l e s s of d i s t a n c e from t h e n e a r e s t f a c i l i t y , s h a l l be r e q u i r e d t o have wa'ter and sewage f a c i l i t i e s be fo re constru t i o n of e l e c t r i c s e r v i c e .

A l l r equ i r ed fees and advances s h a l l be p a i d be fo re cons t ruc t ion begins.

A l l extensions of up t o 150 feet from t h e n e a r e s t f a c i l i t y s h a l l be made without charge.

Extensions g r e a t e r than 150 f e e t from t h e n e a r e s t f a c i l i t y and up t c 300 feet s h a l l be made, provided t h e customer s h a l l pay t h e u t i l i t y a customer advance f o r cons t ruc t ion o f f i f t y d o l l a r s ($50) i n a d d i t i o n t o any o t h e r charges required by t h e u t i l i t y f o r a l l customers, which w i l l be t h e $10.00 membership fee. The $50.00 advance s h a l l be refunded a t t h e end of one (1) year i f t h e s e r v i c e s t o t h e mobile home continue f o r t h a t l eng th of time. ,

For extension g r e a t e r than 300 f e e t and less than 1,000 f e e t from t h e n e a r e s t f a c i l i t y , t h e u t i l i t y w i l l charge $1.20 p e r f o o t f o r t h a t p o r t i o n of t h e s e r v i c e 1,000 fee t . Beyond 1,000 fee t , t h e extension Sect ion 10 o f PSC Rules and Regulations apply.

PER UNIT

1s

of the Public Service Co Case No. Ir dated e

Page 17: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

Form f o r f i l i n g Rate Schedules For ENTIRE TERRITORY SERVED Community, Town or’ C i t y

P.S.C. NO. .? i_

Owen County Rural Electr ic Cooperative Corporation

Name o f I s s u i n g Corporat ion

F i r s t Revised SIIEET N Q J 1 Q

CANCELLING PeSmC. NO. 3 Orig ina l SHEET N Q a 11

CLASSIFICATION OF SERVICE a

11. TRAILERS (Page Two)

(a) This advance sha l l be refunded t o t h e customer over a four (4) yea r per iod i n equal amounts f o r each year t h e s e r v i c e i s continued and t h e refund advance da te begins with t h e b i l l i n g da te .

(b) If t h e s e r v i c e i s discont inued f o r a per iod of s i x t y days o r should t h e mobile home be removed and another not take i t s p l ace o r be replaced by a permanent s t r u c t u r e , t he remainder o f t h e advance s h a l l be f o r f e i t e d .

(c) No refunds s h a l l be made t o any customer who d id not make t h e advance o r i g i n a l l y .

(7) A l l mobile home meter po les s h a l l be wired and inspected according t o t h e National Code and s h a l l be wired and inspec ted a t t h e expense of t h e consumer

(8) The consumer s h a l l have t h e r e s p o n s i b i l i t y of contac t ing t h e Cooperative f o r any refunds due.

TIXLE bfANAGER

he Publ ic Serv ice Co Case N o . dated 0

I

Page 18: P. Ky. S. Electric Cooperative, Inc... · the difference in cost between overhead and underground construction. ... The underground system for a single dwelling unit will normally

Dated: June 4, 1973

EXHIBIT A

AVERAGE UNDERGROUND COST DIFFERENTIAL

(Filed i n Commission i n Administrative Case No. 146, dated February 2 , 1973.)

compliance with Appendix t o the Order of t h e Public Service

Estimated cost of Underground per foot

Estimated cost of Overhead per foot

$2.75

$ .80

Estimated cos t Di f fe ren t ia l per foot $1.95