Top Banner
Operationall y Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
14

Operationally Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION.

Dec 30, 2015

Download

Documents

Lynette Warner
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Operationally Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION.

Operationally Responsive Space (ORS) Office

Rapid Response Space Center Industry Day

6 November 2009

Peter M. Wegner

Director, ORS Office

1DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

Page 2: Operationally Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION.

- Assured Space Power Focused on Timely Satisfaction of Joint Force Commanders’ Needs - ORS OFFICE

Initial Comments

• Welcome!

• This effort represents significant steps forward to develop and deliver key ORS enablers focused on standing up a Tier 2 capability – Creating the infrastructure—industry and govt teams, contract

vehicles, MOSA implementation, bricks and mortar necessary to sustain and grow

– Building the architecture—payloads, buses, rapid response space works

– Demonstrating the capability

• Thank you!!!

2

Page 3: Operationally Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION.

- Assured Space Power Focused on Timely Satisfaction of Joint Force Commanders’ Needs - ORS OFFICE

Drivers for Responsive Space Operations Four Reasons, One ORS, One Mission

Page 4: Operationally Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION.

- Assured Space Power Focused on Timely Satisfaction of Joint Force Commanders’ Needs - ORS OFFICE

4UNCLASSIFIED//FOR OFFICIAL USE ONLY

Communications

Full Range Tactical EWTactically Persistent ISR

SSA/Space Protection

Robust Rapid Reconstitution

NationalDefenseCivilCommercialInternationalAcademic

ASSURED SPACE POWER FOCUSED ON TIMELY SATISFACTION OF JFCs’ NEEDS

ORS - End State User View

TargetTracks

SurfaceDisturbances

Change DetectionChange Detection

Laptop & PDA Displays

Tactical Info to UserTheater Tasking

Tier-1

Tier-2Tier-3

4

Page 5: Operationally Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION.

- Assured Space Power Focused on Timely Satisfaction of Joint Force Commanders’ Needs - ORS OFFICE

5

5

Tier 1 “Employ it”

On-demand with existing assets

Minutes to hours

Tier 2 “Launch/deploy it”

On-call with ready-to-field assets

Days to weeks

Tier 3 “Develop it”

Rapid transition from development to delivery of new or modified capabilities

Months (not years)

ORS Approaches

Gaps / Needs Identified and Prioritized by

USSTRATCOM

Warfighting EffectsORS Needs

Reconstitute lost capabilities

Augment/Surge existing capabilities

Fill Unanticipated Gaps in capabilities

Exploit new technical/ operational innovations

Respond to unforeseen or episodic events

Enhance survivability and deterrence

CDRUSSTRATCOM Desired 2015 End State

Page 6: Operationally Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION.

- Assured Space Power Focused on Timely Satisfaction of Joint Force Commanders’ Needs - ORS OFFICE

Target Area

Mission Operations Center

Theater

CONUS SIPRNET & Other Networks

ACPTMission Planning

ORS 2015 Blueprint

• Launch vehicle and services cost <$20M

• Robust inventory of multiple types of launch vehicles

• Six-day call-up from storage to launch

Responsive C2 & TPEDResponsive Buses & Payloads Responsive Range & Launch• Robust distributed C2—

ground and space based• Simplified warfighter

interfaces• Net-centric TPED utilizing

existing systems

• Space vehicle costs <$40M• Robust inventory of multi-

function, modular bus and payload components

• MOSA incorporated throughout solution set

Modular Open System Architecture (MOSA)

Rapid Integration & Launch

Rapid Transport toLaunch Range

Tier 1 Solutions

Tactical Tasking & Downlink

Plug-and-Fight spacecraft components– MOSA standards

Govt s/w

Library

ISR Mission Kit

Comm Mission Kit

Space Protection Mission Kit

Innovation Cell

Mission Design Tool

Tier 2/3

Concepts/Solutions Group

“ORS Brain”

Tier 2/3 Solutions

S&T Infusion

JFC

Needs

JFC

Needs

6

Page 7: Operationally Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION.

- Assured Space Power Focused on Timely Satisfaction of Joint Force Commanders’ Needs - ORS OFFICE

• Develop end-to-end ORS enablers required to meet JFCs’ need for highly responsive space capabilities:– Satellite payload tasking and sensor data processing, exploitation and

dissemination– Responsive space CONOPS– Satellite payloads and busses– Space launch vehicles and supporting range operations– Satellite telemetry, tracking, command and control – Authorities necessary for achieving ORS objectives

• Execute rapid end-to-end capability efforts to meet emerging JFC operational needs– Augment, reconstitute, or implement new capability– Complementary to fielded space capabilities– Coordinated ORS planning, acquisition, and ops across DoD

ORS Office Mission Essential Tasks

7

Page 8: Operationally Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION.

- Assured Space Power Focused on Timely Satisfaction of Joint Force Commanders’ Needs - ORS OFFICE

8

Innovation Philosophy

1. Understand the heart of the customer

– Engage Warfighter in developing ORS capabilities

2. Control critical lead-time drivers– Reduce process variation via

Modular, Open-Systems Architecture

3. Utilize open innovation– Enforce modular, open systems

standards– Establish government owned flight

software libraries– Leverage resources across space

community

Tenets

• Develop ORS Enablers by conducting end-to-end missions

• Every ORS mission

−Exercises ORS CONOPs, demonstrates ops utility, and/or

−Advances ORS enablers• Block development strategy that

leverages service S&T/Acq organizations

• Focus primarily on ORS Tier 2/3• Execute limited number of small Tier 1

initiatives • Work with services for Operational

Transition

ORS Office Philosophy and Tenets

Page 9: Operationally Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION.

- Assured Space Power Focused on Timely Satisfaction of Joint Force Commanders’ Needs - ORS OFFICE

Enabling Capabilities Required

• Mission kit development

• Space platform development

• Rapid AI&T facility

• ORS Standards development, approval and deployment

• Launch and range enablers

• Rapid acquisition

• Management capabilities

• Frequency allocation approval

Crawl (2010)

Walk (2013)Run (2015)

Page 10: Operationally Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION.

- Assured Space Power Focused on Timely Satisfaction of Joint Force Commanders’ Needs - ORS OFFICE

This is ORS

10

Payload Flexibility

• Telescopes, comm pkgs, Mini-SAR• RF ID, PAN/MSI/HSI backplane

Responsive Buses

Bus Flexibility/Compatibility

• Plug-n-Play, standard interfaces• Modularity On-Demand

Launchers

Responsive Payloads

“Recon Wing Capability for Space”

Responsive Platforms- Satellite buses

- Plug-n-play satellite payloads- Launch Vehicles

Rapid Build-Up/TurnTimes- JFC Call-Up

- Operation, not acquisition- Air Tasking Order Responsiveness

- Sustained high ops tempo

Responsive Infrastructure• Scalable, Responsive Lift

• Responsive Range & Network• Responsive Sat Ops

• Responsive, Tailorable C2 & TPED

ORS OfficeArchitect & Demonstrate

ServicesProcure, Field, Operate, Sustain

10

UNCLASSIFIED

Page 11: Operationally Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION.

- Assured Space Power Focused on Timely Satisfaction of Joint Force Commanders’ Needs - ORS OFFICE

1. Develop End-to-End enablers for USSTRATCOM’s 2015 CONOPS

2. Respond to JFCs’ Needs from CDRUSSTRATCOM • Simultaneous submission to JUONS process required to obtain funding

CDL TWISTER

Wallops

Taskingand payload planning

Minotaur Family of LV’s

Rapid Assembly, Integration & Test

Plug ‘n Play

DCGS PED

Kodiak

Falcon I

RAPTOR

ResponsiveBusses/Payloads

Manufacturing Responsive Launch

Responsive Range

Responsive C2 / TPED

Vandenberg AFB

Cape

Super Strypi

Kwajalein

ORS Mission Essential TasksDoD Executive Agent Direction to ORS Office

11

ORS End-to-End Enablers

Compatible C2 Framework Multi-Service SOC

Main Focus of this effort

Page 12: Operationally Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION.

- Assured Space Power Focused on Timely Satisfaction of Joint Force Commanders’ Needs - ORS OFFICE

12

• ORS-1 on track for 24 month “go” to launch• TacSat-3 launch—Wallops Island, 19 May 09• Jumpstart I - 6-day integration to launch

Jumpstart II – PnPSat– mission design, assembly, integration and test in less than 1 Day

• 3 COCOM Urgent Needs:– UHF Satcom - Joint Task Force-Global Network Operations– SSA - Joint Functional Component Commander, Space– ISR – CENTCOM (OSR-1)

Joint Reconnaissance Platform – COCOM Tasking of NTM Space Capability– Continue USPACOM demo & expand to other COCOMS

• Tier 1 Demonstrations:– RADARSAT 2 (Canada)– Scheduled 6 COCOM exercises, 5 demonstrations, 2 JMUAs

• 4-Hour Plug-and-Play Satellite Assembly• Broad Agency Announcements for ORS Enablers

– 3 BAAs released, over 220 proposals evaluated, 24 awards

ORS—meeting Warfighter needs

Space-X Falcon Launch Aug 08 from Kwajalein – 6-day call-up to launch

RADARSAT-2 Images of Vancouver BC

Operationally Responsive SpaceRecent Accomplishments

Page 13: Operationally Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION.

- Assured Space Power Focused on Timely Satisfaction of Joint Force Commanders’ Needs - ORS OFFICE

13

ORS & NASA Collaboration

1. Directly addresses high-level policy direction to collaborate in the advancement of innovative technologies

2. Leverages broad community involvement to capitalize on small satellite development efforts

3. Creates a pathway to identify and insert the next generation of space systems and technologies into NASA, DoD, and Commercial Space Programs

4. ORS Office Director Ltr dtd, 4 Jun 09, “To capitalize on their collective expertise, I have established an Integrated Product Team in which, initially, NASA ARC will lead overall contracting, programmatic, and system engineering activities…with support and participation from SMDC, SDTW, and SPAWAR.”

13

Page 14: Operationally Responsive Space (ORS) Office Rapid Response Space Center Industry Day 6 November 2009 Peter M. Wegner Director, ORS Office 1 DISTRIBUTION.

- Assured Space Power Focused on Timely Satisfaction of Joint Force Commanders’ Needs - ORS OFFICE

14

Takeaway message

1. End state vision for ORS consistent with Presidential Direction, Congressional intent, and USSTRATCOM CONOPS

2. Making strong progress toward maturing ORS enablers and meeting JFC Needs

14