SUBMITTAL NUMBER: 12321302.00 OCPS CLAY SPRINGS ES SUBMITTAL ASSIGNMENT MEMO SUBMITTAL DETAILS: REVIEWERS: SUBJECT: MANUFACTURED CASEWORK - SAMPLES DATE RFI RECIEVED: Jan 07, 2015 DISCIPLINE: Architecture PRIMARY: DEVON TULLY [email protected]RICK DUNN [email protected]RHODES+BRITO ARCHITECTS INC. PHN: (407) 648-7288 FAX: RHODES+BRITO ARCHITECTS INC. PHN: (407) 648-7288 FAX: (407) 648-7289 SECONDARY: PRIORITY STATUS: 2-STANDARD REVIEWER DUE DATE: 1/19/2015 SPECIFICATION REF: 12 32 13 DWG REF. NONE DWG TITLE: REVIEW STATUS: THIS SUBMITTAL IS ISSUED TO YOU FOR YOUR REVIEW. PLEASE RESPOND AND RETURN...WITH THIS COMPLETED SAM TRANSMITTAL...TO MICHELE BUDAY-URDANETA NO LATER THAN: 1/19/2015. PLEASE COMPLETE REVIEW STATUS AT RIGHT SUBMITTAL CONTENTS: NO OF ITEMS: ITEM DESCRIPTION (please print) THIS SUBMITTAL WAS REVIEWED BY : RE-SUBMIT WITH ITEMS NOT REVIEWED REJECTED REVISE AND RESUBMIT FURNISHED AS MARKED REVIEWED COMMENTS: 7 SAMPLE(S) cc: OWNER : CALVIN WOOLFOLK 6501 MAGIC WAY, BLDG. 200 ORLANDO, FL, 32809 R+B FILE: : 13017-0001.X6 CONTR/CM: : WILLIAMS COMPANY : BRAD KUBIN 2301 SILVER STAR RD.
4
Embed
OCPS CLAY SPRINGS ES SUBMITTAL ASSIGNMENT MEMO€¦ · ocps clay springs es submittal assignment memo submittal details: reviewers: subject: manufactured casework - samples date rfi
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
THIS SUBMITTAL IS ISSUED TO YOU FOR YOUR REVIEW. PLEASE RESPOND AND RETURN...WITH THIS COMPLETED SAM TRANSMITTAL...TO MICHELE BUDAY-URDANETA NO LATER THAN: 1/19/2015. PLEASE COMPLETE REVIEW STATUS AT RIGHT
SUBMITTAL CONTENTS:
NO OF ITEMS: ITEM DESCRIPTION
(please print)THIS SUBMITTAL WAS REVIEWED BY :
RE-SUBMIT WITH ITEMS
NOT REVIEWED
REJECTED
REVISE AND RESUBMIT
FURNISHED AS MARKED
REVIEWED
COMMENTS:
7 SAMPLE(S)
cc:
OWNER : CALVIN WOOLFOLK
6501 MAGIC WAY, BLDG. 200
ORLANDO, FL, 32809
R+B FILE: : 13017-0001.X6CONTR/CM: : WILLIAMS COMPANY
during this review do not relieve Subcontractor/Supplier
from compliance with requirements of the drawings and
specifications. This check is only for review of the
general conformance with the design of the project and
general compliance with the information given in the
contract documents. The Subcontractor/Supplier is
responsible for: Confirming and correlating all quantities
and dimensions; selecting fabrication processes and
techniques of construction.
WILLIAMS COMPANY BUILDING DIVISION
Date:
Trent Bonnett
Project Manager
SUBMITTAL REVIEW STAMP
Rhodes+Brito Architects, Inc.
Reviewed Submit Specified Items
Furnish as Marked Rejected
Revise and Resubmit Not Reviewed
This review is only for general conformance with the design concept and the information given in the Contract Documents. Corrections or comments made on shop drawings do not relieve the Contractor from compliance with the requirements of the plans and specifications. The Contractor is responsible for dimensions to be confirmed and correlated at the jobsite, methods, techniques, sequences, and procedures of construction; coordination of Work with other trades and performing all Work in a safe and satisfactory manner.