Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh , Chief Operating Officer North Delhi Power Limited Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 3 rd Capacity Building Programme for Officers of Electricity Regulatory Commissions 23 – 28 August, 2010 Forum of Regulators 2 Structure of Presentation: Background Strategic Road Map and Strategic Decisions Key Initiatives Results Rewards & Recognitions Issues / areas requiring attention of Regulators
25

NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

Mar 25, 2018

Download

Documents

dangduong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

Performance Improvement of the Distribution Segment

(A Case Study of NDPL)

Arup Ghosh , Chief Operating OfficerNorth Delhi Power Limited

Department of Industrial and Management Engineering

Indian Institute of Technology Kanpur

3rd Capacity Building Programme for Officers of Electricity Regulatory Commissions

23 – 28 August, 2010

Forum of Regulators

2

Structure of Presentation:

• Background

• Strategic Road Map and Strategic Decisions

• Key Initiatives

• Results

• Rewards & Recognitions

• Issues / areas requiring attention of Regulators

Page 2: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

3

Delhi Vidyut Board in the Year - 2002:

• AT & C Loss - More than 53%

• Financial Loss - Approx Rs 10 Cr / Day

• Govt. Subsidies - Approx. 1,200 Cr / Annum

• Billing Receivables - Close to 1 year outstanding

• Equipments / Network - Pathetic

• Consumer Records - Manual & incomplete

• Consumer Care - None, No focus

• Power Interruptions - Availability 16 hrs/Day

0

10

20

30

40

50

60

1983

-84

1985

-86

1987

-88

1989

-90

1991

-92

1993

-94

1995

-96

1997

-98

1999

-00

2001

-02

Percentage T&D Losses

T & D Loss Trend - Pre-privatization

4

Page 3: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

5

Key Parameters - In Year 2002

• Billing Efficiency = 53.72

• Collection Efficiency = 97.18

• AT & C Loss Level = approx 53 %

6

Geographic Description:

NDPL

BSES Rajdhani

BSES Yamuna

NDMCMES

Joint Venture of TATA Group with Delhi Govt.51:49%

Page 4: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

NDPL Profile:

7

As on date

Rs. 2,759 Cr (FY 0910)

1,313 MW (Jul ’10)

6,911 MU

1.21 Million

3,950

510 Sq Kms

4.8 Million

1,439 *2,372

0.57

08% / 06%

As on Jul’2002

Rs. 1,095 Cr

850 MW

5,237 MU

0.8 Million

5,400

510 Sq Kms

4.2 Million

1,246

1,568

1.03

-

Particulars

Turnover

Peak Load

Energy Requirement

Total Registered Consumers

Number of Employees

Area of Distribution

Population Serviced (approx)

Per Capita Consumption (Units)

No of Consumers / Sq km

Employees / MU input

Load / Energy Growth

* (National Average of 500, Mumbai – close to 850)

8

Structure of Presentation:

• Background

• Strategic Road Map and Strategic Decisions

• Key Initiatives

• Results

• Rewards & Recognitions

• Issues / areas requiring attention of Regulators

Page 5: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

Strategic Roadmap:

WHAT NDPL INHERITED – JULY 2002

AT&C Losses> 53%

No concept ofconsumer service

& IT Interface

Electricity Supply System on the

verge of collapse

Lack of Performance Orientation

STRATEGY FOR THE 1S T CONTROL PERIOD (2002 – 2007)

AT&C Losses <25%

Consumer service & IT Interface to be

comparable with World Standards

System Reliabilityto be comparable with Best Utilities in

India.

Performance Orientation through

Change Management

Ø50%

1,00,000 Backlog

Complaints

No Planned CAPEX & OPEX

in Past 3 Yrs

5,400 Staff (Unfavorable

Working Condition)

9

Strategic Decision:

• Decentralization of O & M activities / function

• Centralization of Commercial activities / Processes

• Replacement of Old Electro-mechanical Meters by New Electronic Meters

• Energy Accounting

• Intensive introduction of Technology

10

Page 6: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

• Background

• Strategic Road Map and Strategic Decisions

• Key Initiatives

• Results

• Rewards & Recognitions

• Issues / areas requiring attention of Regulators

Structure of Presentation:

11

• Identification of components of AT&C Losses

• Loss Reduction Strategy - Technical Solutions

• Energy Accounting

• Re-engineering of Commercial Processes (BPR)

• AMR for all connections above 10 KW

• Automation Roadmap

• Technical & Process Related Initiatives

• Initiatives in association with Govt.

• Initiatives related to Society

Key Initiatives & Implementation:

12

Page 7: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

Collection Process Deficiencies:20. Part Payment by Consumer21. Non Delivery of Bills22. Non Payment by Consumer (Defaulters)23. Premise Disconnected with Dues

Billing Process Deficiencies:14. Consumer not billed / under-billed15. Provisional Billing16. Bills pending for Quality Check (BQC)17. Bills pending for assessment18. Meters installed but not appearing in data base19. Un-metered connections:

(Unauthorized Colonies, JJ ClustersStreet Lights Poles)

Metering Process Deficiencies:7. Meter (address) not traceable8. Import / Export Metering Error 9. CT Ratio Errors

10. Stop / Slow / Defective Meter11. CT Ratio Errors12. Meters not read 13. Mismatch of Meters

Theft / Unauthorized Use:2. Direct Hooking3. Tampering / By -passing of Meter4. Misuse of Category5. Use of Multiple Connections - Misuse of Slab6. Sanctioned Load lower than actual usage

Technical Loses:1. Iron & Copper losses atSub-transmission (66kV/33kV) & Distribution (11kV & below) Network

Components of AT & C Losses:

13

• Identification of components of AT&C Losses

• Loss Reduction Strategy - Technical Solutions

• Energy Accounting

• Re-engineering of Commercial Processes (BPR)

• AMR for all connections above 10 KW

• Automation Roadmap

• Technical & Process Related Initiatives

• Initiatives in association with Govt.

• Initiatives related to Society

Key Initiatives & Implementation:

14

Page 8: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

HVDS

High Loss

High Resistance

Areas

Implemented in more than 250 areas, more

under implementation.

High Loss

Low Resistance

Areas

LT ABCApprox. 2,500 Kms of

LT ABC laid, more under implementation

MeteringInitiatives

Electronic Meters, AMR,

Pre-Paid Metering

Schemes implemented successfully, more

under implementation

Loss Reduction Strategy – Technical Solutions

15

• Identification of components of AT&C Losses

• Loss Reduction Strategy - Technical Solutions

• Energy Accounting

• Re-engineering of Commercial Processes (BPR)

• AMR for all connections above 10 KW

• Automation Roadmap

• Technical & Process Related Initiatives

• Initiatives in association with Govt.

• Initiatives related to Society

Key Initiatives & Implementation:

16

Page 9: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

17

M

M

M

M

By STU

66 or 33 KV

11 KV

At Consumer Premises With HT Load

Feeder Meter

11KV/415 V DT

For Energy Accounting

At Consumer Premises

66/33/11 KV

STU to DISCOM

FEEDERS TO ZONES

Tier 1: Transmission level

M

Tier 2 : Sub transmission Level

Tier 3 : Distribution level

M

Energy Accounting – Flow Chart

• Identification of components of AT&C Losses

• Loss Reduction Strategy - Technical Solutions

• Energy Accounting

• Re-engineering of Commercial Processes (BPR)

• AMR for all connections above 10 KW

• Automation Roadmap

• Technical & Process Related Initiatives

• Initiatives in association with Govt.

• Initiatives related to Society

Key Initiatives & Implementation:

18

Page 10: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

19

CMG RRG RDGMRG RBG RCGMMG

RAG

Policy Regulatory Bench Data Revenue Infrastructure Advocacy Compliance Marking Analysis Protection Support

Consumers

Call Center

Customer Care Center

Website E mail LettersDrop boxes

SAMBANDH – Integrated Commercial Package software- Industry First!!

Business Process Re-engineering (BPR)

CCG

• Identification of components of AT&C Losses

• Loss Reduction Strategy - Technical Solutions

• Energy Accounting

• Re-engineering of Commercial Processes (BPR)

• AMR for all connections above 10 KW

• Automation Roadmap

• Technical & Process Related Initiatives

• Initiatives in association with Govt.

• Initiatives related to Society

Key Initiatives & Implementation:

20

Page 11: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

Automatic Meter Reading (AMR):

METER

GSM-MODEM GSM-Network

PSTN-NetworkPSTN-MODEM

S/W

USERS

LA

N

DB

DEBS

I. METERING

II. COMMUNICATION

III. BACK OFFICE

21

• Identification of components of AT&C Losses

• Loss Reduction Strategy - Technical Solutions

• Energy Accounting

• Re-engineering of Commercial Processes (BPR)

• AMR for all connections above 10 KW

• Automation Roadmap

• Technical & Process Related Initiatives

• Initiatives in association with Govt.

• Initiatives related to Society

Key Initiatives & Implementation:

22

Page 12: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

Automation Roadmap: Journey so far …

23

• GIS - Completed

• GSAS - Completed

• Communication Network - Established and Stabilized

• SCADA - In Operation

• DMS - Under Implementation

• DA - Under Implementation

• OMS - Under Implementation

• Identification of components of AT&C Losses

• Loss Reduction Strategy - Technical Solutions

• Energy Accounting

• Re-engineering of Commercial Processes (BPR)

• AMR for all connections above 10 KW

• Automation Roadmap

• Technical & Process Related Initiatives

• Initiatives in association with Govt.

• Initiatives related to Society

Key Initiatives & Implementation:

24

Page 13: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

Technical / Process Related Initiatives:

• Development of Tamper Proof Energy Meters

• Payment Avenues increased from 20 Nos. (July 2002) to more than 1500 Nos.

• Door delivery of new Electricity Connection

• SMS Based Complaint Management System

• Instant Camp Connections at JJ Clusters

25

• Identification of components of AT&C Losses

• Loss Reduction Strategy - Technical Solutions

• Energy Accounting

• Re-engineering of Commercial Processes (BPR)

• AMR for all connections above 10 KW

• Automation Roadmap

• Technical & Process Related Initiatives

• Initiatives in association with Govt.

• Initiatives related to Society

Key Initiatives & Implementation:

26

Page 14: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

Initiatives in association with Govt.:

• Constitution of Special Court

• Assistance of Police Force / CISF during Enforcement Activities

• Relocation of JJ Clusters to a new resettlement Colony (Sawda Ghevra) for providing better services

• Amnesty schemes for settlement of old disputed cases (DT / DAE etc)

27

• Identification of components of AT&C Losses

• Loss Reduction Strategy - Technical Solutions

• Energy Accounting

• Re-engineering of Commercial Processes (BPR)

• AMR for all connections above 10 KW

• Automation Roadmap

• Technical & Process Related Initiatives

• Initiatives in association with State Govt.

• Initiatives related to Society

Key Initiatives & Implementation:

28

Page 15: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

Initiatives / Programmes related to Society:

• Life Insurance Policy for Socially / Economically Backward Consumers

• Development of local people as Franchisee

• Energy Conservation and Awareness through Energy Club (more than 31,000 Students covered)

• Woman Empowerment (Vocational Training, beautician Courses etc)

• Health Check-ups, Blood Donation etc

• Adult Literacy, Drug / alcohol de-addiction, Support to Orphanages, HIV / AIDS awareness etc.

• Engagement with the Public Representatives

29

New Initiatives:

• 108 MW Combined Cycle Power Plant

• Solar PV Based Power Plant

• GPRS based spot Billing

• SAP – ISU (Billing + CRM)(Industry Specific Solution for Utilities Industry)

• Centralized Call Centre (No current + Commercial)

• Special Consumer Group

30

Page 16: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

31

Structure of Presentation:

• Background

• Strategic Road Map and Strategic Decisions

• Key Initiatives

• Results

• Rewards & Recognitions

• Issues / areas requiring attention of Regulators

Savings to Govt. – Victory Curve

32

Page 17: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

Loss Reduction (Trend):

33

Parameters FY 02-03 FY 03-04 FY 04-05 FY 05-06 FY 06-07 FY 07-08 FY 08-09 FY 09-10

Energy Input (MU) 5,237 5,552 5,549 5,695 5,986 6,281 6,327 6,911

Units Billed (MU) 2,813 3,196 3,667 4,154 4,351 4,975 5,225 5,816

Amt. Billed 1,126 1,272 1,565 1,883 2,032 2,323 2,468 2,722

(Rs Cr)

Amt. Collected (Rs Cr) 1,095 1,219 1,568 1,897 2,132 2,394 2,539 2,759

AT&C Loss47.79 44.86 33.79 26.52 23.72 18.38 15 .04 14.47

(%)

Billing Efficiency (%)

53.72 57.56 66.08 72.95 72.68 79.21 82.58 84.16

Collection Efficiency (%)

97.18 95.78 100.2 100.73 104.94 103.04 102.87 101.34

Augmentation of Network Capacity:

Particulars Voltage Level

Unit On Takeover- Jul 2002

2010 (As on date)

% Change

Transformation Capacity

66 kV MVA 860 1,545 80

33 kV MVA 791 1,484 88

11 kV MVA 1703 3,770 121

Total (MVA) MVA 3,354 6,799 102

Transmission Lines

66 kV KM 176 309 76

33 kV KM 156 318 103

11 kV KM 2,245 3,555 58

Total (KM) KM 2,578 4,182 62

34

Page 18: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

Results – Few other parameters

PARAMETERS / PARTICULARS BEFORE TAKEOVER

AT PRESENT

OPERATIONAL:

Capital Investment (Rs Crores) 1,210(Valuation)

Add. 2,500

Transformer Failures w.r.t Installed Capacity (%) 11 1.2

Percentage Share in Load Shedding (In Delhi) 40 < 1

COMMERCIAL:

Average Days for New Connection Energization (Days) 51.8 8.0

Number of Electronic Meters - > 1.2 Million

% Provisional Billing 22.5 < 1

DT – Wise Energy Auditing (%) - 100

Special Courts (Nos) - 2

AT&C Losses (%) 53 < 14.0

35

36

Structure of Presentation:

• Background

• Strategic Road Map and Strategic Decisions

• Key Initiatives

• Results

• Rewards & Recognitions

• Issues / areas requiring attention of Regulators

Page 19: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

37

Awards & Recognitions - To name a few

National Award for Meritorious Performance (For Years 2004-2005 & 2005-2006)

38

Awards & Recognitions - To name a few

National Award for Meritorious Performance (For Year 2007-08)

Page 20: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

39

Awards & Recognitions - To name a few

National Award for Meritorious Performance (For Year 2008-09)

40

Awards & Recognitions - To name a few

ASIAN POWER AWARDS – POWER UTILITY OF THE YEAR

(FOR YEARS - 2007, 2008 & 2009)

Page 21: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

41

Edison Electric Institute (EEI) 2008 - Award for Implementation of GIS

Edison Electric Institute (EEI) 2009 – Award for Policy Advocacy

Awards & Recognitions - To name a few

Awards & Recognitions - To name a few

Public Lok Adalat Award for the 10,000 Settlements

in 2 ½ years

Expert Choice Award for Most Admired Organization - By

Power Line

SUGAM Award for Transparency in Billing

System

Intelligent Enterprise Award for IT initiatives

- By Indian Express

Award for Corporate Social Responsibility -

By Amity

Leadership Award for excellence in Power

Distribution – By Amity

42

Page 22: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

43

Structure of Presentation:

• Background

• Strategic Road Map and Strategic Decisions

• Key Initiatives

• Results

• Rewards & Recognitions

• Issues / areas requiring attention of Regulators

Issues / Areas requiring attention of Regulator :

• Appropriate balancing between the interests of all stakeholders (Consumer, Society, Environment, Govt. DISCOM etc):

a) Cost reflective tariff

b) Timely recovery of Cost

c) Encourage settlement of disputed arrears

d) Sharing of Income (Section 51, EA 2003) – Attractive sharing of profit / income to encourage Asset Sweating

e) Promotion of green power through Regulatory provisions

44

Page 23: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

• Regulatory Asset:

a) Against economic principles

b) Sends improper economic signal

c) Unnecessary burden of carrying cost

d) Deferment of problem, not a solution

e) Hence, use of this facility should be minimum and should not be repetitive

45

Issues / Areas requiring attention of Regulator :

46

• Practical approach while framing performance standard regulations keeping in view the ground realities

• Focus on long term development / sustainability of power sector

• An equitable approach towards various incentives / penalties provisions of performance standard regulations

• Regulatory provisions for introduction / promotion of new technologies / Systems

• Long term road map for the development of the power sector

• Pro-active measures to remove difficulties / problems faced by DISCOM (which are beyond the reasonable control of DISCOM)

Issues / Areas requiring attention of Regulator :

Page 24: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

Harmonization of regulations in power sector :

• Fuel price variance:

a) Immediate pass through for Generator

b) Annual / Periodic pass through for DISCOM

• Large disparity on treatment of various parameters:

a) O & M Costs (Normative Vs Actual)

b) Consolidated O & M Costs

c) Separate allowance for employee / A & G / R & M Costs

d) R & M Costs: Yearly inflation / % of Gross Fixed Asset

e) Employee and A & G Costs: Yearly inflation / Yearly inflation together with increased growth (MU / Consumers)

47

Harmonization of regulations in power sector :

• Large disparity on treatment of various parameters:

f) Depreciation rate:

- Ministry of Power, GOI specified rates

- CERC rates (2004 notification) with provision of Advance Against Depreciation (AAD) provision

- As per Companies Act

g) Allowance of Depreciation:

- Allowed on all assets

- Depreciation not allowed on assets financed from grants / consumer contribution

48

Page 25: NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh

Harmonization of regulations in power sector :

• Large disparity on treatment of various parameters:

h) Start Date for depreciation:

- From the year of Capitalization

- From the succeeding year after capitalization

i) Provisioning of bad debts:

- No provision

- Based on actual bad debts

- As a % of approved ARR

j) Return:

- Return on Equity

- Return on Capital

49

50

Thank You