Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh , Chief Operating Officer North Delhi Power Limited Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 3 rd Capacity Building Programme for Officers of Electricity Regulatory Commissions 23 – 28 August, 2010 Forum of Regulators 2 Structure of Presentation: • Background • Strategic Road Map and Strategic Decisions • Key Initiatives • Results • Rewards & Recognitions • Issues / areas requiring attention of Regulators
25
Embed
NDPL Performance Improvement of the Distribution Segment ... - Y S Butola - Performance... · Performance Improvement of the Distribution Segment (A Case Study of NDPL) Arup Ghosh
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Performance Improvement of the Distribution Segment
(A Case Study of NDPL)
Arup Ghosh , Chief Operating OfficerNorth Delhi Power Limited
Department of Industrial and Management Engineering
Indian Institute of Technology Kanpur
3rd Capacity Building Programme for Officers of Electricity Regulatory Commissions
23 – 28 August, 2010
Forum of Regulators
2
Structure of Presentation:
• Background
• Strategic Road Map and Strategic Decisions
• Key Initiatives
• Results
• Rewards & Recognitions
• Issues / areas requiring attention of Regulators
3
Delhi Vidyut Board in the Year - 2002:
• AT & C Loss - More than 53%
• Financial Loss - Approx Rs 10 Cr / Day
• Govt. Subsidies - Approx. 1,200 Cr / Annum
• Billing Receivables - Close to 1 year outstanding
• Equipments / Network - Pathetic
• Consumer Records - Manual & incomplete
• Consumer Care - None, No focus
• Power Interruptions - Availability 16 hrs/Day
0
10
20
30
40
50
60
1983
-84
1985
-86
1987
-88
1989
-90
1991
-92
1993
-94
1995
-96
1997
-98
1999
-00
2001
-02
Percentage T&D Losses
T & D Loss Trend - Pre-privatization
4
5
Key Parameters - In Year 2002
• Billing Efficiency = 53.72
• Collection Efficiency = 97.18
• AT & C Loss Level = approx 53 %
6
Geographic Description:
NDPL
BSES Rajdhani
BSES Yamuna
NDMCMES
Joint Venture of TATA Group with Delhi Govt.51:49%
NDPL Profile:
7
As on date
Rs. 2,759 Cr (FY 0910)
1,313 MW (Jul ’10)
6,911 MU
1.21 Million
3,950
510 Sq Kms
4.8 Million
1,439 *2,372
0.57
08% / 06%
As on Jul’2002
Rs. 1,095 Cr
850 MW
5,237 MU
0.8 Million
5,400
510 Sq Kms
4.2 Million
1,246
1,568
1.03
-
Particulars
Turnover
Peak Load
Energy Requirement
Total Registered Consumers
Number of Employees
Area of Distribution
Population Serviced (approx)
Per Capita Consumption (Units)
No of Consumers / Sq km
Employees / MU input
Load / Energy Growth
* (National Average of 500, Mumbai – close to 850)
8
Structure of Presentation:
• Background
• Strategic Road Map and Strategic Decisions
• Key Initiatives
• Results
• Rewards & Recognitions
• Issues / areas requiring attention of Regulators
Strategic Roadmap:
WHAT NDPL INHERITED – JULY 2002
AT&C Losses> 53%
No concept ofconsumer service
& IT Interface
Electricity Supply System on the
verge of collapse
Lack of Performance Orientation
STRATEGY FOR THE 1S T CONTROL PERIOD (2002 – 2007)
AT&C Losses <25%
Consumer service & IT Interface to be
comparable with World Standards
System Reliabilityto be comparable with Best Utilities in
India.
Performance Orientation through
Change Management
Ø50%
1,00,000 Backlog
Complaints
No Planned CAPEX & OPEX
in Past 3 Yrs
5,400 Staff (Unfavorable
Working Condition)
9
Strategic Decision:
• Decentralization of O & M activities / function
• Centralization of Commercial activities / Processes
• Replacement of Old Electro-mechanical Meters by New Electronic Meters
• Energy Accounting
• Intensive introduction of Technology
10
• Background
• Strategic Road Map and Strategic Decisions
• Key Initiatives
• Results
• Rewards & Recognitions
• Issues / areas requiring attention of Regulators
Structure of Presentation:
11
• Identification of components of AT&C Losses
• Loss Reduction Strategy - Technical Solutions
• Energy Accounting
• Re-engineering of Commercial Processes (BPR)
• AMR for all connections above 10 KW
• Automation Roadmap
• Technical & Process Related Initiatives
• Initiatives in association with Govt.
• Initiatives related to Society
Key Initiatives & Implementation:
12
Collection Process Deficiencies:20. Part Payment by Consumer21. Non Delivery of Bills22. Non Payment by Consumer (Defaulters)23. Premise Disconnected with Dues
Billing Process Deficiencies:14. Consumer not billed / under-billed15. Provisional Billing16. Bills pending for Quality Check (BQC)17. Bills pending for assessment18. Meters installed but not appearing in data base19. Un-metered connections:
Metering Process Deficiencies:7. Meter (address) not traceable8. Import / Export Metering Error 9. CT Ratio Errors
10. Stop / Slow / Defective Meter11. CT Ratio Errors12. Meters not read 13. Mismatch of Meters
Theft / Unauthorized Use:2. Direct Hooking3. Tampering / By -passing of Meter4. Misuse of Category5. Use of Multiple Connections - Misuse of Slab6. Sanctioned Load lower than actual usage
Technical Loses:1. Iron & Copper losses atSub-transmission (66kV/33kV) & Distribution (11kV & below) Network
Components of AT & C Losses:
13
• Identification of components of AT&C Losses
• Loss Reduction Strategy - Technical Solutions
• Energy Accounting
• Re-engineering of Commercial Processes (BPR)
• AMR for all connections above 10 KW
• Automation Roadmap
• Technical & Process Related Initiatives
• Initiatives in association with Govt.
• Initiatives related to Society
Key Initiatives & Implementation:
14
HVDS
High Loss
High Resistance
Areas
Implemented in more than 250 areas, more
under implementation.
High Loss
Low Resistance
Areas
LT ABCApprox. 2,500 Kms of
LT ABC laid, more under implementation
MeteringInitiatives
Electronic Meters, AMR,
Pre-Paid Metering
Schemes implemented successfully, more
under implementation
Loss Reduction Strategy – Technical Solutions
15
• Identification of components of AT&C Losses
• Loss Reduction Strategy - Technical Solutions
• Energy Accounting
• Re-engineering of Commercial Processes (BPR)
• AMR for all connections above 10 KW
• Automation Roadmap
• Technical & Process Related Initiatives
• Initiatives in association with Govt.
• Initiatives related to Society
Key Initiatives & Implementation:
16
17
M
M
M
M
By STU
66 or 33 KV
11 KV
At Consumer Premises With HT Load
Feeder Meter
11KV/415 V DT
For Energy Accounting
At Consumer Premises
66/33/11 KV
STU to DISCOM
FEEDERS TO ZONES
Tier 1: Transmission level
M
Tier 2 : Sub transmission Level
Tier 3 : Distribution level
M
Energy Accounting – Flow Chart
• Identification of components of AT&C Losses
• Loss Reduction Strategy - Technical Solutions
• Energy Accounting
• Re-engineering of Commercial Processes (BPR)
• AMR for all connections above 10 KW
• Automation Roadmap
• Technical & Process Related Initiatives
• Initiatives in association with Govt.
• Initiatives related to Society
Key Initiatives & Implementation:
18
19
CMG RRG RDGMRG RBG RCGMMG
RAG
Policy Regulatory Bench Data Revenue Infrastructure Advocacy Compliance Marking Analysis Protection Support
Consumers
Call Center
Customer Care Center
Website E mail LettersDrop boxes
SAMBANDH – Integrated Commercial Package software- Industry First!!
Business Process Re-engineering (BPR)
CCG
• Identification of components of AT&C Losses
• Loss Reduction Strategy - Technical Solutions
• Energy Accounting
• Re-engineering of Commercial Processes (BPR)
• AMR for all connections above 10 KW
• Automation Roadmap
• Technical & Process Related Initiatives
• Initiatives in association with Govt.
• Initiatives related to Society
Key Initiatives & Implementation:
20
Automatic Meter Reading (AMR):
METER
GSM-MODEM GSM-Network
PSTN-NetworkPSTN-MODEM
S/W
USERS
LA
N
DB
DEBS
I. METERING
II. COMMUNICATION
III. BACK OFFICE
21
• Identification of components of AT&C Losses
• Loss Reduction Strategy - Technical Solutions
• Energy Accounting
• Re-engineering of Commercial Processes (BPR)
• AMR for all connections above 10 KW
• Automation Roadmap
• Technical & Process Related Initiatives
• Initiatives in association with Govt.
• Initiatives related to Society
Key Initiatives & Implementation:
22
Automation Roadmap: Journey so far …
23
• GIS - Completed
• GSAS - Completed
• Communication Network - Established and Stabilized
• SCADA - In Operation
• DMS - Under Implementation
• DA - Under Implementation
• OMS - Under Implementation
• Identification of components of AT&C Losses
• Loss Reduction Strategy - Technical Solutions
• Energy Accounting
• Re-engineering of Commercial Processes (BPR)
• AMR for all connections above 10 KW
• Automation Roadmap
• Technical & Process Related Initiatives
• Initiatives in association with Govt.
• Initiatives related to Society
Key Initiatives & Implementation:
24
Technical / Process Related Initiatives:
• Development of Tamper Proof Energy Meters
• Payment Avenues increased from 20 Nos. (July 2002) to more than 1500 Nos.
• Door delivery of new Electricity Connection
• SMS Based Complaint Management System
• Instant Camp Connections at JJ Clusters
25
• Identification of components of AT&C Losses
• Loss Reduction Strategy - Technical Solutions
• Energy Accounting
• Re-engineering of Commercial Processes (BPR)
• AMR for all connections above 10 KW
• Automation Roadmap
• Technical & Process Related Initiatives
• Initiatives in association with Govt.
• Initiatives related to Society
Key Initiatives & Implementation:
26
Initiatives in association with Govt.:
• Constitution of Special Court
• Assistance of Police Force / CISF during Enforcement Activities
• Relocation of JJ Clusters to a new resettlement Colony (Sawda Ghevra) for providing better services
• Amnesty schemes for settlement of old disputed cases (DT / DAE etc)
27
• Identification of components of AT&C Losses
• Loss Reduction Strategy - Technical Solutions
• Energy Accounting
• Re-engineering of Commercial Processes (BPR)
• AMR for all connections above 10 KW
• Automation Roadmap
• Technical & Process Related Initiatives
• Initiatives in association with State Govt.
• Initiatives related to Society
Key Initiatives & Implementation:
28
Initiatives / Programmes related to Society:
• Life Insurance Policy for Socially / Economically Backward Consumers
• Development of local people as Franchisee
• Energy Conservation and Awareness through Energy Club (more than 31,000 Students covered)