H H H H H H H H LS LS LS LS LS LS LS ES LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS ES LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS Ramp Long Term Car Park HORIZON LOGISTICS PARK Car Park Car Park Car Park Car Park LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS ES LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS LS Mh Mh Mh H Mh H Mh Long Term Car Park Spring Long Term Car Park LS Mayeston Clos Creston Mh Resevoir (Covered) MERRYFALLS Merryfalls MEAKSTOWN Baile Maidheac Sillogue Water Pumping Station. Water Tower Under Const. Tk Playground 63.1 64.6 Mayeston Green Mayeston Green Sports Ground Golf Course Golf Course Mh Mh Mhs Mh LS LS LS LS LS LS T LS LS T 10kv SILLOGE Saileog Car Park Car Park Steps Steps Steps Car Park Car Park Car Park Under Const. Sluice Gate 21 - 60 Dublin Bus Depot wn wn FUTURE CONNECTION FUTURE CONNECTION FUTURE CONNECTION PROPOSED CONSTRUCTION COMPOUND NO. 3 MH-14 MH-15 MH-18 MH-17 MH-16 MH-19 MH-21 MH-20 MH-22 MH-23 MH-24 MH-27 MH-26 MH-25 AP-6 AP-7A NE E SE S SW W NW N Ordnance Survey Ireland Licence number EN 0016018. © Ordnance Survey Ireland/Government of Ireland N O T E S : 1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. 2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE 3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES 4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND, BEFORE ANY WORK COMMENCES. 5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD Client: Project: Title: Scale @ A1: Prepared by: Checked: Date: Project Director: Drawing No.: Revision: Rev Date Description By Chkd. TOBIN Consulting Engineers will not be liable for any use of this document for any purpose other than that for which it was originally prepared and provided. Except where specifically and explicitly agreed in writing by TOBIN Consulting Engineers, as copyright holder, no part of this document may be reproduced or transmitted in any form and this document shall not be relied upon by any third party for any purpose. Drawing Status: 1:2,500 PROJECT ROUTE MAP - Sheet 5 of 14 - 1:2,500 A. O'Callaghan B. Downes June 2018 C. O'Keeffe Planning 32102902-2005 P01 P01 08.06.18 ISSUE FOR PLANNING AOC BD 0 150m 100m 50m 50m KEY PLAN: 5 OSI 1:5,000 Sheet No's: 7029 OSI 1:2,500 Sheet No's: 3062-D, 3063-C, 3063-D, 3064-B, 3064-C, 3064-D, 3065-A, 3065-B, 3065-C, 3065-D, 3066-A, 3066-C, 3130-A, 3130-B, 3130-C, 3130-D, 3131-A. OSI 1:1,000 Sheet No's: 3063-12, 3063-13, 3063-14, 3063-15, 3064-11, 3064-12, 3065-15, 3066-06, 3066-11, 3129-15, 3129-20, 3129-25, 3130-11, 3130-12, 3130-15, 3130-16, 3130-17, 3130-20, 3130-21, 3130-22, 3131-01, 3131-06, 3131-07. FOR CONTINUATION REFER TO DRG. NO.: 32102902-2006 FOR CONTINUATION REFER TO DRG. NO.: 32102902-2004 MANHOLE AIR VALVE SCOUR VALVE MH-1 AV-1 SCV-1 ACCESS CHAMBER AC-1 LEGEND: PLANNING BOUNDARY CONSTRUCTION COMPOUNDS PROPOSED ORBITAL SEWER ROUTE (GRAVITY) PROPOSED OUTFALL PIPELINE ROUTE (LAND BASED SECTION) PROPOSED OUTFALL PIPELINE ROUTE (MARINE SECTION) PROPOSED WWTP/PS PROPOSED ORBITAL SEWER ROUTE (RISING MAIN)