MBAM CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT (CCPD) PROGRAMME TRAINING CALENDAR 2019 No Title & Content Outline Date & Time 1 01BM102 Time, Cost, Quality & Occupational Safety, Health & Environmental (OSHE) Management (01C01/01BM/02) Critical Success Factors For Construction Projects Managing Time & Cost In Relation To Quality Of Work Quality Achievement & Control In Construction Projects Construction Occupational Safety, Health & Environmental Management & Control For Construction Projects Wed, 13 Mar 19 14:00 – 6:00PM 2 01BM103 Project Management Body Of Knowledge (PMBOK) For Construction & Project Development The Project Management Framework & System The Function Of Project Management In Construction & Its Body Of Knowledge Understanding Core & Facilitating Construction Project Management Functions Dominating Knowledge Areas Of Construction Project Management Practices Thu, 14 Mar 19 14:00 – 6:00PM 3 01BM312 Identifying & Assessing Risks & Uncertainties In Construction Projects An Overview On Risk Management Categories Of Risks In Construction Identifying Risks In Construction Assessing & Analysing Risks In Construction Sat, 16 Mar 19 09:00 – 13:00 4 01BM313 Minimising & Mitigating Contractual Risk Through Effective Contract Management Project Risk Allocation & Contract Documentation Sources & Effects Of Contractual Risks Systematic Approach In Contractual Risk Management Project Risk Monitoring & Control As Part Of Contract Management Process Sat, 16 Mar 19 14:00 – 6:00PM 5 01BM314 Systematic Approach In Effective Contract Negotiation Characteristics & Critical Factors Of Contract Negotiation Negotiation Principles & Techniques Dealing With Difficult Negotiators Systematic Approach In Effective Contract Negotiation Sat, 23 Mar 19 09:00 – 13:00 6 01BM315 Contract Negotiation Techniques & Strategies Integrative Versus Distributive Approach In Contract Negotiation Planning & Preparing For Successful Contract Negotiation Strategising Successful Contract Negotiation The Art Of Successful Negotiation Sat, 23 Mar 19 14:00 – 6:00PM
12
Embed
MBAM CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT ...mbam.org.my/wp-content/uploads/2017/03/CCPD... · MBAM CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT (CCPD) PROGRAMME TRAINING
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
MBAM CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT (CCPD) PROGRAMME TRAINING CALENDAR 2019
No Title & Content Outline Date & Time
1 01BM102 Time, Cost, Quality & Occupational Safety, Health &
Environmental (OSHE) Management (01C01/01BM/02)
Critical Success Factors For Construction Projects Managing Time & Cost In Relation To Quality Of Work Quality Achievement & Control In Construction Projects Construction Occupational Safety, Health & Environmental Management & Control For Construction Projects
Wed, 13 Mar 19
14:00 – 6:00PM
2 01BM103 Project Management Body Of Knowledge (PMBOK)
For Construction & Project Development
The Project Management Framework & System The Function Of Project Management In Construction & Its Body Of Knowledge
Understanding Core & Facilitating Construction Project Management Functions
Dominating Knowledge Areas Of Construction Project Management Practices
Thu, 14 Mar 19
14:00 – 6:00PM
3 01BM312 Identifying & Assessing Risks & Uncertainties In
Construction Projects
An Overview On Risk Management Categories Of Risks In Construction Identifying Risks In Construction Assessing & Analysing Risks In Construction
Sat, 16 Mar 19
09:00 – 13:00
4 01BM313 Minimising & Mitigating Contractual Risk Through
Effective Contract Management
Project Risk Allocation & Contract Documentation Sources & Effects Of Contractual Risks Systematic Approach In Contractual Risk Management Project Risk Monitoring & Control As Part Of Contract Management Process
Sat, 16 Mar 19
14:00 – 6:00PM
5 01BM314 Systematic Approach In Effective Contract
Negotiation
Characteristics & Critical Factors Of Contract Negotiation Negotiation Principles & Techniques Dealing With Difficult Negotiators Systematic Approach In Effective Contract Negotiation
Factors Influencing Cost Of Preliminaries Data Collection & Analysis For Pricing Approach In Building-up Rates Building-up Unit Rates For Preliminaries
Wed, 17 Apr 19
14:00 – 6:00PM
10 06SM304 Organising & Controlling Construction Project
Preliminaries
An Overview On Construction Project Preliminaries Problems In The Execution Of Construction Project Preliminaries
Monitoring & Controlling Cost On Project Preliminaries A Systematic Approach In The Administration Of Project Preliminaries
Thu, 18 Apr 19
14:00 – 6:00PM
11 04PS101 Effective Project Planning & Scheduling I
Stages & Critical Factors In Project Planning, Monitoring & Control
Principles Of Effective Construction Project Planning For Successful Project Implementation
Cost & Time Distinction In Construction Project Planning Distinction Between Project Planning & Scheduling – Best Practices In Construction Project Planning & Scheduling
Wed, 24 Apr 19
14:00 – 6:00PM
12 04PS301 Project Planning & Scheduling For Tendering &
Estimating
Challenges & Critical Issues In Project Tendering & Estimating
Pre-requisites & The Approach Of Pre-tender Evaluation & Risk Assessment
Practical Pre-tender Planning In Project Tendering & Estimating
Stakeholder Management In Project Tendering & Estimating
Thu, 25 Apr 19
14:00 – 6:00PM
MBAM CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT (CCPD) PROGRAMME TRAINING CALENDAR 2019
No Title & Content Outline Date & Time
13 04PS201 Project Planning & Scheduling Using Gantt/ Bar
Chart & Critical Path Analysis (CPA) Methods II
Types, Purposes & Content Of Construction Project Schedules
Common Scheduling Techniques For Construction & Project Development
Comparing Traditional Gantt (Bar) Chart & Network Diagram – Do-It-Yourself In Preparing A Construction Project Schedule
14 04PS202 Project Planning & Scheduling Using Gantt/ Bar
Chart & Critical Path Analysis (CPA) Methods III
Scheduling As Part Of Construction Project Management Process
Project Planning & Scheduling Using CPA Network Scheduling Methods
Do-It-Yourself In Preparing A Construction Project Schedule Using The CPA Method
Post Contract (Award) Scheduling – Establishing & Maintaining Construction Project Schedule During Contract Execution
Sat, 27 Apr 19
14:00 – 6:00PM
15 04PS305 Project S Curve & Earned Value Management (EVM)
For Project Monitoring & Control II
Elements Of Effective Construction Project Monitoring & Control
Project S Curve & The Evolution Of Earned Value Management (EVM) In Project Time & Cost Monitoring & Control
Hands-on Application Of Project S Curve For Project Progress Monitoring & Control
Earned Schedule Management – An Enhancement For Project Progress Monitoring & Control
Wed, 12 Jun 19
14:00 – 6:00PM
MBAM CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT (CCPD) PROGRAMME TRAINING CALENDAR 2019
No Title & Content Outline Date & Time
16 04PS306 Project S Curve & Earned Value Analysis (EVA) From
Project Budgeting, Performance Measurement To
Project Forecasting III
Earned Value Project Management (EVPM) & Its Elements For Project Monitoring & Control
Using Earned Value Management For Detail Project Budgeting & Cost Control
Hands-on Application Of Earned Value Management For Overall Project Monitoring & Control
Using Earned Value Performance Indices For Overall Project Performance Measurement, Variance Analysis & Control; Reviewing & Forecasting Future Performance
Thu, 13 Jun 19
14:00 – 6:00PM
17 05CM201 Construction Procurement System & Contractual
Arrangement
An Overview Of The Construction Procurement Systems Types & Characteristics Of The Construction Procurement Systems
Contractual Arrangement In Relation To The Respective Procurement Systems
Effects Of The Construction Procurement System& Contractual Arrangement On The Management Structure Of Construction Project
Sat, 15 Jun 19
09:00 – 13:00
18 05CM202 Construction Contracts, Contractual Rights &
Obligations
An Overview Of The Law Of Contract Contract Terms & The Nature Of Construction Contracts Essential Criteria For The Formation Of Valid Contracts Considerations Of Implications & Consequences Prior Commitment To A Contract
Sat, 15 Jun 19
14:00 – 6:00PM
19 05CM401 Subcontracting & Domestic Subcontract
Administration
Construction Contract & Contract Execution Strategy Budgeting& Subcontracting Works In Project Execution Criteria & Selection Of Domestic Subcontractors Documentation For Subcontracting & Domestic Subcontract Administration
Sat, 22 Jun 19
09:00 – 13:00
MBAM CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT (CCPD) PROGRAMME TRAINING CALENDAR 2019
No Title & Content Outline Date & Time
20 05CM402 Nominated Sub-contract Administration
Purpose & Basis Of Nomination Of Subcontract Works & Supplies
Delay In & Objection To Nomination Contractual Relationship Amongst The Employer, The Main Contractor, The Nominated Subcontractors (NSC) & Nominated Suppliers (NS)
Effective Nominated Subcontract Administration
Sat, 22 Jun 19
14:00 – 6:00PM
21 06SM305 Nominated & Domestic Sub-contract Work
Coordination
Effects Of Procurement System & Contractual Arrangement To Contractor’s Management Organisation
Importance Of Effective Sub-contract Work Coordination & Control
Practical Approach In Effective Sub-contract Work Coordination & Control
Avoidance Of Pitfalls In Sub-contract Work Coordination
Wed, 03 Jul 19
14:00 – 6:00PM
22 05CM302 Construction Contracts & Contract Documentation
Appreciating The Use Of Standard Form Of Contract For Construction Projects
Understanding The Types Of Contract Documents For Project Execution
Identifying The Appropriate Project Documents For Contract Administration
Performing Effective Contract Administration With The Appropriate Project Documents
Thu, 04 Jul 19
14:00 – 6:00PM
23 05CM303 Effective Construction Drawing & Information
Management
Principles Of Construction Drawing & Information Management
Management Of Drawings & Information For Tendering Management Of Drawings & Information For Construction & Contract Administration
Communication & Dissemination Of Construction Information For Contract Execution
Wed, 10 Jul 19
14:00 – 6:00PM
MBAM CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT (CCPD) PROGRAMME TRAINING CALENDAR 2019
No Title & Content Outline Date & Time
24 05CM602 Construction Progress Monitoring, Variation &
Change Management
An Over View On Project Monitoring & Control For Construction Projects
Causes & Impact of Changes & Variations On Construction Cost & Schedule
Pitfalls In Contract Variation Claims Practical Approach In Managing Construction Changes & Contract Variations
Thu, 11 Jul 19
14:00 – 6:00PM
25 05CM701 Instructions, Variations & Claims I
Contractual Implication Of SO’s Or Architect’s Instruction & Direction
Oral & Written Instructions & Work Variation Principles & Practices Of Variation Claim Application, Administration & Settlement
Effects Of Price Fluctuation & Its Administration
Wed, 17 Jul 19
14:00 – 6:00PM
26 05CM703 Project Delays & Extension Of Time (EOT) I
Time Element & Time Related Clauses In Construction Contracts
Effects Of Site Possession & Work Suspension Effects Of Project Delays & Non-completion Extension Of Time Application & Imposition Of Liquidated & Ascertained Damages (LAD)
Thu, 18 Jul 19
14:00 – 6:00PM
27 05CM709 Contractual Claims & Dispute Avoidance I
Common Contractual Problems & Pitfalls Giving Rise To Contractual Claims & Disputes
Complexity Of Contractual Disputes First Line Of Defence In Contractual Dispute Avoidance Second Line Of Defence In Contractual Dispute Avoidance
Wed, 31 Jul 19
14:00 – 6:00PM
28 05CM710 Contractual Claims & Dispute Management II
Effects Of Contractual Disagreement & Disputes Recovery Of Damages & Other Remedies Responding To & Managing Contractual Claims Alternative Dispute Resolution (ADR) For Dispute Settlement
Thu, 01 Aug 19
14:00 – 6:00PM
MBAM CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT (CCPD) PROGRAMME TRAINING CALENDAR 2019
No Title & Content Outline Date & Time
29 06SM101 Pre-construction Planning & The Construction
Management Plan For Project Execution
Essential Elements Of Project Planning For Project Execution
Pre-construction Planning – The Cornerstone Of A Successful Project
The Scope Of Pre-construction Planning Construction Project Management Plan – A Systematic Approach In Pre-construction Planning
Wed, 07 Aug 19
14:00 – 6:00PM
30 06SM102 Construction Site Preparation & Organisation
The Nature & Types Of Construction Project Sites Planning For Site Preparation & Organisation Site Layout, Preparation & Control Site Organisation & Setting Out For Construction
Thu, 08 Aug 19
14:00 – 6:00PM
31 06SM103 Traffic Management & Control For Project Execution
Safety Risks & Hazards On Construction Sites Work Practices & Workplace Transport During Construction Planning A Safe Site For Vehicle Operation Effective Traffic Management In Construction
Wed, 14 Aug 19
14:00 – 6:00PM
32 06SM902 Lean Construction Project Management
Understanding The Lean Principles Lean Thinking In Construction – A New Paradigm For Construction Project Management
Critical Success Factor & The Barrier To Lean Construction Applying Lean Construction As An Approach To Waste Management
Thu, 15 Aug 19
14:00 – 6:00PM
33 06SM104 Construction Site Office Administration
Construction Site Office Administration & Management For Contract Compliance
Effective Site Office Administration & Management Systems Construction Documentation Management Methods & Techniques Of Formal & Informal Communication
Sat, 17 Aug 19
09:00 – 13:00
MBAM CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT (CCPD) PROGRAMME TRAINING CALENDAR 2019
No Title & Content Outline Date & Time
34 06SM105 Construction Site Security Management & Control
Principles & Practices Of Site Security Management Site Security Related Problems & Solutions Implementation Of Site Security Measures Roles Of Site Personnel In Effective Site Security Management & Control
Sat, 17 Aug 19
14:00 – 6:00PM
35 06SM301 Organising & Controlling Project Work Performance
Project Monitoring & Control In Construction Project Management
Critical Factors In Managing Project Performance To Expectation
Planning & Organising Control In Project Work Performance
Sectional & Practical Completion Of Contract Works Obligations Of Contractors In Defect Rectification Certificate Of Making Good Defects & The Release Of Retention Sum
Practical Approach To Project Close-out
Thu, 29 Aug 19
14:00 – 6:00PM
37 06SM404 Quality Management & Assurance For Construction
& Project Development
Competitive Environment In Contracting & The Quality Challenge
Quality & Quality Assurance In Construction & Project Development
Development Of Quality Assurance & Control For Construction Work Operation
Implementing & Maintaining Quality In Construction Works & Activities
Wed, 04 Sep 19
14:00 – 6:00PM
38 06SM406 Quality Management & Assurance For Contract &
Project Administration
The Old & The New Quality Culture Systematic Approach In Project Tendering Process Quality In Contract Administration & Procurement Management
Post-contract Review & Feedback For Continuous Quality Improvement
Thu, 05 Sep 19
14:00 – 6:00PM
MBAM CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT (CCPD) PROGRAMME TRAINING CALENDAR 2019
No Title & Content Outline Date & Time
39 06SM202 Construction Safety & Health Policies & Management
Requirement & Development Of Safety & Health Policy The Need For Safety Audit Development Of Appropriate Safety Programme Management Of Safety Programme
Sat, 07 Sep 19
09:00 – 13:00
40 06SM203 Monitoring & Supervising Construction
Occupational Safety & Health Performance
Planning & Operation Of Safe Working Environment Preparation & Dissemination Of Safety Plan Employer Responsibility On Site Safety Assessment Of Personal Protective Equipment Needs
Sat, 07 Sep 19
14:00 – 6:00PM
41 06SM408 Quality Management & ISO 9000 For Construction &
Project Development
Quality Performance – The Pre-requisite For Project Success
The Process Approach In Quality Management & The ISO 9000 Quality Standard
The Backbone Of Quality Management System & Documentation
Quality Audits & The Management Review In ISO 9000
Wed, 11 Sep 19
14:00 – 6:00PM
42 06SM410 Total Quality Management (TQM) & Continuous
Improvement (Kaizen) For Construction & Project
Development
Quality Management & The Building Process Principles Of Total Quality Management (TQM) Application Of TQM For Construction & Project Development
Kaizen (Continuous Improvement/ PDCA) & The Total Quality Management Framework
Thu, 12 Sep 19
14:00 – 6:00PM
43 05CM503 Construction Material Management & Inventory
Control
Principles & Practices Of Material Management & Inventory Control
Construction Material Procurement & Administration Site Material Inventory Control & Store Management Role Of Site Personnel In Effective Material Management & Inventory Control
Sat, 21 Sep 19
09:00 – 13:00
MBAM CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT (CCPD) PROGRAMME TRAINING CALENDAR 2019
No Title & Content Outline Date & Time
44 06SM302 Construction Material Management & Wastage
Control
Principles & Practices Of Material Management & Wastage Control
Types Of Construction Wastes & Wastage Prevention Wastage Control Through Material Reconciliation & Wastage Factor Evaluation
Roles Of Site Personnel In Effective Material Management & Wastage Control
Quality & Quality Management In The Construction Industry Fundamentals Of The Construction Process & Products In Quality Achievement
Quality Management & The Construction Process in Quality Achievement
Principles & Practices of Quality Assessment for Construction & Project Development
Wed, 25 Sep 19
14:00 – 6:00PM
46 06SM422 Quality Management & Assessment For Construction
Projects
Quality Standard For Construction Works & Development Project
Quality Assessment Procedures & The Quality Assessment Tools
Quality Performance & Computation Of Quality Assessment Scores
Application Of Quality Assessment System For Specific Purpose
Thu, 26 Sep 19
14:00 – 6:00PM
47 06SM501 Effective Construction Project Supervision & Control
I
Tip for Construction Project Management Success Effective Construction Project Supervision & Control – Schedule, Cost, Quality & Scope
Duties & Responsibilities of Construction Supervisors Towards Project Success
Ladder of Opportunity & Career Advancement
Wed, 09 Oct 19
14:00 – 6:00PM
MBAM CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT (CCPD) PROGRAMME TRAINING CALENDAR 2019
No Title & Content Outline Date & Time
48 06SM906 Application Of The "5S" Principles & Practices For
Effective Project Housekeeping & Sustainable
Construction
An Overview On The “5S” Principles & Practices Project Housekeeping
Reducing Waste Through The Good Practice Of Housekeeping
Planning & Implementing “5S” On Construction Site Planning & Implementing “5S” Audit For Continuous Improvement
Thu, 10 Oct 19
14:00 – 6:00PM
49 05CM504 Construction Plant & Procurement Management
Principles & Practices Of Plant Procurement Management Practical Approach In Construction Plant Procurement, Handling & Control
Criteria On Hire Or Purchase Of Plant Insurance For Construction Plant
Sat, 12 Oct 19
09:00 – 13:00
50 06SM303 Construction Plant & Maintenance Management
Principles & Practices Of Plant Maintenance Management Operation & Maintenance (O&M) Manuals For Plant Operation & Scheduled Maintenance
Selection Criteria On Plant Maintenance Set-up Plant Depot & Spare Part Inventory Management & Control
Sat, 12 Oct 19
14:00 – 6:00PM
51 10HR201 Working With People & Contractors
Human Behavioural Science & The Project Management Process
Understanding Roles & Responsibilities Of Project Team Importance Of Attitude Towards Works, Cooperation & Relationships Of Project Team
Working With People Issues In Project Organisation
Wed, 23 Oct 19
14:00 – 6:00PM
52 10HR202 Managing People & Contractors
Hire, Inspire, Admire, Retire In Human Resource Management
Roles Of Project Manager & Project Team Dynamics Keys To Managing People In Projects – Motivation, Influence, Power & Effectiveness
Organisational & Personal Change Management
Thu, 24 Oct 19
14:00 – 6:00PM
MBAM CONSTRUCTION CONTINUING PROFESSIONAL DEVELOPMENT (CCPD) PROGRAMME TRAINING CALENDAR 2019
No Title & Content Outline Date & Time
53 10HR403 Leadership & Relationship Management In
Construction & Project Development
Leaders Vs Managers Leadership & Its Relationship To Management Performance Leadership Quality In Construction Project Management An Effective Project Leadership & Relationship Management Model for Project Success
Wed, 30 Oct 19
14:00 – 6:00PM
54 10HR501 Stress - The Good, The Bad & The Ugly
An Overview On Stress Its Impact On The Way We Feel & Think The Positive & Negative Side Of Stress The Ugly Side Of Stress – The Balancing Act On Stress Management
Thu, 31 Oct 19
14:00 – 6:00PM
55 10HR603 Effective Project Communication & Written
Communication Skill I
Introduction To Communication Skills Understanding Verbal, Non-verbal & Written Communication
Communication Cycle & The 7 Cs Of Effective Communication
Type Of Written Communication & Getting Written Messages Across Clearly
Wed, 06 Nov 19
14:00 – 6:00PM
56 10HR604 Effective Project Communication & Written
Communication Skill II
Inspiring Action With Effective Writing Skills Elements of Effective Written Communication Choosing The Right Chart & Diagram In Written Communication
Developing Effective Writing Communication Skills
Thu, 07 Nov 19
14:00 – 6:00PM
57 10HR605 Letter & Report Writing For Construction & Project
Development I
Effective & Method Of Communication The Seven Principles of Business Correspondence Effective & Creative Report Writing Tips & Formats Report Writing For Project Delays & Variations For Contractual Claims & Dispute Management
Wed, 20 Nov 19
14:00 – 6:00PM
58 10HR606 Letter & Report Writing for Construction & Project
Development II
Principles Of Effective Writing Skills The Importance Of Written Communication In Contract Execution
Effective & Creative Letter Writing Tips & Formats Letter Writing For Project Delays & Variations For Contractual Claims & Dispute Management