Top Banner

of 25

LSCM Project

Apr 14, 2018

Download

Documents

Manish Kumar
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 7/30/2019 LSCM Project

    1/25

    SUPPLY CHAIN MANAGEMENT

    of TATA MOTORS AND MARUTI

    SUZUKI

    SUBMITTED BY

    Amar Jyoti (12PGDM128)

    Ankur Chaturvedi(12PGDM131)Manish Kumar(12PGDM87)

    Michael Mangalam(12PGDM89)

    Subham Gupta(12PGDM111)

  • 7/30/2019 LSCM Project

    2/25

    OBJECTIVES OF STUDY

    Study of vehicle manufacturing processes

    from raw material to finish vehicles.

    Comparision of supply chain management at

    tata motors and maruti suzuki

  • 7/30/2019 LSCM Project

    3/25

    1 Indias largest automobile company, with revenues of US$ 34.575 billion (2012)

    2Winning products in the compact, midsize cars and utility vehicle segments

    3

    The Companys 60000 employees are guided by the vision to be best in the manner inwhich we operate, best in the products we deliver and best in our value system and ethics

    4Worlds fourth largest truck and second largest bus manufacturer

    5The first company from Indias engineering sector to be listed in New York Stock Exchange

    6

    Subsidiaries are Tata Daewoo, Tata Hispano, Tata Technologies, Jaguar and LandRover

  • 7/30/2019 LSCM Project

    4/25

    Plant Location and production CapacityLocation Type of vehicle

    manufactured

    Production

    Capacity(Lakh/PA)

    Pune Passenger Cars (Indica,

    Indigo, Marina, Indica Vista)

    2.7 L

    Pune Commercial Vehicles (MCVs

    and HCVs, LCVs, Utility

    vehicles)

    2.5 L

    Jamshedpur Trucks & Special Purpose

    Vehicles

    1.08 L

    Lucknow Buses 0.6 L

    Pantnagar(Uttarakhand) Mini Truck (Ace), PassengerCarrier (Magic)

    2.25 L

    Sananand Tata Nano

    Hereafter we have limited the scope of study to a single location which is

    Passenger Car Business Unit (PCBU), K Block, Pune

  • 7/30/2019 LSCM Project

    5/25

    Competitive Priorities for TATA Motors

    1 Maintaining global standards to tackle competition

    2

    For luxury bus segment: its major focus is on the fully-built vehicle

    delivery rather than supplying only chassis

    3 Diversified suppliers, eg. NANO car has more than 128 suppliers

    4

    Sourcing through reverse auction which includes evaluating suppliers,

    identifying new suppliers, leading to better supply management

    5

    To cut costs, Tata Motors tried innovative techniques such as zero-basedcosting

    6

    Believed in developing strong in house design, engineering, and

    manufacturing capabilities

  • 7/30/2019 LSCM Project

    6/25

    Management Hierarchy of PCBU, Pune

    HR

    Formalized selection, evaluation, and payroll processes

    Records basic selection, training and development, capabilities and skills management,compensation planning records etc.

    Engineering& Research

    Centre

    The facility includes - improving Engine Performance, Reducing Emissions, Test Tracks, Designingand Styling and Safety

    Technical &Productivity

    Services

    necessary technical assistance for smooth production in the plant

    Functions includes setting up new assembly lines, seeking prospects for modifications in the

    current assembly lines, etc.

    Production

    Group carries out production as per the production plan prepared by production planning andcontrol (PPC)

    VendorDevelopmen

    t

    Small parts are outsourced to various vendors, due to various in-house constraints

    Identifies the appropriate vendor and ensures proper quality standards

  • 7/30/2019 LSCM Project

    7/25

    Production Strategy Followed in TATA

    Motors

    Passenger Car Division in 'K' block executes the entire process ofcar manufacture over five shops

    Engine shopTransmission

    shop

    Press and

    body shopsPaint shop

    Assembly

    shop

    1

    The shops are fully automated ensuring that there is minimal chance for error in the

    manufacturing processes

    2Production Strategy being implemented in Tata Motors is Make to Stock

    3

    Demand forecast is done by the marketing team and accordingly a production plan is

    prepared

    4

    The cars produced are tested thoroughly and after successful completion, they are stored

    in large free space available in the company premises

    5

    Some special purpose vehicles such as utility vehicles for defence, mini-ambulance for

    hospitals are made as per the order

  • 7/30/2019 LSCM Project

    8/25

    Plant Layout of PCBU, Pune

    Machine Shop

    Engine Shop

    Press Shop

    Paint Shop

    TCF

  • 7/30/2019 LSCM Project

    9/25

    Quality Management

    1 Has introduced cleaner engines

    2

    First Indian company introduce vehicles with

    Euro I and Euro II norms

    3

    Manufacturing stage - regulars quality audits

    held by in-house auditors

    4

    Post manufacturing -stringent testing standards

    such as shower test, wheel balancing

  • 7/30/2019 LSCM Project

    10/25

    ENVIRONMENTAL MANAGEMENT

    1

    Reduce the emission levels of vehicles in full complianceof the regulatory norms

    2

    proactively work with the industry, Government, other

    related industries & agencies to bring in internationalpractices

    3

    Conserve natural resources and energy by minimizingtheir consumption & wastage

    4

    Certified with ISO 14001 : 1996 for EnvironmentalManagement System (EMS)

  • 7/30/2019 LSCM Project

    11/25

    WORK MEASUREMENT

    1

    first Indian Company to introduce the Balance Scorecard System inautomotive sector in India

    2

    Balance Scorecard System - incorporates SQDCM (Safety, Quality,

    Delivery, Cost and Morale)

    3

    Suggestion scheme - any employee irrespective of his cadre can suggest

    an improvement in the work place ; if approved, employee gets rewards

    points

    4

    Gift voucher for achieving certain number of points

    5Bonus on certain festive occasion

  • 7/30/2019 LSCM Project

    12/25

    VALUE ENGINEERING

    1 Continuous efforts are made to reduce the cost of

    service

    2

    Rejection of input parts received from vendors -

    closely monitored

    3

    Vendors penalised if rejection exceeds beyond the

    defined limits

    4

    consumption of electricity, water, LPG, Compressed

    air - continuously monitored ; steps taken to reduce

    their consumption

  • 7/30/2019 LSCM Project

    13/25

    MATERIAL MANAGEMENT

    Tata Motors uses SAP 4.6C Material

    Management (MM) module for:

    materials planning and control,

    purchasing,

    goods receiving,

    inventory management, invoice verification.

  • 7/30/2019 LSCM Project

    14/25

    REVERSE ENGINEERING

    Reverse engineering is a process bywhich the design of a product is

    analysed or re-created using a

    physical part or mock-up as a

    starting point. This becomes truly

    valuable when trying to extract thedesign intent from a handmade

    model

    Tata motors does reverse

    engineering of its competitors cars

    in an effort to constantly improve

    on the design of its cars

  • 7/30/2019 LSCM Project

    15/25

    Problems identified

    Waste management and hygiene issue

    Major environmental wastes: machine lubricants and coolants;

    aqueous and solvent cleaning systems; paint; and scrap metals

    and plastics. Hazardous cleaning chemicals very common, requirespecial waste management arrangements.

    Efficient utilization of Human resource

    Efficient utilization of human capital is always a questionable task.On comparing the human capital utilization with that with the

    best in the business, TATA motors was found lagging behind.

  • 7/30/2019 LSCM Project

    16/25

    Tools management

    Lot of time wasted in tools movement from the stock to theshop floor. Whenever a tool is broken or is declared useless,

    than the assembly line has to stop till the new

    Unorganised flow path

    The place for each item was not clearly labelled ordemarcated. Items not arranged in a manner that promotes

    efficient work flow (eg : Workers had to bend repetitively to

    access materials) Each tool, part, supply, or piece of

    equipment was not kept close to where it will be used

    Untidy shop floor with dusts in the weld shop and press

    shop

    Customer complaints and defects in products after delivery

  • 7/30/2019 LSCM Project

    17/25

    OUR RECOMMENDATIONS

    Adoption of Kaizen

    The Kaizen Management System addresses all aspects that

    contribute to company results including quality, costs, logistics,

    staff motivation, safety, technology

    The entire process chain from supplier via the internal

    customer to the final customer is therefore taken

    available tools are used to eliminate all wasteful activities

  • 7/30/2019 LSCM Project

    18/25

    Adoption of six sigma methodology

    6 sigma is a structured statistical methodology that can be

    used to measure the quality of the service and performance.

    6 sigma is 3.4 Defects per million opportunities(DPMO).

    The accuracy is at a level of 99.9997%.

    Six Sigma is a process improvement set of tools and strategies

  • 7/30/2019 LSCM Project

    19/25

  • 7/30/2019 LSCM Project

    20/25

    Device to clean foot - Before coming to the assembly

    lines and the shop floors everyone should clean their

    shoes

  • 7/30/2019 LSCM Project

    21/25

  • 7/30/2019 LSCM Project

    22/25

  • 7/30/2019 LSCM Project

    23/25

    Efficient utilization of space

  • 7/30/2019 LSCM Project

    24/25

    Focus on hygiene

    Problems in implementing kaizan

  • 7/30/2019 LSCM Project

    25/25

    Problems in implementing kaizan

    managementresistance

    managers may find it hard to manage empowered workers

    employeeresistance

    this may occur, especially in situations where industrial relations have been

    poor in the past. Employees may simply feel that they are being asked to do

    more without extra pay

    cost oftraining

    - attitudes will need to change and the type of training required to achieveattitudinal change will be expensive and lengthy.

    justifying thecost

    the costs of implementing a kaizen programme, in terms of both training

    and lost production, will be clear. The benefits will be unknown until the

    programme is up and running.

    Unfortunately there are a number of barriers that must be overcome in order

    to implement a kaizen programme.