LEED-EB: LEED-EB: Going for Platinum Going for Platinum LEADERSHIP IN ENERGY AND LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN ENVIRONMENTAL DESIGN FOR EXISTING BUILDINGS FOR EXISTING BUILDINGS Theresa Townsend, Senior Architect, DGS Green Team Linda McMullen, Assistant Chief of DGS’ Building and Property Management Branch Vince Paul, Manager of the Environmental Safety Health Operations Program for DGS’ Building and Property Management Branch
56
Embed
LEED-EB: Going for Platinum LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN FOR EXISTING BUILDINGS Theresa Townsend, Senior Architect, DGS Green Team Linda.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
LEED-EB:LEED-EB:Going for PlatinumGoing for Platinum
LEADERSHIP IN ENERGY AND LEADERSHIP IN ENERGY AND
ENVIRONMENTAL DESIGNENVIRONMENTAL DESIGN
FOR EXISTING BUILDINGSFOR EXISTING BUILDINGS
Theresa Townsend, Senior Architect, DGS Green Team
Linda McMullen, Assistant Chief of DGS’ Building and Property Management Branch
Vince Paul, Manager of the Environmental Safety Health Operations Program for DGS’ Building and Property Management Branch
California Department of Education Building15th and N Streets in Sacramento
“We have everything we need to get started…”
HOW TO GET STARTED
PREREQUISITES (pr)PREREQUISITES (pr)
PREREQUISITESPREREQUISITES are the first are the first requirements to meet. In several requirements to meet. In several instances, the prerequisite establishes a instances, the prerequisite establishes a baseline. In all cases, baseline. In all cases, allall prerequisites prerequisites must be met in order to achieve any must be met in order to achieve any LEED-EB rating. LEED-EB rating.
14 PREREQUISTES14 PREREQUISTES
RELATED CREDITS (cr)RELATED CREDITS (cr)
RELATED CREDITRELATED CREDIT refers to the credit refers to the credit that is directly tied to the calculations that is directly tied to the calculations used for establishing a PREREQUISITE.used for establishing a PREREQUISITE.
19 19 RELATED CREDITSRELATED CREDITS of the 85 total of the 85 total
ALL OTHER CREDITS (cr)ALL OTHER CREDITS (cr)
66 other 66 other CREDITS CREDITS of the total 85of the total 85
Measurable and Quantifiable MetricsMeasurable and Quantifiable Metrics
Exceed a PREREQUISITE or DEFINED CREDIT Exceed a PREREQUISITE or DEFINED CREDIT by an additional incremental percentageby an additional incremental percentage
Allowed one Educational Credit. Group all related Allowed one Educational Credit. Group all related educational programs in one innovation crediteducational programs in one innovation credit
“Growing California Green” Annual Educational
Program at the Child Care Center at the Education
Building
“Thrift-a-saurus Sav-a wattus”
Treat the earth well.It was not given to you by your parents.It was loaned to you by your children.Ancient Kenyan Proverb
LEED-EB Checklist
•Prerequisites (highlighted in yellow)
•Related Credits (highlighted in lt. green)
www.green.ca.gov/greenbuildings/bbbtmanual.htm
SUSTAINABLE SUSTAINABLE SITES (SS)SITES (SS)
SS pr1 Erosion & SS pr1 Erosion & Sedimentation Sedimentation ControlControl
SS pr2 Age of SS pr2 Age of BuildingBuilding
No related credits No related credits in this categoryin this category
SS
Sustainable Sites
WATER WATER EFFICIENCY (WE)EFFICIENCY (WE)
WE pr1 Minimum Water EfficiencyWE pr1 Minimum Water Efficiency RELATED CREDIT: WE cr3.1, 3.2 RELATED CREDIT: WE cr3.1, 3.2
(exceed baseline by 10%, or 20%)(exceed baseline by 10%, or 20%)
WE pr2 Discharge Water ComplianceWE pr2 Discharge Water Compliance National Pollution Discharge Elimination System (NPDES) National Pollution Discharge Elimination System (NPDES)
PermitPermit
WE
Water Efficiency
ENERGY & ENERGY & ATMOSPHERE (EA)ATMOSPHERE (EA)
EA pr1 Existing Building CommissioningEA pr1 Existing Building Commissioning
EA pr2 Minimum Energy PerformanceEA pr2 Minimum Energy Performance RELATED CREDIT: EA c1 (Energy Star)RELATED CREDIT: EA c1 (Energy Star)
EA pr3 Ozone Protection (CFCs)EA pr3 Ozone Protection (CFCs) RELATED CREDIT: EA c4 (HCFCs)RELATED CREDIT: EA c4 (HCFCs)
MR pr2 Reduced Mercury in Light BulbsMR pr2 Reduced Mercury in Light Bulbs RELATED CREDITS: MR 6, IU credit optionRELATED CREDITS: MR 6, IU credit option
MR
Materials and Resources
IEQ pr1 Outside Air Introduction & Exhaust IEQ pr1 Outside Air Introduction & Exhaust Systems (ASHRAE 62.1-2004)Systems (ASHRAE 62.1-2004) RELATED CREDIT: IEQ cr2 (exceed by RELATED CREDIT: IEQ cr2 (exceed by
The Education building is the first State Building to have a Under Floor Air Distribution System (UFAD)
INNOVATION INNOVATION in Operations in Operations & Upgrades (IU)& Upgrades (IU)
RELATED CREDIT: IU c2RELATED CREDIT: IU c2
LEED ACCREDITED PROFESSIONALLEED ACCREDITED PROFESSIONAL
IU c1: ADDITIONAL REDUCED MERCURY IN IU c1: ADDITIONAL REDUCED MERCURY IN LIGHT BULBS related to MRpr2 and MRcr6LIGHT BULBS related to MRpr2 and MRcr6
IUInnovation in Operation & Upgrades
LEED-EB Checklist
•Records or Reports
•Calculations
•Drawings
•Management Plan
•Other
LEED-EB: LEED-EB: Going for Going for Platinum: Platinum:
Management PlansManagement Plans
Linda McMullenAssistant ChiefDGS/Building and Property Management [email protected]
California Best Practices ManualBetter Building Management for a Better Tomorrow
•Objectives:• To provide a one-source document
of department wide policies for each building•To meet the LEED-EB requirements•Provide sample documents in the event of a renovation, addition or remodeled space•Create a template / format to share
with other entities applying for LEED-EB
California Best Practices ManualBetter Building Management for a Better Tomorrow
California Best Practices ManualBetter Building Management for a Better Tomorrow
•Custodial Plan•General Staffing•Special Cleaning Requirements•Custodial Plan•Cleaning Systems Method•Environmental Maintenance Program•Inventory Management and Purchasing Program •Employee Orientation and Training
Better Building Management for a Better TomorrowCalifornia Best Practices Manual
•Integrated Pest Management (IPM)•IPM Objectives and Strategies•IPM Program•Pesticide Planning and Use•Guidance
California Best Practices ManualBetter Building Management for a Better Tomorrow
•Engineering and Trades Plan•Engineering Staff•Maintenance•Operations•Building Systems Monitoring•Indoor Air Quality Management Plan•Refrigerant Management
California Best Practices ManualBetter Building Management for a Better Tomorrow
•Site and Grounds•Erosion and Sedimentation Control•Exterior Management Plan
California Best Practices ManualBetter Building Management for a Better Tomorrow
•Purchasing•Reduced Mercury Light Bulbs•Products with Salvaged or Recyclable Materials•Indoor Air Quality (IAQ) Products•Green Cleaning Products
California Best Practices ManualBetter Building Management for a Better Tomorrow
•Waste and Recycling Management•Organization Integrated Waste
Management Plan •Universal Hazardous Waste•Recycling Area Guidelines
California Best Practices ManualBetter Building Management for a Better Tomorrow
•Construction and Renovation Policies•Asbestos Management Plan•PCB Management Plan•Construction and Demolition IAQ Plan•Building Space Churn Renovation Plan•Construction Waste Management Plan
California Best Practices ManualBetter Building Management for a Better Tomorrow
•Tenant Handbook•Building Security•Emergency Procedures•Building Amenities•Building Services•Policies and Procedures•General Rules and Policies
California Best Practices ManualBetter Building Management for a Better Tomorrow
•Appendices
• Samples of Specifications
•Erosion and Sedimentation Control
•Construction and Demolition Waste
•Construction Indoor Air Management
www.green.ca.gov/greenbuildings/bbbtmanual.htm
LEED-EB:LEED-EB:Going for Platinum Going for Platinum
The “Sweet 16”The “Sweet 16”
Vince PaulManager of the Environmental Safety Health Operations ProgramDGS/Building and Property Management [email protected]