Test IV Test IV Test IV Test IV The “Townsend” Test The “Townsend” Test Herb Townsend Herb Townsend The Townsend Test The Townsend Test Townsend Corrosion Consultants Townsend Corrosion Consultants 1 1 Townsend Corrosion Consultants
Test IVTest IVTest IV Test IV The Townsend TestThe Townsend Test
Herb TownsendHerb Townsend
The Townsend TestThe Townsend TestTownsend Corrosion ConsultantsTownsend Corrosion Consultants
11 Townsend Corrosion Consultants
ScopeScopepp
Fundamental definitions and concepts Fundamental definitions and concepts
Review of previous studiesReview of previous studies
Test IV description and purposep p p
Current status of testing
22 Townsend Corrosion Consultants
Specific RequirementsSpecific RequirementsFor Hydrogen EmbrittlementFor Hydrogen Embrittlementy gy g
33 Townsend Corrosion Consultants
Sustained, HighSustained, High--Tensile LoadTensile Load, g, g
Hydrogen embrittlement requires a sustained, high tensile loadhigh tensile load.
Cracking is a slow process Cracking is a slow process
Time needed for hydrogen to diffuseTime needed for hydrogen to diffuse to crack site
Not detected at normal test speeds
44 Townsend Corrosion Consultants
Sources Of HydrogenSources Of Hydrogeny gy g
Process HydrogenAcid cleaning Acid cleaning
Galvanizing Phosphatingp g Electroplating
Corrosion HydrogenCorrosion Hydrogen Cathodic protection Galvanic corrosion of zinc
55 Townsend Corrosion Consultants
Fundamental ConceptsFundamental Conceptspp
There is a critical threshold load for SCC
In terms of fracture mechanics, the critical value is Kis KIscc
KI decreases with increasing hardnessKIscc decreases with increasing hardness
KIscc decreases with decreasing electrochemical Iscc gpotential
66 Townsend Corrosion Consultants
Key DefinitionsKey Definitionsyy
Hydrogen embrittlement (HE) loss of cohesion between atoms caused by H in steelbetween atoms caused by H in steel
Internal hydrogen embrittlement (IHE) HE caused by H entering the steel during processing also calledH entering the steel during processing, also called process hydrogen
External hydrogen embrittlement (EHE) HE caused External hydrogen embrittlement (EHE) HE caused by H entering from the environment
In the case of exposure to water EHE is often called In the case of exposure to water, EHE is often called corrosion hydrogen embrittlement, or stress corrosion cracking (SCC)
77 Townsend Corrosion Consultants
Electrochemical ReactionsElectrochemical ReactionsOn Galvanized SteelOn Galvanized Steel
Galvanized coatingZn Zn+2 + 2eZn Zn+2 + 2e-
Exposed steel2e- + 2H2O 2OH
- + H2
In solutionZn+2 + 2OH- Zn(OH)2 (white rust)
Overall reactionOverall reactionZn + 2H2O Zn(OH)2 + H2
99 Townsend Corrosion Consultants
Results of Results of Previous StudiesPrevious StudiesPrevious StudiesPrevious Studies
1973 1973 Large research program conducted by Large research program conducted by BattelleBattelleg p g yg p g yfor the Research Council on Structural Connectionsfor the Research Council on Structural Connections
1010 Townsend Corrosion Consultants
Battelle Bolt Study Battelle Bolt Study 19731973yy
A325 (HRC 25-34) bolts
A490 (HRC 33-39) bolts
Black, ungalvanized
Galvanized
Laboratory and outdoor tests
1111 Townsend Corrosion Consultants
Battelle Bolt Study Battelle Bolt Study 1973 Results1973 Results
Bare and galvanized A325 bolts no failures
Bare A490 bolts no failures
Galvanized A490 numerous failures
Battelle suggested that failures were due to EHE caused by galvanic activity of galvanized y g y gcoatings
1212 Townsend Corrosion Consultants
1975 1975 Fracture Mechanics TestsFracture Mechanics TestsPrecrackedPrecracked 11--in SQ Bars (ASTM E 1681)in SQ Bars (ASTM E 1681)( )( )
1313 Townsend Corrosion Consultants
19751975Fracture Mechanics TestsFracture Mechanics Tests
4140 1-in. bars, HRC 32 to 48
Notched cantilever-beam specimens
Fatigue precracked Fatigue precracked
Bare and zinc-coated
Rapid-load tests in air for baseline toughness
Sl l d t t i i f IHE Slow-load tests in air for IHE
Slow-load tests in 3.5% salt solution for EHE
1414 Townsend Corrosion Consultants
FpcFpc Specimen and Specimen and the the KiesKies EquationEquationqq
The stress intensity factor, K1, is calculated from Equation 1, the Kies equation as given by Brown [8, 13] and modified to account for side grooves:
2/32/1
2/13
3
1
112.4
WBB
MK
(1)
In equation 1, M is the applied moment, W is the overall specimen height, B is the overall
WBB n
the overall specimen height, B is the overall specimen width, Bn is the net specimen width
at the side grooves, and is defined:
a1
Where a is the overall crack length, notch depth included.
w1
1515 Townsend Corrosion Consultants
g , p
Dry, SlowDry, Slow--Load Tests Galvanized Load Tests Galvanized Bars In Air For IHEBars In Air For IHE
1616 Townsend Corrosion Consultants
Greater Susceptibility to EHEGreater Susceptibility to EHEp yp y
1717 Townsend Corrosion Consultants
Effect of HardnessEffect of Hardnesson EHE Thresholdon EHE Threshold
70Kscc vs Hardness
dKscc/dHRC = -3.8 50
60
KSI
in^0
.5
30
40
y Fa
ctor
, K
20
30
ss In
tens
ity
0
10
30 35 40
Stre
s
H d HRC
1818 Townsend Corrosion Consultants
Hardness, HRC
Effect of Electrochemical Effect of Electrochemical Potential on EHE ThresholdPotential on EHE Threshold
100
Kscc vs E (HRC=35)
80
90
100
SI in
^0.5
Steel
dK/dE = - 0.134 Ksi-in0.5/mv
60
70
y Fa
ctor
, KS
40
50
ss In
tens
ity
Zi
20
30
0.6 0.65 0.7 0.75 0.8 0.85 0.9 0.95 1 1.05 1.1
Stre
s Zinc
1919 Townsend Corrosion Consultants
Potential, -Vsce
Townsend 1975Townsend 1975Summary of ResultsSummary of Resultsyy
Dry slow-step load Loss of strength due to hydrogen from galvanizing processhydrogen from galvanizing process
Wet slow-step load Larger loss of strength Wet slow-step load Larger loss of strength due to hydrogen from galvanic corrosion of zinc coatingg
Led to prohibition of galvanizing for A490 bolts and HRC 32 maximum for galvanized A325
2020 Townsend Corrosion Consultants
Model for Hydrogen Embrittlement Model for Hydrogen Embrittlement of Highof High--Strength Galvanized BoltsStrength Galvanized Boltsgg gg
1. Galvanized coatings crack at the thread roots of A490 bolts with high pretensionof A490 bolts with high pretension (using turn-of-the-nut or equivalent)
2. Hydrogen is galvanically deposited on bare steel exposed at these cracks
3. If the load is greater than the threshold for hydrogen embrittlement, slow crack growth begins
4. The crack grows until a critical length is
2121 Townsend Corrosion Consultants
4. The crack grows until a critical length is reached, and the bolt breaks
Test IV ObjectivesTest IV Objectivesjj
Determine the threshold load levels for Determine the threshold load levels for hydrogen embrittlement of full-size galvanized A354 BD rods exposed to salt waterA354 BD rods exposed to salt water
Use the results as a guide to identifying safe g y gload levels and if necessary, suggest remedial action for galvanized fasteners on the SAS
2222 Townsend Corrosion Consultants
Application of Application of PrecrackedPrecracked Results Results to Rods is a Significant Challengeto Rods is a Significant Challengeg gg g
Fracture mechanics equations for threaded sections are approximationssections are approximations
Uniform hardness for bars vs. hardness profiles for rods
The 1975 analysis for bolts assumed turn-of-The 1975 analysis for bolts assumed turn ofthe-nut tightening, which generally leads to stresses greater than yield strength
Rods on the SAS are tensioned by jacking to lower-than-yield stress levels
2323 Townsend Corrosion Consultants
lower than yield stress levels
BuecknerBueckner Equation Equation for Stress Intensity Factor, K, of a for Stress Intensity Factor, K, of a Circumferentially Notched Round BarCircumferentially Notched Round Baryy
K= (D1/2) f(d/D)Where:
d = diameter of notch = tensile stressD = diameter of barD = diameter of barf(d/D) is a constant
K ( t t) 0 80(%F ) fK = x (constant) ~ 0.80(%Fu) for 3-inch rods
2424 Townsend Corrosion Consultants
Differences Between Differences Between 1975 Lab Tests and Test IV1975 Lab Tests and Test IV
Cantilever bending vs. tensioning for rods
No fatigue precrack for Test IV
K calculations for rods are approximations
Uniform HRC vs. HRC gradients
1 in bars vs 2 in to 4 in rods 1-in bars vs. 2-in to 4-in rods
Low-iron vs. high-iron coatings for rods
2525 Townsend Corrosion Consultants
Low iron vs. high iron coatings for rods
Test IV Common Design FeaturesTest IV Common Design Featuresgg
Slow-step, load increases to determine thresholdthreshold
Exposure to 3 5% NaCl solution Exposure to 3.5% NaCl solution
Measurement of electrochemical potentialMeasurement of electrochemical potential and pH
2626 Townsend Corrosion Consultants
Test IV Design FeaturesTest IV Design Featuresgg
Step load increases applied by hydraulic tensioningtensioning
Displacement measurementDisplacement measurement
2727 Townsend Corrosion Consultants
Test IV Additional Design Test IV Additional Design FeaturesFeatures
Loads measured by strain gages
Full-size rods
Intentional coating holidays
Continuous monitoring of temperatures
Acoustic emission monitoring
2828 Townsend Corrosion Consultants
Test IV Load ScheduleTest IV Load ScheduleLoad, % Fu K, KSI-in1/2 Hold time , days
30 24 230 24 240 32 250 40 255 44 260 48 265 52 270 56 275 60 280 64 2
2929 Townsend Corrosion Consultants
85 68 6Fu = minimum specified ultimate strength
Test IV Average Load Rate Compared Test IV Average Load Rate Compared to 1975 Testing ksito 1975 Testing ksi--inin1/21/2 per Hourper Hourgg pp
1975 Test IV
0.2 ksi-in1/2/hr 0.1 ksi-in1/2/hr
3030 Townsend Corrosion Consultants
Test IV Rig for FullTest IV Rig for Full--length length Bridge Rods Bridge Rods gg
3131 Townsend Corrosion Consultants
Test IV Phase 1 (2010 E2 Rods)Test IV Phase 1 (2010 E2 Rods)( )( )
2, Full-length 3-in dia shear key bottom anchor rodsanchor rods
2 Full-length 3-in dia bearing bolts bottom 2, Full-length 3-in dia bearing bolts bottom housing rods
Tests completed analysis in progress
3232 Townsend Corrosion Consultants
Setting Up Test IV RigSetting Up Test IV Rigg p gg p g
3333 Townsend Corrosion Consultants
Tent Enclosure During TestingTent Enclosure During Testingg gg g
3434 Townsend Corrosion Consultants
After FractureAfter Fracture
3535 Townsend Corrosion Consultants
Fracture SurfaceFracture Surface
3636 Townsend Corrosion Consultants
Test IV Preliminary ResultTest IV Preliminary ResultHighlightsHighlightsg gg g
4, 3-inch 2010 rods fractured at loads of,0.80 Fu, 0.85 Fu, 0.85 Fu, and >0.85 Fu
3838 Townsend Corrosion Consultants
Test IV SlowTest IV Slow--Step Step Load ApplicationLoad Applicationpppp
FRACTURE AT 0 80 FAT 0.80 Fu
3939 Townsend Corrosion Consultants
Test IV Preliminary Results Test IV Preliminary Results yy
Scanning electron microscopy shows evidence of intergranular cracking on the fracture facesof intergranular cracking on the fracture faces for 3 out of 4 rods
This is consistent with failure by hydrogen embrittlement
The fracture morphology was similar to that of the failed 2008 rods
4040 Townsend Corrosion Consultants
Test IV Results to DateTest IV Results to DateIntergranularIntergranular Cracking X500Cracking X500gg gg
4141 Townsend Corrosion Consultants
Test IV Test IV Results to DateResults to Date
2 of 4 rods broke at end without coating holiday
This suggests that coating defects are not critical in the mechanism of fracturecritical in the mechanism of fracture
4242 Townsend Corrosion Consultants
Galvanized Coating CrackGalvanized Coating CrackRod 4 X500Rod 4 X500
4343 Townsend Corrosion Consultants
Test IV Results to DateTest IV Results to Date
Electrochemical potentials were 0.15 V to 0.20 V less negative than expected for typicalless negative than expected for typical galvanized
Galvanized rod coatings were generally higher in iron content
The high iron content accounts for the reduced galvanic activity of the Test IV rods
4444 Townsend Corrosion Consultants
Test IV Results to DateTest IV Results to Date
4545 Townsend Corrosion Consultants
Test IV Phase 2Test IV Phase 2
2-in dia. Upper Bearing Rod
3-in dia. Tower Base Anchor Rod
4 in dia Tower Saddle Tie Rod 4-in dia. Tower Saddle Tie Rod
3.5-in dia. Main Cable Anchor Rods with rolled threads
3.5-in dia. Main Cable Anchor Rods with cut threads
Tests completed analysis in progress
4646 Townsend Corrosion Consultants
Tests completed analysis in progress
Test IV Phase 3Test IV Phase 3
3-in 2008 shear key bottom anchor rods (2 Samples)( p )
Test set-up in progress
4747 Townsend Corrosion Consultants
Test IV Phase 4 Test IV Phase 4 Planning PhasePlanning Phasegg
Plan to Test:
3-in dia. shear key anchor replacement rods (2013 upgrade)
Black and galvanized
Effect of Second Heat treatmentEffect of Second Heat treatment
4848 Townsend Corrosion Consultants
Thank youThank youThank youThank you
4949 Townsend Corrosion Consultants