Kennewick School District Daily Report: Eastgate Elementary Specializing in Projects that Make a Difference® PROJECT TEAM Kennewick School District 1000 4th Ave. Kennewick, WA 99336 (509) 222-7667 www.ksd.org Doug Carl Director of Capital Projects Madsen Mitchell Evenson and Conrad, PLLC 8905 West Gage, Ste 200 Kennewick, WA 99336 (509) 396-7278 www.madmitch.com Doug Mitchell, AIA, LEED AP Project Architect Joe Hampton Project Manager Leone & Kebble Contractor 108 West Boone Spokane, WA 99201 (509) 327-4451 www.leone-keeble.com Tom Mercer Project Manager Carl Clausen Superintendent Strategic Construcon Management, Inc. 3601 North 20th Pasco, WA 99301 (509) 737-0072 www.strategic-cm.com David L. Robison, CCM, LEED AP Owner’s Representave CONSTRUCTION ACTIVITY OBSERVED Report No.: 040114-01 JUNE 4, 2014 VOL. 1 n ISSUE 12 Kennewick Elementary Improvement Program Prepared By: V. Guzman Weather: 84° Sunny Wind Speed: 7 mph Humidity: 20% Precipitaon: 0.00 in. The recently completed ulity trench has now been back filled with soil and is being compacted as required. Installaon of the remaining structural steel in preparaon for concrete connues at all recently installed foongs and stem walls. Doug Mitchell, Principal, MMEC Architects, walks the site before the construcon meeng with Leone & Keeble contractors. Doug Carl, Capital Projects Director, discusses the relocaon and removal schedule for the exisng portables prior to demolion.