Top Banner
Kennewick School District Daily Report: Eastgate Elementary Specializing in Projects that Make a Difference® PROJECT TEAM Kennewick School District 1000 4th Ave. Kennewick, WA 99336 (509) 222-7667 www.ksd.org Doug Carl Director of Capital Projects Madsen Mitchell Evenson and Conrad, PLLC 8905 West Gage, Ste 200 Kennewick, WA 99336 (509) 396-7278 www.madmitch.com Doug Mitchell, AIA, LEED AP Project Architect Joe Hampton Project Manager Leone & Kebble Contractor 108 West Boone Spokane, WA 99201 (509) 327-4451 www.leone-keeble.com Tom Mercer Project Manager Carl Clausen Superintendent Strategic Construcon Management, Inc. 3601 North 20th Pasco, WA 99301 (509) 737-0072 www.strategic-cm.com David L. Robison, CCM, LEED AP Owner’s Representave CONSTRUCTION ACTIVITY OBSERVED Report No.: 040114-01 JUNE 4, 2014 VOL. 1 n ISSUE 12 Kennewick Elementary Improvement Program Prepared By: V. Guzman Weather: 84° Sunny Wind Speed: 7 mph Humidity: 20% Precipitaon: 0.00 in. The recently completed ulity trench has now been back filled with soil and is being compacted as required. Installaon of the remaining structural steel in preparaon for concrete connues at all recently installed foongs and stem walls. Doug Mitchell, Principal, MMEC Architects, walks the site before the construcon meeng with Leone & Keeble contractors. Doug Carl, Capital Projects Director, discusses the relocaon and removal schedule for the exisng portables prior to demolion.
1

Kennewick School District · Kennewick School District 1000 4th Ave. Kennewick, WA 99336 (509) 222-7667 Doug Carl Director of Capital Projects Madsen Mitchell Evenson and Conrad,

Jan 23, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Kennewick School District · Kennewick School District 1000 4th Ave. Kennewick, WA 99336 (509) 222-7667 Doug Carl Director of Capital Projects Madsen Mitchell Evenson and Conrad,

Kennewick School DistrictDaily Report: Eastgate Elementary

Specializing in Projects that Make a Difference®

PROJECT TEAM

Kennewick School District 1000 4th Ave.

Kennewick, WA 99336 (509) 222-7667

www.ksd.org Doug Carl

Director of Capital Projects

Madsen Mitchell Evenson and Conrad, PLLC

8905 West Gage, Ste 200 Kennewick, WA 99336

(509) 396-7278 www.madmitch.com

Doug Mitchell, AIA, LEED AP Project Architect

Joe Hampton Project Manager

Leone & Kebble Contractor

108 West Boone Spokane, WA 99201

(509) 327-4451 www.leone-keeble.com

Tom Mercer Project Manager

Carl Clausen Superintendent

Strategic Construction Management, Inc.

3601 North 20th Pasco, WA 99301 (509) 737-0072

www.strategic-cm.com David L. Robison, CCM, LEED AP

Owner’s Representative

CONSTRUCTION ACTIVITY OBSERVED Report No.: 040114-01

JUNE 4, 2014 VOL. 1 n ISSUE 12

Kennewick Elementary Improvement ProgramPrepared By: V. Guzman

Weather: 84° SunnyWind Speed: 7 mph

Humidity: 20%Precipitation: 0.00 in.

The recently completed utility trench has now been back filled with soil and is being compacted as required.

Installation of the remaining structural steel in preparation for concrete continues at all recently installed footings and stem walls.

Doug Mitchell, Principal, MMEC Architects, walks the site before the construction meeting with Leone & Keeble contractors.

Doug Carl, Capital Projects Director, discusses the relocation and removal schedule for the existing portables prior to demolition.