Kennewick School District Daily Report: Eastgate Elementary Specializing in Projects that Make a Difference® PROJECT TEAM Kennewick School District 1000 4th Ave. Kennewick, WA 99336 (509) 222-7667 www.ksd.org Doug Carl Director of Capital Projects Madsen Mitchell Evenson and Conrad, PLLC 8905 West Gage, Ste 200 Kennewick, WA 99336 (509) 396-7278 www.madmitch.com Doug Mitchell, AIA, LEED AP Project Architect Joe Hampton Project Manager Leone & Kebble Contractor 108 West Boone Spokane, WA 99201 (509) 327-4451 www.leone-keeble.com Tom Mercer Project Manager Carl Clausen Superintendent Strategic Construcon Management, Inc. 3601 North 20th Pasco, WA 99301 (509) 737-0072 www.strategic-cm.com David L. Robison, CCM, LEED AP Owner’s Representave CONSTRUCTION ACTIVITY OBSERVED Report No.: 040114-01 OCTOBER 24, 2014 VOL. 1 n ISSUE 108 Kennewick Elementary Improvement Program Prepared By: V. Guzman Weather: 56° Cloudy Wind Speed: 8 mph Humidity: 83% Precipitaon: 0.00 in. Material sorng aſter demolion is complete. Grinding and recycling is now in progress. The structural steel is in place and the pouring of the concrete above on the metal deck now allows framing of the exterior walls. Concrete has been poured and is now curing on the second floor deck of the school. Great job Leone and Keeble Construcon! The electrical floor boxes are now being wired in the second floor classrooms.