Top Banner
27
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Kbt corporate
Page 2: Kbt corporate

2

Page 3: Kbt corporate

3

Page 4: Kbt corporate

4

EPL-3943

EPL-3941 EPL-3942

EPL-3979

EPL-3944

Grootfontein Otavi

Otjituuo

Harasib

Gross Otavi

Kombat

Copper Smelter

Mined -12 Mt @ 2.3% Cu, 1.9% Pb, 18 g/t Ag Inferred Resource 1.7 Mt @ 1.93% Cu, 16 g/t Ag (2.15% Cu Eq)

Tsumeb Mine – 30Mt at 4.3% Cu, 13.9% Pb/Zn, 95g/t Ag

Tschudi Project Reserve 22.5Mt @ 0.87% Cu

Page 5: Kbt corporate

5

Asis Far West Sector

Inferred Resource of 1.7Mt @ 1.93% Cu and 16g/t Ag (2.15% Cu Eq.)

#1 Shaft

Kombat Town

#3 Shaft

Tailings

Mill

Asis Far West Shaft

0 3.5km

Page 6: Kbt corporate

6

Page 7: Kbt corporate

7

Page 8: Kbt corporate

8

Cut-Off

Grade

Cu%

Tonnes

(000's)

Bulk

Density

t/m3

Cu

%

Pb

%

Ag

g/t

CuEq

%

Wireframe 2,967 2.82 1.39 0.17 12.6 1.58

0.25 2,938 2.82 1.4 0.16 12.7 1.59

0.5 2,729 2.82 1.48 0.15 13.2 1.67

1.0 1,679 2.83 1.93 0.13 15.9 2.15

1.5 787 2.85 2.71 0.13 20.3 2.98

2.0 439 2.86 3.51 0.1 26.2 3.83

2.5 286 2.88 4.19 0.09 30.7 4.56

3.0 206 2.89 4.76 0.09 34.7 5.18

3.5 155 2.9 5.27 0.09 38.8 5.73

4.0 114 2.91 5.82 0.09 42.8 6.33

4.5 78 2.92 6.53 0.09 48.1 7.1

5.0 54 2.94 7.32 0.09 55.7 7.97

Page 9: Kbt corporate

9

Page 10: Kbt corporate

10

sandstone

Fe-Mn

ore

dolomite

Page 11: Kbt corporate

11

Rod and Ball Crushers Flotation and Filtration Circuits Shaft Hoist

Page 12: Kbt corporate

12

Page 13: Kbt corporate

13

Central Pit Area

Page 14: Kbt corporate

14

Year 1 Year 2

Page 15: Kbt corporate
Page 16: Kbt corporate

Sabre Resources# –– Guchab Deposit GCDD0001 - 107.75m @ 1.15% Cu, 6.90g/t Ag GCDD0005 - 22.20m @ 3.45% Cu, 29.70g/t Ag GCDD0011 - 18.85m @ 1.06% Cu, 15.05g/t Ag GCDD0014 - 53.10m @ 1.23% Cu, 11.20g/t Ag GCDD0015 - 51.85m @ 1.35% Cu, 15.50g/t Ag GCDD0025 - 58.62m @ 1.38% Cu, 28.30g/t Ag GCDD0019 - 45.65m @ 1.04% Cu, 12.27g/t Ag GCDD0039 - 23.15m @ 1.29% Cu, 4.5g/t Ag GCDD0045 - 21.86m @ 2.22% Cu, 44.6g/t Ag GCDD0046 - 26.40m @ 2.44% Cu, 43.6g/t Ag

Historic Resource*

Tonnes Cu % Pb % Ag g/t

157,549 1.54 5.85 15.43

Mined -12 Mt @ 2.3% Cu, 1.9% Pb, 18 g/t Ag Inferred Resource 1.7 Mt @ 1.93% Cu, 16 g/t Ag (2.15% Cu Eq)

Page 17: Kbt corporate
Page 18: Kbt corporate

18

Tschudi Project Reserve 22.5 Mt @

0.87% Cu

Page 19: Kbt corporate

19

EPL-3943

EPL-3941 EPL-3942

EPL-3979

EPL-3944

Grootfontein

Otavi Otjituuo

Harasib

Gross Otavi

Kombat

Copper Smelter Tsumeb Mine – 30Mt at 4.3% Cu,

13.9% Pb/Zn, 95g/t Ag

Tschudi Project Reserve 22.5 Mt @ 0.87% Cu

B2 Gold’s Otjikoto Mine 29MT @ 1.4g/t Au

Base Metals

Base Metals

Base Metals and Gold

Mined -12 Mt @ 2.3% Cu, 1.9% Pb, 18 g/t Ag Inferred Resource 1.7 Mt @ 1.93% Cu, 16 g/t Ag (2.15% Cu Eq.)

Page 20: Kbt corporate

20

Angola

Botswana

South Africa

Zambia

Kombat Mine

Page 21: Kbt corporate

21

Page 22: Kbt corporate

22

52 Week Price Performance

$0.00

$0.02

$0.04

$0.06

$0.08

$0.10

$0.12

$0.14

$0.16

$0.18

$0.20

Page 23: Kbt corporate

23

Page 24: Kbt corporate

24

Page 25: Kbt corporate

25

Page 26: Kbt corporate

26

Page 27: Kbt corporate

27