Internal Services Department
Small Business Development 111 NW 1 Street, 19th Floor
Miami, Florida 33128
T 305-375-3111 F 305-375-3160
Miami-Dade County
Small Business Enterprise – Architecture and Engineering Advisory Board Meeting
Wednesday, August 28, 2019 Stephen P. Clark Center, 111 N.W. 1st Street
19th Floor SBD Main Conference Room @10:30 a.m.
AGENDA
I. Welcome/Introductions (5 min)
II. SBD Section Reports (30 min) a. SBE-A&E Certification Report – Claudious Thompson (SBD Section Chief,
Certification) b. SBE-A&E Utilization Report– Tracie Auguste (SBD Section Chief, Policy &
Legislation Management) c. SBE-A&E Business Outreach and Education Report – Lawanda Wright-
Robinson (SBD Section Chief, Business Outreach & Education)
III. Reports (15 min) a. Jackson Health System Report – Teodoro Carrasco (JHS) b. Water and Sewer Department (WASD) A&E Contracts Report – WASD - Transparency Report: Exhibit A – Projects in Procurement, which includes
all the A&E and Design Build projects with their pertinent and current status. https://www8.miamidade.gov/global/water/transparency-report.page
IV. Old Business (10 min) a. Approval of June 29, 2019 Meeting Minutes
V. New Business (20 min)
a. A&E Taskforce Update – ISD/Strategic Procurement Division b. Request for future agenda items
VI. Reasonable opportunity for the public to be heard before County Boards
(Sec. 2-11.39.3) (5 min)
VII. Adjournment (5 min)
NEXT BOARD MEETING: Wednesday, October 30, 2019 at 10:30 a.m.
TABLE OF CONTENTS
AGENDA
SBE A&E Certification Report 1 SBE A&E Utilization Report 2 SBE A&E Business Outreach & Education (BOE) Report 3 Water & Sewer Infrastructure Projects in Procurement: July 2019 4 Awarded Water & Sewer Infrastructure Projects 5 A&E Taskforce Update – ISD /Strategic Procurement Division 6 June 29, 2019 Meeting Minutes 7
Total
Amount
African
AmericanCaucasian Hispanic Asian
Native
AmericanOther Female
224 18 40 149 14 0 3 50
New1 year
Renewal
3 year
Recert
1
Approved Applications (New, Annual Renewal, Recertification)
4 24 0 28
2 Graduated 0
3 Denied 0
4 Removed 3
Certification Type: SBE A&EPERIOD: June 1, 2019 to July 31, 2019
This is a race and gender neutral program. This report is for informational purpose only.
Total Certified SBE-A&E as of 7/31/19
Note: The SBE program is race and gender neutral. This report is for informational purposes only.
Certified Directory - Ethnicity & Gender Summary
As of 7/31/2019
This is a race and gender neural program. This report is for informational purpose only.
Ethnicity & Gender Summary
Ethnicity Gender Number Firms
Asian-Pacific American Female 1
Asian-Pacific American Male 12
Black American Female 1
Black American Male 17
Caucasian Female 15
Caucasian Male 25
Hispanic American Female 33
Hispanic American Male 116
Other Minority Male 3
Subcontinent Asian American
Male 1
Total Firms 224
Certified Directory - Ethnicity & Gender Summary
As of 7/31/2019
This is a race and gender neural program. This report is for informational purpose only.
Ethnicity Summary
Ethnicity Number Firms
Asian-Pacific American 13
Black American 18
Caucasian 40
Hispanic American 149
Other Minority 3
Subcontinent Asian American 1
Total Firms 224
Gender Summary
Gender Number Firms
Female 50
Male 174
Total Firms 224
Miami-Dade County Small Business Enterprise (SBE)/Architectural & Engineering (A&E) Program
Applicable Contracts
(October 1, 2018 – June 30, 2019)
AWARDED CONTRACTS
In this period, there were 18 projects approved for award during this period totaling $39,855,293.
AWARDED CONTRACTS AVAILABLE FOR SMALL BUSINESS PARTICIPATION
12 projects have SBE–A&E measures totaling $4,232,204 or 10.62%
o $0 (Set-asides)
o $4,232,204 as Sub-consultants (A&E Goal)
SBE-A&E firms were awarded 2 open market projects totaling $3,253,113.
Of the projects awarded during this period, SBE–A&E firms are participating as Prime and/or
Sub-consultants (with or without measures) for a dollar value of $8,783,436 or 22.04%.
SBE-A&E Contracted breakdown by Race/Ethnicity/Gender
SBE-A&E/Black
Male
SBE-A&E /Hispanic
Male
SBE-A&E /Women SBE-A&E /Other
or Unidentified
Total SBE-A&E
SET-
ASIDE $0
(0%)
$0
(0%)
$0
(0%)
$0
(0%)
$0 GOALS/
A&E $1,966,756
(35.56%)
$2,116,331
(38.27%)
$1,187,055
(21.46%)
$260,182
(4.71%)
$5,530,323 TOTAL
MEASURES $1,966,756
(35.56%)
$2,116,331
(38.27%)
$1,187,055
(21.46%)
$260,182
(4.71%)
$5,530,323 OPEN
MARKET $2,205,500
(67.80%)
$1,047,613
(32.20%)
$0
(0%)
$0
(0%)
$3,253,113
TOTAL
$4,172,256
(47.50%)
$3,163,944
(36.02%)
$1,187,055
(13.51%)
$260,182
(2.97%)
$8,783,436
In this period, there were 114 Equitable Distribution Program (EDP) projects approved for award
totaling $12,483,754.
o Of the EDP awards, 54 were awarded to SBE-A&E certified firms, totaling $5,933,068.
Department Project # Project Title Award Date End Date Prime Subcontractors CertificationsOwner
Ethnicity/GenderMeasure
Measure Amount
Award Amount
Aviation E17-MDAD-01FORENSIC GLAZING
CURTAIN WALL CONSULTANT
10/2/2018 9/30/2020305 CONSULTING ENGINEERS LLC
DBE, SBE-AE, SBE-GS
Hispanic - MaleGoal 15% SBE-AE,
Goal .50% SBE-GS
$147,250.00 $1,047,612.50
305 CONSULTING ENGINEERS LLC (self-
performing)
DBE, SBE-AE, SBE-GS
Hispanic - Male Goal 15% SBE-AE $142,500.00
BEN LOPEZ & ASSOCIATES, P.A./DBA
BL&A ARCHITECTNone Hispanic - Male None $0.00
ZUNIGA & BARTELL FORENSIC
CONSULTANTS, LLCNone N/A None $0.00
H. RODRIGUEZ CONSULTING
ENGINEERING, INC.SBE-AE, SBE-GS Hispanic - Male
Goal .50% SBE-GS
$4,750.00
A16-MDAD-04AIRPORT
WAYFINDING/SIGNAGE DESIGN SERVICES
1/17/2019 1/12/2024M.C. HARRY AND
ASSOCIATES, INC.DBE, ACDBE,
SBE-GS, SBE-AEBlack - Male
Goal 20% SBE-AE, Goal 1% SBE-GS
$420,000.00 $2,205,500.00
BLISS & NYITRAY INC SBE-AE Caucasian - Male Goal 5% SBE-AE $100,000.00
BCC ENGINEERING, INC.
None Hispanic - Male None $0.00
BUILDING CENTER NO. 3, LLC
SBE-AE, SBE-GS Hispanic - MaleGoal 0.5% SBE-
GS$10,000.00
GO GREEN DOCUMENT
SOLUTIONS INCSBE-GS Black - Female
Goal 0.5% SBE-GS
$10,000.00
LABOZAN ASSOCIATES, IN
None Caucasian - Male None $0.00
SDM CONSULTING ENGINEERS, INC.
DBE, SBE-AE, SBE-GS
Hispanic - Male Goal 5% SBE-AE $100,000.00
M.C. HARRY AND ASSOCIATES, INC.
(self performing)
DBE, ACDBE, SBE-GS, SBE-AE
Black - Male Goal 20% SBE-AE $400,000.00
E16-MDAD-06FLAMINGO AND DOLPHIN GARAGES REPAIRS AND
UPGRADES2/5/2019 1/31/2024 T.Y. LIN INTERNATIONAL None N/A
Goal 20% SBE-AE, Goal 1% SBE-GS
$1,037,438.43 $5,447,786.80
ALLEGUEZ ARCHITECTURE, INC.
DBE, SBE-AE, SBE-GS
Hispanic - Female Goal 5% SBE-AE $247,009.15
Miami-Dade County SBE/Architectural & Engineering
Applicable Contracts
(October 1, 2018 - June 30, 2019)
Demographic data provided for informational purposes only. 1
Department Project # Project Title Award Date End Date Prime Subcontractors CertificationsOwner
Ethnicity/GenderMeasure
Measure Amount
Award Amount
Miami-Dade County SBE/Architectural & Engineering
Applicable Contracts
(October 1, 2018 - June 30, 2019)
CENOFFI INC. D/B/A BEST OFFICE PRODUCTS
LDB, SBE-GS Hispanic - Male Goal 1% SBE-GS $49,401.83
NIFAH AND PARTNERS CONSULTING
ENGINEERS, INC.
ACDBE, DBE, SBE-AE, SBE-GS
Black - Male Goal 5% SBE-AE $247,009.15
SDM CONSULTING ENGINEERS, INC.
DBE, SBE-AE, SBE-GS
Hispanic - Male Goal 5% SBE-AE $247,009.15
THE ARCHITECTURAL DESIGN CONSORTIUM,
INC.SBE-AE Black - Male Goal 10% SBE-AE $494,018.30
UNICOM GOVERNMENT, INC.
None Asian - Male None $0.00
A17-MDAD-01
MIA EMPLOYEE PARKING GARAGE A/E SERVICES FOR
DESIGN CRITERIA PROFESSIONAL SERVICES
5/7/2019 5/2/2024BERMELLO, AJAMIL &
PARTNERS, INC.None Hispanic - Male
Goal 26% SBE-AE, Goal 0.5% SBE-
GS$702,250.00 $2,922,287.50
FRAGA ENGINEERS, LLC
DBE, SBE-AE, SBE-GS
Hispanic - Female Goal 11% SBE-AE $291,500.00
BND ENGINEERS, INC.DBE, SBE-AE,
SBE-GSBlack - Male Goal 13% SBE-AE $344,500.00
SOL - ARCH, INC.DBE, SBE-AE,
SBE-GSHispanic - Female Goal 2% SBE-AE $53,000.00
RADISE INTERNATIONAL, L.C.
LDB, SBE-AE Asian/Indian - Male Goal 1.5% SBE-AE $39,750.00
HADONNE CORP.LDB, SBE-AE,
SBE-GS Hispanic - Male Goal 0.5% SBE-AE $13,250.00
TOM GRABOSKI ASSOCIATES, INC. DBA TGA DESIGN
SBE-GS Caucasian - MaleGoal 0.5% SBE-
GS$13,250.00
DESMAN, INC. None Asian/Pacific - Male
Transportation Planning
Organization
E18-TPO-01 (1)GENERAL PLANNING CONSULTANT (GPC)
SUPPORT - PHASE VII12/31/2018 12/26/2023 WSP USA INC None N/A
No Measure Funding Source
$0.00 $3,300,000.00
E18-TPO-01 (2)GENERAL PLANNING CONSULTANT (GPC)
SUPPORT - PHASE VII12/31/2018 12/26/2023
KIMLEY-HORN AND ASSOCIATES, INC.
None N/ANo Measure
Funding Source$0.00 $3,300,000.00
Demographic data provided for informational purposes only. 2
Department Project # Project Title Award Date End Date Prime Subcontractors CertificationsOwner
Ethnicity/GenderMeasure
Measure Amount
Award Amount
Miami-Dade County SBE/Architectural & Engineering
Applicable Contracts
(October 1, 2018 - June 30, 2019)
E18-TPO-01 (3)GENERAL PLANNING CONSULTANT (GPC)
SUPPORT - PHASE VII12/31/2018 12/26/2023
ATKINS NORTH AMERICA, INC.
None N/ANo Measure
Funding Source$0.00 $3,300,000.00
E18-TPO-01 (4)GENERAL PLANNING CONSULTANT (GPC)
SUPPORT - PHASE VII12/31/2018 12/26/2023
KITTELSON & ASSOCIATES, INC.
None N/ANo Measure
Funding Source$0.00 $3,300,000.00
E18-TPO-01 (5)GENERAL PLANNING CONSULTANT (GPC)
SUPPORT - PHASE VII12/31/2018 12/26/2023 GANNETT FLEMING, INC. None N/A
No Measure Funding Source
$0.00 $3,300,000.00
Public Works and Waste Mangement
E15-PWWM-11
ROADWAY IMPROVEMENTS TO NW 25 STREET FROM NW
117 AVENUE TO NW 87 AVENUE
2/5/2019 2/2/2022 GANNETT FLEMING, INC. None N/A Goal 30% SBE-AE $622,995.17 $2,284,315.62
HBC ENGINEERING COMPANY
DBE, LDB, SBE-AE, SBE-GS
Black - Male Goal 18% SBE-AE $373,797.10
MARLIN ENGINEERING, INC.
DBE, SBE-AE (at time of contract)
Hispanic - Male Goal 30% SBE-AE $622,995.17
PROFESSIONAL SERVICE INDUSTRIES,
INC.None N/A None $0.00
Regulatory and Economic Resources
E16-RER-01
DESIGN SERVICES FOR DEVELOPING AN
ADAPTATION STRATEGY TO RESPOND TO SEA LEVEL
RISE
12/4/2018 12/2/2021 ARCADIS U.S., INC. None N/A Goal - 6% SBE-AE $32,400.00 $594,000.00
NOVA CONSULTING, INC.
SBE-AE Hispanic - Female Goal - 6% SBE-AE $32,400.00
E15-RER-01
ENVIRONMENTAL CLEANUP, COMPLIANCE AND RELATED SERVICES FOR MIAMI-DADE TRANSIT DEPARTMENT AND
OTHER COUNTY DEPARTMENTS UTILIZING
FEDERAL FUNDS
2/5/2019 1/31/2024
STEARNS, CONRAD AND SCHMIDT, CONSULTING
ENGINEERS, INC.
None N/ANo Measure
Funding Source$0.00 $550,000.00
E15-RER-03 PTP
ENVIRONMENTAL CLEANUP, COMPLIANCE AND RELATED SERVICES FOR MIAMI-DADE
TRANSIT DEPARTMENT (MDT) AND OTHER COUNTY DEPARTMENTS UTILIZING
PEOPLE'S TRANSPORTATION PLAN (PTP) FUNDS
5/7/2019 5/3/2024
STEARNS, CONRAD AND SCHMIDT, CONSULTING
ENGINEERS, INC.
None N/A Goal 11% SBE-AE $110,000.00 $1,100,000.00
LONGITUDE SURVEYORS, LLC
DBE, ACDBE, SBE-GS, SBE-AE
Hispanic - Male Goal 11% SBE-AE $110,000.00
Demographic data provided for informational purposes only. 3
Department Project # Project Title Award Date End Date Prime Subcontractors CertificationsOwner
Ethnicity/GenderMeasure
Measure Amount
Award Amount
Miami-Dade County SBE/Architectural & Engineering
Applicable Contracts
(October 1, 2018 - June 30, 2019)
PACE ANALYTICAL SERVICES, INC.
None N/A
JAEE ENVIRONMENTAL SERVICES, INC.
None N/A
Transportation and Public
Works
E18-DTPW-06
ROADWAY IMPROVEMENTS TO SW 157 AVENUE FROM SW 42 STREET TO SW 26
STREET
2/5/2019 2/2/2022KIMLEY-HORN AND ASSOCIATES, INC.
None N/A Goal 20% SBE-AE $94,540.08 $519,970.45
CALTRAN ENGINEERING GROUP,
INC.SBE-AE, SBE-GS Hispanic - Female Goal 4% SBE-AE $18,908.02
GEOSOL, INC. SBE-AE, SBE-GS Hispanic - Male Goal 5% SBE-AE $23,635.03
RIBBECK ENGINEERING, INC.
SBE-AE Hispanic - Male Goal 11% SBE-AE $51,997.05
Water and Sewer
DB17-WASD-01 (DESIGN)
DESIGN-BUILD SERVICES FOR THE CONSTRUCTION OF
AN OXYGEN PRODUCTION FACILITY AT THE CENTRAL
DISTRICT WASTEWATER TREATMENT PLANT
12/18/2018 2/26/2022PCL CONSTRUCTION,
INC.None N/A
Goal 17.13% SBE-AE
$736,117.21 $4,297,240.00
BELLO AND BELLO LAND SURVEYING
CORPORATIONSBE-GS, SBE-AE Hispanic - Female Goal 1.5% SBE-AE $64,458.60
HBC ENGINEERING COMPANY
DBE, LDB, SBE-GS, SBE-AE
Black - Male Goal 1.5% SBE-AE $64,458.60
GAMBOA ENGINEERS LLC
SBE-GS, SBE-AE Hispanic - Male Goal 15% SBE-AE $644,586.00
NADIC ENGINEERING SERVICES
INCORPORATEDSBE-GS, SBE-AE Black - Male Goal 1% SBE-AE $42,972.40
CFM ARCHITECTS INCLDB, SBE-AE,
SBE-GSHispanic - Female Goal 8% SBE-AE $343,779.20
Demographic data provided for informational purposes only. 4
Department Project # Project Title Award Date Prime Subcontractors CertificationsOwner
Ethnicity/GenderAward Amount
Aviation EDP-AV-Y108AMIA - 3090 UTILITIES
BUILDING ASSESSMENT11/5/2018
FANJUL & ASSOCIATES,
LLCSBE-A&E, SBE-GS Hispanic - Male $50,000.00
EDP-AV-Y109AMIA - CC H 2ND FLOOR
CONCESSIONS
UPGRADES11/5/2018
KEITH MARTIN
ARCHITECT, INCNone N/A $50,000.00
EDP-AV-X125ABUILDING 3030 (WING D)
INFORMATION SYSTEMS
ASSESSMENT11/30/2018
ARCO CARIBE
ARCHITECTS, PSC, INC.None Hispanic - Male $50,000.00
EDP-AV-Y127AMIA BUILDING 3040 FIRE
UPGRADES12/11/2018
DESIGN TECH
INTERNATIONAL
ASSOCIATES, INC.None N/A $200,000.00
EDP-AV-Y080A-RNORTH TERM UPGRADES
TO FOG CONTROL
DEVICES12/13/2018
TLC ENGINEERING FOR
ARCHITECTURE, INC.None N/A $200,000.00
EDP-AV-V008BARCHITECTURAL
SUPPORT SERVICES1/4/2019 TGA CONSULTING, LLC DBE Hispanic - Female $200,000.00
EDP-AV-AA009AE SATELLITE APM
BRIDGE CERTIFICATION1/16/2019 T.Y. LIN INTERNATIONAL None N/A $175,000.00
EDP-AV-Y148A
ENVIRONMENTAL
CONSULTING AND
REGULATORY
COMPLIANCE
2/21/2019LANGAN ENGINEERING
AND ENVIRONMENTAL
SERVICES, INCNone N/A $200,000.00
EDP-AV-AA010ABLDG 708 2ND FLOOR
RESTROOM
RENOVATION3/19/2019
RODRIGUEZ PETERSON
& PORRAS ARCHITECTS,
INC.
DBE, SBE-AE, SBE-
GSHispanic - Male $200,000.00
P. J. V.
ENGINEERING.
INC.
None Hispanic - Male
EDP-AV-Y096AROOF AND STUCCO
FAILURE AT E-F3/27/2019 SOL - ARCH, INC.
DBE, SBE-AE, SBE-
GSHispanic - Female $200,000.00
EDP-AV-Y153A
MIA 716 CARGO
BUILDING ROOF
REPLACEMENT
BETWEEN F-G-H
5/22/2019NYARKO
ARCHITECTURAL
GROUP, INC.
DBE, SBE-AE, SBE-
GSBlack - Male $150,000.00
EDP-AV-AA017A-1MIA PUBLIC RESTROOMS
MODERNIZATION NORTH
TERMINAL GROUP 16/6/2019
RAYMOND
ENGINEERING-GEORGIA,
INC.None Hispanic - Male $200,000.00
EDP-AV-AA017C-1MIA PUBLIC RESTROOMS
MODERNIZATION SOUTH
TERMINAL GROUP 16/13/2019
JORGE A. GUTIERREZ
ARCHITECT LLCNone Hispanic - Male $200,000.00
Equitable Distribution Program (EDP) Contracts
(October 1, 2018 - June 30, 2019)
Demographic data provided for informational purposes only.
EDP-AV-AA017C-2MIA PUBLIC RESTROOMS
MODERNIZATION SOUTH
TERMINAL GROUP 26/13/2019
MATEU ARCHITECTURE,
INCSBE-AE, SBE-GS Hispanic - Male $200,000.00
EDP-AV-AA17A-2MIA PUBLIC RESTROOMS
MODERNIZATION NORTH
TERMINAL GROUP 26/17/2019
ARCO CARIBE
ARCHITECTS, PSC, INC.None Hispanic - Male $200,000.00
EDP-AV-AA064AMIA BLDG 700 SERIES
AND E SATELLITE NOVS6/25/2019
GALLARDO ARCHIECTS,
INCSBE-AE Hispanic - Male $100,000.00
Fire Department EDP-FR-41T-CVSTRFIRE STATION 41
TEMPORARY TRAILERS10/24/2018
MAURICE GRAY
ASSOCIATES, INC.
DBE, SBE-AE, SBE-
GSBlack - Male $100,000.00
EDP-FR-OR-LNDMDFRD OCEAN RESCUE
HEADQUARTERS10/26/2018
LAURA LLERENA &
ASSOCIATES, INC.SBE-AE, SBE-GS Hispanic - Female $18,000.00
EDP-FR-45-LNDMDFR FS 45 LANDSCAPE
ARCHITECT11/2/2018
LAURA LLERENA &
ASSOCIATES, INC.SBE-AE, SBE-GS Hispanic - Female $12,000.00
EDP-FR-SHP2SHOP 2 40 YEAR RE-
CERTIFICATION4/5/2019 TCAPA INC. SBE-AE, SBE-GS Hispanic - Male $6,300.00
EDP-FR-HCATMDFR HQ INCREASE
BLDG. CATEGORY6/28/2019
INGELMO ASSOCIATES,
P.A.None Hispanic - Male $45,000.00
Internal Services EDP-ID-W160104MDPD HEADQUARTERS
CAFETORIUM STAGE
REMODEL10/8/2018
J.S.K. INTERNATIONAL,
INC. DBA JSK
ARCHITECTURAL
GROUP
SBE-AE, SBE-GS,
SBE-CONHispanic - Male $50,000.00
EDP-ID-901060CORAL GABLES LIBRARY
INTERIOR RENOVATIONS10/11/2018
WILLIAM B. MEDELLIN
ARCHITECT P.A.SBE-AE, SBE-GS Hispanic - Male $240,000.00
EDP-ID-207931EMPOWERMENT CENTER
- OWNER REP.
OVERSIGHT11/6/2018
PISTORINO & ALAM
CONSULTING
ENGINEERS, INC.None N/A $200,000.00
Demographic data provided for informational purposes only.
EDP-ID-W190004
ISD PARKING
STRUCTURAL,
ELECTRICAL AND
MECHANICAL SURVEY OF
HICKMAN GARAGE
1/17/2019 G.M. SELBY, INC. SBE-AE Hispanic - Female $26,000.00
EDP-ID-W19ARC01MULTIPLE
ARCHITECTURAL
SERVICES3/28/2019
UNITED ARCHITECTS,
INC.SBE-AE, SBE-GS Hispanic - Female $200,000.00
EDP-ID-W190004R
ISD PARKING
STRUCTURAL,
ELECTRICAL AND
MECHANICAL SURVEY OF
HICKMAN GARAGE
4/3/2019
CONEMCO
ENGINEERING, INC. DBA
CONEMCO
CONSULTANTS
LDB, SBE-AE, SBE-
GSHispanic - Male $19,653.00
EDP-ID-E162061FUMD REPLACE ROOF
AND AC UNITS4/17/2019 INITIAL ENGINEERS, P.A.
DBE, SBE-AE, SBE-
GSHispanic - Male $200,000.00
DDA ENGINEERS,
P.A.None Hispanic - Male
RVL
ARCHITECTURE
+ DESIGN, P.A.
None Hispanic - Male
EDP-ID-W180053
AOR PUNCH LIST - ITEM
#571 PONDING AT
SEVERAL AREAS IN
PARKING LOT
5/21/2019 GRAEF-USA, INC. None Caucasian - Male $10,000.00
EDP-ID-W190046JOSEPH CALEB CENTER
WATERPROOFING6/4/2019
ONE PULSE DESIGN
STUDIO, INC.
DBE, SBE-AE, SBE-
GSHispanic - Male $130,000.00
EDP-ID-I190002
SOUTH DADE
GOVERNMENT CENTER
40 YEAR
RECERTIFICATION
6/7/2019FRANCISCO CUELLO JR.,
P.E., INC.SBE-AE, SBE-GS Hispanic - Male $30,000.00
EDP-ID-W190041 SPCC SECURITY LOBBY 6/25/2019ME ENGINEERING
CONSULTANTS, INC.None Hispanic - N/A $38,856.00
EDP-ID-I190006
40 YEAR
RECERTIFICATION FOR
MULTIPLE COUNTY
FACILITIES.
6/25/2019 G.M. SELBY, INC. SBE-AE Hispanic - Female $150,000.00
EDP-ID-I190005
GREASE TRAPS
ASSESSMENT ,
CALCULATIONS, AS
BUILTS AND DESIGN FOR
6/26/2019MARTIN-VILATO
ASSOCIATES,
INCORPORATEDSBE-AE, SBE-GS Hispanic - Male $150,000.00
Library EDP-LB-AEMISC01MULTIPLE
ARCHITECTURAL AND
ENGINEERING PROJECTS10/9/2018
LAURA M. PEREZ AND
ASSOCIATES, INC.
DBE, SBE-AE, SBE-
GSHispanic - Female $200,000.00
Demographic data provided for informational purposes only.
EDP-LB-PDM01
STRUCTURAL
ENGINEERING SERVICES
FOR PRE-DISASTER
MITIGATION FEMA
10/12/2018
C.H. PEREZ &
ASSOCIATES
CONSULTING
ENGINEERS, INC.
None Hispanic - Male $30,000.00
EDP-LB-WELLWEST DADE HEALTH
CARE CENTER12/6/2018
ANGEL C. SAQUI, FAIA,
ARCHITECTS,
PLANNERS, INTERIORS,
LTD.
SBE-AE, SBE-GS Hispanic - Male $90,000.00
EDP-LB-DC-DORALNEW DORAL BRANCH
LIBRARY DCP4/9/2019 SILVA ARCHITECTS, LLC SBE-AE Hispanic - Male $200,000.00
EDP-LB-NC-AC01NORTH CENTRAL
BRANCH LIBRARY HVAC5/28/2019 INITIAL ENGINEERS, P.A.
DBE, SBE-AE, SBE-
GSHispanic - Male $20,000.00
EDP-LB-IREVMULTIPLE A & E MDPLS
FACILITY RENOVATIONS6/6/2019
ARLOTTA BAZO &
ASSOCIATES, INC.None Hispanic - Female $200,000.00
Parks, Recreation
and Open SpacesEDP-PR-32080117002
PELICAN HARBOR
MARINA DREDGING OF
DOCK D AREA10/29/2018
CUMMINS CEDERBERG,
INC.SBE-AE Caucasian - Male $55,000.00
EDP-PR-110218TAMIAMI PARK MIRACLE
LEAGUE RESTROOM
BUILDING11/2/2018
COASTAL SYSTEMS
INTERNATIONAL, INC.None N/A $100,000.00
EDP-PR-110218-2PELICAN HARBOR
MARINA DREDGING OF
DOCK D AREA11/2/2018
CUMMINS CEDERBERG,
INC.SBE-AE Caucasian - Male $82,420.00
EDP-PR-3232018AVENETIAN CAUSEWAY
CONCRETE TOLL LANE
LOOP UPGRADE12/21/2018
SNUBBS CONSULTING
INC.SBE-AE, SBE-GS Hispanic - Male $32,941.00
EDP-PR-4934018AKENDALE LAKES PARK
RECREATION CENTER
RENOVATION12/21/2018
MAQUEIRA
ENGINEERING
CONSULTANTS, INC.SBE-AE, SBE-GS Hispanic - Male $12,000.00
EDP-PR-Z122718AMISCELLANEOUS DESIGN
OF ZOO PROJECTS1/14/2019 ELM ARCH, LLC None N/A $95,000.00
EDP-PR-510601FA
MATHESON HAMMOCK
PARK - FEMA HURRICANE
IRMA ATOLL POOL
DAMAGES
1/25/2019 WANTMAN GROUP, INC. None Caucasian - Male $117,045.00
EDP-PR-502501FC
CHARLES DEERING
ESTATE- PEOPLE'S DOCK
AND MANGROVE
BOARDWALK
RENOVATION
2/19/2019MOFFATT & NICHOL,
INC.None N/A $200,000.00
Demographic data provided for informational purposes only.
EDP-PR-999999AMULTIPLE CIVIL
ENGINEERING SERVICES3/5/2019
CALVIN, GIORDANO &
ASSOCIATES, INC.None Caucasian - Male $75,000.00
EDP-PR-9999999B
SEA LEVEL RISE
MITIGATION FEASIBILITY
STUDY CRANDON AND
HAULOVER PARKS
4/22/2019CUMMINS CEDERBERG,
INC.SBE-AE Caucasian - Male $200,000.00
EDP-PR-51060119BOAT RAMP PARKING &
HARBOR MASTER BLDG
IMPROVEMENT5/21/2019
AXIOMA 3, INC. DBA
AXIOMA 3, ARCHITECTS
DBE, SBE-AE, SBE-
GSHispanic - Male $41,000.00
EDP-PR-50250118CHARLES DEERING
ESTATE- STONE HOUSE
STRUCTURAL SURVEY6/13/2019
R.J. HEISENBOTTLE
ARCHITECTS, P.A.SBE-AE, SBE-GS Caucasian - Unknown $50,000.00
DOUGLAS WOOD
ASSOCIATES,
INC.
SBE-AE Caucasian - Male
JOHNSON,
AVEDANO,
LOPEZ,
RODRIGUEZ &
WALEWSKI
ENGINEERING
GROUP,INC.
SBE-AE, SBE-GS Hispanic - Male
EDP-PR-42200319
RICKENBACKER
CAUSEWAY WILLIAM
POWELL BRIDGE
NORTHEAST SHORELINE
PROTECTION
6/5/2019COASTAL SYSTEMS
INTERNATIONAL, INC.None N/A $70,000.00
Police EDP-ID-W190016
MIAMI-DADE PUBLIC
SAFETY TRAINING
INSTITUTE - DRAINAGE
AND PARKING
3/12/2019DEVELOPMENT
CONSULTING SERVICES,
INC.None Hispanic - Female $55,440.00
Public Health Trust EDP-PH-94913JHS PRELIMINARY
PROJECT PLANNING
SUPPORT12/26/2018
RED DESIGN GROUP,
LLCSBE-AE, SBE-GS Hispanic - Male $200,000.00
EDP-PH-51018019PPW PUBLIC SAFETY
RESTROOM
RENOVATIONS1/11/2019
BUILDING CENTER NO.
3, LLC
ACDBE, DBE, SBE-
AE, SBE-GSHispanic - Male $10,000.00
EDP-PH-94913-2JHS MISCELLANEOUS
DESIGN SERVICES1/22/2019
J.S.K. INTERNATIONAL,
INC. DBA JSK
ARCHITECTURAL
GROUP
SBE-AE, SBE-GS,
SBE-CONHispanic - Male $200,000.00
Demographic data provided for informational purposes only.
EDP-PH-51018054JHS PNEUMATIC TUBE
MODERNIZATION3/20/2019 HCS ENGINEERS, LLC
LDB, SBE-AE, SBE-
GSHispanic - Male $50,000.00
RED DESIGN
GROUP, LLCSBE-AE, SBE-GS Hispanic - Male
EDP-PH-9101781OR-91 HARMONY LED
LIGHTS6/6/2019
JOHN FORBES, INC. DBA
FORBES ARCHITECTSNone Caucasian - Male $13,000.00
Public Housing and
Community
Development
EDP-HD-CNA-RAD
RENTAL ASSISTANCE
DEMONSTRATION (RAD)
PHYSICAL CONDITION
ASSESSMENT (RPCA) OF
MULTIPLE PHCD
PROPERTIES
10/18/2018KEITH MARTIN
ARCHITECT, INCNone Black - Male $20,000.00
EDP-HD-COLE14
ANNIE COLEMAN 14 -
PHASE I
ENVIRONMENTAL SITE
ASSESSMENT
10/26/2018EE&G ENVIRONMENTAL
SERVICE, LLCNone N/A $10,000.00
EDP-HD-HCT
HARRY CAIN TOWER -
PHASE I
ENVIRONMENTAL SITE
ASSESSMENT
2/5/2019EE&G ENVIRONMENTAL
SERVICE, LLCNone N/A $1,800.00
EDP-HD-AMV
ARTHUR MAYS VILLAS -
PHASE I
ENVIRONMENTAL SITE
ASSESSMENT
2/5/2019ABSOLUTE CIVIL
ENGINEERING
SOLUTIONS LLCNone Caucasian - Female $2,400.00
EDP-HD-SMG
SOUTH MIAMI GARDENS -
PHASE I
ENVIRONMENTAL SITE
ASSESSMENT
2/5/2019NELCO TESTING &
ENGINEERING
SERVICES, INC.None Hispanic - Male $1,400.00
EDP-HD-LIBSQUCMLIBERTY SQUARE -
CONSTRUCTION SITE
INSPECTION SUPPORT2/14/2019
JORGE A. GUTIERREZ
ARCHITECT LLCNone Hispanic - Male $83,500.00
EDP-HD-SPF
STIRRUP PLAZA FAMILY -
PHASE I
ENVIRONMENTAL SITE
ASSESSMENT
3/4/2019ACB2 ENGINEERING,
INC.None Hispanic - Male $8,000.00
EDP-HD-PHCDFLA5EDISON PLAZA 5-56
GENERATOR & WINDOW
REPLACEMENT3/29/2019
RODRIGUEZ PETERSON
& PORRAS ARCHITECTS,
INC.
DBE, SBE-AE, SBE-
GSHispanic - Male $100,000.00
EDP-HD-395ENVIRONMENTAL SITE
ASSESSMENT PHASE 14/10/2019
ACB2 ENGINEERING,
INC.None Hispanic - Male $3,060.00
EDP-HD-FL5-060
40 YEAR RE
CERTIFICATION FOR
SOUTH MIAMI GARDENS
9 BUILDINGS
4/22/2019RAYMOND
ENGINEERING-GEORGIA,
INC.None Hispanic - Male $35,536.00
Demographic data provided for informational purposes only.
EDP-HD-CG-PARK1CULMER GARDENS
CONCEPTUAL PARK
DESIGN6/13/2019
CURTIS & ROGERS
DESIGN STUDIO, INC.SBE-AE, SBE-GS Hispanic - Female $25,000.00
Regulatory and
Economic ResourcesEDP-PE-DE-33WM
CIVIL ENGINEERING
SERVICES11/9/2018 ENCOBRIDGE, INC.
LDB, SBE-AE, SBE-
GSHispanic - Male $200,000.00
EDP-PE-DE-27WMMDC STORMWATER
MASTER PLAN UPDATE11/13/2018 GANNETT FLEMING, INC. None N/A $200,000.00
EDP-PE-DE-34WMWATER MANAGEMENT
CONSULTING SERVICES11/30/2018 ENCOBRIDGE, INC.
LDB, SBE-AE, SBE-
GSHispanic - Male $200,000.00
EDP-PE-DE-26WMMDC STORMWATER
MASTER PLAN UPDATE12/28/2018 CDM SMITH, INC. None Caucasian - Male $200,000.00
EDP-PE-ARMB2019MDC ARTIFICIAL REEF
AND MOORING BUOY
PROGRAMS4/12/2019
CUMMINS CEDERBERG,
INC.SBE-AE Caucasian - Male $100,000.00
EDP-PE-DE-35WMSURVEYING AND
MAPPING-VARIOUS SITES4/26/2019
BARNES, FERLAND AND
ASSOCIATES, INC.SBE-AE, SBE-GS Black - Male $200,000.00
EDP-PE-DE-36WMSURVEYING AND
MAPPING-VARIOUS SITES4/26/2019
C.H. PEREZ &
ASSOCIATES
CONSULTING
ENGINEERS, INC.
None Hispanic - Male $200,000.00
Seaport EDP-SP-18-037BSEAPORT MULTIPLE
SMALL ARCHITECTURAL
PROJECTS1/8/2019
KIMLEY-HORN AND
ASSOCIATES, INC.None N/A $200,000.00
Demographic data provided for informational purposes only.
EDP-SP-18-037CSEAPORT MULTIPLE
SMALL ARCHITECTURAL
PROJECTS1/28/2019
WOLFBERG/ALVAREZ
AND PARTNERS, INC.None Hispanic - Male $5,740.00
EDP-SP-19-021TRAFFIC STUDY-
PARKING GARAGE K2/20/2019
KIMLEY-HORN AND
ASSOCIATES, INC.None N/A $49,860.00
EDP-SP-18-048CONSTRUCTION
MANAGEMENT SERVICES3/26/2019
COBB, FENDLEY &
ASSOCIATES, INC.None N/A $200,000.00
EDP-SP-18-047A/E SUPPORT SERVICES
FOR DESIGN CRITERIA
DOCUMENTATION4/9/2019
BERENBLUM BUSCH
ARCHITECTURE, INC.SBE-AE Hispanic - Male $200,000.00
Solid Waste
ManagementEDP-SW-18N007
NORTH DADE LANDFILL
STORMWATER
ASSESSMENT10/4/2018
WOOD ENVIRONMENT &
INFRASTRUCTURE
SOLUTIONS INCNone Caucasian - Male $65,000.00
EDP-SW-18H009
WEST ACCESS WAY TO
58TH ST. HOME
CHEMICALS COLLECTION
CENTER
11/6/2018TRISKELION
ENGINEERING
COMPANYSBE-A&E, SBE-GS Hispanic - Male $49,958.00
EDP-SW-18M010
USED OIL COLLECTION
EXPANSION AT VARIOUS
TRASH AND RECYCLING
CENTERS
11/14/2018STEARNS, CONRAD AND
SCHMIDT, CONSULTING
ENGINEERS, INC.None N/A $76,093.00
EDP-SW-19MG004MIAMI GARDENS
LANDFILL CLOSURE
REMEDIATION2/22/2019
E SCIENCES,
INCORPORATEDSBE-AE Caucasian - Male $199,996.00
EDP-SW-19N001
NORTH DADE
FEASIBILITY STUDY FOR
LANDFILL GAS SYSTEM
IMPROVEMENTS
3/1/2019STEARNS, CONRAD AND
SCHMIDT, CONSULTING
ENGINEERS, INC.None N/A $32,132.00
EDP-SW-19M002FEMA ROOF REPAIRS
MULTIPLE SITES3/25/2019
TERRACON
CONSULTANTS, INC.None N/A $30,000.00
Demographic data provided for informational purposes only.
EDP-SW-19W003
WEST TRANSFER
STATION REPLACEMENT
OF WATER AND SEWER
LINE
4/18/2019PROCON ENGINEERING,
INC.
DBE, LDB, SBE-
AE, SBE-GSHispanic - Male $7,800.00
EDP-SW-19N006NEW TRANSFER STATION
AT NORTH DADE
LANDFILL4/26/2019 ARDURRA GROUP, INC. None White - Male $200,000.00
Transportation and
Public WorksEDP-MT-OSP237
COMPLETE STREETS
COLLABORATIVE10/12/2018 GOAL ASSOCIATES, INC.
DBE, SBE-AE, SBE-
GSBlack - Male $145,000.00
EDP-MT-20180169SNOWDEN PEDESTRIAN
BRIDGE ALONG
COMMODORE TRAIL10/19/2018 PEDELTA, INC. SBE-AE Caucasian - Male $120,000.00
C.H. PEREZ &
ASSOCIATES
CONSULTING
ENGINEERS, INC.
None Hispanic - Male
UNIVERSAL
ENGINEERING
SCIENCES, INC.
None N/A
EDP-MT-20000534COUNTYWIDE BRIDGE
REHABILITATION AND
IMPROVEMENTS11/29/2018
C.H. PEREZ &
ASSOCIATES
CONSULTING
ENGINEERS, INC.
None Hispanic - Male $80,000.00
EDP-MT-20190022COUNTYWIDE TRAFFIC
DATA COLLECTION 2019
A1/2/2019
C.H. PEREZ &
ASSOCIATES
CONSULTING
ENGINEERS, INC.
None Hispanic - Male $60,000.00
EDP-MT-2016115DESIGN CRITERIA FOR
NE 2ND AVE1/11/2019 SRS ENGINEERING, INC. SBE-AE, SBE-GS Hispanic - Male $140,000.00
BASULTO &
ASSOCIATES,
INC.
DBE, SBE-AE, SBE-
GSHispanic - Male
CURTIS &
ROGERS DESIGN
STUDIO, INC.
SBE-AE, SBE-GS Caucasian - Female
SNUBBS
CONSULTING
INC.
SBE-AE, SBE-GS Hispanic - Male
EDP-MT-CIP201ROADWAY SIGNS IN THE
VICINITY OF THE
METRORAIL STATIONS1/14/2019 WANTMAN GROUP, INC. None Caucasian - Male $100,000.00
Demographic data provided for informational purposes only.
EDP-MT-20190023COUNTYWIDE TRAFFIC
DATA COLLECTION 2019
B1/23/2019
FLORIDA
TRANSPORTATION
ENGINEERING, INC.
(FTE)
SBE-AE Asian - Male $60,000.00
EDP-MT-CIP134-1GOVERNMENT CENTER
STATION ROOF & FIRE
SUPPRESSION DCP-12/27/2019
KEITH MARTIN
ARCHITECT, INCNone Black - Male $200,000.00
EDP-MT-CIP134-2GOVERNMENT CENTER
STATION
REFURBISHMENT DCP-22/27/2019
R. E. CHISHOLM
ARCHITECTS, INC.SBE-AE, SBE-GS Hispanic - Male $200,000.00
EDP-MT-CIP209
CARIBBEAN BLVD OVER
C1-N CANAL BRIDGE
REPLACEMENT AND
DRAINAGE
IMPROVEMENTS
3/5/2019JACOBS ENGINEERING
GROUP, INC.None Caucasian - Male $182,257.00
GANNETT
FLEMING, INC.None Other - Uknown
MARLIN
ENGINEERING,
INC.
DBE Hispanic - Male
EDP-MT-20190042
SW 42 ST FROM SW 162
AV TO SW 157 AV
ROADWAY
IMPROVEMENTS
3/14/2019DAVID PLUMMER &
ASSOCIATES, INC.None N/A $160,000.00
EDP-MT-20190026TRAFFIC SIGNAL FOR
FIRE STATION 693/20/2019
COBB, FENDLEY &
ASSOCIATES, INC.None N/A $30,000.00
EDP-MT-2000534COUNTYWIDE
UNDERWATER BRIDGE
INSPECTIONS4/2/2019
MARLIN ENGINEERING,
INC.DBE Hispanic - Male $50,000.00
EDP-MT-20190087TRAFFIC ENGINEERING
PLANS REVIEW4/4/2019
ALVAREZ ENGINEERS,
INC.SBE-AE, SBE-GS Hispanic - Male $100,000.00
EDP-MT-20190060TRAFFIC FLOW
MODIFICATION STREET
CLOSURE PROCEDURES4/8/2019
FLORIDA
TRANSPORTATION
ENGINEERING, INC.
(FTE)
SBE-AE Other - Male $70,000.00
EDP-MT-20190082TRAFFIC ENGINEERING
STUDIES4/9/2019
COBB, FENDLEY &
ASSOCIATES, INC.None N/A $200,000.00
EDP-MT-2019PMT1PERMITING PLANS
REVIEW4/16/2019 AMBRO, INC.
DBE, SBE-AE, SBE-
GSBlack - Male $70,000.00
EDP-MT-2019PMT2PERMIT PACKAGE
REVIEW FOR THE 5G4/16/2019 FORD ENGINEERS, INC. None Hispanic - Male $70,000.00
EDP-MT-2019PMT3PERMIT PACKAGE
REVIEW FOR THE 5G4/16/2019
SNUBBS CONSULTING
INC.SBE-AE, SBE-GS Hispanic - Male $70,000.00
Demographic data provided for informational purposes only.
FORD
ENGINEERS, INC.None Hispanic - Male
Water and Sewer EDP-WS-SR-334PUMP STATION 14
ENGINEERING
OVERSIGHT10/10/2018
LUDOVICI & ORANGE
CONSULTING
ENGINEERS, INCNone Caucasian - Male $70,000.00
EDP-WS-S-329
ENGINEERING SERVICES
WATER USE AND ASR
PERMITTING AND
EVALUATION
10/18/2018BLACK & VEATCH
CORPORATIONNone Caucasian - Male $199,567.00
EDP-WS-S-2993D BUILDING
INFORMATION MODELING
(BIM) AUDIT11/30/2018 GHD SERVICES, INC. None N/A $200,000.00
EDP-WS-S-335WASD STREET
REHABILITATION2/26/2019
M & J ENGINEERING,
P.C.None Asian - Male $200,000.00
EDP-WS-S-336WASD STREET
REHABILITATION2/26/2019
TARGET ENGINERING
GROUP, LLCNone N/A $200,000.00
Demographic data provided for informational purposes only.
Internal Services Department
Small Business Development (SBD) Small Business Enterprise –Architect & Engineers Business Outreach and Education S e c t i o n
June 2019 to July 2019
Total for Period
YTD Total
Activity
Assistance Provided to Small Business Enterprise- Architecture & Engineering Program
1 Assistance with Certification 6 72
2 Needs Assessment Meetings (NAMS) 4 16
3 Technical Assistance 23 281
4 Payment Issues 2
3
4.1 Payment Issues Related Dollars $243,440 $403,676
5 Prompt Payment Issues 0 0
5.1 Prompt Payment Related Dollars 0 0
6 Contract Issues (Non-dollar related) 1 1
7
Contact with SBE-Architecture & Engineering Firms (emails highlighting contract opportunities
354 5,008
Total for Period
YTD Total
Activity Training, Education and Outreach Activities
1
Small Business Development (sponsored) Workshops and Forums
1 3
1.1 Number of Attendants 8
79
2 Partnership Workshops & Forums 0 15
2.1 Number of Firms (with whom contact was made) 0 155
Activity Technical Training & Development Workshops
3 None 0 0
3.1 n/a
WASD TRANSPARENCY REPORT – EXHIBIT A Water & Sewer Infrastructure Projects in Procurement: July 2019
07/31/2019 1
Accelerate Ordinance
No. 14-77
Yes/No
ISD Project No. & Project
Description & Commission
Districts
Contract Amount
& OMB Project No.
ISD Review SBE Goal
(Small Business
Enterprise) Architectural/ Engineering
(A/E), Construction,
Goods & Services (G/S)
Proposed Method
of Award
Advertisement (S Date
COS Begins
Industry Pre-
Submittal Conference
(Project Briefing)
First Tier/Step 1 Selection
Second Tier/
Step 2 Selection
Oral Presentation
BCC Committee
Meeting
BCC Meeting
Date
Firms Awarded, Status and Comments
* Projects Under the Cone of
Silence (COS)
1 No DB18-WASD-02 Commission District 7 & 8 (Consent Decree) South & Central District Wastewater Treatment Plants Dewatering Thickening Facilities
$172,000,000 Proposing Received Item 14% A/E; 2% G/S; 9.43 Con; 10% CWP
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
11/08/2018 11/15/2018 3/06/2019 TBD COS 1/11/2019 Step 1 Proposals Due 3/26/2019 Step 2 Project Briefing and Site Visit 6/07/2019 Step 2 Oral Presentation Meeting 7/2/2019 Negotiation Memorandum Approved 8/9/2019 First Negotiation Meeting with Poole & Kent Company of Florida
Summary of Minimum Experience & Qualifications:
• The Lead Constructor must have constructed at least three process facilities of similar size, scope and complexity in wastewater treatment plants.
• The Lead Designer must have designed at least one wastewater process projects with rated capacity of not less than fifty (50) MGD of comparable scope and complexity, and one (1) project consisting on the thickening and/or dewatering process.
WASD TRANSPARENCY REPORT – EXHIBIT A Water & Sewer Infrastructure Projects in Procurement: July 2019
07/31/2019 2
Accelerate Ordinance
No. 14-77
Yes/No
ISD Project No. & Project
Description & Commission
Districts
Contract Amount
& OMB Project No.
ISD Review SBE Goal
(Small Business
Enterprise) Architectural/ Engineering
(A/E), Construction,
Goods & Services (G/S)
Proposed Method
of Award
Advertisement (S Date
COS Begins
Industry Pre-
Submittal Conference
(Project Briefing)
First Tier/Step 1 Selection
Second Tier/
Step 2 Selection
Oral Presentation
BCC Committee
Meeting
BCC Meeting
Date
Firms Awarded, Status and Comments
* Projects Under the Cone of
Silence (COS)
2 No S-916 Commission District 6 Rehabilitation of 54-Inch PCCP Force Main on W. Flagler St. from SW 78 Place to Meter Station East of SW 72 Ave.
$5,120,384.00 Resubmittal 9/12/2018 Review Item Approved SBE – No Measure, CWP – N/A
Invitation to Bid to the lowest responsive, responsible bidder
10/02/2018 10/11/2018 TBD TBD COS 12/11/2018 Bids Received
Summary of Minimum Experience & Qualifications: Bidding restricted only to prequalified members of the prequalification pool for Contract No. RTQ-00298 Trenchless Pipe Installation and Pipe Rehabilitation Services for Group 2. Bidders shall be a member of the prequalified pool and shall hold all required licenses at the time of the bid due date for this project.
3 No DB17-WASD-02 Commission District 6 Design-Build Services for the Installation of a 54-inch Diameter Water Transmission Main near Red Road from John E. Preston Treatment Plant to West 53 Street
$32,000,000 9654031- North Miami-Dade- Water Transmission Main Improvements
Review Item Sent 4/11/2018 Proposing 19% SBE A/E 8.4% Constr. 0.5% G/S Review Item Received 5/24/2018 24% SBE A/E 10.% Constr. 0.5% G/S
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid
7/25/2018 7/31/2018 1/16/2019 TBD COS 9/28/2018 Proposal Submittal Deadline 12/19/2018 Competitive Selection Committee Approved 1/16/2019 First Step Meeting
WASD TRANSPARENCY REPORT – EXHIBIT A Water & Sewer Infrastructure Projects in Procurement: July 2019
07/31/2019 3
Accelerate Ordinance
No. 14-77
Yes/No
ISD Project No. & Project
Description & Commission
Districts
Contract Amount
& OMB Project No.
ISD Review SBE Goal
(Small Business
Enterprise) Architectural/ Engineering
(A/E), Construction,
Goods & Services (G/S)
Proposed Method
of Award
Advertisement (S Date
COS Begins
Industry Pre-
Submittal Conference
(Project Briefing)
First Tier/Step 1 Selection
Second Tier/
Step 2 Selection
Oral Presentation
BCC Committee
Meeting
BCC Meeting
Date
Firms Awarded, Status and Comments
* Projects Under the Cone of
Silence (COS)
Summary of Minimum Experience and Qualifications:
• The construction firm performing the open cut installation work must have a minimum of five (5) years total industry experience as of the date of the solicitation
• The Lead Designer firm performing the design of the water transmission main installation must have a minimum of five (5) years total industry experience.
• The construction firm or specialty subcontractor performing the shaft construction shall have successfully constructed at least one (1) deep shaft(s) that was at least 25-foot deep (below grade).
4 No DB18-WASD-01 Various Commission Districts Design-Build Services for Installation of a 36-Inch Diameter Sanitary Sewer Force Main on N.W. 107 Avenue from south N.W.7 Street to N.W. 25 Street
$9,600,000 9653371 Peak Flow Management Facilities
Review Item Sent 4/11/2018 Proposing 13% SBE A/E 7.6% Constr. 2.% G/S 6/8/2018 Received 28% A/E 4% G/S 10.60 Constr 10% CWP
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
8/7/2018 8/21/2018 1/10/2019 TBD COS 7/17/2018 RTA Approved 8/07/2018 Project Advertised 8/01/2018 Project Briefing 10/12/2018 Proposals Submittal Deadline 11/15/2018 Competitive Selection Committee Approved 1/10/2019 First Step Meeting
WASD TRANSPARENCY REPORT – EXHIBIT A Water & Sewer Infrastructure Projects in Procurement: July 2019
07/31/2019 4
Accelerate Ordinance
No. 14-77
Yes/No
ISD Project No. & Project
Description & Commission
Districts
Contract Amount
& OMB Project No.
ISD Review SBE Goal
(Small Business
Enterprise) Architectural/ Engineering
(A/E), Construction,
Goods & Services (G/S)
Proposed Method
of Award
Advertisement (S Date
COS Begins
Industry Pre-
Submittal Conference
(Project Briefing)
First Tier/Step 1 Selection
Second Tier/
Step 2 Selection
Oral Presentation
BCC Committee
Meeting
BCC Meeting
Date
Firms Awarded, Status and Comments
* Projects Under the Cone of
Silence (COS)
6/04/2019 Step 2 Pre-Submittal Project Briefing 7/23/2019 Technical Proposals Due 8/27/2019 Step 2 Oral Presentations
Summary of Minimum Experience and Qualifications: The Lead Construction firm performing the open cut installation work must have successfully constructed at least one (1) pressure pipeline project(s) of similar size and complexity in an urban environment and a minimum 36-inch nominal diameter pipe. The Lead Designer firm performing the design of the force main must have designed at least one (1) pressure pipeline project(s) in an urban environment consisting of a minimum thirty-six (36) inch nominal diameter. The Lead Construction firm performing the shaft construction shall have successfully constructed at least one (1) shaft project(s) that was at least twenty-five (25) feet below ground surface. mum thirty-six (36) inch nominal diameter.
WASD TRANSPARENCY REPORT – EXHIBIT A Water & Sewer Infrastructure Projects in Procurement: July 2019
07/31/2019 5
Accelerate Ordinance
No. 14-77
Yes/No
ISD Project No. & Project
Description & Commission
Districts
Contract Amount
& OMB Project No.
ISD Review SBE Goal
(Small Business
Enterprise) Architectural/ Engineering
(A/E), Construction,
Goods & Services (G/S)
Proposed Method
of Award
Advertisement (S Date
COS Begins
Industry Pre-
Submittal Conference
(Project Briefing)
First Tier/Step 1 Selection
Second Tier/
Step 2 Selection
Oral Presentation
BCC Committee
Meeting
BCC Meeting
Date
Firms Awarded, Status and Comments
* Projects Under the Cone of
Silence (COS)
5 No S-946 Various Commission Districts Two-Year Countywide Contract for Rehabilitation of Sanitary Sewers by the Cured-In-Place Pipe Lining Method with County OTR for an Add’l. Two Years on a Yearly Basis
$16,000,000 3/06/2019 Review Item Approved SBE – No Measure CWP-N/A
Invitation to Bid to the lowest responsive, responsible bidder
5/15/2019 5/23/2019 N/A
TBD COS 6/14/2019 Bid Due Date
Summary of Minimum Experience & Qualifications: One of the following licenses is required: General Engineering, State Underground, Pipeline and/or other categories as applicable by Chapter 489 of the Florida Statutes or County Code Chapter 10. (See Instruction to Bidders, Section 13). Also see SP 1.0 of the Special Provisions for additional bidder qualifications and minimum construction experience requirements to be provided at bid submittal, specifically: • Bidders shall submit proof that their firm has been successfully engaged in (on a regular basis) with the installation of the proposed liner product for a minimum of one year and has performed repairs of 8-inch through 36-inch (or larger) diameter sewer gravity lines in an aggregate amount of at least 500,000 linear feet in sub-aqueous conditions. • Bidders shall submit proof that the liner product to be installed has a documented minimum amount of 500,000 linear feet of any pipe diameter for a successful wastewater installation in the United States.
6 Yes S-914 Commission District 8 (Consent Decree Project)
$7,073,307.00 9/13/2018 Review Item Approved SBE/GS 4.00%
Invitation to Bid to the lowest responsive,
10/19/2018 10/30/2018 N/A TBD COS 5/28/2019 Request to
WASD TRANSPARENCY REPORT – EXHIBIT A Water & Sewer Infrastructure Projects in Procurement: July 2019
07/31/2019 6
Accelerate Ordinance
No. 14-77
Yes/No
ISD Project No. & Project
Description & Commission
Districts
Contract Amount
& OMB Project No.
ISD Review SBE Goal
(Small Business
Enterprise) Architectural/ Engineering
(A/E), Construction,
Goods & Services (G/S)
Proposed Method
of Award
Advertisement (S Date
COS Begins
Industry Pre-
Submittal Conference
(Project Briefing)
First Tier/Step 1 Selection
Second Tier/
Step 2 Selection
Oral Presentation
BCC Committee
Meeting
BCC Meeting
Date
Firms Awarded, Status and Comments
* Projects Under the Cone of
Silence (COS)
1.11 General Electrical Design SubStation 9, 10, 11 & 12
SBE/CONS – 15.37% CWP – 10.00%
responsible bidder
Reject all Bids filed with Clerk
Summary of Minimum Experience & Qualifications: One of the following licenses is required: State General Contractor, General Engineering Contractor and/or other categories as applicable by Chapter 489 of the Florida Statutes or Chapter 10 of Miami-Dade County Code. (See Instruction to Bidders, Section 13). In addition to licensing requirements, Bidders are required to submit proof that his/her firm meet the following:
• The Bidder or Bidder’s Electrical Subcontractor shall have successfully completed a minimum of three (3) projects demonstrating experience with medium or high voltage power supply systems, including transformers and switchgear.
Also See SP 1.0 of the Special Provisions for additional bidder qualifications and minimum construction experience requirements.
7 No W-942 Commission District 6 72-Inch Water Main in West 2nd Avenue between 11th Street & 13th Street
$8,285,999.00 9/25/2018 Review Item Approved SBE/GS 3.17% SBE/CONS – 5.27% CWP – N/A
Invitation to Bid to the lowest responsive, responsible bidder
TBD TBD N/A TBD RTA Approved
Summary of Minimum Experience & Qualifications: One of the following licenses is required: State General Contractor License, General Engineering License, State Underground Utilities and Excavation License, or Pipeline Engineering License and/or other categories as applicable by Chapter 489 of the Florida Statutes or County Code Chapter 10. Also Bidders shall be experienced in the installation of prestressed cylinder concrete pipe (PCCP) by providing a minimum of three (3) projects successfully completed with PCCP of a minimum of 42-inches in diameter.
WASD TRANSPARENCY REPORT – EXHIBIT A Water & Sewer Infrastructure Projects in Procurement: July 2019
07/31/2019 7
Accelerate Ordinance
No. 14-77
Yes/No
ISD Project No. & Project
Description & Commission
Districts
Contract Amount
& OMB Project No.
ISD Review SBE Goal
(Small Business
Enterprise) Architectural/ Engineering
(A/E), Construction,
Goods & Services (G/S)
Proposed Method
of Award
Advertisement (S Date
COS Begins
Industry Pre-
Submittal Conference
(Project Briefing)
First Tier/Step 1 Selection
Second Tier/
Step 2 Selection
Oral Presentation
BCC Committee
Meeting
BCC Meeting
Date
Firms Awarded, Status and Comments
* Projects Under the Cone of
Silence (COS)
8 No S-920 Commission District 7 CDWWTP Municipal Injection Wells (CE-2) under Injection Wells Prequalification Pool
$52,923,573.00 8/14/2018 Review Item Approved SBE/GS No Measure SBE/CONS – No Measure CWP-N/A
Invitation to Bid to the lowest responsive, responsible bidder
9/27/2018 10/10/2018 N/A
TBD COS 12/07/2018 Bids Received
Summary of Minimum Experience & Qualifications: Bidding restricted only to prequalified members of Contract No. RTQ-00566, Injection Wells Prequalification Pool. Bidders shall be a member of the prequalified pool and shall hold all required licenses at the time of the bid due date for this project.
WASD TRANSPARENCY REPORT – EXHIBIT A Water & Sewer Infrastructure Projects in Procurement: July 2019
07/31/2019 8
Accelerate Ordinance
No. 14-77
Yes/No
ISD Project No. & Project
Description & Commission
Districts
Contract Amount
& OMB Project No.
ISD Review SBE Goal
(Small Business
Enterprise) Architectural/ Engineering
(A/E), Construction,
Goods & Services (G/S)
Proposed Method
of Award
Advertisement (S Date
COS Begins
Industry Pre-
Submittal Conference
(Project Briefing)
First Tier/Step 1 Selection
Second Tier/
Step 2 Selection
Oral Presentation
BCC Committee
Meeting
BCC Meeting
Date
Firms Awarded, Status and Comments
* Projects Under the Cone of
Silence (COS)
9 No S-921 Commission District 8 SDWWTP Municipal Injection Wells (SE-2) under Injection Wells Prequalification Pool
$20,151,441 8/14/2018 Review Item Approved SBE/GS No Measure SBE/CONS – No Measure CWP-N/A
Invitation to Bid to the lowest responsive, responsible bidder
9/27/2018 10/10/2018 N/A
TBD COS 12/07/2018 Bids Received
Summary of Minimum Experience & Qualifications: Bidding restricted only to prequalified members of Contract No. RTQ-00566, Injection Wells Prequalification Pool. Bidders shall be a member of the prequalified pool and shall hold all required licenses at the time of the bid due date for this project.
10 No S-922 Commission District 8 (Consent Decree Project) CD 1.05(2) SDWWTP -Effluent Pump Station Electrical Improvements for Pumps 1 through 6
$23,678,826 1/15/2019 Review Item Approved SBE/GS – 3.03% SBE/CONS – 8.62% CWP-N/A
Invitation to Bid to the lowest responsive, responsible bidder
2/07/2019 2/19/2019 N/A
TBD COS 4/04/2019 Bids Received
WASD TRANSPARENCY REPORT – EXHIBIT A Water & Sewer Infrastructure Projects in Procurement: July 2019
07/31/2019 9
Accelerate Ordinance
No. 14-77
Yes/No
ISD Project No. & Project
Description & Commission
Districts
Contract Amount
& OMB Project No.
ISD Review SBE Goal
(Small Business
Enterprise) Architectural/ Engineering
(A/E), Construction,
Goods & Services (G/S)
Proposed Method
of Award
Advertisement (S Date
COS Begins
Industry Pre-
Submittal Conference
(Project Briefing)
First Tier/Step 1 Selection
Second Tier/
Step 2 Selection
Oral Presentation
BCC Committee
Meeting
BCC Meeting
Date
Firms Awarded, Status and Comments
* Projects Under the Cone of
Silence (COS)
Summary of Minimum Experience & Qualifications: One of the following licenses is required: State General Contractor, General Engineering Contractor and/or other categories as applicable by Chapter 489 of the Florida Statutes or County Code Chapter 10. (See Instruction to Bidders, Section 13). Also see SP 1.0 of the Special Provisions and Section 01 10 00 Summary of Work for additional bidder qualifications and minimum construction experience requirements to be provided at bid submittal, specifically: •The Bidder or Bidder’s Electrical Subcontractor shall have successfully completed a minimum of three (3) projects demonstrating experience with installation of electrical equipment rated for 13.2 KV and 480V power supply within the last 10 years.
11 No S-918 Commission District 3 Replacement of 8-Inch Sanitary Sewer Sub-Aqueous Crossing (Inverted Siphon) under the Sabal Lake Canal (PS 0021)
$883,954.40 12/20/2018 Review Item Approved SBE/CONS – 5.09% SBE/GOODS – 1.03%, SBE/SERV – 1.54%, CWP – N/A
Invitation to Bid to the lowest responsive, responsible bidder
1/16/2019 1/23/2019 TBD TBD COS 5/21/2019 Request to Reject all Bids filed with Clerk
Summary of Minimum Experience & Qualifications: In accordance with the requirements of RTQ-00298 Trenchless Pipe Installation and Pipe Rehabilitation Services, the bidder, at the time of such offer, shall hold a currently active State General Contractor License, General Engineering License, State Underground Utilities and Excavation License, or Pipeline Engineering License. Also see SP 1.0 of the Special Provisions for additional bidder qualifications.
12 No S-940 Commission District 4 (Consent Decree Project)
$9,144,543 2/07/2019 Review Item Approved SBE/CONS – 14.72%
Invitation to Bid to the lowest responsive, responsible bidder
4/04/2019 4/18/2019 TBD TBD COS 6/07/2019 Revised Bid Due Date
WASD TRANSPARENCY REPORT – EXHIBIT A Water & Sewer Infrastructure Projects in Procurement: July 2019
07/31/2019 10
Accelerate Ordinance
No. 14-77
Yes/No
ISD Project No. & Project
Description & Commission
Districts
Contract Amount
& OMB Project No.
ISD Review SBE Goal
(Small Business
Enterprise) Architectural/ Engineering
(A/E), Construction,
Goods & Services (G/S)
Proposed Method
of Award
Advertisement (S Date
COS Begins
Industry Pre-
Submittal Conference
(Project Briefing)
First Tier/Step 1 Selection
Second Tier/
Step 2 Selection
Oral Presentation
BCC Committee
Meeting
BCC Meeting
Date
Firms Awarded, Status and Comments
* Projects Under the Cone of
Silence (COS)
CD 5.9 Upgrade of Regional Pump Station 0301
SBE/GOODS – 5.25%, CWP – N/A
Summary of Minimum Experience & Qualifications: One of the following licenses is required: State General Contractor, General Engineering Contractor and/or other categories as applicable by Chapter 489 of the Florida Statutes or County Code Chapter 10. (See Instruction to Bidders, Section 13). Also see SP 1.0 of the Special Provisions for additional bidder qualifications and minimum construction experience requirements to be provided at bid submittal, specifically: a) The Bidder shall demonstrate relevant experience of directing/managing specialty contractors such as structural, electrical and instrumentation subcontractors by listing a least three (3) projects completed as the prime contractor within the last ten (10) years at sewage facilities, with a minimum total construction cost of three million dollars ($3,000,000) or more each. b) The Bidder, as prime contractor, shall have successfully completed the installation or removal and replacement of pumps and motors for at least one (1) raw sewage pump station within the last ten (10) years which included the Installation of submersible centrifugal pumps (minimum 100 horsepower). c) The Bidder or Bidder’s Electrical Subcontractor shall have successfully completed at least one (1) project demonstrating experience with 460 VAC power supply and pump station controls/integration within the last ten (10) years meeting the following requirements: 1. 460 VAC switchgear 2. 460 VAC variable frequency drives 3. PLC auxiliary control panel 4. Pump Station Control System Integrator d) The Prime Contractor or Subcontractor responsible for installing new wet well shall have completed at least three (3) projects within the past ten (10) years demonstrating: 1. Experience with deep excavations, dewatering and concrete placement near coastal/marine waterways 2. Experience mitigating environmental issues raise during construction near wetlands/marine/coastal waterways.
13 No S-915 Commission District 7 (Consent Decree Project) CD 2.15(3) CDWWTP - Plant
$28,273,088 3/08/2019 Review Item Approved SBE/CONS – 10.70% SBE/GOODS – 1.50%
Invitation to Bid to the lowest responsive, responsible bidder
5/02/2019 Cancelled -New Date TBD
N/A
TBD COS Bid Due Date Postponed Until Further Notice
WASD TRANSPARENCY REPORT – EXHIBIT A Water & Sewer Infrastructure Projects in Procurement: July 2019
07/31/2019 11
Accelerate Ordinance
No. 14-77
Yes/No
ISD Project No. & Project
Description & Commission
Districts
Contract Amount
& OMB Project No.
ISD Review SBE Goal
(Small Business
Enterprise) Architectural/ Engineering
(A/E), Construction,
Goods & Services (G/S)
Proposed Method
of Award
Advertisement (S Date
COS Begins
Industry Pre-
Submittal Conference
(Project Briefing)
First Tier/Step 1 Selection
Second Tier/
Step 2 Selection
Oral Presentation
BCC Committee
Meeting
BCC Meeting
Date
Firms Awarded, Status and Comments
* Projects Under the Cone of
Silence (COS)
2 Cluster 3 Digester Upgrades
CWP-N/A
Summary of Minimum Experience & Qualifications: One of the following licenses is required: State General Contractor, General Engineering Contractor and/or other categories as applicable by Chapter 489 of the Florida Statutes or County Code Chapter 10. (See Instruction to Bidders, Section 13). Also see SP 1.0 of the Special Provisions and Section 01 10 00 Summary of Work for additional bidder qualifications and minimum construction experience requirements to be provided at bid submittal, specifically: • Bidders shall have successfully completed the construction and/or rehabilitation of a minimum of two (2) projects which included new wastewater digester tanks or rehabilitation of existing wastewater digester tanks. • In addition, experience is required with the installation of at least one (1) new digester tank floating cover. This requirement can be met by the experience of the bidder or bidder’s subcontractor. • The bidder or bidder’s electrical subcontractor shall have successfully completed a minimum of two (2) projects demonstrating experience with installation of electrical equipment rated for 480V power supply.
14 Yes Various Commission Districts Heavy Equipment (HV), Construction Equipment (CE), and Light Vehicles (LV)
HV: $9,181,500, CE: $2,841,000, and LV: $1,350,091
TBD RFQ TBD TBD TBD TBD Accessing Cooperative Contracts
The draft solicitations are posted on Internal Services Department’s webpage at http://www.miamidade.gov/procurement/solicitations.asp and Small Business Development’s webpage at http://www.miamidade.gov/business/contracting-opportunities-architecture-engineering.asp
for industry review and comments prior to advertisement.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 1
AWARDED CONTRACTS
1 No S-907 Commission District 7 (Consent Decree Project) CD 2.11 Central District Wastewater Treatment Plant Effluent Pump Station Electrical Improvements
$21,865,770 964120 Wastewater Treatment Plants - Consent Decree Projects
4/09/2018 Review Item Approved SBE/GS 2.52% SBE/CONS – 10.67% CWP – N/A
Invitation to Bid to the lowest responsive, responsible bidder
5/31/2018 6/07/2018 N/A 5/07/2019 BCC Approval R-506-19
5/07/2019 Contract Award Recommendation Approved to PCL Construction
2 No DB16-WASD-02 Commission District 7 Alexander Orr Water Treatment Plant Drinking Water Laboratory
$7,100,000 Review Item Sent 5/06/2016 Proposing 14.98% A/E; 26.68% Construction 3.08% G/S; Received 5/24/2016 14.98% A/E; 15.02% Construction; 2.58% G/S
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
7/06/2016 7/14/2016 6/06/2017
12/08/2016 10/05/2017
1/23/2019 BCC Approval R-69-18
1/23/2019 Contract Award Recommendation To Florida Lenmark Corporation
3 No DB17-WASD-01 Commission District 7 Central District Wastewater Treatment Plant Oxygen Production Facility Consent Decree 2.27
$57,000,0000 Review Item Sent 6/23/2017 Proposing A/E 13.13% Const. 7.15% G/S 1% Received Item 6/30/2017
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid
7/25/2017 8/01/2017
12/01/2017 Step 1 Meeting 3/23/2018 Step 2 Meeting
12/18/2018BCC Approval R-1285-18
1/04/2019 Contract Award Recommendation Approved to PLC Construction, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 2
A/E 17.13% Const. 7.42% G/S 1.10%
4 Yes S-908R Commission District 8 (Consent Decree Project) 5.3 Upgrades to Sewage Pump Station No. 0692
$9,956,581.46 964440 Sewer Pump Station Systems - Consent Decree Projects
8/6/2018 Review Item Approved SBE/GS 6.80% SBE/CONS – 14.59% CWP – N/A
Invitation to Bid to the lowest responsive, responsible bidder
8/16/2018 8/27/2018 N/A 2/20/2019 BCC Approval R-201-19
11/13/2018 Contract Award Recommendation Approved to Poole & Kent
5 No W-944 Commission District 7 AOWTP Lime Kiln Electrical Switchgear Building (Was RPQ P0211)
$6,270,105.91 2/01/2018 Review Item Approved SBE/GS 1.79% SBE/CONS – 8.46% CWP-N/A
Invitation to Bid to the lowest responsive, responsible bidder
2/09/2018 3/01/2018 N/A
10/02/2018 BCC Approval R-1022-18
4/02/2018 Bids Received 10/02/2018 BCC Approved Contract Award Recommendation to Lee Construction Group
6 No S-896 Commission District 7 (Consent Decree Project) CD 3.05(2) NDWWTP Secondary Clarifiers Upgrades (Remaining Scope of Work)
$22,841,250.00 BAFO
964120 Wastewater Treatment Plants - Consent Decree Projects
1/03/2018 Review Item Approved SBE/GS 0.00% SBE/CONS – 12.01% CWP – N/A
Invitation to Bid to the lowest responsive, responsible bidder
2/22/2018 3/06/2018 BAFO 5/15/2018
10/02/2018 BCC Approval R-1023-18
4/27/2018 Bids Received 5/15/2018 BAFO 10/02/2018 BCC Approved Contract Award Recommendation to Daniel O’Connell’s Sons
7 Yes S-895 Commission District 4 (Consent Decree Project) CD 3.02(2) NDWWTP Primary Clarifiers
$50,478,067.70 BAFO
964120 Wastewater Treatment Plants -
1/03/2018 Review Item Approved SBE/GS 0.00% SBE/CONS – 12.01% CWP – N/A
Invitation to Bid to the lowest responsive, responsible bidder
2/09/2018 2/20/2018 BAFO 5/31/2018
1/23/2019 BCC Approval R-71-19
10/12/2018 Contract Award Recommendation Approved to Kiewit Infrastructure South, Co.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 3
and Odor Control Upgrades
Consent Decree Projects
8 Yes S-882R Commission District 8 (Consent Decree Project) 1.02 Oxygen Production Upgrades SDWWTP
$9,084,330 1/31/2018 Review Item Approved SBE/GS 4.80% SBE/CONS – 17.46% CWP-10%
Invitation to Bid to the lowest responsive, responsible bidder
4/09/2018 4/19/2018 N/A
2/05/2019 BCC Approval R-155-19
6/21/2018 Bids Received 10/12/2018 Contract Award Recommendation Approved to Poole & Kent
9 Yes S-892 Commission District 7 (Consent Decree Project) 2.08 Secondary Clarifiers Plant 2, 2.10 Return Sludge Ps Plant 2, And 2.01 (3) Electrical Improvements @ CDWWTP
$22,237,250.00 964120 Wastewater Treatment Plants - Consent Decree Projects
2/01/2018 Review Item Approved SBE/GS 1.44% SBE/CONS – 8.65% CWP-N/A
Invitation to Bid to the lowest responsive, responsible bidder
4/12/2018 4/23/2018 N/A
Pending BCC Ratification
6/05/2018 Bids Received 10/12/2018 Contract Award Recommendation Approved to Kiewit Infrastructure South, Co.
10 No RTQ-00566 Various Commission Districts Deep Injection Wells Drilling and Construction Services for WASD Ocean Outfall Program
$225,000,000 TBD for each Spot Market Bid
Pre-Qualification Pool
7/19/2017 TBD TBD 7/24//2018 BCC Approved R-774-18
8/11/2017 Bids Due Date Submittals are being evaluated Youngquist Brothers, Inc. Layne Christensen Company Recommendation for Award is being routed for approval.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 4
11 No S-912 Commission District 4 (Consent Decree Project) 3.6 NDWWTP Disinfection
$12,430,010 BAFO 964120 Wastewater Treatment Plants - Consent Decree Projects
11/20/2017 Review Item Approved SBE/GS 1.57% SBE/CONS – 13.29% CWP-10%
Invitation to Bid to the lowest responsive, responsible bidder
1/05/2018 1/16/2018 BAFO 3/08/2018
09/05/2018 BCC Approval R-903-18
9/05/2018 BCC Approved Contract Award Recommendation to Daniel O’Connell’s Sons
12 Yes S-908 Commission District 8 (Consent Decree Project) 5.3 Upgrades to Sewage Pump Station No. 069 2
$7,974,014
964440 Sewer Pump Station Systems - Consent Decree Projects
9/18/2017 Review Item Approved SBE/GS 7.94% SBE/CONS – 15.62% CWP – N/A
Invitation to Bid to the lowest responsive, responsible bidder
2/15/2018 2/27/2018 N/A TBD 5/29/2018 Rejection of All Bids Approved Will be re-advertised as S-908R
13 Yes S-882 Commission District 8 (Consent Decree Project) 1.02 Oxygen Production Upgrades SDWWTP
$6,920,074 Received 1/30/2017 From SBD: 4.80% SBE/G&S; 19.21% SBE/CONST; 10.0% CWP
Invitation to Bid to the lowest responsive, responsible bidder
2/23/2017 3/07/2017 N/A TBD 6/07/2017 Two Bids Received 11/17/2017 All Bids Rejected. Project to be rebid as S-882R
14 Yes E15-WASD-19 Various Commission Districts Design of Upgrades to the Alexander Orr Water Treatment Plant, and the South Miami- Dade Water Supply System, which includes the following
$10,000,000 9650031 Water Treatment Plant – Alexander Orr Jr. Expansion
Review Item Sent 11/20/2015 Proposing 20% A/E Received Item 12/30/2016 24% A/E 3% G/S
Request for Qualifications/Negotiations
4/01/2016 4/06/2016 9/12/2016 Pending BCC Ratification
7/05/2018 Contract Award Recommendation Approved to HDR Engineering, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 5
Plants: Leisure City, Naranja, Elevated Water Tank, Everglades Labor Camp, and Newton Water Treatment Plants; and Ancillary Facilities to those Plants; as well as Well Fields, Re-Pumping Facilities, Remote Storage and its Appurtenant Facilities
15 Yes E15-WASD-18 Commission District 6 Design of Upgrades to the Hialeah and John E. Preston Water Treatment Plants, Pipelines, Wellfields, Re-Pumping Facilities, Remote Storage and Appurtenant Water Facilities
$10,000.000 9650041 Water Treatment Plant – Hialeah/ Preston Improvement
Review Item Sent 11/20/2015 Proposing 20% A/E Received Item 12/30/2016 24% A/E 3% G/S
Request for Qualifications/Negotiations
4/01/2016 4/06/2016 9/12/2016 Pending BCC Ratification
7/05/208 Contract Award Recommendation Approved to Black & Veatch Corporation, Inc.
16 Yes DB15-WASD-01 Commission District 1 Design-Build Services for Replacement of Water Mains and Service Conversions in the Miami Dade
$10,349,000 9653311 Water Distribution System Extension Enhancement
2/23/2016 Review Item Sent Proposing 20% A/E; 16% Construction; .25% G/S 3/14/2016
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal
5/25/2016 6/01/2016 12/20/2016 09/25/2018 BCC Ratification R-907-18
6/25/2018 Contract Award Recommendation Approved to Lanzo Construction, Co., Florida
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 6
County North Miami Beach "Donut Hole" Service Area
Received Item 11/12/2015 25% A/E 4% G/S 16% Construction
(lowest adjusted bid
17 Yes E17-WASD-01 Various Commission Districts Engineering Services for three (3) Non-Exclusive Professional Services Agreements for Engineering Design and Related Services for the Design of a Small Diameter Water and Wastewater Pipelines
Three (3) Agreements $500,000 each
Review Item Sent 4/6/2017 Proposing First Tier Set Asides 4/7/2017 Received Item First Tier Set Asides
Request for Qualifications/Negotiations
5/24/2017 6/08/2017 10/19/2017 09/05/2018 BCC Ratification R-846-18
6/04/2018 Contract Award Recommendation Approved to Aluces Corporation PE Consulting Engineering, Inc. Thompson & Associates, Inc.
18 Yes S-919 Commission Districts 8 & 9 Installation of 14" Nom. Pipe Size HDPE Sewage Force Main Canal Crossing (C-102N) via Horizontal Direction Drill at Old Dixie Hwy. & N. of SW 232 Street using Trenchless Technology
$518,594 SBE: No Measure CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
3/23/2018 3/26/2018 N/A Pending BCC Ratification
5/31/2018 Contract Award Recommendation Approved to Metro Equipment Service, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 7
19 Yes W-938 Commission District 7 AOWTP East High Service Pump No. 6 Replacement
$8,716,142 12/12/2017 Review Item Approved SBE/GS 1.79% SBE/CONS – 3.20%
Invitation to Bid to the lowest responsive, responsible bidder
2/16/2018 2/23/2018 N/A 09/05/2018 BCC Ratification R-906-18
5/22/2018 Contract Award Recommendation Approved to Poole and Kent Company of Florida
20 Yes S-897 Commission District 8 (Consent Decree Project) 1.07 SDWWTP Digesters and Control Building Upgrades Acid Phase and Substation 7 & 8
$103,341,518 964120
11/02/2017 Review Item Approved SBE/GS 0.86% SBE/CONS – 10.24% CWP – 10.00%
Invitation to Bid to the lowest responsive, responsible bidder
1/12/2018 1/25/2018 N/A 09/05/2018 BCC Ratification R-908-18
5/18/2018 Contract Award Recommendation Approved to Poole and Kent Company of Florida
21 Yes S-909 Commission District 7 (Consent Decree Project) 2.15(2) CDWWTP Plant 2 Cluster 2 Digester Upgrades
$33,062,374
964120 Wastewater Treatment Plants - Consent Decree Projects
9/24/2017 Review Item Approved SBE/GS 2.71% SBE/CONS – 10.43% CWP – N/A
Invitation to Bid to the lowest responsive, responsible bidder
1/04/2018 1/12/2018 N/A 09/05/2018 BCC Ratification R-905-18
5/18/2018 Contract Award Recommendation Approved to Poole and Kent Company of Florida
22 No DB16-WASD-01 (Consent Decree) Commission District 7 & 8 South & Central District Wastewater Treatment Plants Dewatering Thickening Facilities
$167,000,000 Review Item Sent 5/25/2016 Proposing 18% A/E; 1% G/S; 7.88 Con 6/21/2016 Received Item 14% A/E; 2% G/S;
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid
7/20/2016 8/02/2016 12/16/2016 07/24/2018 BCC Ratification R-790-18
5/29/2018 Rejection of All Bids Approved Will be re-advertised under Project No. DB18-WASD-02
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 8
9.43 Con; 10% CWP
23
Yes DB14-WASD-09 Various Commission Districts Design-Build Services for Installation of a 36-inch Diameter Sanitary Sewer Force Main located at 107 Avenue between N.W. 7 Street to N.W. 25 Street
$7,148,718 9653371 Peak Flow Management Facilities
Review Item Sent 3/13/2015 13% A/E; .2% G/S; 8.3% Construction Received item 3/24/2015 20% A/E; .2% G/S; 8.% Construction; 10% CWP
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
4/27/2015 4/30/2015 1/21/2016 Step 2 Project Briefing Short-listed Firms
1/07/2015 4/08/2016 Step 2 Meeting
Pending BCC Ratification
4/27/2018 Rejection of All Bids Approved Will be re-advertised under Project No. DB18-WASD-01
24 Yes S-911 Commission District 5 Installation of Port of Miami (POM) 42" WM & POM 10" FM & PS 9141 Replacement
$20,751,456 9654031 North Miami-Dade – Water Transmission Main Improvements
10/30/2017 Review Item Approved SBE/GS 5.35% SBE/CONS – 8.65% CWP – 10.00%
Invitation to Bid to the lowest responsive, responsible bidder
12/05/2017 12/14/2017 N/A 06/05/2018 BCC Ratification R-608-18
2/14/2018 Contract Award Recommendation Approved to David Mancini and Sons
25 No E15-WASD-03A Various Commission Districts Engineering Design and Related Services for the Design of a Small Diameter Water and Wastewater Pipelines for the Water and Sewer Department’s Wastewater and
Eight (8) Agreements $3,000,000 each Various Funding Sources
Review Item Sent Proposing 8 - SBE 8 Set Aside Received Item 8/24/2015 8 SBE Set Aside
Request for Qualifications/Negotiations
4/21/2016 4/27/2016 1/30/2017 11/14/2017 ILUC Committee 12/19/2017 BCC Approved R-1192
BCC Approved Contract Award Recommendation for the following firms: -Ross Engineering, Inc. Subconsultants: Longitude Sureyors, LLC 5%; Thompson & Associates, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 9
Water Collection, Transmission and Distribution System
Civil Engineering, 43% -HSQ Group, Inc. Subconsultant: Aluces Corporation 40% -A.D.A. Engineering, Inc. Subconsultant: Hadonne Corp 5% -SRS Engineering, Inc. Subconsultant Subconsultant: Hadonne Corp 5% -Chen Moore and Associates, Inc. Subconsultant: Longitude Surveyors, LLC 3% -Premiere Design Solutions, Inc.
26 Yes E15-WASD-03A Various Commission Districts Engineering Design and Related Services for the Design of a Small Diameter Water and Wastewater Pipelines for the Water and Sewer
Eight (8) Agreements $3,000,000 each Various Funding Sources
Review Item Sent Proposing 8 - SBE 8 Set Aside Received Item 8/24/2015 8 SBE Set Aside
Request for Qualifications/Negotiations
4/21/2016 4/27/2016 1/30/2017 12/05/2017 BCC Ratification R-1192-17
8/04/2017 Contract Award Recommendation Approved to -Nova Consulting, Inc. SBE Subconsultant: Bell and Bello Land Surveying Corporation 5%
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 10
Department’s Wastewater and Water Collection, Transmission and Distribution System
-300 Engineering Group, P.A. SBE Subconsultants: Miller Legg & Associates, Inc. 20%
27 Yes S-904 Commission District 3 Furnish and Install 42-inch PCCP/HDPE Force Main along North Miami Avenue
$18,029,179 SBE-Constr. 270% SBE-G/S 0.90% CWP 15.40%
Invitation to Bid to the lowest responsive, responsible bidder
7/26/2017 8/04/2017 TBD 07/24/2018 BCC Ratification R-789-18
12/05/2017 Contract Awarded to Metro Equipment Services, Inc.
28 Yes W-934A Commission District 6 Miami Springs Wellfield Rehabilitation – Step 1, Production Wells MS-01 through MS -23
$5,158,845 9654061 Safe Drinking Water Act Modifications - SWT Rule and D-DBP
9/30/2016 Review Item
Received “No Measure” Determination
Invitation to Bid to the lowest responsive, responsible bidder
5/05/2017 5/16/2017 N/A 07/10/2018 BCC Ratification R-726-18
10/06/2017 Contract Award Recommendation Approved to A.C. Schultes of Florida
29 Yes S-905R Commission District 1 Consent Decree Project) 5.5 Upgrade of Sewage Pump Station No. 0415
$7,554,564 964440 Sewer Pump Station Systems - Consent
Resubmitted 4/18/2017 Review Item Approved SBE/GS 2.40% SBE/CONS – 17.05% CWP – 10.00%
Invitation to Bid to the lowest responsive, responsible bidder
6/02/2017 6/13/2017 N/A Pending BCC Ratification
9/19/2017 Contract Award Recommendation Approved to Poole & Kent Company of Florida
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 11
30 Yes S-910 Commission District 7 8-Inch and 12-Inch Gravity Sewer Rehabilitation Crossing U.S. 1 at SW 88 St. and SW 98 St. using Trenchless Technology
$435,500 Received 03/15/2017 From SBD: SBE: No Measure CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
3/20/2017 3/21/2017 N/A Pending BCC Ratification
8/09/2017 Contract Awarded to Metro Equipment Services, Inc.
31 No RFP 00188 Various Commissions District Security Guard Services
Project estimate: $108,588,0003-year initial term, with two [2] additional two (2) year terms. Propriety Revenues
Set-aside: Sector B 100% SBE- Good & Services Set-Aside Sector C 100% SBE- Good & Services Set-Aside Subcontractor Goal: Sector A 20.00% SBE- Good & Services Sub-Consultant Goal Sector D 20.00% SBE-Good & Services Sub-Consultant Goal
RFP Process 9/01/2015 N/A N/A 07/17/2017 BCC Approved R-749-17
Contract Awarded to Allied Universal Security Service For Sector A, Centurion Feick Partnership For Sectors B and C, Security Alliance For Sector D
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 12
32
Yes S-891 Commission District 7 CD 2.19(2) Co-Gen Facility and 2.01(6) Electrical Improvements
$36,300,895 964120 Wastewater Treatment Plants - Consent Decree Projects
10/4/2016 Review Item Received SBE/GS – 1.12%; SBE/CONS – 5.06%
Invitation to Bid to the lowest responsive, responsible bidder
11/17/2016 11/29/2016 N/A 01/23/2018 BCC Ratification R-52-18
6/29/2017 Contract Award Recommendation Approved to Poole & Kent Company of Florida
33 Yes E15-WASD-02 Various Commission Districts Engineering Design and related services for the Improvement, Upgrades and Expansion of Wastewater Local Pump Stations and related Facilities
Five (5) Agreements in total $2,000,000 each Various Funding Sources
Review Item Sent 8/11/2015 Proposing SBE Set-Aside Received Item 8/28/2015 SBE Set-Aside
Request for Qualifications/Negotiations
3/14/2016 3/21/2016 7/22/2016 Pending BCC Ratification
6/30/2017 Contract Award Recommendation Approved to Premier Design Solutions, Inc. C-Solutions, Inc. 8/04/2017 Contract Award Recommendation Approved to -Miller Legg & Associates, Inc. -SRS Engineering, Inc.
34 Yes E15-WASD-03B Various Commission Districts Engineering Design and Related Services for the Design of a Small Diameter Water and Wastewater Pipelines for the Water and Sewer Department’s
Two (2) Agreements $4,400,000 each Various Funding Sources
Review Item Sent Proposing 20% SBE Received Item 8/24/2015 8- SBE Set Aside
Request for Qualifications/Negotiations
4/21/2016 4/27/2016 11/29/2016 7/18/2017 BCC Ratification R-731-17
6/14/2017 Contract Award Recommendation Approved to The Corradino Group, Inc. 6/26/2017 A&P Consulting Transportation Group, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 13
Wastewater and Water Collection, Transmission and Distribution System
35 Yes DB15-WASD-03 Various Commission Districts Design-Build Services for Installation of a 48-inch Diameter Water Main Downtown Loop Closure
$13,800,000 9654031 North Miami-Dade Water Transmission Main Improvement Project
Review Item Sent 11/02/2015 Proposing 20% A/E; 8.2% Construction; .25% G/S Received Item 11/09/2015 Proposing 26% A/E; 14.00% Construction; 4.00% G/S
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid
3/25/2016 3/30/20/16 7/19/2016 10/27/2016
2/22/2017 BCC Ratification R-187-17
5/15/2017 Contract Award Recommendation Approved to Ric-Man Construction Florida, Inc.
36 Yes S-870 Commission District 7 Central District Wastewater Treatment Plant - Industrial Injection Well Pump Station
$32,276,884 10/28/2016 Review Item Approved SBE/GS 2.89% SBE/CONS – 4.21%
Invitation to Bid to the lowest responsive, responsible bidder
12/06/2016 12/13/2016 N/A 6/20/2017 BCC Ratification R-642-17
3/16/2017 Contract Award Recommendation Approved to Poole & Kent Company of Florida
37 Yes 47457 Various Commission Districts Enterprise Construction Project Management Software (E-Builder, Inc.) S-910 Commission District 7
$3,601,326 N/A Access of other Governmental Entity Contract
TBD TBD TBD 5/17/2017 BCC Ratification R543-17
3/01/2017 Contract Award Recommendation approved to E-Builder, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 14
8-Inch and 12-Inch Gravity Sewer Rehabilitation Crossing U.S. 1 at SW 88 St. and SW 98 St. using Trenchless Technology
38 Yes E16-WASD-03 Various Commission Districts Design Services for Wastewater Treatment Plant Projects related to the State of Florida Ocean Outfall Legislation
Three (3) Agreements $30,000,000
3/29/2016 Review Item Sent 20% A/E; 1% G/S 4/12/2016 Received Item 20% A/E; 4% G/S
Request for Qualifications/Negotiations
5/12/2016 5/18/2016 10/19/2016 7/18/2017 BCC Ratification R-732-17
3/29/2017 Contract Award Recommendation Approved to Brown and Caldwell Corporation 4/06/2017 Black & Veatch Corporation 4/26/2017 CDM Smith Inc.
39 Yes S-901 Commission District 6 (Consent Decree Project) 4.10 (1) Rehabilitation of 48-Inch PCCP Force Main from NW 37th Avenue to NW 32nd Avenue along North Right of Way of Biscayne (C-Canal (Green Space)
$3,432,000
Received 05/25/2016 From SBD: SBE -: No measure CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
9/12/2016 9/21/2016 N/A Pending BCC Ratification
11/21/2016 Contract Award Recommendation Filed with Clerk -Award Under Spot Market Solicitation RTQ-00298 – Group 2 Trenchless Lanzo Trenchless Technologies, Inc. South
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 15
40
Yes S-903 Commission District 6 CD 5.12 Upgrade of Sewage Pump Station No. 0187
$5,271,450 964440 Sewer Pump Station Systems - Consent Decree Projects
8/28/2016 Review Item Received SBE/GS – 1.00%; SBE/CONS – 4.30%
Invitation to Bid to the lowest responsive, responsible bidder
11/18/2016 11/30/2016 N/A 5/12/2017 BCC Ratification R-484-17
2/07/2017 Contract Award Recommendation Approved to Poole & Kent Company of Florida
41 Yes E15-WASD-04 Various Commission Districts Engineering Design and related Services for the Improvement, Upgrades and Expansion of Wastewater Regional Pump Stations
Two (2) Agreements at $6,000,000 Various Funding Sources
Review Item Sent 8/11/2015 Proposing 20% SBE; .05% G/S Received Item 8/28/2015 20% SBE; 4% G/S
Request for Qualifications/Negotiations
3/18/2016 3/23/2016 8/23/2016
BCC Ratification R-483-17
2/21/2017 Contract Award Recommendation Approved to Jacobs Engineering, Inc. Parsons Water & Infrastructure, Inc.
42
Yes DB14-WASD-03 Various Commission Districts (includes Consent Decree project) Design-Build Criteria Package or the Proposed 48-inch Diameter Water Transmission Main for Area “N”
$37,206,382 9653311 Water Distribution System Enhancement
Review Item Sent 12/30/2014 Proposed 15% A/E; .25% G/S; 7.20% Construction Received item 2/06/2015 21% A/E; 0.18% G/S; 7.20% Construction
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
3/20/2015 3/27/2015 7/01/2015 11/04/2015 Reconvening Competitive Selection Committee 2/05/2016 Step 2 Oral Presentation Meeting
02/09/2017 BCC Approval R-141-17
2/07/2017 Contract Award Recommendation Approved to Garney Companies, Inc.
43 Yes DB14-WASD-06 Commission District 9 Design-Build Services for the Replacement of
$18,767,355 965331 Water Distribution System
Draft sent 3/06/2015 Review Item Sent 3/23/2015 Proposing
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of
5/04/2015 5/12/2015 10/14/2015 Step 2 Project Briefing
9/09/2015 4/05/2016 Step 2 Meeting
6/06/2017 BCC Ratification R-576-17
11/18/2016 Contract Award Recommendation Approved with Ric-Man International, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 16
Water Mains and Service Conversions in the South Miami Heights Area (A)
Extension Enhancement
20% A/E; 16% Construction; 12.4% CWP; .25% G/S Received item 4/03/2015 25% A/E;11.56% Construction;10% CWP; .25% G/S
Technical and Price Proposal lowest adjusted bid)
Short-listed Firms
44 Yes
DB14-WASD-07 Commission District 9 Design-Build Services for the Replacement of Water Mains and Service Conversions in the South Miami Heights Area (Phase B)
$19,117,199 965331 Water Distribution System Extension Enhancement
Draft Sent 3/06/2015 Review Item Sent 3/23/2015 Proposing 20% A/E; 16% Construction; 12.4% CWP; .25% G/S Received Item 4/03/2015 25% A/E; 12.01% Construction; 12.4% CWP; .25% G/S; 10.00% CWP
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
5/04/2015 5/12/2015 10/14/2015 Step 2 Project Briefing Short-listed Firms
9/09/2015 3/09/2016 Step 2 – Oral Presentation Meeting
6/06/2017 BCC Ratification R-576-17
11/18/2016 Contract Award Recommendation Approved to Ric-Man International, Inc.
45 Yes E15-WASD-01 Various Commission Districts Design of Upgrades for Water Transmission and Sanitary Sewer Force Mains and
Eight (8) agreements in total $5,000,000 each Various Funding Sources
Review Item Sent 8/03/2015 Proposing 20% A/E Received Item 8/13/2015
Request for Qualifications/Negotiations
09/02/2015 12/11/2015 6/22/2016 2/22/2017 BCC Ratification R-176-17 3/07/2017 BCC Ratification R208-17
Contract Award Recommendation Approved to the following firms: 11/08/2016 Parsons Brinkerhoff, Inc. 11/18/2016
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 17
Sanitary Sewer Gravity Interceptors
20% SBE A/E; 0% G/S Re-submitted Review Item 1/29/2016 Received Item 2/01/2016
4/04/2017 BCC Ratification R-335-17
A&P Consulting Transportation Engineers Corp. 11/21/2016 EAC Consulting, Inc. 11/21/2016 Wade Tim, Inc. 11/23/2016 Stantec Consulting Services Inc. 12/01/2016 Kimley-Horn and Associates, Inc. 12/12/2016 Black & Veatch Corporation 1/20/2017 Jacobs Engineering, Inc.
46 Yes S-879 Various Commission Districts (Consent Decree Project) Two Year Countywide Contract for Cleaning and Televising of Large Diameter Sewers
$2,669,865 Received 4/21/2016 SBE: Construction 0%; SBE: G/S 1.12%; CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
6/16/2016 6/27/2016 N/A 2/22/2017 BCC Ratification R-174-17
9/01/2016 Contract Award Recommendation Approved to Metro Express, Inc.
47 Yes S-889 Commission District 7
$30,635,227 6/16/2016 Review Item Received
Invitation to Bid to the lowest responsive,
7/07/2016 7/19/2016 N/A 2/22/2017 BCC Ratification R-174-17
10/19/2016 Contract Award Recommendation Approved to
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 18
(Consent Decree Project) 2.15(1) CDWWTP Digesters Plant 2 Cluster 1 Upgrades
SBE/G&S 1.80%; SBE/CONS – 10.10%
responsible bidder
Poole & Kent Company of Florida
48 Yes S-900 Various Commission Districts (Consent Decree Project) Two Year Countywide Contract for Rehabilitation of Sanitary Sewers by the Sectional Lining Method
$1,000,000 968150 – Wastewater Collection and Transmission Lines – Consent Decree Projects
Received 6/10/2016 SBE: Construction 100% Set Aside CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
7/14/2016 7/26/2016 TBD 2/22/2017 BCC Ratification R-174-17
10/19/2016 Contract Award Recommendation Approved to UIT, LLC
49 Yes
E15-WASD-13 Various Commission Districts Soils, Foundations, Geotechnical, Special Inspections, Structural Assessments, Materials and Testing Services for the Improvement, Upgrades and Expansions of Water and Wastewater Treatment Plants, Pump Stations, Collection, Distribution and Transmission Piping and all
Three (3) Agreements $2,000,000 each Various Funding Sources
Review Item Sent 7/22/2015 Proposing 20% A/E; .25% G/S Received Item 7/29/2015 20% A/E; 0% G/S
Request for Qualifications/Negotiations
8/14/2015 8/26/2015 5/03/2016 Pending BCC Ratification
10/04/2016 Contract Award Recommendation Approved to the following firms: -Professional Services Industries, Inc. -Terracon Consultants, Inc. -AMEC Foster Wheeler Environment & Infrastructure, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 19
Related Facilities as Necessary to Ensure Quality Control/ Assurance for WASD’S Capital Improvement Projects
50 Yes S-902 Commission Districts 1 (Consent Decree Project) 4.10 (2) Installation of Approx. 10,000 LF of 54-inch DI Force Main along South Right of Way of Biscayne Canal (C-8) from NW 57th Ave. to NW 37th Ave.
$15,029,202. 5/24/2016 Review Item Received SBE/GS 1.51% SBE/CONS – 1.92%
Invitation to Bid to the lowest responsive, responsible bidder
6/17/2016 6/27/2016 N/A 2/07/2017 BCC Ratification R-87-17
9/20/2016 Contract Award Recommendation Approved to Munilla Construction Management, LLC dba MCM, LLC
51 No S-899 Commission District 6 (Consent Decree Project) 4.8 Rehabilitation of 54-inch PCCP Force Main from N.W. 11 ST and N.W. 37 AVE to N.W. 2 ST and N.W. 67 AVE
$21,679,408
Received 02/17/2016 From SBD: SBE/GS: Trade Set-Aside 1-Hauling; SBE/CONST: Trade Set-Aside 2 – Paving CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
5/25/2016 6/03/2016 N/A Pending BCC Ratification
8/19/2016 Contract Award Recommendation Filed with Clerk -Award Under Spot Market Solicitation RTQ-00298 – Group 2 Trenchless Ric-Man Construction, Florida
52 Yes S-898 Commission Districts 8 & 9 (Consent Decree Project) 4.5 (1) Installation of 54-inch Force Main from S.W. 127
$25,471,288 4/05/2016 Review Item Received SBE/GS 5.16% SBE/CONS – 5.11%
Invitation to Bid to the lowest responsive, responsible bidder
6/17/2016 6/27/2016 N/A 2/07/2017 BCC Ratification R-87-17
9/19/2016 Contract Award Recommendation Approved to Lanzo Construction Co., Florida
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 20
Avenue and S.W. 280 ST to S.W. 107 Avenue and S.W. 248 Street
53 Yes E15-WASD-17 Various Commission Districts Hydrogeological and Engineering Services for Disposal, Water Supply, Monitoring Wells and Aquifer Storage and Recovery Wells
$15,000,000 9653411 9655481
Review Item Sent 11/0a2/2015 Proposing 20% A/E; .25% G/S Received Item 11/12/2015 25% SBE; 4% G/S
Request for Qualifications/Negotiations
1/25/2016 2/10/2016 5/23/2016 2/22/2017 BCC Ratification R-176-17
9/28/2016 Contract Award Recommendation Approved to MWH Americas, Inc.
54 Yes S-880 Commission District 7 (Consent Decree Project) 2.03 and 2.04 Plant 1 and Plant 2 Headworks Upgrades, 2.18(1) Odor Control Systems and 2.25(2) Ventilation Improvements
$20,944 Received 5/02/2016 SBE: Construction 2.20%; SBE: G/S 10.85%; CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
6/02/2016 6/13/2016 N/A 2/07/2017 BCC Ratification R-87-17
8/24/2016 Contract Award Recommendation Approved to Poole and Kent Company of Florida
55 Yes S-877 Commission District 4 (Consent Decree Project) 3.07 North District Wastewater Treatment Plant New Pumps for Existing Deep Injection Well Pumping Station
$12,510,000 Received 5/04/2016 SBE: Construction 0%; SBE: G/S 0%; CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
6/03/2016 6/14/2016 N/A 2/22/2017 BCC Ratification R-175-17
9/01/2016 Contract Award Recommendation Approved to Poole and Kent Company of Florida
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 21
56 Yes S-868R Various Commission Districts (Consent Decree Project) Two Year Countywide Contract for Removal and Replacement of Sanitary Sewer Gravity Mains
$7,002,082 968150 – Wastewater Collection and Transmission Lines - Consent
Received 10/27/2015 SBE: Construction 23%; SBE: G/S 4.00%; CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
4/08/2016 4/19/2016 N/A 2/22/2017 BCC Ratification R-175-17
9/01/2016 Contract Award Recommendation Approved to Metro Express
57 Yes DB14-WASD-05 Commission District 3 Design-Build Services for Furnishing and Installing a 48-inch Force Main along North Miami Avenue from N.W. 8 Street along to 36 Street and along N.E. 36 Street from North Miami Avenue to N.E. 2 Avenue
$21,000,000 9650241 Central Miami-Dade Wastewater Transmission Mains and Pump Station
Review Item Sent 12/23/2014 Proposed 17.5% A/E; .25% G/S; 11.2% Construction Received item 2/13/2015 22% A/E; .25% G/S; 8.57% Construction
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
3/20/2015 3/26/2015
7/01/2015 1/06/2016 Step 2 Oral Presentation Meeting
12/06/2016 BCC Ratification R-1124-16
6/17/2016 Contract Award Recommendation Approved to David Mancini & Sons, Inc.
58 Yes E15-WASD-12 Commission District 8 Proposed Upgrades to Miami-Dade South Wastewater Treatment Plant
$8,800,000 9653401
Review Item Sent 7/15/2015 Proposing 35% A/E; .25% G/S Received Item 7/25/2015 .35% A/E; 0% G/S
Request for Qualifications/Negotiations
8/07/2015 8/21/2015 2/26/2016 Second-Tier Meeting E15-WASD-12
Pending BCC Ratification
5/06/2016 Contract Award Recommendation Approval to CH2M Hill, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 22
59 No E15-WASD-14 Various Commission Districts Water and Sewer Rates, Fee Analysis and Bond Engineering Services
$4,500,000 3 years with 2 one-year option to renew Operating Revenues
Sent Review Items 7/21/2015 0% SBE Received Item 8/04/2015 0% SBE
Request for Qualifications/Negotiations
8/25/2015 9/08/2015 1/21/2016 4/19/2016 BCC Approval R-329-16
Contract Award Recommendation Approved to Arcadis U.S., Inc.
61 Yes E15-WASD-10 Commission District 7 Proposed Upgrades to Miami-Dade Central District Wastewater Treatment Plant
$8,800,000 9653421
Review Item Sent 7/15/2015 Proposing 35% A/E; .25% G/S Received Item 7/25/2015 .35% A/E; 0% G/S
Request for Qualifications/Negotiations
8/07/2015 8/21/2015 1/15/2016 2/03/2016 Second-Tier Meeting E15-WASD-10
Pending BCC Ratification
4/15/2016 Contract Award Recommendation Approedl to MWH Americas, Inc.
62 Yes E15-WASD-11 Commission District 4 Proposed Upgrades to Miami-Dade North District Wastewater Treatment Plant
$8,800,000 9653411
Review Item Sent 7/15/2015 Proposing 35% A/E; .25% G/S Received Item 7/25/2015 .35% A/E; 0% G/S
Request for Qualifications/Negotiations
8/07/2015 8/21/2015 1/15/2016
Pending BCC Ratification
4/28/2016 Contract Award Recommendation Approved to Brown Caldwell Inc.
63 Yes FB-00296 Natural Gas Consulting Services
$500,000 Propriety Revenues
Bid Preference
Pre-Qualification Pool
10/27/2015 N/A N/A N/A 4/18/2016 Contract Award Recommendation Approved to TriEnergy, Solutions, LLC
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 23
64 No RTQ 00291 Various Commission Districts Public Outreach for Capital Improvement Project
$500,000 Propriety Revenues
SBE Set-Aside
Pre-Qualification Pool
10/09/2015 N/A N/A N/A 1/22/2016 Solicitation has been Awarded. Prequalification Pool started
65 Yes W-931 Commission District 9 Furnish & Install 36-Inch Duct Iron Water Transmission Main along S.W. 152 Street from S.W. 137 Avenue to S.W. 112 Avenue
$12,300,000 9653311 Wastewater Treatment Plants- Consent Decree Projects
Received 5/20/2015 A/E: N/A; SBE: Construction 7.27%; SBE: G/S 4.00%; CWP: 10.00%
Invitation to Bid to the lowest responsive, responsible bidder
7/16/2015 7/27/2015 N/A 6/21/2016 BCC Approved Ratification R-544-16
11/03/2015 Contract Award Recommendation Approved to Lanzo Construction Co., Florida
66 Yes S-758-R Commission District 12 Conversion of Sewage Pumps Station 418 to Booster Station
$6,000,000 964440 Sewer Pump Stations Systems-Consent Decree Projects
Received 10/09/2015 SBE: Construction 13.25%; SBE: G/S 4.00%; CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
10/30/2015 11/12/2015 N/A 6/07/2016 BCC Approved Ratification R-456-16
3/28/2016 Contract Award Recommendation Approved to Metro Equipment Service, Inc.
67 Yes S-890 Commission District 7 Conversion of Sewage Pumps Station 418 to Booster Station
$14,115,745 964120 Wastewater Treatment Plants - Consent Decree Projects
Review Item Sent 12/01/15 Proposing 5% Construction; 1.50% G/S Received Item 12/11/15 Proposing 5% Construction, 1.75% G/S
Open Competitive – Low Bid
12/28/2015 1/07/2016 N/A 6/07/2016 BCC Approved Ratification R-456-16
3/28/2016 Contract Award Recommendation Approved to Poole & Kent Company of Florida
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 24
68 Yes RTQ-00298 Various Commission Districts Trenchless Technologies
$85,000,000 8 years Propriety Revenues
SBE to review each individual project order
Pre-Qualification Pool
9/25/15, proposals due 10/09/15
N/A N/A N/A 3/10/2016 Contract Award Recommendation Approved to the following Pool of contractors: David Mancini and Sons, Fibrwrap Construction Services, IMR Contract Corp. dba Jennings Engineering and Construction, Insituform Technologies, Killebrew, Layne Heavy Civil, LMK Pipe Renewal, Murphy Pipeline Contractors, PM Construction & Rehab, Portland Utilities Construction, Sak Construction, Shenandoah General Construction, Shen-Line
69 Yes S-871 Commission District 4 North District Wastewater Treatment Plant Pretreatment / Sludge Transfer Rehabilitation
$21,700,000 964120 Wastewater Treatment Plants- Consent Decree
Received 5/29/2015 A/E: N/A; SBE: Construction 5.78%; SBE: G/S .97%
Invitation to Bid to the lowest responsive, responsible bidder
7/20/2015 7/29/2015 N/A 6/21/2016 BCC Approved Ratification R-544-16
10/22/2015 Contract Award Recommendation Approved to Poole & Kent Company of Florida
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 25
70 Yes W-930 Commission District 9 South Miami Heights Water Treatment Plant Deep Injection Well System and Upper Floridian Test Production Well
$18,700,000 Total Contract Term 616 Days 9652821 South Miami Heights Water Treatment Plant and Wellfields
A/E: N/A; Construction: 7.27%; CWP: 10%
Invitation to Bid to the lowest responsive, responsible bidder
3/25/2015 4/02/2015 N/A 10/06/2015 BCC Approved Ratification R-805-15
7/08/2015 Contract Award Recommendation to Youngquist Brothers, Inc. Approved
71 Yes E14-WASD-02 Professional Cost Estimating and Scheduling Services
Operating Revenues
Received item 11/15/2014 30.05% A/E; .05% G/S
9/01/2015 BCC Ratification Approved R-686-15
6/24/2015 Contract Award Recommendation with Atkins North America, Inc. Approved
72
Yes E14-WASD-03 Various Commission Districts Professional Engineering Services relating to the operations and maintenance of the Water and Sewer Department’s water system
$11,000,000 Operating Revenues
Review Item Sent 7/25/2014 Received Item 8/14/2014 32% A/E; 1% G/S
Request for Qualifications/Negotiations
9/29/2014 10/08/2014 2/09/2015 2/23/2015
7/14/2015 BCC Ratification Approval R-623-15
6/08/2015 Contract Award Recommendation Approved Hazen and Sawyer, P.C.
73
Yes RTQ-00103 Various Commission Districts (including Consent Decree Projects) Protective Coating Services
$48,000,000 Proprietary Revenues
Proposing SBE Trade Set-Aside for Site Preparation Contractors; CWP Goal 10%; also Responsible Wages- Heavy Construction
Pre-Qualification Pool
1/13/2015 N/A N/A 4/23/2015 2/02/2016 BCC Ratification R-93-16
4/23/2015 Approval Bid Award Recommendation Construction Affairs, Inc. Pool & Kent Company of Florida Southland Painting Corp.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 26
74 No S-866 Various Commission Districts (Consent Decree) Two Year Countywide Contract for Rehabilitation of Sanitary Sewers by the Cured-In-Place Pipe Lining Method
$6,100,050 968150 – Wastewater Collection and Transmission Lines - Consent
A/E: N/A; Construction: No measure due to insufficient availability; CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
7/10/2014 7/22/2014 N/A 4/14/2015 5/05/2015
5/05/2015 BCC Approved Insituform Technologies R-416-15
75 No W-927 Commission District 10 Southwest Wellfield Middle Lagoon Removal of Calcium Carbonate
$13,590,050 Water Operating Revenues
Construction 5.70%
Invitation to Bid to the lowest responsive responsible bidder
12/03/2014 12/11/2014 N/A 4/14/2015 5/05/2015
5/05/2015 BCC Approved Lanzo Construction, Co., Florida, Inc. R-415-15
76
No E14-WASD-01 Various Commission Districts Engineering and Geological Services Water, Wastewater and Reclaimed Water Planning Services
$7,700,000 Operating Revenues
Review Item Sent 3/25/2014 Received 4/16/2014 Revised item 6/4/2014 Received 6/11/2014 30% A/E
Request for Qualifications/Negotiations
7/30/2014 8/11/2014 11/13/2014 N/A
04/21/2015 BCC Ratification
3/17/2015 Mayor Approved Contract Award Recommendation Tetra Tech, Inc. 04/21/2015 BCC Ratification Approval R-286-15
77-
No DB14-WASD-01 Commission Districts 2 (Consent Decree Project) Design-Build Services for Replacement/
$16,746,672 968750 Wastewater Pipes and Infrastructure Projects
Draft Review Item Sent 2/18/2014 Final item Sent 3/11/2014 Received
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and
5/02/2014 5/09/2014 7/22/2014 9/25/2014
12/16/2014 BCC Approved Emergency Item R-1119-14
3/02/2015 Mayor Approved Ric-Man Construction Florida, Inc. 04/21/2015
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 27
Rehabilitation of 72-inch Sanitary Sewage Force Main along NW/NE 159th Street Between Northwest 17th Avenue and N.E. 10th Avenue for the 72-inch Force Main
4/03/2014 15.50% CSBE; 30% SBE; 10% CWP
Price Proposal (lowest adjusted bid)
BCC Ratification Approval R-286-15
78
No DB13-WASD-03 Commission District 5 Design-Build Services for the Replacement of Water Mains and Service Conversions in the Shenandoah Area in the City of Miami Phase A
$11,326,347 9653311 Water Distribution System Extension & Enhancement
Review Item Sent 11/20/2013 Received 1/14/2014 26% A/E; 20% Construction; 12.40% CWP
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
4/11/2014 4/17/2014 7/23/2014 10/15/2014
1/13/2015 2/03/2015 Deferred Item 2/18/2015
2/18/2015 BCC Approved Ric-Man Construction Co., Florida, Inc. R-172-15
79
No E13-WASD-10 Various Commission Districts Engineering services for Design of Upgrades for Water Distribution & Transmission and Sanitary Sewage Collection & Trans. Systems
Two (2) agreements $5,500,000 each Various Funding Sources
Review Item Sent 1/27/2014 Received 2/19/2014 25%
Request for Qualifications/Negotiations
4/15/2014 4/22/2014 7/18/2014 N/A
1/13/2015 2/03/2015
2/03/2015 BCC Approved King Engineering Associates, Inc. R-115-15 2/03/2015 BCC Approved A & P Consulting Transportation Engineers, Corp. R-115-15
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 28
80
No DB13-WASD-04 Commission District 5 Design-Build Services for the Replacement of Water Mains and Service Conversions in the Shenandoah Area in the City of Miami Phase B
$9,756,000 9653311 Water Distribution System Extension & Enhancement
Review Item Sent 11/20/2013 Received 1/14/2014 26% SBE; 20% CSBE; 12.40 CWP
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
4/11/2014 4/17/2014 7/23/2014 10/21/2014
1/13/2015 2/03/2015
2/03/2015 BCC Approved Lanzo Construction Co., Inc. R-117-15
81 No
E13-WASD-04 Various Commission Districts (Consent Decree Project) Design Services for Wastewater Collection & Transmission System related to the Consent Decree Projects
$44,000,000 968150 Wastewater Collection Transmission Lines
Review Item Sent 10/01/2013 Received 10/24/2013 30% SBE
Request for Qualifications/Negotiations
2/12/2014 6/02/2014 9/02/2014 9/16/2014
12/15/2014 Committee Waiver Requested 12/16/2014
12/16/2014 BCC Approved HDR Engineering, Inc. R-1118-14
82 No E13-WASD-05 Various Commission Districts (Consent Decree Project) Design Services for Wastewater Treatment Plant related to the Consent Decree Projects
$66,000,000 964120 Wastewater Treatment Plants
Review Item Sent 11/05/2013 Received 11/18/2013 30% SBE
Request for Qualifications/Negotiations
2/12/2014 6/02/2014 7/31/2014 8/11/2014
12/15/2014 Committee Waiver Requested 12/16/2014
12/16/2014 MWH Americas, Inc. R-1120-14
83 No E13-WASD-06 Various Commission Districts (Consent Decree Project)
$16,500,000 Operating Revenue
Review Item Sent 10/01/2013 Received 11/07/2013
Request for Qualifications/Negotiations
2/12/2014 6/02/2014 7/30/2014 N/A
12/15/2014 Committee Waiver Requested
12/16/2014 BCC Approved Woolpert, Inc. R-1117-14
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 29
Engineering Services for Capacity, Management, Operations & Maintenance Program related to the Consent Decree Projects
32% SBE 12/16/2014
84 N/A S-869 Commission District 7 (Ocean Outfall Legislation Project) Central District Wastewater Treatment Plant - Industrial Waste Deep Injection Well System
$19,887,887 9653421- Central District Upgrades - Wastewater Treatment Plant
SBE: N/A; CSBE: No measure due to insufficient availability; CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
5/08/2014 5/21/2014 N/A 8/29/2014 10/21/2014
10/21/2014 BCC Approved Youngquist Brothers, Inc. R-935-14
85 N/A E13-WASD-11 Various Commission Districts Owner’s Representative for Engineering Services for Ocean Outfall Legislation
$139,394,748 962670 Outfall Legislation
Review item Sent 3/03/2014 Received 3/26/2014 28% SBE
Request for Qualifications/Negotiations
4/24/2014 6/02/2014 7/29/2014 8/14/2014
N/A 10/21/2014
10/21/2014 BCC Approved CH2M Hill, Inc. R-936-14
86 N/A E13-WASD-07 Various Commission Districts (Consent Decree Project) Geographic Information Systems Utility Backlog
$9,900,000 Operating Revenues
Review Item Sent 10/01/2013 Received 10/24/2013 20% SBE
Request for Qualifications/Negotiations
12/09/2013 12/18/2013 4/11/2014 5/12/2014
7/08/2014 7/15/2014
7/15/2014 BCC Approved Woolpert, Inc. R-674-14
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 30
87 N/A
E13-WASD-03 Various Commission Districts Design Services for the Implementation of Pump Station Improvement Program
Five (5) Agreements $3,300,000 each 9651071 Pump Station Improvement Program
Review Item Sent 8/26/2013 Received 9/13/2013 40% SBE each
Request for Qualifications/Negotiations
1/17/2014 1/28/2014 4/21/2014 N/A
7/08/2014 7/15/2014
7/15/2014 BCC Approved King Engineering Associates, Inc. R-677-14 Stantec Consulting Services, Inc. R-675-14 CES Consultants, Inc. R-676-14 A&P Consulting Transportation Engineers, Inc. R-673-14 Milian, Swain & Associates, Inc. R-672-14
88 N/A
DB12-WASD-01 (Consent Decree Project) Design-Build services for the replacement of the existing 54-inch sanitary sewage force main from the Central District Wastewater Treatment Plant to Fisher Island, under Norris Cut Channel
$72,101,600 968150 Wastewater Collection and Transmission Lines
Review Item Sent 1/17/2013 Received 2/01/2013 10.9% CSBE; 22% SBE
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
2/26/2013 3/08/2013 4/17/2014 6/26/2013 Reconvened 7/03/2013
12/10/2013 12/17/2013
12/17/2013 BCC Approved Nicholson Construction Company R-1060-13
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 31
89 N/A DB13-WASD-01 Commission District 5 (Brickell Basin Project) Design-Build Services for Gravity Sewer Interceptors for Pump Station No. 3
$12,107,000 9653371 Peak Flow Management Facilities
Review Item Sent 7/26/2013 Received 7/31/2013 17.5% SBE; 11.2% CSBE
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
8/22/2013 8/30/2013 10/08/2013 12/11/2013
2/11/2014 2/19/2014 Waiver approved
2/19/2014 BCC Approved Ric-Man Construction, Inc. R-174-14
90 N/A S-852 Commission District 5 (Brickell Basin Construction Project) Proposed Master Pump Station No. 3
$21,976,500 9653371 Peak Flow Management Facilities
2.59% CSBE
Invitation to Bid to the lowest responsive, responsible bidder
6/27/2013 Pre-Bid Conference 7/16/2013
N/A N/A 2/19/2014
2/19/2014 BCC Approved Poole & Kent Company R-173-14
91 N/A Expression of Interest (EOI) Public-Private Partnership N/A
N/A N/A N/A N/A N/A N/A N/A 2/14/2014 31 Responses Received for EOI
92 N/A E13-WASD-02-R Various Commission Districts Program and Construction Management Services for the Implementation of a Pump Station Improvement Program
$17,600,000 9651071 Pump Station Improvement Program
Review Item Sent 5/20/2013 Received 5/20/2013 29% SBE
Request for Qualifications/Negotiations
6/06/2013 6/12/2013 10/22/2013 11/07/2013
12/10/2013 12/17/2013
12/17/2013 BCC Approved Nova Consulting, Inc. R-1061-13
93 N/A E12-WASD-03 Various Commission Districts Program
$2,200,000 967190 Water/Pipes and
Review Item Sent 9/18/2013 Received 10/19/2013
Request for Qualifications/Negotiations
3/29/2013 4/04/2013 9/24/2013 10/23/2013
4/09/2014 5/06/2014
5/06/2014 BCC Approved Lockwood Andrews & Newnam, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 32
Management Consultant and related services to establish a Comprehensive Infrastructure Assessment and Replacement Program for Water Transmission and Distribution Mains including Preparation of Condition Evaluations, Forensic Analysis, Risk Assessments and Renewal Option Protocols
Infrastructure Projects
25% SBE Committee Reconvening 12/04/2013
R-432-14
94 N/A E13-WASD-01-R Various Commission Districts (Consent Decree Project) Program and Construction Management Services related to the Wastewater Systems Priority Projects
$91,000,000 Various Funding Sources
Review Item Sent 5/20/2013 Received 5/20/2013 28% SBE
Request for Qualifications/Negotiations
6/06/2013 6/12/2013 8/14/2013 8/28/2013
N/A 5/20/2014
5/20/2014 BCC Approved AECOM Technical Services, Inc. R-469-14
The draft solicitations are posted on Internal Services Department’s webpage at http://www.miamidade.gov/procurement/solicitations.asp and Small Business Development’s webpage at http://www.miamidade.gov/business/contracting-opportunities-architecture-engineering.asp
for industry review and comments prior to advertisement.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 1
AWARDED CONTRACTS
1 No S-907 Commission District 7 (Consent Decree Project) CD 2.11 Central District Wastewater Treatment Plant Effluent Pump Station Electrical Improvements
$21,865,770 964120 Wastewater Treatment Plants - Consent Decree Projects
4/09/2018 Review Item Approved SBE/GS 2.52% SBE/CONS – 10.67% CWP – N/A
Invitation to Bid to the lowest responsive, responsible bidder
5/31/2018 6/07/2018 N/A 5/07/2019 BCC Approval R-506-19
5/07/2019 Contract Award Recommendation Approved to PCL Construction
2 No DB16-WASD-02 Commission District 7 Alexander Orr Water Treatment Plant Drinking Water Laboratory
$7,100,000 Review Item Sent 5/06/2016 Proposing 14.98% A/E; 26.68% Construction 3.08% G/S; Received 5/24/2016 14.98% A/E; 15.02% Construction; 2.58% G/S
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
7/06/2016 7/14/2016 6/06/2017
12/08/2016 10/05/2017
1/23/2019 BCC Approval R-69-18
1/23/2019 Contract Award Recommendation To Florida Lenmark Corporation
3 No DB17-WASD-01 Commission District 7 Central District Wastewater Treatment Plant Oxygen Production Facility Consent Decree 2.27
$57,000,0000 Review Item Sent 6/23/2017 Proposing A/E 13.13% Const. 7.15% G/S 1% Received Item 6/30/2017
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid
7/25/2017 8/01/2017
12/01/2017 Step 1 Meeting 3/23/2018 Step 2 Meeting
12/18/2018BCC Approval R-1285-18
1/04/2019 Contract Award Recommendation Approved to PLC Construction, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 2
A/E 17.13% Const. 7.42% G/S 1.10%
4 Yes S-908R Commission District 8 (Consent Decree Project) 5.3 Upgrades to Sewage Pump Station No. 0692
$9,956,581.46 964440 Sewer Pump Station Systems - Consent Decree Projects
8/6/2018 Review Item Approved SBE/GS 6.80% SBE/CONS – 14.59% CWP – N/A
Invitation to Bid to the lowest responsive, responsible bidder
8/16/2018 8/27/2018 N/A 2/20/2019 BCC Approval R-201-19
11/13/2018 Contract Award Recommendation Approved to Poole & Kent
5 No W-944 Commission District 7 AOWTP Lime Kiln Electrical Switchgear Building (Was RPQ P0211)
$6,270,105.91 2/01/2018 Review Item Approved SBE/GS 1.79% SBE/CONS – 8.46% CWP-N/A
Invitation to Bid to the lowest responsive, responsible bidder
2/09/2018 3/01/2018 N/A
10/02/2018 BCC Approval R-1022-18
4/02/2018 Bids Received 10/02/2018 BCC Approved Contract Award Recommendation to Lee Construction Group
6 No S-896 Commission District 7 (Consent Decree Project) CD 3.05(2) NDWWTP Secondary Clarifiers Upgrades (Remaining Scope of Work)
$22,841,250.00 BAFO
964120 Wastewater Treatment Plants - Consent Decree Projects
1/03/2018 Review Item Approved SBE/GS 0.00% SBE/CONS – 12.01% CWP – N/A
Invitation to Bid to the lowest responsive, responsible bidder
2/22/2018 3/06/2018 BAFO 5/15/2018
10/02/2018 BCC Approval R-1023-18
4/27/2018 Bids Received 5/15/2018 BAFO 10/02/2018 BCC Approved Contract Award Recommendation to Daniel O’Connell’s Sons
7 Yes S-895 Commission District 4 (Consent Decree Project) CD 3.02(2) NDWWTP Primary Clarifiers
$50,478,067.70 BAFO
964120 Wastewater Treatment Plants -
1/03/2018 Review Item Approved SBE/GS 0.00% SBE/CONS – 12.01% CWP – N/A
Invitation to Bid to the lowest responsive, responsible bidder
2/09/2018 2/20/2018 BAFO 5/31/2018
1/23/2019 BCC Approval R-71-19
10/12/2018 Contract Award Recommendation Approved to Kiewit Infrastructure South, Co.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 3
and Odor Control Upgrades
Consent Decree Projects
8 Yes S-882R Commission District 8 (Consent Decree Project) 1.02 Oxygen Production Upgrades SDWWTP
$9,084,330 1/31/2018 Review Item Approved SBE/GS 4.80% SBE/CONS – 17.46% CWP-10%
Invitation to Bid to the lowest responsive, responsible bidder
4/09/2018 4/19/2018 N/A
2/05/2019 BCC Approval R-155-19
6/21/2018 Bids Received 10/12/2018 Contract Award Recommendation Approved to Poole & Kent
9 Yes S-892 Commission District 7 (Consent Decree Project) 2.08 Secondary Clarifiers Plant 2, 2.10 Return Sludge Ps Plant 2, And 2.01 (3) Electrical Improvements @ CDWWTP
$22,237,250.00 964120 Wastewater Treatment Plants - Consent Decree Projects
2/01/2018 Review Item Approved SBE/GS 1.44% SBE/CONS – 8.65% CWP-N/A
Invitation to Bid to the lowest responsive, responsible bidder
4/12/2018 4/23/2018 N/A
Pending BCC Ratification
6/05/2018 Bids Received 10/12/2018 Contract Award Recommendation Approved to Kiewit Infrastructure South, Co.
10 No RTQ-00566 Various Commission Districts Deep Injection Wells Drilling and Construction Services for WASD Ocean Outfall Program
$225,000,000 TBD for each Spot Market Bid
Pre-Qualification Pool
7/19/2017 TBD TBD 7/24//2018 BCC Approved R-774-18
8/11/2017 Bids Due Date Submittals are being evaluated Youngquist Brothers, Inc. Layne Christensen Company Recommendation for Award is being routed for approval.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 4
11 No S-912 Commission District 4 (Consent Decree Project) 3.6 NDWWTP Disinfection
$12,430,010 BAFO 964120 Wastewater Treatment Plants - Consent Decree Projects
11/20/2017 Review Item Approved SBE/GS 1.57% SBE/CONS – 13.29% CWP-10%
Invitation to Bid to the lowest responsive, responsible bidder
1/05/2018 1/16/2018 BAFO 3/08/2018
09/05/2018 BCC Approval R-903-18
9/05/2018 BCC Approved Contract Award Recommendation to Daniel O’Connell’s Sons
12 Yes S-908 Commission District 8 (Consent Decree Project) 5.3 Upgrades to Sewage Pump Station No. 069 2
$7,974,014
964440 Sewer Pump Station Systems - Consent Decree Projects
9/18/2017 Review Item Approved SBE/GS 7.94% SBE/CONS – 15.62% CWP – N/A
Invitation to Bid to the lowest responsive, responsible bidder
2/15/2018 2/27/2018 N/A TBD 5/29/2018 Rejection of All Bids Approved Will be re-advertised as S-908R
13 Yes S-882 Commission District 8 (Consent Decree Project) 1.02 Oxygen Production Upgrades SDWWTP
$6,920,074 Received 1/30/2017 From SBD: 4.80% SBE/G&S; 19.21% SBE/CONST; 10.0% CWP
Invitation to Bid to the lowest responsive, responsible bidder
2/23/2017 3/07/2017 N/A TBD 6/07/2017 Two Bids Received 11/17/2017 All Bids Rejected. Project to be rebid as S-882R
14 Yes E15-WASD-19 Various Commission Districts Design of Upgrades to the Alexander Orr Water Treatment Plant, and the South Miami- Dade Water Supply System, which includes the following
$10,000,000 9650031 Water Treatment Plant – Alexander Orr Jr. Expansion
Review Item Sent 11/20/2015 Proposing 20% A/E Received Item 12/30/2016 24% A/E 3% G/S
Request for Qualifications/Negotiations
4/01/2016 4/06/2016 9/12/2016 Pending BCC Ratification
7/05/2018 Contract Award Recommendation Approved to HDR Engineering, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 5
Plants: Leisure City, Naranja, Elevated Water Tank, Everglades Labor Camp, and Newton Water Treatment Plants; and Ancillary Facilities to those Plants; as well as Well Fields, Re-Pumping Facilities, Remote Storage and its Appurtenant Facilities
15 Yes E15-WASD-18 Commission District 6 Design of Upgrades to the Hialeah and John E. Preston Water Treatment Plants, Pipelines, Wellfields, Re-Pumping Facilities, Remote Storage and Appurtenant Water Facilities
$10,000.000 9650041 Water Treatment Plant – Hialeah/ Preston Improvement
Review Item Sent 11/20/2015 Proposing 20% A/E Received Item 12/30/2016 24% A/E 3% G/S
Request for Qualifications/Negotiations
4/01/2016 4/06/2016 9/12/2016 Pending BCC Ratification
7/05/208 Contract Award Recommendation Approved to Black & Veatch Corporation, Inc.
16 Yes DB15-WASD-01 Commission District 1 Design-Build Services for Replacement of Water Mains and Service Conversions in the Miami Dade
$10,349,000 9653311 Water Distribution System Extension Enhancement
2/23/2016 Review Item Sent Proposing 20% A/E; 16% Construction; .25% G/S 3/14/2016
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal
5/25/2016 6/01/2016 12/20/2016 09/25/2018 BCC Ratification R-907-18
6/25/2018 Contract Award Recommendation Approved to Lanzo Construction, Co., Florida
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 6
County North Miami Beach "Donut Hole" Service Area
Received Item 11/12/2015 25% A/E 4% G/S 16% Construction
(lowest adjusted bid
17 Yes E17-WASD-01 Various Commission Districts Engineering Services for three (3) Non-Exclusive Professional Services Agreements for Engineering Design and Related Services for the Design of a Small Diameter Water and Wastewater Pipelines
Three (3) Agreements $500,000 each
Review Item Sent 4/6/2017 Proposing First Tier Set Asides 4/7/2017 Received Item First Tier Set Asides
Request for Qualifications/Negotiations
5/24/2017 6/08/2017 10/19/2017 09/05/2018 BCC Ratification R-846-18
6/04/2018 Contract Award Recommendation Approved to Aluces Corporation PE Consulting Engineering, Inc. Thompson & Associates, Inc.
18 Yes S-919 Commission Districts 8 & 9 Installation of 14" Nom. Pipe Size HDPE Sewage Force Main Canal Crossing (C-102N) via Horizontal Direction Drill at Old Dixie Hwy. & N. of SW 232 Street using Trenchless Technology
$518,594 SBE: No Measure CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
3/23/2018 3/26/2018 N/A Pending BCC Ratification
5/31/2018 Contract Award Recommendation Approved to Metro Equipment Service, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 7
19 Yes W-938 Commission District 7 AOWTP East High Service Pump No. 6 Replacement
$8,716,142 12/12/2017 Review Item Approved SBE/GS 1.79% SBE/CONS – 3.20%
Invitation to Bid to the lowest responsive, responsible bidder
2/16/2018 2/23/2018 N/A 09/05/2018 BCC Ratification R-906-18
5/22/2018 Contract Award Recommendation Approved to Poole and Kent Company of Florida
20 Yes S-897 Commission District 8 (Consent Decree Project) 1.07 SDWWTP Digesters and Control Building Upgrades Acid Phase and Substation 7 & 8
$103,341,518 964120
11/02/2017 Review Item Approved SBE/GS 0.86% SBE/CONS – 10.24% CWP – 10.00%
Invitation to Bid to the lowest responsive, responsible bidder
1/12/2018 1/25/2018 N/A 09/05/2018 BCC Ratification R-908-18
5/18/2018 Contract Award Recommendation Approved to Poole and Kent Company of Florida
21 Yes S-909 Commission District 7 (Consent Decree Project) 2.15(2) CDWWTP Plant 2 Cluster 2 Digester Upgrades
$33,062,374
964120 Wastewater Treatment Plants - Consent Decree Projects
9/24/2017 Review Item Approved SBE/GS 2.71% SBE/CONS – 10.43% CWP – N/A
Invitation to Bid to the lowest responsive, responsible bidder
1/04/2018 1/12/2018 N/A 09/05/2018 BCC Ratification R-905-18
5/18/2018 Contract Award Recommendation Approved to Poole and Kent Company of Florida
22 No DB16-WASD-01 (Consent Decree) Commission District 7 & 8 South & Central District Wastewater Treatment Plants Dewatering Thickening Facilities
$167,000,000 Review Item Sent 5/25/2016 Proposing 18% A/E; 1% G/S; 7.88 Con 6/21/2016 Received Item 14% A/E; 2% G/S;
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid
7/20/2016 8/02/2016 12/16/2016 07/24/2018 BCC Ratification R-790-18
5/29/2018 Rejection of All Bids Approved Will be re-advertised under Project No. DB18-WASD-02
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 8
9.43 Con; 10% CWP
23
Yes DB14-WASD-09 Various Commission Districts Design-Build Services for Installation of a 36-inch Diameter Sanitary Sewer Force Main located at 107 Avenue between N.W. 7 Street to N.W. 25 Street
$7,148,718 9653371 Peak Flow Management Facilities
Review Item Sent 3/13/2015 13% A/E; .2% G/S; 8.3% Construction Received item 3/24/2015 20% A/E; .2% G/S; 8.% Construction; 10% CWP
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
4/27/2015 4/30/2015 1/21/2016 Step 2 Project Briefing Short-listed Firms
1/07/2015 4/08/2016 Step 2 Meeting
Pending BCC Ratification
4/27/2018 Rejection of All Bids Approved Will be re-advertised under Project No. DB18-WASD-01
24 Yes S-911 Commission District 5 Installation of Port of Miami (POM) 42" WM & POM 10" FM & PS 9141 Replacement
$20,751,456 9654031 North Miami-Dade – Water Transmission Main Improvements
10/30/2017 Review Item Approved SBE/GS 5.35% SBE/CONS – 8.65% CWP – 10.00%
Invitation to Bid to the lowest responsive, responsible bidder
12/05/2017 12/14/2017 N/A 06/05/2018 BCC Ratification R-608-18
2/14/2018 Contract Award Recommendation Approved to David Mancini and Sons
25 No E15-WASD-03A Various Commission Districts Engineering Design and Related Services for the Design of a Small Diameter Water and Wastewater Pipelines for the Water and Sewer Department’s Wastewater and
Eight (8) Agreements $3,000,000 each Various Funding Sources
Review Item Sent Proposing 8 - SBE 8 Set Aside Received Item 8/24/2015 8 SBE Set Aside
Request for Qualifications/Negotiations
4/21/2016 4/27/2016 1/30/2017 11/14/2017 ILUC Committee 12/19/2017 BCC Approved R-1192
BCC Approved Contract Award Recommendation for the following firms: -Ross Engineering, Inc. Subconsultants: Longitude Sureyors, LLC 5%; Thompson & Associates, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 9
Water Collection, Transmission and Distribution System
Civil Engineering, 43% -HSQ Group, Inc. Subconsultant: Aluces Corporation 40% -A.D.A. Engineering, Inc. Subconsultant: Hadonne Corp 5% -SRS Engineering, Inc. Subconsultant Subconsultant: Hadonne Corp 5% -Chen Moore and Associates, Inc. Subconsultant: Longitude Surveyors, LLC 3% -Premiere Design Solutions, Inc.
26 Yes E15-WASD-03A Various Commission Districts Engineering Design and Related Services for the Design of a Small Diameter Water and Wastewater Pipelines for the Water and Sewer
Eight (8) Agreements $3,000,000 each Various Funding Sources
Review Item Sent Proposing 8 - SBE 8 Set Aside Received Item 8/24/2015 8 SBE Set Aside
Request for Qualifications/Negotiations
4/21/2016 4/27/2016 1/30/2017 12/05/2017 BCC Ratification R-1192-17
8/04/2017 Contract Award Recommendation Approved to -Nova Consulting, Inc. SBE Subconsultant: Bell and Bello Land Surveying Corporation 5%
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 10
Department’s Wastewater and Water Collection, Transmission and Distribution System
-300 Engineering Group, P.A. SBE Subconsultants: Miller Legg & Associates, Inc. 20%
27 Yes S-904 Commission District 3 Furnish and Install 42-inch PCCP/HDPE Force Main along North Miami Avenue
$18,029,179 SBE-Constr. 270% SBE-G/S 0.90% CWP 15.40%
Invitation to Bid to the lowest responsive, responsible bidder
7/26/2017 8/04/2017 TBD 07/24/2018 BCC Ratification R-789-18
12/05/2017 Contract Awarded to Metro Equipment Services, Inc.
28 Yes W-934A Commission District 6 Miami Springs Wellfield Rehabilitation – Step 1, Production Wells MS-01 through MS -23
$5,158,845 9654061 Safe Drinking Water Act Modifications - SWT Rule and D-DBP
9/30/2016 Review Item
Received “No Measure” Determination
Invitation to Bid to the lowest responsive, responsible bidder
5/05/2017 5/16/2017 N/A 07/10/2018 BCC Ratification R-726-18
10/06/2017 Contract Award Recommendation Approved to A.C. Schultes of Florida
29 Yes S-905R Commission District 1 Consent Decree Project) 5.5 Upgrade of Sewage Pump Station No. 0415
$7,554,564 964440 Sewer Pump Station Systems - Consent
Resubmitted 4/18/2017 Review Item Approved SBE/GS 2.40% SBE/CONS – 17.05% CWP – 10.00%
Invitation to Bid to the lowest responsive, responsible bidder
6/02/2017 6/13/2017 N/A Pending BCC Ratification
9/19/2017 Contract Award Recommendation Approved to Poole & Kent Company of Florida
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 11
30 Yes S-910 Commission District 7 8-Inch and 12-Inch Gravity Sewer Rehabilitation Crossing U.S. 1 at SW 88 St. and SW 98 St. using Trenchless Technology
$435,500 Received 03/15/2017 From SBD: SBE: No Measure CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
3/20/2017 3/21/2017 N/A Pending BCC Ratification
8/09/2017 Contract Awarded to Metro Equipment Services, Inc.
31 No RFP 00188 Various Commissions District Security Guard Services
Project estimate: $108,588,0003-year initial term, with two [2] additional two (2) year terms. Propriety Revenues
Set-aside: Sector B 100% SBE- Good & Services Set-Aside Sector C 100% SBE- Good & Services Set-Aside Subcontractor Goal: Sector A 20.00% SBE- Good & Services Sub-Consultant Goal Sector D 20.00% SBE-Good & Services Sub-Consultant Goal
RFP Process 9/01/2015 N/A N/A 07/17/2017 BCC Approved R-749-17
Contract Awarded to Allied Universal Security Service For Sector A, Centurion Feick Partnership For Sectors B and C, Security Alliance For Sector D
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 12
32
Yes S-891 Commission District 7 CD 2.19(2) Co-Gen Facility and 2.01(6) Electrical Improvements
$36,300,895 964120 Wastewater Treatment Plants - Consent Decree Projects
10/4/2016 Review Item Received SBE/GS – 1.12%; SBE/CONS – 5.06%
Invitation to Bid to the lowest responsive, responsible bidder
11/17/2016 11/29/2016 N/A 01/23/2018 BCC Ratification R-52-18
6/29/2017 Contract Award Recommendation Approved to Poole & Kent Company of Florida
33 Yes E15-WASD-02 Various Commission Districts Engineering Design and related services for the Improvement, Upgrades and Expansion of Wastewater Local Pump Stations and related Facilities
Five (5) Agreements in total $2,000,000 each Various Funding Sources
Review Item Sent 8/11/2015 Proposing SBE Set-Aside Received Item 8/28/2015 SBE Set-Aside
Request for Qualifications/Negotiations
3/14/2016 3/21/2016 7/22/2016 Pending BCC Ratification
6/30/2017 Contract Award Recommendation Approved to Premier Design Solutions, Inc. C-Solutions, Inc. 8/04/2017 Contract Award Recommendation Approved to -Miller Legg & Associates, Inc. -SRS Engineering, Inc.
34 Yes E15-WASD-03B Various Commission Districts Engineering Design and Related Services for the Design of a Small Diameter Water and Wastewater Pipelines for the Water and Sewer Department’s
Two (2) Agreements $4,400,000 each Various Funding Sources
Review Item Sent Proposing 20% SBE Received Item 8/24/2015 8- SBE Set Aside
Request for Qualifications/Negotiations
4/21/2016 4/27/2016 11/29/2016 7/18/2017 BCC Ratification R-731-17
6/14/2017 Contract Award Recommendation Approved to The Corradino Group, Inc. 6/26/2017 A&P Consulting Transportation Group, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 13
Wastewater and Water Collection, Transmission and Distribution System
35 Yes DB15-WASD-03 Various Commission Districts Design-Build Services for Installation of a 48-inch Diameter Water Main Downtown Loop Closure
$13,800,000 9654031 North Miami-Dade Water Transmission Main Improvement Project
Review Item Sent 11/02/2015 Proposing 20% A/E; 8.2% Construction; .25% G/S Received Item 11/09/2015 Proposing 26% A/E; 14.00% Construction; 4.00% G/S
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid
3/25/2016 3/30/20/16 7/19/2016 10/27/2016
2/22/2017 BCC Ratification R-187-17
5/15/2017 Contract Award Recommendation Approved to Ric-Man Construction Florida, Inc.
36 Yes S-870 Commission District 7 Central District Wastewater Treatment Plant - Industrial Injection Well Pump Station
$32,276,884 10/28/2016 Review Item Approved SBE/GS 2.89% SBE/CONS – 4.21%
Invitation to Bid to the lowest responsive, responsible bidder
12/06/2016 12/13/2016 N/A 6/20/2017 BCC Ratification R-642-17
3/16/2017 Contract Award Recommendation Approved to Poole & Kent Company of Florida
37 Yes 47457 Various Commission Districts Enterprise Construction Project Management Software (E-Builder, Inc.) S-910 Commission District 7
$3,601,326 N/A Access of other Governmental Entity Contract
TBD TBD TBD 5/17/2017 BCC Ratification R543-17
3/01/2017 Contract Award Recommendation approved to E-Builder, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 14
8-Inch and 12-Inch Gravity Sewer Rehabilitation Crossing U.S. 1 at SW 88 St. and SW 98 St. using Trenchless Technology
38 Yes E16-WASD-03 Various Commission Districts Design Services for Wastewater Treatment Plant Projects related to the State of Florida Ocean Outfall Legislation
Three (3) Agreements $30,000,000
3/29/2016 Review Item Sent 20% A/E; 1% G/S 4/12/2016 Received Item 20% A/E; 4% G/S
Request for Qualifications/Negotiations
5/12/2016 5/18/2016 10/19/2016 7/18/2017 BCC Ratification R-732-17
3/29/2017 Contract Award Recommendation Approved to Brown and Caldwell Corporation 4/06/2017 Black & Veatch Corporation 4/26/2017 CDM Smith Inc.
39 Yes S-901 Commission District 6 (Consent Decree Project) 4.10 (1) Rehabilitation of 48-Inch PCCP Force Main from NW 37th Avenue to NW 32nd Avenue along North Right of Way of Biscayne (C-Canal (Green Space)
$3,432,000
Received 05/25/2016 From SBD: SBE -: No measure CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
9/12/2016 9/21/2016 N/A Pending BCC Ratification
11/21/2016 Contract Award Recommendation Filed with Clerk -Award Under Spot Market Solicitation RTQ-00298 – Group 2 Trenchless Lanzo Trenchless Technologies, Inc. South
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 15
40
Yes S-903 Commission District 6 CD 5.12 Upgrade of Sewage Pump Station No. 0187
$5,271,450 964440 Sewer Pump Station Systems - Consent Decree Projects
8/28/2016 Review Item Received SBE/GS – 1.00%; SBE/CONS – 4.30%
Invitation to Bid to the lowest responsive, responsible bidder
11/18/2016 11/30/2016 N/A 5/12/2017 BCC Ratification R-484-17
2/07/2017 Contract Award Recommendation Approved to Poole & Kent Company of Florida
41 Yes E15-WASD-04 Various Commission Districts Engineering Design and related Services for the Improvement, Upgrades and Expansion of Wastewater Regional Pump Stations
Two (2) Agreements at $6,000,000 Various Funding Sources
Review Item Sent 8/11/2015 Proposing 20% SBE; .05% G/S Received Item 8/28/2015 20% SBE; 4% G/S
Request for Qualifications/Negotiations
3/18/2016 3/23/2016 8/23/2016
BCC Ratification R-483-17
2/21/2017 Contract Award Recommendation Approved to Jacobs Engineering, Inc. Parsons Water & Infrastructure, Inc.
42
Yes DB14-WASD-03 Various Commission Districts (includes Consent Decree project) Design-Build Criteria Package or the Proposed 48-inch Diameter Water Transmission Main for Area “N”
$37,206,382 9653311 Water Distribution System Enhancement
Review Item Sent 12/30/2014 Proposed 15% A/E; .25% G/S; 7.20% Construction Received item 2/06/2015 21% A/E; 0.18% G/S; 7.20% Construction
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
3/20/2015 3/27/2015 7/01/2015 11/04/2015 Reconvening Competitive Selection Committee 2/05/2016 Step 2 Oral Presentation Meeting
02/09/2017 BCC Approval R-141-17
2/07/2017 Contract Award Recommendation Approved to Garney Companies, Inc.
43 Yes DB14-WASD-06 Commission District 9 Design-Build Services for the Replacement of
$18,767,355 965331 Water Distribution System
Draft sent 3/06/2015 Review Item Sent 3/23/2015 Proposing
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of
5/04/2015 5/12/2015 10/14/2015 Step 2 Project Briefing
9/09/2015 4/05/2016 Step 2 Meeting
6/06/2017 BCC Ratification R-576-17
11/18/2016 Contract Award Recommendation Approved with Ric-Man International, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 16
Water Mains and Service Conversions in the South Miami Heights Area (A)
Extension Enhancement
20% A/E; 16% Construction; 12.4% CWP; .25% G/S Received item 4/03/2015 25% A/E;11.56% Construction;10% CWP; .25% G/S
Technical and Price Proposal lowest adjusted bid)
Short-listed Firms
44 Yes
DB14-WASD-07 Commission District 9 Design-Build Services for the Replacement of Water Mains and Service Conversions in the South Miami Heights Area (Phase B)
$19,117,199 965331 Water Distribution System Extension Enhancement
Draft Sent 3/06/2015 Review Item Sent 3/23/2015 Proposing 20% A/E; 16% Construction; 12.4% CWP; .25% G/S Received Item 4/03/2015 25% A/E; 12.01% Construction; 12.4% CWP; .25% G/S; 10.00% CWP
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
5/04/2015 5/12/2015 10/14/2015 Step 2 Project Briefing Short-listed Firms
9/09/2015 3/09/2016 Step 2 – Oral Presentation Meeting
6/06/2017 BCC Ratification R-576-17
11/18/2016 Contract Award Recommendation Approved to Ric-Man International, Inc.
45 Yes E15-WASD-01 Various Commission Districts Design of Upgrades for Water Transmission and Sanitary Sewer Force Mains and
Eight (8) agreements in total $5,000,000 each Various Funding Sources
Review Item Sent 8/03/2015 Proposing 20% A/E Received Item 8/13/2015
Request for Qualifications/Negotiations
09/02/2015 12/11/2015 6/22/2016 2/22/2017 BCC Ratification R-176-17 3/07/2017 BCC Ratification R208-17
Contract Award Recommendation Approved to the following firms: 11/08/2016 Parsons Brinkerhoff, Inc. 11/18/2016
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 17
Sanitary Sewer Gravity Interceptors
20% SBE A/E; 0% G/S Re-submitted Review Item 1/29/2016 Received Item 2/01/2016
4/04/2017 BCC Ratification R-335-17
A&P Consulting Transportation Engineers Corp. 11/21/2016 EAC Consulting, Inc. 11/21/2016 Wade Tim, Inc. 11/23/2016 Stantec Consulting Services Inc. 12/01/2016 Kimley-Horn and Associates, Inc. 12/12/2016 Black & Veatch Corporation 1/20/2017 Jacobs Engineering, Inc.
46 Yes S-879 Various Commission Districts (Consent Decree Project) Two Year Countywide Contract for Cleaning and Televising of Large Diameter Sewers
$2,669,865 Received 4/21/2016 SBE: Construction 0%; SBE: G/S 1.12%; CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
6/16/2016 6/27/2016 N/A 2/22/2017 BCC Ratification R-174-17
9/01/2016 Contract Award Recommendation Approved to Metro Express, Inc.
47 Yes S-889 Commission District 7
$30,635,227 6/16/2016 Review Item Received
Invitation to Bid to the lowest responsive,
7/07/2016 7/19/2016 N/A 2/22/2017 BCC Ratification R-174-17
10/19/2016 Contract Award Recommendation Approved to
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 18
(Consent Decree Project) 2.15(1) CDWWTP Digesters Plant 2 Cluster 1 Upgrades
SBE/G&S 1.80%; SBE/CONS – 10.10%
responsible bidder
Poole & Kent Company of Florida
48 Yes S-900 Various Commission Districts (Consent Decree Project) Two Year Countywide Contract for Rehabilitation of Sanitary Sewers by the Sectional Lining Method
$1,000,000 968150 – Wastewater Collection and Transmission Lines – Consent Decree Projects
Received 6/10/2016 SBE: Construction 100% Set Aside CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
7/14/2016 7/26/2016 TBD 2/22/2017 BCC Ratification R-174-17
10/19/2016 Contract Award Recommendation Approved to UIT, LLC
49 Yes
E15-WASD-13 Various Commission Districts Soils, Foundations, Geotechnical, Special Inspections, Structural Assessments, Materials and Testing Services for the Improvement, Upgrades and Expansions of Water and Wastewater Treatment Plants, Pump Stations, Collection, Distribution and Transmission Piping and all
Three (3) Agreements $2,000,000 each Various Funding Sources
Review Item Sent 7/22/2015 Proposing 20% A/E; .25% G/S Received Item 7/29/2015 20% A/E; 0% G/S
Request for Qualifications/Negotiations
8/14/2015 8/26/2015 5/03/2016 Pending BCC Ratification
10/04/2016 Contract Award Recommendation Approved to the following firms: -Professional Services Industries, Inc. -Terracon Consultants, Inc. -AMEC Foster Wheeler Environment & Infrastructure, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 19
Related Facilities as Necessary to Ensure Quality Control/ Assurance for WASD’S Capital Improvement Projects
50 Yes S-902 Commission Districts 1 (Consent Decree Project) 4.10 (2) Installation of Approx. 10,000 LF of 54-inch DI Force Main along South Right of Way of Biscayne Canal (C-8) from NW 57th Ave. to NW 37th Ave.
$15,029,202. 5/24/2016 Review Item Received SBE/GS 1.51% SBE/CONS – 1.92%
Invitation to Bid to the lowest responsive, responsible bidder
6/17/2016 6/27/2016 N/A 2/07/2017 BCC Ratification R-87-17
9/20/2016 Contract Award Recommendation Approved to Munilla Construction Management, LLC dba MCM, LLC
51 No S-899 Commission District 6 (Consent Decree Project) 4.8 Rehabilitation of 54-inch PCCP Force Main from N.W. 11 ST and N.W. 37 AVE to N.W. 2 ST and N.W. 67 AVE
$21,679,408
Received 02/17/2016 From SBD: SBE/GS: Trade Set-Aside 1-Hauling; SBE/CONST: Trade Set-Aside 2 – Paving CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
5/25/2016 6/03/2016 N/A Pending BCC Ratification
8/19/2016 Contract Award Recommendation Filed with Clerk -Award Under Spot Market Solicitation RTQ-00298 – Group 2 Trenchless Ric-Man Construction, Florida
52 Yes S-898 Commission Districts 8 & 9 (Consent Decree Project) 4.5 (1) Installation of 54-inch Force Main from S.W. 127
$25,471,288 4/05/2016 Review Item Received SBE/GS 5.16% SBE/CONS – 5.11%
Invitation to Bid to the lowest responsive, responsible bidder
6/17/2016 6/27/2016 N/A 2/07/2017 BCC Ratification R-87-17
9/19/2016 Contract Award Recommendation Approved to Lanzo Construction Co., Florida
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 20
Avenue and S.W. 280 ST to S.W. 107 Avenue and S.W. 248 Street
53 Yes E15-WASD-17 Various Commission Districts Hydrogeological and Engineering Services for Disposal, Water Supply, Monitoring Wells and Aquifer Storage and Recovery Wells
$15,000,000 9653411 9655481
Review Item Sent 11/0a2/2015 Proposing 20% A/E; .25% G/S Received Item 11/12/2015 25% SBE; 4% G/S
Request for Qualifications/Negotiations
1/25/2016 2/10/2016 5/23/2016 2/22/2017 BCC Ratification R-176-17
9/28/2016 Contract Award Recommendation Approved to MWH Americas, Inc.
54 Yes S-880 Commission District 7 (Consent Decree Project) 2.03 and 2.04 Plant 1 and Plant 2 Headworks Upgrades, 2.18(1) Odor Control Systems and 2.25(2) Ventilation Improvements
$20,944 Received 5/02/2016 SBE: Construction 2.20%; SBE: G/S 10.85%; CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
6/02/2016 6/13/2016 N/A 2/07/2017 BCC Ratification R-87-17
8/24/2016 Contract Award Recommendation Approved to Poole and Kent Company of Florida
55 Yes S-877 Commission District 4 (Consent Decree Project) 3.07 North District Wastewater Treatment Plant New Pumps for Existing Deep Injection Well Pumping Station
$12,510,000 Received 5/04/2016 SBE: Construction 0%; SBE: G/S 0%; CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
6/03/2016 6/14/2016 N/A 2/22/2017 BCC Ratification R-175-17
9/01/2016 Contract Award Recommendation Approved to Poole and Kent Company of Florida
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 21
56 Yes S-868R Various Commission Districts (Consent Decree Project) Two Year Countywide Contract for Removal and Replacement of Sanitary Sewer Gravity Mains
$7,002,082 968150 – Wastewater Collection and Transmission Lines - Consent
Received 10/27/2015 SBE: Construction 23%; SBE: G/S 4.00%; CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
4/08/2016 4/19/2016 N/A 2/22/2017 BCC Ratification R-175-17
9/01/2016 Contract Award Recommendation Approved to Metro Express
57 Yes DB14-WASD-05 Commission District 3 Design-Build Services for Furnishing and Installing a 48-inch Force Main along North Miami Avenue from N.W. 8 Street along to 36 Street and along N.E. 36 Street from North Miami Avenue to N.E. 2 Avenue
$21,000,000 9650241 Central Miami-Dade Wastewater Transmission Mains and Pump Station
Review Item Sent 12/23/2014 Proposed 17.5% A/E; .25% G/S; 11.2% Construction Received item 2/13/2015 22% A/E; .25% G/S; 8.57% Construction
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
3/20/2015 3/26/2015
7/01/2015 1/06/2016 Step 2 Oral Presentation Meeting
12/06/2016 BCC Ratification R-1124-16
6/17/2016 Contract Award Recommendation Approved to David Mancini & Sons, Inc.
58 Yes E15-WASD-12 Commission District 8 Proposed Upgrades to Miami-Dade South Wastewater Treatment Plant
$8,800,000 9653401
Review Item Sent 7/15/2015 Proposing 35% A/E; .25% G/S Received Item 7/25/2015 .35% A/E; 0% G/S
Request for Qualifications/Negotiations
8/07/2015 8/21/2015 2/26/2016 Second-Tier Meeting E15-WASD-12
Pending BCC Ratification
5/06/2016 Contract Award Recommendation Approval to CH2M Hill, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 22
59 No E15-WASD-14 Various Commission Districts Water and Sewer Rates, Fee Analysis and Bond Engineering Services
$4,500,000 3 years with 2 one-year option to renew Operating Revenues
Sent Review Items 7/21/2015 0% SBE Received Item 8/04/2015 0% SBE
Request for Qualifications/Negotiations
8/25/2015 9/08/2015 1/21/2016 4/19/2016 BCC Approval R-329-16
Contract Award Recommendation Approved to Arcadis U.S., Inc.
61 Yes E15-WASD-10 Commission District 7 Proposed Upgrades to Miami-Dade Central District Wastewater Treatment Plant
$8,800,000 9653421
Review Item Sent 7/15/2015 Proposing 35% A/E; .25% G/S Received Item 7/25/2015 .35% A/E; 0% G/S
Request for Qualifications/Negotiations
8/07/2015 8/21/2015 1/15/2016 2/03/2016 Second-Tier Meeting E15-WASD-10
Pending BCC Ratification
4/15/2016 Contract Award Recommendation Approedl to MWH Americas, Inc.
62 Yes E15-WASD-11 Commission District 4 Proposed Upgrades to Miami-Dade North District Wastewater Treatment Plant
$8,800,000 9653411
Review Item Sent 7/15/2015 Proposing 35% A/E; .25% G/S Received Item 7/25/2015 .35% A/E; 0% G/S
Request for Qualifications/Negotiations
8/07/2015 8/21/2015 1/15/2016
Pending BCC Ratification
4/28/2016 Contract Award Recommendation Approved to Brown Caldwell Inc.
63 Yes FB-00296 Natural Gas Consulting Services
$500,000 Propriety Revenues
Bid Preference
Pre-Qualification Pool
10/27/2015 N/A N/A N/A 4/18/2016 Contract Award Recommendation Approved to TriEnergy, Solutions, LLC
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 23
64 No RTQ 00291 Various Commission Districts Public Outreach for Capital Improvement Project
$500,000 Propriety Revenues
SBE Set-Aside
Pre-Qualification Pool
10/09/2015 N/A N/A N/A 1/22/2016 Solicitation has been Awarded. Prequalification Pool started
65 Yes W-931 Commission District 9 Furnish & Install 36-Inch Duct Iron Water Transmission Main along S.W. 152 Street from S.W. 137 Avenue to S.W. 112 Avenue
$12,300,000 9653311 Wastewater Treatment Plants- Consent Decree Projects
Received 5/20/2015 A/E: N/A; SBE: Construction 7.27%; SBE: G/S 4.00%; CWP: 10.00%
Invitation to Bid to the lowest responsive, responsible bidder
7/16/2015 7/27/2015 N/A 6/21/2016 BCC Approved Ratification R-544-16
11/03/2015 Contract Award Recommendation Approved to Lanzo Construction Co., Florida
66 Yes S-758-R Commission District 12 Conversion of Sewage Pumps Station 418 to Booster Station
$6,000,000 964440 Sewer Pump Stations Systems-Consent Decree Projects
Received 10/09/2015 SBE: Construction 13.25%; SBE: G/S 4.00%; CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
10/30/2015 11/12/2015 N/A 6/07/2016 BCC Approved Ratification R-456-16
3/28/2016 Contract Award Recommendation Approved to Metro Equipment Service, Inc.
67 Yes S-890 Commission District 7 Conversion of Sewage Pumps Station 418 to Booster Station
$14,115,745 964120 Wastewater Treatment Plants - Consent Decree Projects
Review Item Sent 12/01/15 Proposing 5% Construction; 1.50% G/S Received Item 12/11/15 Proposing 5% Construction, 1.75% G/S
Open Competitive – Low Bid
12/28/2015 1/07/2016 N/A 6/07/2016 BCC Approved Ratification R-456-16
3/28/2016 Contract Award Recommendation Approved to Poole & Kent Company of Florida
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 24
68 Yes RTQ-00298 Various Commission Districts Trenchless Technologies
$85,000,000 8 years Propriety Revenues
SBE to review each individual project order
Pre-Qualification Pool
9/25/15, proposals due 10/09/15
N/A N/A N/A 3/10/2016 Contract Award Recommendation Approved to the following Pool of contractors: David Mancini and Sons, Fibrwrap Construction Services, IMR Contract Corp. dba Jennings Engineering and Construction, Insituform Technologies, Killebrew, Layne Heavy Civil, LMK Pipe Renewal, Murphy Pipeline Contractors, PM Construction & Rehab, Portland Utilities Construction, Sak Construction, Shenandoah General Construction, Shen-Line
69 Yes S-871 Commission District 4 North District Wastewater Treatment Plant Pretreatment / Sludge Transfer Rehabilitation
$21,700,000 964120 Wastewater Treatment Plants- Consent Decree
Received 5/29/2015 A/E: N/A; SBE: Construction 5.78%; SBE: G/S .97%
Invitation to Bid to the lowest responsive, responsible bidder
7/20/2015 7/29/2015 N/A 6/21/2016 BCC Approved Ratification R-544-16
10/22/2015 Contract Award Recommendation Approved to Poole & Kent Company of Florida
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 25
70 Yes W-930 Commission District 9 South Miami Heights Water Treatment Plant Deep Injection Well System and Upper Floridian Test Production Well
$18,700,000 Total Contract Term 616 Days 9652821 South Miami Heights Water Treatment Plant and Wellfields
A/E: N/A; Construction: 7.27%; CWP: 10%
Invitation to Bid to the lowest responsive, responsible bidder
3/25/2015 4/02/2015 N/A 10/06/2015 BCC Approved Ratification R-805-15
7/08/2015 Contract Award Recommendation to Youngquist Brothers, Inc. Approved
71 Yes E14-WASD-02 Professional Cost Estimating and Scheduling Services
Operating Revenues
Received item 11/15/2014 30.05% A/E; .05% G/S
9/01/2015 BCC Ratification Approved R-686-15
6/24/2015 Contract Award Recommendation with Atkins North America, Inc. Approved
72
Yes E14-WASD-03 Various Commission Districts Professional Engineering Services relating to the operations and maintenance of the Water and Sewer Department’s water system
$11,000,000 Operating Revenues
Review Item Sent 7/25/2014 Received Item 8/14/2014 32% A/E; 1% G/S
Request for Qualifications/Negotiations
9/29/2014 10/08/2014 2/09/2015 2/23/2015
7/14/2015 BCC Ratification Approval R-623-15
6/08/2015 Contract Award Recommendation Approved Hazen and Sawyer, P.C.
73
Yes RTQ-00103 Various Commission Districts (including Consent Decree Projects) Protective Coating Services
$48,000,000 Proprietary Revenues
Proposing SBE Trade Set-Aside for Site Preparation Contractors; CWP Goal 10%; also Responsible Wages- Heavy Construction
Pre-Qualification Pool
1/13/2015 N/A N/A 4/23/2015 2/02/2016 BCC Ratification R-93-16
4/23/2015 Approval Bid Award Recommendation Construction Affairs, Inc. Pool & Kent Company of Florida Southland Painting Corp.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 26
74 No S-866 Various Commission Districts (Consent Decree) Two Year Countywide Contract for Rehabilitation of Sanitary Sewers by the Cured-In-Place Pipe Lining Method
$6,100,050 968150 – Wastewater Collection and Transmission Lines - Consent
A/E: N/A; Construction: No measure due to insufficient availability; CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
7/10/2014 7/22/2014 N/A 4/14/2015 5/05/2015
5/05/2015 BCC Approved Insituform Technologies R-416-15
75 No W-927 Commission District 10 Southwest Wellfield Middle Lagoon Removal of Calcium Carbonate
$13,590,050 Water Operating Revenues
Construction 5.70%
Invitation to Bid to the lowest responsive responsible bidder
12/03/2014 12/11/2014 N/A 4/14/2015 5/05/2015
5/05/2015 BCC Approved Lanzo Construction, Co., Florida, Inc. R-415-15
76
No E14-WASD-01 Various Commission Districts Engineering and Geological Services Water, Wastewater and Reclaimed Water Planning Services
$7,700,000 Operating Revenues
Review Item Sent 3/25/2014 Received 4/16/2014 Revised item 6/4/2014 Received 6/11/2014 30% A/E
Request for Qualifications/Negotiations
7/30/2014 8/11/2014 11/13/2014 N/A
04/21/2015 BCC Ratification
3/17/2015 Mayor Approved Contract Award Recommendation Tetra Tech, Inc. 04/21/2015 BCC Ratification Approval R-286-15
77-
No DB14-WASD-01 Commission Districts 2 (Consent Decree Project) Design-Build Services for Replacement/
$16,746,672 968750 Wastewater Pipes and Infrastructure Projects
Draft Review Item Sent 2/18/2014 Final item Sent 3/11/2014 Received
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and
5/02/2014 5/09/2014 7/22/2014 9/25/2014
12/16/2014 BCC Approved Emergency Item R-1119-14
3/02/2015 Mayor Approved Ric-Man Construction Florida, Inc. 04/21/2015
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 27
Rehabilitation of 72-inch Sanitary Sewage Force Main along NW/NE 159th Street Between Northwest 17th Avenue and N.E. 10th Avenue for the 72-inch Force Main
4/03/2014 15.50% CSBE; 30% SBE; 10% CWP
Price Proposal (lowest adjusted bid)
BCC Ratification Approval R-286-15
78
No DB13-WASD-03 Commission District 5 Design-Build Services for the Replacement of Water Mains and Service Conversions in the Shenandoah Area in the City of Miami Phase A
$11,326,347 9653311 Water Distribution System Extension & Enhancement
Review Item Sent 11/20/2013 Received 1/14/2014 26% A/E; 20% Construction; 12.40% CWP
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
4/11/2014 4/17/2014 7/23/2014 10/15/2014
1/13/2015 2/03/2015 Deferred Item 2/18/2015
2/18/2015 BCC Approved Ric-Man Construction Co., Florida, Inc. R-172-15
79
No E13-WASD-10 Various Commission Districts Engineering services for Design of Upgrades for Water Distribution & Transmission and Sanitary Sewage Collection & Trans. Systems
Two (2) agreements $5,500,000 each Various Funding Sources
Review Item Sent 1/27/2014 Received 2/19/2014 25%
Request for Qualifications/Negotiations
4/15/2014 4/22/2014 7/18/2014 N/A
1/13/2015 2/03/2015
2/03/2015 BCC Approved King Engineering Associates, Inc. R-115-15 2/03/2015 BCC Approved A & P Consulting Transportation Engineers, Corp. R-115-15
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 28
80
No DB13-WASD-04 Commission District 5 Design-Build Services for the Replacement of Water Mains and Service Conversions in the Shenandoah Area in the City of Miami Phase B
$9,756,000 9653311 Water Distribution System Extension & Enhancement
Review Item Sent 11/20/2013 Received 1/14/2014 26% SBE; 20% CSBE; 12.40 CWP
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
4/11/2014 4/17/2014 7/23/2014 10/21/2014
1/13/2015 2/03/2015
2/03/2015 BCC Approved Lanzo Construction Co., Inc. R-117-15
81 No
E13-WASD-04 Various Commission Districts (Consent Decree Project) Design Services for Wastewater Collection & Transmission System related to the Consent Decree Projects
$44,000,000 968150 Wastewater Collection Transmission Lines
Review Item Sent 10/01/2013 Received 10/24/2013 30% SBE
Request for Qualifications/Negotiations
2/12/2014 6/02/2014 9/02/2014 9/16/2014
12/15/2014 Committee Waiver Requested 12/16/2014
12/16/2014 BCC Approved HDR Engineering, Inc. R-1118-14
82 No E13-WASD-05 Various Commission Districts (Consent Decree Project) Design Services for Wastewater Treatment Plant related to the Consent Decree Projects
$66,000,000 964120 Wastewater Treatment Plants
Review Item Sent 11/05/2013 Received 11/18/2013 30% SBE
Request for Qualifications/Negotiations
2/12/2014 6/02/2014 7/31/2014 8/11/2014
12/15/2014 Committee Waiver Requested 12/16/2014
12/16/2014 MWH Americas, Inc. R-1120-14
83 No E13-WASD-06 Various Commission Districts (Consent Decree Project)
$16,500,000 Operating Revenue
Review Item Sent 10/01/2013 Received 11/07/2013
Request for Qualifications/Negotiations
2/12/2014 6/02/2014 7/30/2014 N/A
12/15/2014 Committee Waiver Requested
12/16/2014 BCC Approved Woolpert, Inc. R-1117-14
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 29
Engineering Services for Capacity, Management, Operations & Maintenance Program related to the Consent Decree Projects
32% SBE 12/16/2014
84 N/A S-869 Commission District 7 (Ocean Outfall Legislation Project) Central District Wastewater Treatment Plant - Industrial Waste Deep Injection Well System
$19,887,887 9653421- Central District Upgrades - Wastewater Treatment Plant
SBE: N/A; CSBE: No measure due to insufficient availability; CWP: N/A
Invitation to Bid to the lowest responsive, responsible bidder
5/08/2014 5/21/2014 N/A 8/29/2014 10/21/2014
10/21/2014 BCC Approved Youngquist Brothers, Inc. R-935-14
85 N/A E13-WASD-11 Various Commission Districts Owner’s Representative for Engineering Services for Ocean Outfall Legislation
$139,394,748 962670 Outfall Legislation
Review item Sent 3/03/2014 Received 3/26/2014 28% SBE
Request for Qualifications/Negotiations
4/24/2014 6/02/2014 7/29/2014 8/14/2014
N/A 10/21/2014
10/21/2014 BCC Approved CH2M Hill, Inc. R-936-14
86 N/A E13-WASD-07 Various Commission Districts (Consent Decree Project) Geographic Information Systems Utility Backlog
$9,900,000 Operating Revenues
Review Item Sent 10/01/2013 Received 10/24/2013 20% SBE
Request for Qualifications/Negotiations
12/09/2013 12/18/2013 4/11/2014 5/12/2014
7/08/2014 7/15/2014
7/15/2014 BCC Approved Woolpert, Inc. R-674-14
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 30
87 N/A
E13-WASD-03 Various Commission Districts Design Services for the Implementation of Pump Station Improvement Program
Five (5) Agreements $3,300,000 each 9651071 Pump Station Improvement Program
Review Item Sent 8/26/2013 Received 9/13/2013 40% SBE each
Request for Qualifications/Negotiations
1/17/2014 1/28/2014 4/21/2014 N/A
7/08/2014 7/15/2014
7/15/2014 BCC Approved King Engineering Associates, Inc. R-677-14 Stantec Consulting Services, Inc. R-675-14 CES Consultants, Inc. R-676-14 A&P Consulting Transportation Engineers, Inc. R-673-14 Milian, Swain & Associates, Inc. R-672-14
88 N/A
DB12-WASD-01 (Consent Decree Project) Design-Build services for the replacement of the existing 54-inch sanitary sewage force main from the Central District Wastewater Treatment Plant to Fisher Island, under Norris Cut Channel
$72,101,600 968150 Wastewater Collection and Transmission Lines
Review Item Sent 1/17/2013 Received 2/01/2013 10.9% CSBE; 22% SBE
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
2/26/2013 3/08/2013 4/17/2014 6/26/2013 Reconvened 7/03/2013
12/10/2013 12/17/2013
12/17/2013 BCC Approved Nicholson Construction Company R-1060-13
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 31
89 N/A DB13-WASD-01 Commission District 5 (Brickell Basin Project) Design-Build Services for Gravity Sewer Interceptors for Pump Station No. 3
$12,107,000 9653371 Peak Flow Management Facilities
Review Item Sent 7/26/2013 Received 7/31/2013 17.5% SBE; 11.2% CSBE
Step 1 – Evaluation of Qualifications and Step 2 – Evaluation of Technical and Price Proposal (lowest adjusted bid)
8/22/2013 8/30/2013 10/08/2013 12/11/2013
2/11/2014 2/19/2014 Waiver approved
2/19/2014 BCC Approved Ric-Man Construction, Inc. R-174-14
90 N/A S-852 Commission District 5 (Brickell Basin Construction Project) Proposed Master Pump Station No. 3
$21,976,500 9653371 Peak Flow Management Facilities
2.59% CSBE
Invitation to Bid to the lowest responsive, responsible bidder
6/27/2013 Pre-Bid Conference 7/16/2013
N/A N/A 2/19/2014
2/19/2014 BCC Approved Poole & Kent Company R-173-14
91 N/A Expression of Interest (EOI) Public-Private Partnership N/A
N/A N/A N/A N/A N/A N/A N/A 2/14/2014 31 Responses Received for EOI
92 N/A E13-WASD-02-R Various Commission Districts Program and Construction Management Services for the Implementation of a Pump Station Improvement Program
$17,600,000 9651071 Pump Station Improvement Program
Review Item Sent 5/20/2013 Received 5/20/2013 29% SBE
Request for Qualifications/Negotiations
6/06/2013 6/12/2013 10/22/2013 11/07/2013
12/10/2013 12/17/2013
12/17/2013 BCC Approved Nova Consulting, Inc. R-1061-13
93 N/A E12-WASD-03 Various Commission Districts Program
$2,200,000 967190 Water/Pipes and
Review Item Sent 9/18/2013 Received 10/19/2013
Request for Qualifications/Negotiations
3/29/2013 4/04/2013 9/24/2013 10/23/2013
4/09/2014 5/06/2014
5/06/2014 BCC Approved Lockwood Andrews & Newnam, Inc.
WASD TRANSPARENCY REPORT – EXHIBIT A Awarded Water & Sewer Infrastructure Projects
07/31/2019 32
Management Consultant and related services to establish a Comprehensive Infrastructure Assessment and Replacement Program for Water Transmission and Distribution Mains including Preparation of Condition Evaluations, Forensic Analysis, Risk Assessments and Renewal Option Protocols
Infrastructure Projects
25% SBE Committee Reconvening 12/04/2013
R-432-14
94 N/A E13-WASD-01-R Various Commission Districts (Consent Decree Project) Program and Construction Management Services related to the Wastewater Systems Priority Projects
$91,000,000 Various Funding Sources
Review Item Sent 5/20/2013 Received 5/20/2013 28% SBE
Request for Qualifications/Negotiations
6/06/2013 6/12/2013 8/14/2013 8/28/2013
N/A 5/20/2014
5/20/2014 BCC Approved AECOM Technical Services, Inc. R-469-14
The draft solicitations are posted on Internal Services Department’s webpage at http://www.miamidade.gov/procurement/solicitations.asp and Small Business Development’s webpage at http://www.miamidade.gov/business/contracting-opportunities-architecture-engineering.asp
for industry review and comments prior to advertisement.
Status of revision to I.O. 3-39
DATE ACTION
07/08/2019 CAO provided comments to ISD draft on the Revised Draft I.O. 3-39 dated 04/24/2019
ISD is currently working on the following:
1. Addressing CAO comments
2. Incorporating language previously recommended by the Task Force not present on
the previous I.O. 3-39 Draft dated 04/24/2019
3. Extracting from the current A.O. 3-39 Section I – Capital Construction Project Tracking
and Reporting and Section III – Capital Construction Contracting to be part of a new
I.O. to specifically address Capital Construction, or to be incorporated into the
existing I.O. 3-53 – Miscellaneous Construction Contracts Program.
09-03-2019 Revisions to new I.O. 3-39 based on above changes to be presented to the ISD CPO and
concurrent documents:
5. New I.O. regarding compliance of the Locally Headquarter Legislations on awarded
projects.
6. Draft of revision to Miami-Dade County Code 2-85 for A/E from 5% to 5 Qualitative
Points.
09-09-2019 Revised draft of I.O. 3-39 to be presented to CAO
October ’19* First Reading at BCC
November ’19* Second Reading Committee
December ’19* Second Reading/Adoption BCC
*Above dates are tentative and subject to change.
Small Business Development Architecture and Engineering Advisory Board
June 29, 2019 Meeting Start: 10:32am Appointed: 7 Stop: 11:24am Quorum: 4 (E)= Excused (U) = Unexcused
PRESENT ABSENT Ivette Argudin Juan Crespi (E) Cheryl Jacobs
Deborah Swain Berrin Tansel Christopher Benjamin Conrad S. Cangahuala
County Staff Present: Laurie Johnson (SBD), Tracie Auguste (SBD), Lawanda Wright-Robinson
(SBD), Michou Jean (SBD), Rebekah Harvard (SBD), Francisco Caldera (SBD), Elizabeth Zabowski
(SBD), Lily Vilaboy (SBD), Mike Ramos (WASD), Kenneth Robertson (Jackson Health System), Pablo
Valin (Procurement), Milton Collins (MDAD), Gayna McDonald (MDAD), Leticia Smith (DTPW).
I. Welcome/Introductions- Acting Chairperson Ivette Argudin called the meeting to order at
10:32am. Board members introduced themselves.
II. SBD Section Reports
a. SBE A&E Certification
i. Deferred to the next meeting.
b. SBE A&E Utilization
i. The report was presented by Tracie Auguste (SBD Section Chief).
ii. Board Member Argudin requested the percentages of Equitable Distribution
Program (EDP) awards that are certified firms, and which EDP awards are to
firms that are locally headquartered.
iii. Board Members had discussion on the status of awarded contracts. Ms. Auguste
advised that a column with a projected end day will be added in the Utilization
report moving forward.
c. SBE A&E Business Outreach and Education
i. The report was presented by Lawanda Wright-Robinson (SBD Section Chief).
III. Reports
a. Jackson Health System Report
i. The report was presented by Kenneth Robertson (JHS). He provided an update
on small business participation on A&E and signature six Jackson Memorial
Hospital projects.
ii. Board Member Argudin commended Jackson on providing work to small
businesses.
Small Business Development Architecture and Engineering Advisory Board
June 29, 2019 Meeting
b. Aviation A&E Contracts Report
i. The report was presented by Marie Clark-Vincent (Aviation).
ii. Ms. Clark-Vincent provided an update on the previous year and upcoming
A&E projects for the Aviation Department.
IV. Old Business
a. Approval of April 24, 2019 Meeting Minutes
i. Board Member Cheryl Jacobs motioned to approve the minutes. Board Member Berrin Tansel seconded the motion. Approved (6-0).
V. New Business
a. A&E Taskforce Update – ISD/Strategic Procurement Division
Pablo Valin (ISD, Senior A/E Consultant Selection Coordinator) stated that a
draft of Implementing Order (I.O.) 3-39 was provided to the County
Attorney’s office and they are currently reviewing it and awaiting their
comments. He also noted that the revised I.O. incorporates the Professional
Services Task Force recommendations and in all likelihood the
recommendation regarding dropping the low will be considered as an
addition to the I.O.
i. Board Member Deborah Swain, as president of the Miami Dade A&E Society,
expressed concerns about the many recommendations made by the
Professional Services Task that may not be incorporated in the subsequent
draft I.O.
ii. Mr. Rick Crooks (Chairperson, A&E Task Force) requested a timeline from the
department. Mr. Valin advised that he will provide the Board a timeline and
additional feedback at the August 28, 2019 A&E board meeting.
ii. Board Member Swain motioned to request a County Attorney be present at the next Board Meeting to provide a status of their review of I.O. 3-39 and address the status of the Professional Services Task Force recommendation. Board Member Cheryl Jacobs seconded the motion. Approved 6-0.
VI. Request for future agenda items
a. Board Member Argudin requested continual follow up on the Task Force and I.O. from
ISD/Procurement.
VII. Reasonable opportunity for the public to be heard before County boards (Sec. 2-
11.39.3)
a. Maria Molina (Nova Consulting) discussed the requirement that one can only be in
three teams as a sub-contractor. Ms. Molina expressed the effects it has on a small
business. Mr. Valin advised that the comments and recommendations were noted,
and the department will revisit this topic.
Small Business Development Architecture and Engineering Advisory Board
June 29, 2019 Meeting
VIII. Adjournment – Board member Christopher Benjamin motioned to adjourn the meeting. Seconded by Board Member Tansel. Meeting was adjourned at 11:24 a.m.
Directives
1. Board Member Swain motioned to request a County Attorney be present at the next Board Meeting to provide a status of their review of I.O. 3-39 and address the status of the Professional Services Task Force recommendation. Board Member Cheryl Jacobs seconded the motion. Approved 6-0.
***MINUTES ARE IN SUMMARY FORM***
COPIES OF RECORDINGS OF THIS MEETING ARE AVAILABLE FROM