Top Banner
Fronter 92 and the road ahead Nils Olav Sundsteigen UK Partner Manager LGfL conference, 6 th July 2009 (not for distribution to other than participants at LGfL conference)
18

Fronter 92 and the road ahead

Dec 30, 2015

Download

Documents

stacy-potts

Fronter 92 and the road ahead. Nils Olav Sundsteigen UK Partner Manager LGfL conference, 6 th July 2009 (not for distribution to other than participants at LGfL conference). Agenda. So far, so good… Copy room and EOY/SOY Fronter 92 Online reporting Road map What if…. Copy room. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Fronter 92 and the road ahead

Fronter 92 and the road aheadNils Olav SundsteigenUK Partner Manager

LGfL conference, 6th July 2009(not for distribution to other thanparticipants at LGfL conference)

Page 2: Fronter 92 and the road ahead

Agenda

• So far, so good…• Copy room and EOY/SOY• Fronter 92• Online reporting• Road map• What if…

Page 3: Fronter 92 and the road ahead

Since last conference 15th July 2008 6th July 2009

Number of schools ordered London MLE 659 1193

LA’s with schools in the London MLE 29 31

Number of administrators/teachers trained 870 1370

Number of accredited trainers 87 87

Number of LA training sessions 164 341

Number of SLT meetings held (1+2) 482 1207

Number of MIS integrations in operation 422 948

Schools in phase 7 (so far) 177

Page 4: Fronter 92 and the road ahead

Copy room

Page 5: Fronter 92 and the road ahead

Fronter 92NB: The last release based on the old release cycle

• Room copy• EOY/SOY• Goal module• Open API• Webfronter improvements• Creaza• Support of integrations with RM's Integris G2 MIS• ILP (will be released during the autumn)

• Page (will be released during the autumn)

Page 6: Fronter 92 and the road ahead

Open API

The API makes it easier for external companies to integrate with Fronter

Page 7: Fronter 92 and the road ahead

ILP and Goal module

Page 8: Fronter 92 and the road ahead

ILP and Goal module

Page 9: Fronter 92 and the road ahead

ILP and Goal module

Page 10: Fronter 92 and the road ahead

ILP and Goal module

Page 11: Fronter 92 and the road ahead

ILP and Goal module

Page 12: Fronter 92 and the road ahead

Parental Portal

• “To what extent can/will London MLE meet the requirements of parental reporting set out by Education Minister Jim Knight in January 2008?”

– Governmental target is for• Secondary – 2010• Primary – 2012

Page 13: Fronter 92 and the road ahead

What has Fronter done so far?• Engaged with Sims and all other major MIS

providers to agree scope• Engaged with LGfL and LAs across the UK to discuss

requirements, scope, functionality, timelines etc• Implemented the functionalities/standards needed

to import/export data between Fronter and the MIS• Worked closely with BECTA to make sure that the

solution complies with all mandatory requirements• Issued positional paper

Page 14: Fronter 92 and the road ahead

Our solutionWork in progress…

• Locally installed client• Extact data from ALL MIS systems• Parent Portal will present information within

Fronter• Phase 1 - Attendance & Assessment information• Working demo by BETT 2010?• Support for Sims Learning Gateway

Page 15: Fronter 92 and the road ahead

Work in progress…

Parents will be able to view useful reports regarding their children

Parents will be able to view useful reports regarding their children

Students will be able to see data within the Learning Environment from the MIS as schools prescribe

Students will be able to see data within the Learning Environment from the MIS as schools prescribe

Teachers will be able to take advantage of MIS data in the classroom and at home when designing lessons and / or courses

Teachers will be able to take advantage of MIS data in the classroom and at home when designing lessons and / or courses

Page 17: Fronter 92 and the road ahead

What if…

Fronter could be your operating system for learning…

Page 18: Fronter 92 and the road ahead

Dates

• Fronter 92 release – 24th September

• Autumn Reference GroupsPrimary – 12th OctoberSecondary – 13th October