First Hill Streetcar Project Preview Yesler Terrace Community Association June 2009
15

First Hill Streetcar 6-9 CRC Presentation

May 29, 2015

Download

Travel

Trellis

This is a presentation about the First Hill Streeetcar that SDOT made at the SHA's Yesler Terrace Citizen Review Committee meeting on June 9, 2009.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: First Hill Streetcar 6-9 CRC Presentation

First Hill Streetcar Project Preview

Yesler Terrace Community AssociationJune 2009

Page 2: First Hill Streetcar 6-9 CRC Presentation

Background/Context

• ST2 Plan Provides for Capital Contribution to “a new streetcar connector line between Downtown Seattle, First Hill and the future Capitol Hill light rail station.”

• ST2 Plan-$120M in 2007 Dollars

• ST2 Finance Plan-Expenditures 2010-2015

• Seattle Streetcar Network: First Hill Line Among 4 Promising Routes

Page 3: First Hill Streetcar 6-9 CRC Presentation

Project Background & Purpose

• Replaces First Hill Light Rail Station• Funded as Part of ST2 Ballot Measure• Purpose is to connect light rail trips from

the north and south the health-care oriented jobs and services of First Hill

Page 4: First Hill Streetcar 6-9 CRC Presentation

Key Opportunities

• Streetcar Typologies & First Hill Streetcar

Page 5: First Hill Streetcar 6-9 CRC Presentation

Emerging Streetcar Typologies

City Serving

Local Circulator

City Shaping

Rapid Streetcar

Page 6: First Hill Streetcar 6-9 CRC Presentation

Emerging Streetcar Typologies

2-3 Blocks

8-12 MPH 12-15 MPH

Up to .75 Miles

Local Circulator Rapid Streetcar

Stop Spacing

Average Speed

Page 7: First Hill Streetcar 6-9 CRC Presentation

Emerging Streetcar Typologies

City Serving

Local Circulator

City Shaping

Rapid Streetcar

South Lake Union Line

Central Line First Hill Line

Fremont-Ballard Line

University Line

Page 8: First Hill Streetcar 6-9 CRC Presentation

Key Opportunities

• Shape: YeslerTerrace, Little Saigon, First Hill, Broadway, 12th

Avenue?• Serve: First Hill &

Light Rail stations

Page 9: First Hill Streetcar 6-9 CRC Presentation

Interlocal Agreement• ST provides $120 M ($2007) capital and funds

up to $5.2 M annually ($2007) operations & maintenance.

• City has all project management & delivery responsibilities

• City responsible for cost overruns during construction.

• City has option to reject bids, develop supplemental funding plan prior to construction.

Page 10: First Hill Streetcar 6-9 CRC Presentation

Project Status/ScehduleTeam:• Facilities Engineer: URS• Vehicle/Systems Engineer: LTK• Project Management: SOJ

Proposed Schedule:• Environmental Review, Concept Design,

Alignment Selection (2009-2010)• Preliminary & Final Design (2010-2011)• Advanced Utilities (2010 Q4)• Construction & Startup (2011-2012)

Page 11: First Hill Streetcar 6-9 CRC Presentation

Initial Capital & O&M Estimates

• Total Development Cost: $120M in 2011 Dollars

• 20% Contingency + Allowances for Unidentified Scope, Mitigation

• Funding is $120 M in 2007 Dollars=$140M=Additional $20M Contingency

Page 12: First Hill Streetcar 6-9 CRC Presentation

Initial Capital & O&M Estimates• 2012 O&M Cost: $3.8 to $4.2 M

• Includes Depreciation

• Maximum Funding: $5.2 M in 2007 Dollars

• O&M Cost Estimate Assumes 20 Minute End-to-End Time

• Travel Time/Reliability Is Critical Alignment/Design Consideration

Page 13: First Hill Streetcar 6-9 CRC Presentation

Alignment Alternatives

Page 14: First Hill Streetcar 6-9 CRC Presentation

Alignment Alternatives

Page 15: First Hill Streetcar 6-9 CRC Presentation

www.seattlestreetcar.org