Top Banner
QUALITY ASSESMENT AND PERFORMANCE IMPROVEMENT (QUALITY ASSURANCE)
25
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Final report ppt

QUALITY ASSESMENT AND PERFORMANCE IMPROVEMENT

(QUALITY ASSURANCE)

Page 2: Final report ppt

What is QUALITY?

• a measure of excellence or state of being free of errors

• meeting the standards that are already predetermined.

Page 3: Final report ppt

Why aim QUALITY in health laboratories?

Reliable / QUALITY results: - improves the decision making capacity of the clinicians as well as public health physicians.

Poor quality results :

leads to inappropriate action over treatment

or over investigation lack of treatment

or inadequate investigations

Page 4: Final report ppt

I. Quality Concepts and Terminology Transition

II. Management of Quality

Page 5: Final report ppt

I. Quality Concepts and Terminology Transition

A. Quality Control ( Internal & External)

B. Quality Assurance

C. Total Quality Management (TQM) & Continous Quality Improvement (CQI)

D. Quality Assessment & Improvement (QA&I)

Page 6: Final report ppt

• a management system for initiating and coordinating:

Quality developmentquality maintenance quality improvement

QUALITY CONTROL

VARIOUS DEPARTMENTS

To achieve twin objectives of:

• Economical production• customer satisfaction

Page 7: Final report ppt

QUALITY CONTROL

• “activities directed toward monitoring the individual elements of care” (e.g. intrument and test procedures)

• Relies on quantitative statistical methods that focus on the final product

• Relies on standards and techniques that measure the quality of the product in isolation from the needs of the customer or patient.

• integral component of quality assurance and is the aggregate of processes and techniques to detect, reduce, and correct deficiencies in an analytical process.

Page 8: Final report ppt

OBJECTIVES OF QC

• to provide products which are dependable, satisfactory and economical

• to ensure economic production of products of uniform quality acceptable to the customer

• Aims to preventing the defects rather than detecting the defects

Page 9: Final report ppt

QUALITY CONTROL

Internal quality control (IQC)

External quality assessment scheme (EQAS)

Page 10: Final report ppt

Internal quality control (IQC)

• appropriate measures taken during day-to-day activities

“to control all possible variables that can influence the outcome of laboratory results”

• a continuous process that operated concurrently with analysis.

Page 11: Final report ppt

External quality assessment scheme (EQAS)

• Aims to analyze the accuracy of the entire testing process from receipt of sample and testing of sample to reporting of results ,also known as proficiency testing

• ensure comparability of results among laboratories

• carried out retrospectively and is conducted by an independent agency.

Page 12: Final report ppt

QUALITY ASSURANCE

Page 13: Final report ppt

Quality Assurance• A program in which the overall activities conducted by the

institution are directed toward assuring the quality of the products and services provided.

• Integrates the principles of continous quality improvement (CQI) and total quality management (TQM) into the regulatory process for both moderate and high complexity testing sites.

Page 14: Final report ppt

• Monitors the outcomes or indicators of care.

• Point out that true indicator of a quality service was patient care

• pre-analytical , analytical, post-analytical.

Page 15: Final report ppt

• pre-analytical - patient preparation, specimen collection and processing, technical training, equipment maintenance

• analytical - reagents, apparatus, test method, test procedure, skill in interpretation

• post-analytical - specimen disposal

Page 16: Final report ppt

Quality Assurance vs. Quality Control

Quality Assurance

An overall management plan to guarantee theintegrity of data

Quality Control

A series of analytical measurements used to assess the quality of the analytical data

(The “tools”) (The “system”)

Page 17: Final report ppt

Total Quality Management (TQM)

• A quality management program that includes each component :

customerproducerssuppliers

in the creation process, from the acquisition of supplies to active follow up after the product or service has been received by a delighted customer.

Page 18: Final report ppt

Total Quality Management (TQM) & Continous Quality Improvement (CQI)

• Models for the general management of the laboratory and developing performance appraisal instruments.

• Replacement for QA because of its emphasis on satisfying the needs of the customer.

Page 19: Final report ppt

Quality Assessment and Improvement (QA&I)

A quality management program that focuses on the success of the organization in designing and achieving set goals and objectives

Page 20: Final report ppt

II. Management of Quality

A. The philosophy of qualityB. Operational SystemsC. Quality Management Programs

Page 21: Final report ppt

The Philosophy of Quality

• the attitude of people within the organization towards its work and customers by means of professionalism for the interest of service

• When the requirements are fully met based on quality policies and procedures

• is tied with care and commitment in giving quality service spare headed by top leaders of the organization and is demonstrated how managers spent their time, give attention and supervision.

• Quality pointed to operational quality system and quality management programs

Page 22: Final report ppt

Operational Systems

• represents the actual practices taking place- e.g. not good intentions, wishes or future plans.

• In laboratory / clinical setting:ensure the smooth and continuous flow in the delivery of high quality service.

Page 23: Final report ppt

From Patients Needs :to patient Needs

Service Assessment Physical Utilization

Service Requisition

Specimen Collection

Results Assessment

Information Report

Service Assessment

Analytical process

Page 24: Final report ppt

Quality Management Programs

• addresses specific issues and goals

• Plans for ensuring compliance or bringing about change

• Represents the final results of all efforts and are the actual practices taking place.

• Include the specialized functions that are part of the technical operations of the lab

Page 25: Final report ppt

Others:

• PM or preventive maintenance• Policy and procedure manuals in writing and review• Staff orientation, CPE, and personnel development• Participation in PT 9 proficiency testing )• Trouble shooting procedures• Laboratory accreditation, inspection and licensure