  • 7/31/2019 File 1B AddisonPlasticsEstimate&Schedule

    1/12

    INSTRUMENT & CONTROL SYSTEMS DESIGN PRIMER - PROJECT ESTIMATE

    SCOPE OF THIS ESTIMATE :

    1) Add a new Feed Water System in the North forty

    ASSUMPTIONS:1) Water Supply is handy2) Reference driawings are correct.

    NOTES AND COMMENTS:1)

  • 7/31/2019 File 1B AddisonPlasticsEstimate&Schedule

    2/12

    INSTRUMENT CONTROLS DESIGN PRIMER

    EXECUTIVE SUMMARY WORKSHEET

    Customer: ADDISON PLASTICS Charge No: 332211

    Project: FEED WATER SYS Design Team I&C#2

    CP No. 999444 Revision: A

    WBS No. 001 Date: 2-15-02

    Location: BOONIESVILLE, TX By: ZZZ

    Engineering 102 $90 9,190$

    Design 104 $70 7,304$

    CADD & Clerical 158 $50 7,884$

    Engineering 609 $90 54,783$

    Design 540 $70 37,798$

    CADD & Clerical 843 $50 42,145$

    Engineering 90 $90 8,096$

    Design 209 $70 14,613$CADD & Clerical 94 $50 4,713$

    2,749 186,525$

    AVG RATE COST 1 Meetings

    NA 186,525$ 1 Events$38 85,956$ 1 DaysNA 344,800$ 8 DrawingsNA $25,628 1 Task

    1 Each

    1 Each

    108 Records

    211 I/O PointsItem Total: 124

    317 RecordsInstrument Cost: 344,800$ 1 DrawingsInstallation Hardware Cost: 5,280$ 1 Drawings

    2 Tasks

    COUNT 124 Each

    AI 0 12 Each

    AO 0 4 DrawingsAI 60 4 DrawingsAO 19 77 Drawings

    TCK 0 6 DrawingsTCJ 0 4 Drawings

    TC_ 0 4 DrawingsCU 0 1 Drawings

    PL 3 4 DrawingsDI 81 4 DrawingsDO 48 1 DrawingsDI 0 3 TasksDO 0 1 Each

    Total: 211 248 Documents

    134,727$

    27,421$

    Phase

    One

    Projection

    Phase

    Two

    Projection

    Phase

    ThreeProjection

    24,378$

    24vdc Discrete

    110vac Discrete

    P&ID Dwgs [3]:Control System Spec [5]:

    Analog mv I/O

    Analog mA I/O

    Thermocouples

    RTD's

    I/O TYPE

    I/O SUMMARY

    INSTRUMENT SUMMARY

    PHASE 1 DELIVERABLES SUMMARY

    Project Kickoff Meeting(s)

    Travel Time:

    PROJECT COST SUMMARY

    CATEGORY

    ENGINEERING

    CONSTRUCTION

    INSTRUMENTS

    MATERIAL

    Instrument Plan Dwgs [15]:Power Distribution Dwgs [17]:

    Site Plan [15]:Control Network Single-Line [16]:

    Preliminary Bill of Material [21,22]:

    Site Walkdown / Investigation

    Phase 2 Project Estimate [6]:

    Phase 2 Project Schedule [6]:

    Project Drawing List [7]:

    Final Bill of Material [21,22]:

    arshalling Panel Arrangements [18]:

    ENGINEERING COST SUMMARY

    PROJECT COST SUMMARY SHEET

    Instrument Loop Sheets [17]:

    Control Elementaries [17]:Control Panel Arrangements [18]:

    ld Junction Box Arrangements [18]:

    Instrument Specifications [14]:

    Instrument Calculations [14]:

    PROJECTED COST: 642,908$

    Design Package Squad Check [23]:

    Issue for Construction [24]:

    Develop I/O Configuration [12]:

    Instrument Database [13]:

    PHASE 2 DELIVERABLES SUMMARY

    Instrument Installation Details [19]:ield Junction Box Wiring Dwgs [20]:Marshalling Panel Connections[20]:

    7/6/2012 1:27 AM

  • 7/31/2019 File 1B AddisonPlasticsEstimate&Schedule

    3/12

    INSTRUMENTATION CONTROLSDESIGN PRIMER INSTRUMENT TAKEOFF WORKSHE

    INSTRUMENT & CONTROL SYSTEMS DESIGN PRIMER - PROJECT ESTIMATE

    AI AO AI AO TCK TCJ TC_ CU PL DI DO

    12 EA Analyzer 5,000$ 60,000$ 50$ 600$ 1 1

    3 EA Analyzer, Oxygen 14,000$ 42,000$ 50$ 150$ 1

    6 EA Anal zer, H 2,000$ 12,000$ 50$ 300$ 12 EA Arrestor, Flame 15,000$ 30,000$ -$ 16 EA Assembly, Bubbler Well Pipe 900$ 14,400$ 25$ 400$

    EA Controller, PID, Panel Mnt 1,500$ -$ 10$ -$

    EA Glass, Flow 1,000$ -$ 10$ -$ EA Glass, Level 300$ -$ 10$ -$

    EA Indicator, Digital 400$ -$ 10$ -$

    EA Indicator, Gauge 75$ -$ 10$ -$

    EA Meter, Purge 50$ -$ 10$ -$

    EA Motor, Fixed Spd w/ HOA 100$ -$ 50$ -$

    EA Motor, VSD w/ Tach & HOA 100$ -$ 50$ -$ 1 1

    EA Orifice, Restriction 200$ -$ 10$ -$

    EA Regulator, Pressure 650$ -$ 10$ -$

    EA Relay 48$ -$ 10$ -$

    EA Relay, Interposing 24$ -$ 10$ -$

    EA Relay, Timer 120$ -$ 10$ -$

    EA Rotameter 800$ -$ 10$ -$

    EA RTD 300$ -$ 50$ -$ 1

    EA Rupture Disk 100$ -$ 10$ -$

    EA Switch, Flow 1,200$ -$ 50$ -$ EA Switch, Level, Capacitance 1,000$ -$ 50$ -$ 1

    EA Switch, Level, Tuning Fork 750$ -$ 50$ -$ 1

    EA Switch, Position 100$ -$ 50$ -$ 1

    EA Switch, Pressure 500$ -$ 50$ -$ 1

    EA Switch, Selector 150$ -$ 50$ -$ 1

    EA Switch, Temp 500$ -$ 50$ -$ 1

    EA Switch, Vibration 4,250$ -$ 50$ -$ 1

    EA Totalizer 2,500$ -$ 10$ -$

    EA Transmitter, Conductivity 800$ -$ 50$ -$ 1

    EA Transmitter, Current 500$ -$ 50$ -$ 1

    EA Transmitter, Flow (Mag) 2,000$ -$ 50$ -$ 1

    EA Transmitter, Flow (Mass) 6,000$ -$ 50$ -$ 1

    EA Transmitter, Level, DP Bubbler 1,500$ -$ 50$ -$ 1

    EA Transmitter, Level, Usonic 2,000$ -$ 50$ -$ 1

    5 EA Transmitter, Pressure 1,500$ 7,500$ 50$ 250$ 1

    5 EA Transmitter, Pressure Diff 1,500$ 7,500$ 50$ 250$ 1

    6 EA Transmitter, S eed 500$ 3,000$ 50$ 300$ 17 EA Transmitter, Temp 1,800$ 12,600$ 50$ 350$ 125 EA Valve, On/ Off W/ Limit Sw 2,500$ 62,500$ 50$ 1,250$ 2 12 EA Valve, Pressure Relief 3,300$ 6,600$ 10$ 20$ 12 EA Valve, Solenoid 100$ 1,200$ 15$ 180$ 1

    14 EA Valve, Throttling 3,500$ 49,000$ 50$ 700$ 1

    3 EA Vent, Conservation 3,500$ 10,500$ 10$ 30$ 2 EA Wei h Scale, Load Cell 8,000$ 16,000$ 50$ 100$ 12 EA Wei h Scale, Platform 5,000$ 10,000$ 50$ 100$ 12 EA Weigh Feeder System (Vendor) -$ -$ 150$ 300$ 2 1 1 4 2

    124 Items 344,800$ 5,280$AI AO AI AO TCK TCJ TC_ CU PL DI DO

    4-20Ma ThermocoupleTOTAL

    PRICE

    RTD 24vdc

    QTY U/I DEVICE DESCRIPTION

    DEVICE

    PRICE

    TOTAL

    PRICE

    HARDWARE

    PRICE

    mv

    Page 3 of 12

  • 7/31/2019 File 1B AddisonPlasticsEstimate&Schedule

    4/12

    INSTRUMENT CONTROLS DESIGN PRIMERESTIMATE WORKSHEET

    11

    4.0 Customer: ADDISON PLASTICS Charge No: 3322111.0 Project: FEED WATER SYS Design Team I&C#22.0 CP No. 999444 Revision: A

    2 WBS No. 001 Date: 2-15-021.0 Location: BOONIESVILLE, TX By: ZZZ

    25.025.0 NOTE: Numbers in brackets "[]" indicate Project Deliverables discussed in the Projects chapter

    % Spare: 15% PID Loops: 2

    Type

    Raw

    Points

    Total

    Points

    Pts Per

    Module

    Module

    Total

    Module

    Cost

    Total

    Cost

    Modules

    Per Elem.

    Points

    Per Elem.

    Elem.

    Dwgs

    Points

    Per Loop

    Loop

    Sheets

    AI 0 0 8 0 1,200$ -$ 0 0 - 1 -AO 0 0 8 0 1,200$ -$ 0 0 - 1 -

    AI 52 60 16 4 1,200$ 4,800$ 0 0 - 1 60.0AO 16 19 16 2 1,200$ 2,400$ 0 0 - 1 19.0TCK 0 0 16 0 500$ -$ 0 0 - 1 -TCJ 0 0 8 0 500$ -$ 0 0 - 1 -TC_ 0 0 8 0 500$ -$ 0 0 - 1 -

    CU 0 0 8 0 800$ -$ 0 0 - 1 -PL 2 3 32 1 800$ 800$ 1 0 1.0 0 -DI 70 81 16 6 300$ 1,800$ 2 0 3.0 0 -DO 41 48 16 3 300$ 900$ 2 0 1.5 0 -

    DI 0 0 8 0 300$ -$ 4 0 - 0 -DO 0 0 8 0 300$ -$ 4 0 - 0

    211 16 10,700$ 5.5 77.0Total

    Points

    Total

    Modules

    Total

    Module

    Cost:

    Total

    Elem.

    Dwgs

    Total

    Loop Sheets

    Analog mA I/O

    Thermocouples

    ConnDwgs / Cabinet:

    Racks / Cabinet:ArrngDwgs / Cabinet:

    I/O CONFIGURATION WORKSHEET

    Analog mv I/O

    I/O COUNT / SCHEMATIC CALCULATION SHEET

    RTD's

    24vdc Discrete

    110vac Discrete

    Total Racks:

    Total Cabinets:Points / P&ID:

    Points / Plan Dwg:

    Slots / Rack:

    BACKGROUND DATA

    7/6/2012 1:27 AM

  • 7/31/2019 File 1B AddisonPlasticsEstimate&Schedule

    5/12

    INSTRUMENT CONTROLS DESIGN PRIMERESTIMATE WORKSHEET

    Customer: ADDISON PLASTICS Char e No: 332211

    Pro ect: FEED WATER SYS Desi n Team I&C#2CP No. 999444 Revision: A

    WBS No. 001 Date: 2-15-02Location: BOONIESVILLE, TX B : ZZZ

    NOTE: Numbers in brackets "[]" indicate Project Deliverables discussed in the Projects chapter

    QTY UNITS MODIFIER ENGRG DESIGN CADD ENGRG DESIGN CADD

    1 Meetings 2.0 2.0 2.0 2.0 2.0 2.0 6.0

    1 Events 1.0 1.0 1.0 1.0 1.0 1.0 3.0

    1 Days 8.0 8.0 - 8.0 8.0 - 16.0

    8 Drawings 4.0 2.0 8.0 33.8 16.9 67.5 118.21 Task 8.0 2.0 - 8.0 2.0 - 10.01 Each 8.0 8.0 - 8.0 8.0 - 16.0

    1 Each 8.0 8.0 - 8.0 8.0 - 16.0108 Records 0.0 0.1 0.2 1.1 10.8 21.5 33.3

    211 I/O Points 0.01 0.05 0.00 2.1 10.6 - 12.7317 Records 1.5 0.01 0.01 0.10 3.2 3.2 31.7 38.0

    1 Drawings 1.0 8.0 8.0 1.0 8.0 8.0 17.0

    1 Drawings 8.0 8.0 8.0 8.0 8.0 8.0 24.02 Tasks 9.0 9.0 9.0 18.0 18.0 18.0 54.0

    Total: 102.1 104.3 157.7 364.1

    QTY UNITS MODIFIER ENGRG DESIGN CADD ENGRG DESIGN CADD

    124 Each 2.00 - - 248.0 - - 248.0

    12 Each 2.00 - - 24.0 - - 24.04 Drawings 2.00 17.00 25.00 8.0 68.0 100.0 176.0

    4 Drawings 1.00 4.00 8.00 4.0 16.0 32.0 52.077 Drawings 0.50 2.00 2.00 38.5 154.0 154.0 346.56 Drawings 1.00 12.00 12.00 5.5 66.0 66.0 137.5

    4 Drawings 1.00 8.00 16.00 4.0 32.0 64.0 100.0

    4 Drawings 1.00 4.00 8.00 4.0 16.0 32.0 52.0

    1 Drawings 1.00 8.00 16.00 1.0 8.0 16.0 25.04 Drawings 0.50 2.00 2.00 2.0 8.0 8.0 18.04 Drawings 1.00 8.00 16.00 4.0 32.0 64.0 100.01 Drawings 1.00 8.00 16.00 1.0 8.0 16.0 25.0

    3 Tasks 1.00 16.00 24.00 3.0 48.0 72.0 123.0

    1 Each 0.10 0.10 0.10 34.7 45.6 62.4 142.7

    248 Documents 0.01 0.05 0.10 2.5 12.4 24.8 39.61 Task 40.00 8.00 8.00 40.0 8.0 8.0 56.0

    Total: 424.2 522.0 719.2 1,665.3

    QTY UNITS MODIFIER ENGRG DESIGN CADD ENGRG DESIGN CADD

    1 Task 10% 166.5 - - 166.5

    3 Trips 2.00 4.00 - 6.0 12.0 - 18.0248 Documents - - 0.50 - - 123.8 123.8

    3 Meetings 2.00 2.00 - 6.0 6.0 - 12.03 Reports 2.00 - - 6.0 - - 6.0

    Total: 184.5 18.0 123.8 326.3

    QTY UNITS MODIFIER ENGRG DESIGN CADD ENGRG DESIGN CADD8 Weeks 4.00 8.00 2.00 32.0 64.0 16.0 112.0

    1 Class 2.00 8.00 2.00 2.0 8.0 2.0 12.01 Class 2.00 8.00 2.00 2.0 8.0 2.0 12.0- Weeks 4.00 40.00 2.00 - - - -

    7 Days 1.00 8.00 - 7.0 56.0 - 63.0

    3 Days 12.00 12.00 - 36.0 36.0 - 72.0

    3 Trips 2.00 4.00 - 6.0 12.0 - 18.0248 Document 10% 0.10 0.50 2.00 2.5 12.4 49.5 64.4248 Documents 0.01 0.05 0.10 2.5 12.4 24.8 39.6

    Total: 90.0 208.8 94.3 393.0

    QTY UNITS MODIFIER SUPV CRAFT CLERK ENGRG DESIGN CADD

    2 Personnel 8.00 8.00 - 16.0 16.0 - 32.0

    10 Days 8.00 16.00 2.00 80.0 160.0 20.0 260.015 Days 8.00 16.00 4.00 120.0 240.0 60.0 420.020 Days 8.00 24.00 2.00 160.0 480.0 40.0 680.0

    7 Days 8.00 48.00 2.00 56.0 336.0 14.0 406.0

    3 Task 8.00 48.00 2.00 24.0 144.0 6.0 174.0

    - Trips 2.00 4.00 2.00 - - - -5 Days 8.00 48.00 2.00 40.0 240.0 10.0 290.0

    - - - -

    Total: 496.0 1,616.0 150.0 2,262.0

    Kickoff Meeting

    Craft 1Craft 2Craft 3

    Checkout:Startup:

    Travel Time (En-Route):Cleanup

    Prepare Status Reports:

    CONSTRUCTION LABOR - PHASE THREE

    DESIGN DATA UNIT MANHOURS CALCULATED MANHOURSTOTAL

    DESCRIPTION

    Marshalling Panel Arrangements [18]:

    Field Junction Box Wiring Dwgs [20]:

    Control Panel Arrangements [18]:

    Travel Time (En-Route):Document Control:

    Attend Update Meetings:

    DESIGN DATA UNIT MANHOURS CALCULATED MANHOURSTOTAL

    DESCRIPTION

    Final Bill of Material [21,22]:Marshalling Panel Connections[20]:

    Instrument Loop Sheets [17]:Control Elementaries [17]:

    Field Junction Box Arrangements [18]:

    Site Plan [15]:

    Control Network Single-Line [16]:

    Develop I/O Configuration [12]:

    Project Drawing List [7]:

    P&ID Dwgs [3]:

    DIRECT ENGINEERING LABOR - PHASE TWO (PRODUCTION)

    DIRECT ENGINEERING LABOR - PHASE ONE (INVESTIGATION)

    DESIGN DATATOTAL

    CALCULATED MANHOURSUNIT MANHOURSDESCRIPTION

    UNIT MANHOURS CALCULATED MANHOURSTOTAL

    DESCRIPTION

    Supervision & Proj Mgmt:

    Project Kickoff Meeting(s)Travel Time:

    Instrument Calculations [14]:

    Power Distribution Dwgs [17]:

    Site Walkdown / Investigation

    DESIGN DATA UNIT MANHOURS CALCULATED MANHOURSTOTAL

    DESCRIPTION

    Issue for Construction [24]:O&M Manual:

    ENGINEERING LABOR - PHASE THREE

    INDIRECT ENGINEERING LABOR - PHASE TWO

    DESIGN DATA

    Travel Time (En-Route):

    Packaging for 'Issue for Record'

    Construction Support:

    Construction Management:Checkout:

    Startup:

    Operations Training:Maintenance Training:

    Construction "Red-Lines":

    PROJECT LABOR CALCULATION SHEET

    Design Package Squad Check [23]:

    Control System Spec [5]:

    Instrument Installation Details [19]:

    Preliminary Bill of Material [21,22]:

    Instrument Plan Dwgs [15]:

    Instrument Specifications [14]:

    Instrument Database [13]:

    Phase 2 Project Schedule [6]:Phase 2 Project Estimate [6]:

    Enter the percentage of drawingsthat are likely to require revisionsdue to construction changes ordesign modifications...

    DATALINK=E56

    DATALINK=E47

    DATALINK=SUM(E33:E4

  • 7/31/2019 File 1B AddisonPlasticsEstimate&Schedule

    6/12

    ARKANSAS ESTIMATE 7/6/2012 1:27 AM

    COST SUMMARY

    Customer: ADDISON PLASTICS Charge No: 332211 CABLE $2,303.43

    Project: FEED WATER SYS Design Team I&C#2 CABINET $2,859.80

    CP No. 999444 Revision: A CONDUIT $8,243.12

    WBS No. 001 Date: 2-15-02 TUBING / DETAILS $5,280.00

    Location: BOONIESVILLE, TX By: ZZZ INSTR. AIR PIPING $1,661.22

    GRAND TOTAL: $20,347.57Are there hazardous areas? If so, what percentage of

    the equipment will be in hazardous locations? 75%3696 Wiring Terminations

    66 Tubing Terminations

    101 Conduit Terminations

    200 FT Avg Homerun Distan 50 FT Average Local Run Distance

    13 100 FT $0.39 $39.00 3/C #18 AWG UNSHLD CA BLE, 300V

    118 FT $0.35 $41.30 2/C #18 AWG SHLD CAB LE, 300V

    600 FT $0.30 $180.00 2/C #16 AWG UNSH CABLE, 300V

    500 FT $0.12 $60.00 1/c #16, 600V, Hookup Wire

    463 FT $1.45 $670.63 24twpr #18, Unsh for Digital Ckt Homeruns

    850 FT $1.25 $1,062.50 16twpr #18, Indiv Shld for Analog Ckt Homeruns

    200 FT $1.25 $250.00 4-triad, Indiv Shld for RTD Ckt Homeruns

    0 FT $1.00 $0.00 2/C Thermocouple Extension Wire

    0 FT $0.60 $0.00 Network Communications Cable

    $2,303

    181 Electrical Devices 50% Percentage of Devices Needing Fuses 8 AverageTerminals per Device

    91 EA $5.00 $905.00 Fuseblocks

    1448 EA $1.35 $1,954.80 Terminals

    0 EA $400 $0.00 Digital Junction box

    0 EA $400 $0.00 Analog Junction Box

    0 EA $1,200 $0.00 PLC Cabinet

    0 EA $1,200 $0.00 24VDC Power Supply

    0 EA $500 $0.00 Power Supply components

    0 EA $1,000 $0.00 Power Supply Cabinet

    0 EA $1,000 $0.00 Cabinet Air Condistioner

    $2,860

    66 Instrument Air Users 10 Ft. (Average length of drop Per U ser)

    660 FT $2.20 $1,452 1/2" Pipe, Stl, Galv, Sch 40

    132 EA $0.40 $53 1/2" NPT, TE E, Iron, Galv, 150#

    66 EA $0.50 $33 1/2" NPT, P lug, Iron, Galv, 150#

    66 EA $0.58 $38 Hanger, Pipe, A dj.Clevis, 1/2", Grinnel Fig.260

    66 FT $0.15 $10 Rod, con't. Thd, Stl, Zinc-Coated

    66 EA $0.35 $23 1/2" NPT, Elbow, 90 Deg, Iron, Galv, 150#

    132 EA $0.02 $3 Nut, heavy Hex, Stl

    33 EA $0.50 $17 Clamp, Adj. Beam, 3/8"

    66 EA $0.50 $33 Bushing, Pipe, Iron, Galv, Scr, 150#, 1" x 1/2"

    $1,661

    BULK MATERIAL TAKEOFF WORKSHEET

    WIRE & CABLE CALCULATION TABLE

    TERMINATIONS, JUNCTION BOXES & CABINETS

    I&C PROJECT ESTIMATE - INSTRUMENT AIR PIPING

    Page 6 Of 12 102658848.xls.ms_office, Bulk Matl

  • 7/31/2019 File 1B AddisonPlasticsEstimate&Schedule

    7/12

    ARKANSAS ESTIMATE 7/6/2012 1:27 AM

    25.0% 101 Conduit Drops 10 Ft. (Avg drop Per User)

    FT $0.45 $113.63 3/4" ,RIGID STL CONDUIT

    3 EA $11.60 $34.80 3/4" ,OUTLET BODY, TYPE C27

    3 EA $12.60 $37.80 3/4" ,OUTLET BODY, TYPE T27

    3 EA $11.60 $34.80 3/4" ,OUTLET BODY, TYPE L27

    3 EA $4.25 $12.75 3/4" ,UNION,

    9 EA $1.00 $9.00 COVERS & GASKETS

    26 EA $0.97 $25.22 CONDUIT CLAMP, TYPE RC-3/4

    FT $0.63 $79.54 1" ,RIGID STL CO NDUIT

    1 EA $14.76 $18.63 1" ,OUTLET BODY, TYPE C37

    1 EA $15.52 $19.59 1" ,OUTLET BODY, TYPE T37

    1 EA $14.76 $18.63 1" ,OUTLET BODY, TYPE L37

    1 EA $7.62 $9.62 1" ,UNION,

    4 EA $1.00 $3.79 COVERS & GASKETS

    13 EA $1.07 $13.51 CONDUIT CLAMP, TYPE RC-1

    FT $0.93 $58.71 11/2",RIGID STL CO NDUIT

    1 EA $49.55 $31.28 11/2",OUTLET BODY TYPE GUAC59

    1 EA $54.37 $34.32 11/2",OUTLET BODY TYPE GUAT59

    1 EA $49.55 $31.28 11/2",OUTLET BODY TYPE GUAN59

    1 EA $12.60 $7.95 11/2",UNION,EXPLOSION PROOF ,UNF505

    2 EA $1.00 $1.89 COVERS & GASKETS

    6 EA $11.60 $73.23 CONDUIT CLAMP, TYPE RC-1-1/2

    EA $61.80 $6,241.80 FLEX CONDUIT, ECLK115

    0 ft $12.00 $0.00 CABLE TRAY

    $6,912

    75.0% 101 Conduit Drops 10 Ft. (Avg drop Per User)

    FT $0.45 $340.88 3/4" ,RIGID STL CONDUIT

    8 EA $11.60 $92.80 3/4" ,OUTLET BODY, TYPE GUAC26

    8 EA $12.60 $100.80 3/4" ,OUTLET BODY, TYPE GUAT26

    8 EA $11.60 $92.80 3/4" ,OUTLET BODY, TYPE GUAN26

    8 EA $4.25 $34.00 3/4" ,UNION,EXPLOSION PROOF U NF205

    4 EA $8.00 $32.00 CONDUIT SEAL TYPE EYS21 3/4"

    76 EA $0.97 $73.72 CONDUIT CLAMP, TYPE RC-3/4

    FT $0.63 $238.61 1" ,RIGID STL CO NDUIT

    4 EA $14.76 $55.90 1" ,OUTLET BODY, TYPE GUAC36

    4 EA $15.52 $58.78 1" ,OUTLET BODY, TYPE GUAT37

    4 EA $14.76 $55.90 1" ,OUTLET BODY, TYPE GUAN36

    4 EA $7.62 $28.86 1" ,UNION,EXPLOSION PROOF UNF305

    38 EA $1.07 $40.53 CONDUIT CLAMP, TYPE RC-1

    2 EA $10.00 $18.94 CONDUIT SEAL TYPE EYS21 1"

    FT $0.93 $176.12 11/2",RIGID STL CO NDUIT

    2 EA $49.55 $93.84 11/2",OUTLET BODY TYPE GUAC59

    2 EA $54.37 $102.96 11/2",OUTLET BODY TYPE GUAT59

    2 EA $49.55 $93.84 11/2",OUTLET BODY TYPE GUAN59

    2 EA $12.60 $23.86 11/2",UNION,EXPLOSION PROOF ,UNF505

    19 EA $11.60 $219.68 CONDUIT CLAMP, TYPE RC-1-1/2

    1 EA $28.00 $26.51 CONDUIT SEAL TYPE EYS21 11/2"

    EA $61.80 $6,241.80 FLEX CONDUIT, ECLK115

    0 ft $12.00 $0.00 CABLE TRAY

    $8,243

    Multiplier

    CONDUIT & FITTINGS - CLASS I DIV II

    CONDUIT & FITTINGS - GENERAL PURPOSE

    Multiplier

    Page 7 Of 12 102658848.xls.ms_office, Bulk Matl

  • 7/31/2019 File 1B AddisonPlasticsEstimate&Schedule

    8/12

    Task Budget Spread Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 WeekProject Kickoff Meeting(s) 6.0 0.0 6

    Travel Time: 3.0 0.0 3

    Site Walkdown / Investigation 16.0 0.0 16

    P&ID Dwgs [3]: 118.2 6.2 24 40 40 8

    Control System Spec [5]: 10.0 0.0 8 2

    Phase 2 Project Estimate [6]: 16.0 0.0 16

    Phase 2 Project Schedule [6]: 16.0 0.0 16

    Project Drawing List [7]: 33.3 5.3 16 12

    Develop I/O Configuration [12]: 12.7 0.7 12

    Instrument Database [13]: 38.0 0.0 24 2 12

    Site Plan [15]: 17.0 1.0 16

    Control Network Single-Line [16]: 24.0 0.0 8 16

    Preliminary Bill of Material [21,22]: 54.0 2.0 4 24 24

    Total Phase 1Manhours: 364 15 81 88 86 94 0 0 0 0 0 0 0PHASE TWO MANPOWER: 2.0 2.2 2.2 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0

    Task Budget Spread Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week

    Instrument Specifications [14]: 248.0 0.0 80 80 40 40

    Instrument Calculations [14]: 24.0 0.0 16 8

    Instrument Plan Dwgs [15]: 176.0 0.0 16 40 40 40 40

    Power Distribution Dwgs [17]: 52.0 0.0 40

    Instrument Loop Sheets [17]: 346.5 33.7 40 40 40 40 40 40

    Control Elementaries [17]: 137.5 0.0 16 40 40 40

    Control Panel Arrangements [18]: 100.0 0.0 24 40 32

    Field Junction Box Arrangements [18]: 52.0 0.0 24 24

    Marshalling Panel Arrangements [18]: 25.0 0.0 24Instrument Installation Details [19]: 18.0 0.0

    Field Junction Box Wiring Dwgs [20]: 100.0 0.0 40

    Marshalling Panel Connections[20]: 25.0 0.0

    Final Bill of Material [21,22]: 123.0 0.0 40 40

    Design Package Squad Check [23]: 142.7 2.7

    Issue for Construction [24]: 39.6 -0.4

    O&M Manual: 56.0 0.0

    Total Phase 2 Manhours: 1665 36 0 0 0 0 80 176 176 168 184 208 152 1

    Phase 2 Engrg Manpower: 0.0 0.0 0.0 0.0 2.0 4.4 4.4 4.2 4.6 5.2 3.8

    Task Budget Spread Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week

    Construction Support: 112.0 4.0

    Operations Training: 12.0 0.0

    Maintenance Training: 12.0 0.0

    Construction Management: 0.0 0.0

    Checkout: 63.0 0.0

    Startup: 72.0 0.0

    Travel Time (En-Route): 18.0 0.0

    Construction "Red-Lines": 64.4 2.3

    Packaging for 'Issue for Record' 39.6 1.6

    Total Phase 3 Engrg Manhours: 393 8 0 0 0 0 0 0 0 0 0 0 0

    Phase 3 Engrg Manpower: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

    Kickoff Meeting 32.0 0.0

    Craft 1 260.0 20.0

    Craft 2 420.0 60.0

    Craft 3 680.0 0.0Checkout: 406.0 14.0

    Startup: 174.0 0.0

    Travel Time (En-Route): 0.0 0.0

    Cleanup 290.0 0.0

    Total Phase 3 Construction Manhours: 2262 94 0 0 0 0 0 0 0 0 0 0 0

    Phase 3 Construction Manpower: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

    Staff Allocation:

    Staff Allocation:

    Staff Allocation:

    PROJECT ENGINEERING SCHEDULE - PHASE ONE

    PROJECT ENGINEERING SCHEDULE - PHASE TWO

    PROJECT SCHEDULE - PHASE THREE

    Staff Allocation:

    P1 P1 P2

  • 7/31/2019 File 1B AddisonPlasticsEstimate&Schedule

    9/12

    Manhours per Unit of Time: 40 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Wee

    Task Budget Start Finish Duration Resource 1 2 3 4 5 6 7 8 9

    Project Kickoff Meeting(s) 6.0 1 1 1 0.2 1

    Travel Time: 3.0 1 1 1 0.1 1

    Site Walkdown / Investigation 16.0 1 1 1 0.4 1

    P&ID Dwgs [3]: 118.2 1 4 4 0.7 1 2 3 4

    Control System Spec [5]: 10.0 2 4 3 0.1 2 4

    Phase 2 Project Estimate [6]: 16.0 4 4 1 0.4 4Phase 2 Project Schedule [6]: 16.0 4 4 1 0.4 4

    Project Drawing List [7] : 33.3 1 2 2 0.4 1 2

    Develop I/O Configuration [12]: 12.7 3 3 1 0.3 3

    Instrument Database [13]: 38.0 2 4 3 0.3 2 3 4

    Site Plan [15]: 17.0 1 1 1 0.4 1

    Control Network Single-Line [16]: 24.0 3 4 2 0.3 3 4

    Preliminary Bill of Material [21,22]: 54.0 2 4 3 0.5 2 3 4

    Task Budget Start Finish Duration Resource 1 2 3 4 5 6 7 8 9

    Instrument Specifications [14]: 248.0 5 8 4 1.6 5 6 7 8

    Instrument Calculat ions [14]: 24.0 7 8 2 0.3 7 8

    Instrument Plan Dwgs [15]: 176.0 6 10 5 0.9 6 7 8 9

    Power Distribut ion Dwgs [17]: 52.0 9 14 6 0.2 9

    Instrument Loop Sheets [17]: 346.5 6 14 9 1.0 6 7 8 9

    Control Elementaries [17]: 137.5 6 14 9 0.4 6 7 8 9

    Control Panel Arrangements [18]: 100.0 9 14 6 0.4 9

    Field Junction Box Arrangements [18]: 52.0 15 14 6

    Marshalling Panel Arrangements [18]: 25.0 0 0 - -

    Instrument Installation Details [19]: 18.0 - -

    Field Junction Box Wiring Dwgs [20]: 100.0 11 13 3 0.8

    Marshalling Panel Connections[20]: 25.0 12 14 3 0.2

    Final Bill of Material [21,22]: 123.0 10 14 5 0.6

    Design Package Squad Check [23]: 142.7 13 14 2 1.8

    Issue for Construction [24]: 39.6 14 14 1 1.0

    O&M Manual: 56.0 14 14 1 1.4

    Task Budget Start Finish Duration Resource 1 2 3 4 5 6 7 8 9

    Construct ion Support: 112.0 14 22 9 0.3

    Operations Training: 12.0 19 19 1 0.3

    Maintenance Training: 12.0 19 19 1 0.3

    Construction Management: 0.0 - -

    Checkout: 63.0 20 20 1 1.6

    Startup: 72.0 21 21 1 1.8

    Travel Time (En-Route) : 18.0 20 21 2 0.2

    Construction "Red-Lines": 64.4 22 22 1 1.6

    Packaging for 'Issue for Record' 39.6 22 22 1 1.0

    Kickoff Meeting 32.0 15 15 1 0.8

    Craft 1 260.0 16 17 2 3.3

    Craft 2 420.0 17 19 3 3.5

    Craft 3 680.0 17 21 5 3.4

    Checkout: 406.0 20 20 1 10.2

    Startup: 174.0 21 21 1 4.4

    Travel Time (En-Route): 0.0 - -

    Cleanup 290.0 22 22 1 7.3

    PROJECT ENGINEERING SCHEDULE - P

    PROJECT ENGINEERING SCHEDULE - P

    PROJECT SCHEDULE - PHASE TH

    Units from "Schedule" Worksheeet:

    P1 P1 P2

  • 7/31/2019 File 1B AddisonPlasticsEstimate&Schedule

    10/12

    0

    100

    200

    300

    400

    500

    600

    700

    Week1

    Week2

    Week3

    Week4

    Week5

    Week6

    Week7

    Week8

    Week9

    Week10

    Week11

    Week12

    Week13

    Week14

    Week15

    Week16

    Week17

    Week18

    MANHOURS

    WEEKS

    PROJECT MANHOUR LOADING CHART

    Phase 1 Engr Phase 2 Engr Phase 3 Engr Phase 3 C

  • 7/31/2019 File 1B AddisonPlasticsEstimate&Schedule

    11/12

    Week19

    Week20

    Week21

    Week22

    onstr

  • 7/31/2019 File 1B AddisonPlasticsEstimate&Schedule

    12/12

    Period

    %Comp

    1.0%

    Member#1

    Member#2

    Member#3

    Member#4

    Member#5

    Member#6

    Member#7

    Member#8

    M e m b e r # 9

    Task Budget Spent Remain Week 1 40.0 14.0 - 17.0 2.5 - - -

    Project Kickoff Meeting(s) 6.0 3.3 2.7 3.3 3.3 0.8 - - - 2.5 - - -

    Travel Time: 3.0 0.8 2.2 0.8 0.8 0.8 - - - - - - -Site Walkdown / Investigation 16.0 4.0 12.0 4.0 4.0 4.0 - - - - - - -

    P&ID Dwgs [3]: 118.2 18.3 99.9 18.3 18.3 4.0 12.6 - 1.7 - - - -

    Control System Spec [5]: 10.0 4.0 6.0 4.0 4.0 4.0 - - - - - - -

    Phase 2 Project Estimate [6]: 16.0 4.0 12.0 4.0 4.0 4.0 - - - - - - -

    Phase 2 Project Schedule [6]: 16.0 4.0 12.0 4.0 4.0 4.0 - - - - - - -

    Project Drawing List [7]: 33.3 18.7 14.6 18.7 18.7 2.0 1.4 - 15.3 - - - -

    Develop I/O Configuration [12]: 12.7 2.0 10.7 2.0 2.0 2.0 - - - - - - -

    Instrument Database [13]: 38.0 2.0 36.0 2.0 2.0 2.0 - - - - - - -

    Site Plan [15]: 17.0 2.0 15.0 2.0 2.0 2.0 - - - - - - -

    Control Network Single-Line [16]: 24.0 2.0 22.0 2.0 2.0 2.0 - - - - - - -

    Preliminary Bill of Material [21,22]: 54.0 2.4 51.6 2.4 2.4 2.4 - - - - - - -

    Instrument Specifications [14]: 248.0 4.0 244.0 4.0 4.0 4.0 - - - - - - -

    Instrument Calculations [14]: 24.0 2.0 22.0 2.0 2.0 2.0 - - - - - - -

    Instrument Plan Dwgs [15]: 176.0 - 176.0 - 0.0 - - - - - - - -Power Distribution Dwgs [17]: 52.0 - 52.0 - 0.0 - - - - - - - -

    Instrument Loop Sheets [17]: 346.5 - 346.5 - 0.0 - - - - - - - -

    Control Elementaries [17]: 137.5 - 137.5 - 0.0 - - - - - - - -

    Control Panel Arrangements [18]: 100.0 - 100.0 - 0.0 - - - - - - - -

    Field Junction Box Arrangements [18]: 52.0 - 52.0 - 0.0 - - - - - - - -

    Marshalling Panel Arrangements [18]: 25.0 - 25.0 - 0.0 - - - - - - - -

    Instrument Installation Details [19]: 18.0 - 18.0 - 0.0 - - - - - - - -

    Field Junction Box Wiring Dwgs [20]: 100.0 - 100.0 - 0.0 - - - - - - - -

    Marshalling Panel Connections[20]: 25.0 - 25.0 - 0.0 - - - - - - - -

    Final Bill of Material [21,22]: 123.0 - 123.0 - 0.0 - - - - - - - -

    Design Package Squad Check [23]: 142.7 - 142.7 - 0.0 - - - - - - - -

    Issue for Construction [24]: 39.6 - 39.6 - 0.0 - - - - - - - -

    O&M Manual: 56.0 - 56.0 - 0.0 - - - - - - - -

    Construction Support: 112.0 - 112.0 - 0.0 - - - - - - - -Operations Training: 12.0 - 12.0 - 0.0 - - - - - - - -

    Maintenance Training: 12.0 - 12.0 - 0.0 - - - - - - - -

    Construction Management: 0.0 - - - 0.0 - - - - - - - -

    Checkout: 63.0 - 63.0 - 0.0 - - - - - - - -

    Startup: 72.0 - 72.0 - 0.0 - - - - - - - -

    Travel Time (En-Route): 18.0 - 18.0 - 0.0 - - - - - - - -

    Construction "Red-Lines": 64.4 - 64.4 - 0.0 - - - - - - - -

    Packaging for 'Issue for Record' 39.6 - 39.6 - 0.0 - - - - - - - -

    Kickoff Meeting 32.0 - 32.0 - 0.0 - - - - - - - -

    Craft 1 260.0 - 260.0 - 0.0 - - - - - - - -

    Craft 2 420.0 - 420.0 - 0.0 - - - - - - - -

    Craft 3 680.0 - 680.0 - 0.0 - - - - - - - -

    Checkout: 406.0 - 406.0 - 0.0 - - - - - - - -

    Startup: 174.0 - 174.0 - 0.0 - - - - - - - -

    Travel Time (En-Route): 0.0 - - - 0.0 - - - - - - - -

    Cleanup 290.0 - 290.0 - 0.0 - - - - - - - -

    Total Hours: 4684.4 73.5 4610.9 73.5 # 73.5 40.0 14.0 0.0 17.0 2.5 0.0 0.0 0.0

    47

    74

    27 Behind Schedule!

    To capture each week's expenditures after the times have been

    entered, simply insert a new column to the left of Column G. Then

    "Select" the entire data range in the "Current" column "H". Once the

    entire row is selected, press "Ctrl-C" to copy all the data. Then select

    the top data cell in the new column. Once it is highlighted, with your

    cursor over the highlighted cell, right-click the mouse and select "Paste

    Special". Then select "Values". The current data will be copied as

    data, not as links, and the current week's expenditures will thus be

    saved.

    Hours Deviation

    "Earned" Hours:

    "Actual" Hours:

    "Deviation" Hours:

    In Row 5, Enter the Number of Manhours Charged to the Project for this tim

    Current

    1.0%

    Current

    %Comp

    DISCIPLINE TEAM WEEKLY MANHOURS - PHASE ONE