Page 1: File 1C BlankEstimate&Schedule

INSTRUMENT & CONTROL SYSTEMS DESIGN PRIMER - PROJECT ESTIMATE

Customer: Charge No:Project: Design TeamCP No. Revision:

WBS No. Date:Location: By:

REF DWGS

SCOPE OF THIS ESTIMATE :1) SCOPE OF THIS ESTIMATE :1)

ASSUMPTIONS: 1) ASSUMPTIONS: 1)

NOTES AND COMMENTS: 1) NOTES AND COMMENTS: 1)

Page 2: File 1C BlankEstimate&Schedule

INSTRUMENT & CONTROL SYSTEMS DESIGN PRIMER - PROJECT ESTIMATE

SCOPE OF THIS ESTIMATE :1) SCOPE OF THIS ESTIMATE :1)

ASSUMPTIONS: 1) ASSUMPTIONS: 1)

NOTES AND COMMENTS: 1) NOTES AND COMMENTS: 1)

NOTES:Start with this page. Fill out the header portions and make sure all that information appears on the subsequent worksheets.

NOTES:Start with this page. Fill out the header portions and make sure all that information appears on the subsequent worksheets.

Page 3: File 1C BlankEstimate&Schedule

NOTES:Start with this page. Fill out the header portions and make sure all that information appears on the subsequent worksheets.

NOTES:Start with this page. Fill out the header portions and make sure all that information appears on the subsequent worksheets.

Page 4: File 1C BlankEstimate&Schedule

INSTRUMENT CONTROLS DESIGN PRIMEREXECUTIVE SUMMARY WORKSHEET

04/07/2023 21:35:17

PROJECT COST SUMMARY SHEETCustomer: 0 Charge No: 0.000

Project: 0 Design Team 0.000CP No. 0 Revision: 0.000

WBS No. 0 Date: 0.000Location: 0 By: 0.000

ENGINEERING COST SUMMARYENGINEERING DETAIL Mhrs AVG RATE Cost TOTAL

Engineering - $90 $ -

$ - Design - $70 $ -

CADD & Clerical - $50 $ -

Engineering - $90 $ -

$ - Design - $70 $ -

CADD & Clerical - $50 $ -

Engineering - $90 $ -

$ - Design - $70 $ -

CADD & Clerical - $50 $ -

- $ -

PROJECT COST SUMMARY PHASE 1 DELIVERABLES SUMMARYCATEGORY AVG RATE COST Project Kickoff Meeting(s) - Meetings ENGINEERING NA $ - Travel Time: - Events

CONSTRUCTION $38 $ - Site Walkdown / Investigation - Days INSTRUMENTS NA $ - P&ID Dwgs [3]: - Drawings

MATERIAL NA $ - Control System Spec [5]: - Task PROJECTED COST: $ - Phase 2 Project Estimate [6]: - Each

Phase 2 Project Schedule [6]: - Each INSTRUMENT SUMMARY Project Drawing List [7]: - Records

Develop I/O Configuration [12]: - I/O Points Item Total: 0 Instrument Database [13]: - Records

Instrument Cost: $ - Site Plan [15]: - Drawings Installation Hardware Cost: $ - Control Network Single-Line [16]: - Drawings

Preliminary Bill of Material [21,22]: - Tasks I/O SUMMARY PHASE 2 DELIVERABLES SUMMARY

I/O TYPE COUNT Instrument Specifications [14]: - Each

Analog mv I/OAI 0 Instrument Calculations [14]: - Each AO 0 Instrument Plan Dwgs [15]: - Drawings

Analog mA I/OAI 0 Power Distribution Dwgs [17]: - Drawings AO 0 Instrument Loop Sheets [17]: - Drawings

ThermocouplesTCK 0 Control Elementaries [17]: - Drawings TCJ 0 Control Panel Arrangments [18]: - Drawings TC_ 0 eld Junction Box Arrangements [18]: - Drawings

RTD'sCU 0 rshalling Panel Arrangements [18]: - Drawings PL 0 Instrument Installation Details [19]: - Drawings

24vdc DiscreteDI 0 ield Junction Box Wiring Dwgs [20]: - Drawings DO 0 Marshalling Panel Connections[20]: - Drawings

110vac DiscreteDI 0 Final Bill of Material [21,22]: - Tasks DO 0 Design Package Squad Check [23]: - Each

Total: 0 Issue for Construction [24]: - Documents

PhaseOne

Projection

PhaseTwo

Projection

PhaseThree

Projection

Page 5: File 1C BlankEstimate&Schedule

INSTRUMENTATION CONTROLSDESIGN PRIMER INSTRUMENT TAKEOFF WORKSHEET

04/07/2023 21:35:17

Page 5 of 14

INSTRUMENT & CONTROL SYSTEMS DESIGN PRIMER - PROJECT ESTIMATECustomer: 0 Charge No: 0

Project: 0 Design Team 0CP No. 0 Revision: 0

WBS No. 0 Date: 0Location: 0 By: 0

DEVICE DATA INSTALLATION COST I/O ASSIGNMENT INDEX I/O CALCULATOR FIELD MATERIAL

QTY U/I DEVICE DESCRIPTIONmv 4-20Ma Thermocouple RTD 24vdc 110vac mv 4-20Ma Thermocouple RTD 24vdc 110vac Raw Data Calculated

AI AO AI AO TCK TCJ TC_ CU PL DI DO DI DO AI AO AI AO TCK TCJ TC_ CU PL DI DO DI DO Conduit Tube ConduitEA Analyzer $ - $ 50 $ - 1 1 - - - - - - - - - - - - - 1 1 - EA Analyzer, Oxygen $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 1 - EA Analyzer, pH $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Arrestor, Flame $ - $ - - EA Assembly, Bubbler Well Pipe $ - $ 25 $ - - EA Controller, PID, Panel Mnt $ - $ 10 $ - 1 - EA Glass, Flow $ - $ 10 $ - - EA Glass, Level $ - $ 10 $ - - EA Indicator, Digital $ - $ 10 $ - 1 - EA Indicator, Gauge $ - $ 10 $ - 1 - EA Meter, Purge $ - $ 10 $ - 1 - EA Motor, Fixed Spd w/ HOA $ - $ 50 $ - 1 1 - - - - - - - - - - - - - 1 - EA Motor, VSD w/ Tach & HOA $ - $ 50 $ - 1 1 1 1 - - - - - - - - - - - - - 1 - EA Orifice, Restriction $ - $ 10 $ - - EA Regulator, Pressure $ - $ 10 $ - - EA Relay $ - $ 10 $ - - EA Relay, Interposing $ - $ 10 $ - - EA Relay, Timer $ - $ 10 $ - - EA Rotameter $ - $ 10 $ - 1 - EA RTD $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Rupture Disk $ - $ 10 $ - - EA Switch, Flow $ - $ 50 $ - - - - - - - - - - - - - - 1 - EA Switch, Level, Capacitance $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Switch, Level, Tuning Fork $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Switch, Position $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Switch, Pressure $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Switch, Selector $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Switch, Temp $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Switch, Vibration $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Totalizer $ - $ 10 $ - 1 - EA Transmitter, Conductivity $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Transmitter, Current $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Transmitter, Flow (Mag) $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Transmitter, Flow (Mass) $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Transmitter, Level, DP Bubbler $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Transmitter, Level, Usonic $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 -

- EA Transmitter, Pressure $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Transmitter, Pressure Diff $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Transmitter, Speed $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Transmitter, Temp $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Valve, On/ Off W/ Limit Sw $ - $ 50 $ - 2 1 - - - - - - - - - - - - - 1 1 - EA Valve, Pressure Relief $ - $ 10 $ - - - - - - - - - - - - - EA Valve, Solenoid $ - $ 15 $ - 1 - - - - - - - - - - - - - 1 1 - EA Valve, Throttling $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 1 - EA Vent, Conservation $ - $ 10 $ - - - - - - - - - - - - - - EA Weigh Scale, Load Cell $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 - EA Weigh Scale, Platform $ - $ 50 $ - 1 - - - - - - - - - - - - - 1 -

EA Weigh Feeder System (Vendor) $ - $ 150 $ - 2 1 1 4 2 - - - - - - - - - - - - - 1 - Total

0 Items $ - $ - - - - - - - - - - - - - - - - AI AO AI AO TCK TCJ TC_ CU PL DI DO DI DO AI AO AI AO TCK TCJ TC_ CU PL DI DO DI DO Conduit

mv 4-20Ma Thermocouple RTD 24vdc 110vac mv 4-20Ma Thermocouple RTD 24vdc 110vac Total Drops

I/O ASSIGNMENT CHART I/O CALCULATOR

The I/O Assignment Index is where the User can adjust the I/O load to fit the equipment item. If vendor equipment - such as weigh feeders - arrive pre-engineered, there still may be a need to account for the I/O on that system as it is integrated into the plant control system...

The I/O Calculator uses the I/O Assignment Index as a factor against the numbere of devices selected in order to calculate the total number of I/O points needed for the system.

DEVICEPRICE

TOTALPRICE

HARDWAREPRICE

TOTALPRICE

NOTES:Enter the instrument quantity here, then get the latest prices for each instrument selected. Make sure the I/O Assignment Index is properly configured for your application.

NOTES:Enter the instrument quantity here, then get the latest prices for each instrument selected. Make sure the I/O Assignment Index is properly configured for your application.

AI12
Enter number of conduit drops needed.
AJ12
Enter number of tubes needed.
AK12
Total number of conduit drops needed.
F13
=B13*F13
H13
=B13*H13
E24
Order Switch Station Only
AK64
Total number of conduit drops needed.
Page 6: File 1C BlankEstimate&Schedule

INSTRUMENT CONTROLS DESIGN PRIMERESTIMATE WORKSHEET

04/07/2023 21:35:18

A1 B C D E F G H I J K L M N O2 BACKGROUND DATA I/O COUNT / SCHEMATIC CALCULATION SHEET3 Slots / Rack: 11 4 Racks / Cabinet: 4.0 Customer: 0 Charge No: 05 ArrngDwgs / Cabinet: 1.0 Project: 0 Design Team 06 ConnDwgs / Cabinet: 2.0 CP No. 0 Revision: 07 Total Racks: - WBS No. 0 Date: 08 Total Cabinets: - Location: 0 By: 09 Points / P&ID: 25.0

10 Points / Plan Dwg: 25.0 NOTE: Numbers in brackets "[]" indicate Project Deliverables discussed in the Projects chapter1112 I/O CONFIGURATION WORKSHEET13 % Spare: 15% PID Loops: 0

14 Type

1516

Analog mv I/OAI 0 0 8 0 $ 1,200 $ - 2 0 - 1 -

17 AO 0 0 8 0 $ 1,200 $ - 2 0 - 1 - 18

Analog mA I/OAI 0 0 16 0 $ 1,200 $ - 2 0 - 1 -

19 AO 0 0 16 0 $ 1,200 $ - 2 0 - 1 - 20

Thermocouples

TCK 0 0 16 0 $ 500 $ - 2 0 - 1 - 21 TCJ 0 0 8 0 $ 500 $ - 2 0 - 1 - 22 TC_ 0 0 8 0 $ 500 $ - 2 0 - 1 - 23

RTD'sCU 0 0 8 0 $ 800 $ - 2 0 - 1 -

24 PL 0 0 32 0 $ 800 $ - 2 0 - 0 - 25

24vdc DiscreteDI 0 0 16 0 $ 300 $ - 2 0 - 0 -

26 DO 0 0 16 0 $ 300 $ - 2 0 - 0 - 27

110vac DiscreteDI 0 0 8 0 $ 300 $ - 4 0 - 0 -

28 DO 0 0 8 0 $ 300 $ - 4 0 - 029 0 0 $ - - -

3031

RawPoints

TotalPoints

Pts Per Module

ModuleTotal

ModuleCost

TotalCost

ModulesPer Elem.

PointsPer Elem.

Elem.Dwgs

PointsPer Loop

LoopSheets

TotalPoints

TotalModules

TotalModuleCost:

TotalElem.Dwgs

TotalLoop Sheets

H4
=Cover!D4
H5
=Cover!D5
D7
=ROUNDUP(G30/D3,0) Total Modules / Slots per Rack.
D8
=ROUNDUP(D7/D4,0) Racks / Racks per Cabinet
N13
Enter the number of PID loops anticipated...
C17
=Devices!X13
D17
=Devices!X$64
E17
=ROUNDUP(D18+(D18*C$13),0) Add spare percentage to fetched Raw Points data, and round the result up...
F17
Enter the "Module Point Density" for the particular module type being used.
G17
=ROUNDUP(E17/F17,0)
H17
Enter the estimated module cost.
I17
=H17*G17
J17
If the I/O wiring is to be shown by module on an elementary-style drawing, enter the number of modules that will appear on a single elementary.
K17
If the I/O wiring is to be shown point-by-point on an elementary-style drawing, enter the estimated point-density per drawing.
L17
=IF(SUM(J17+K17)=0,"-",IF(AND((J17>0),(K17>0)),"One Only!",IF(K17=0,(G17/J17),(E17/K17)))) If neither elementary field has data, put a dash in the cell and do not do a calculation. Otherwise, test to see which both are non-zero. If so, display a warning. If one has data and the other doesn't, test to see which column is non-zero, then calculate the number of drawings based on the value.
M17
If the I/O wiring is to be shown on a Loop Sheet -style drawing, enter the estimated point-density per drawing.
N17
=IF(M17=0,"-",D17/M17) This equation prevents divide-by-zero errors. If the "Points Per Loop" value is zero, then a "dash" is displayed. Else, the number of points is divided by the number of points-per-loop sheet, and the results displayed.
N29
The number of Loop Sheets "X" can be approximated by the equation "X=(A+B)-C" where "A" is the number of analog inputs, "B" is the number of analog outputs, and "C" is the number of PID Loops. Loop sheets that show a complete PID loop have both an analog input and output, which will reduce the total number of loops.
Page 7: File 1C BlankEstimate&Schedule

INSTRUMENT CONTROLS DESIGN PRIMERESTIMATE WORKSHEET

04/07/2023 21:35:18

A1 B C D E F G H I J K L M N O2 PROJECT LABOR CALCULATION SHEET34 Customer: 0 Charge No: 05 Project: 0 Design Team 06 CP No. 0 Revision: 07 WBS No. 0 Date: 08 Location: 0 By: 09

10 NOTE: Numbers in brackets "[]" indicate Project Deliverables discussed in the Projects chapter111213 DESIGN DATA UNIT MANHOURS CALCULATED MANHOURS

TOTAL14 DESCRIPTION QTY UNITS MODIFIER ENGRG DESIGN CADD ENGRG DESIGN CADD

15 Project Kickoff Meeting(s) - Meetings 2.0 2.0 2.0 - - - - 16 Travel Time: - Events 1.0 1.0 1.0 - - - - 17 Site Walkdown / Investigation - Days 8.0 8.0 - - - - - 18 P&ID Dwgs [3]: - Drawings 4.0 2.0 8.0 - - - - 19 Control System Spec [5]: - Task 8.0 2.0 - - - - - 20 Phase 2 Project Estimate [6]: - Each 8.0 8.0 - - - - - 21 Phase 2 Project Schedule [6]: - Each 8.0 8.0 - - - - - 22 Project Drawing List [7]: - Records 0.0 0.1 0.2 - - - - 23 Develop I/O Configuration [12]: - I/O Points 0.01 0.05 0.00 - - - - 24 Instrument Database [13]: - Records 1.5 0.01 0.01 0.10 - - - - 25 Site Plan [15]: - Drawings 1.0 8.0 8.0 - - - - 26 Control Network Single-Line [16]: - Drawings 8.0 8.0 8.0 - - - - 27 Preliminary Bill of Material [21,22]: - Tasks 9.0 9.0 9.0 - - - - 28 Total: - - - - 293031 DESIGN DATA UNIT MANHOURS CALCULATED MANHOURS

TOTAL32 DESCRIPTION QTY UNITS MODIFIER ENGRG DESIGN CADD ENGRG DESIGN CADD

33 Instrument Specifications [14]: - Each 2.00 - - - - - - 34 Instrument Calculations [14]: - Each 2.00 - - - - - - 35 Instrument Plan Dwgs [15]: - Drawings 2.00 17.00 25.00 - - - - 36 Power Distribution Dwgs [17]: - Drawings 1.00 4.00 8.00 - - - - 37 Instrument Loop Sheets [17]: - Drawings 0.50 2.00 2.00 - - - - 38 Control Elementaries [17]: - Drawings 1.00 12.00 12.00 - - - - 39 Control Panel Arrangments [18]: - Drawings 1.00 8.00 16.00 - - - - 40 Field Junction Box Arrangements [18]: - Drawings 1.00 4.00 8.00 - - - - 41 Marshalling Panel Arrangements [18]: - Drawings 1.00 8.00 16.00 - - - - 42 Instrument Installation Details [19]: - Drawings 0.50 2.00 2.00 - - - - 43 Field Junction Box Wiring Dwgs [20]: - Drawings 1.00 8.00 16.00 - - - - 44 Marshalling Panel Connections[20]: - Drawings 1.00 8.00 16.00 - - - - 45 Final Bill of Material [21,22]: - Tasks 1.00 16.00 24.00 - - - - 46 Design Package Squad Check [23]: - Each 0.10 0.10 0.10 - - - - 47 Issue for Construction [24]: - Documents 0.01 0.05 0.10 - - - - 48 O&M Manual: - Task 40.00 8.00 8.00 - - - - 49 Total: - - - - 5051 INDIRECT ENGINEERING LABOR - PHASE TWO52 DESIGN DATA UNIT MANHOURS CALCULATED MANHOURS

TOTAL53 DESCRIPTION QTY UNITS MODIFIER ENGRG DESIGN CADD ENGRG DESIGN CADD

54 Supervision & Proj Mgmt: - Task 10% - - - - 55 Travel Time (En-Route): - Trips 2.00 4.00 - - - - - 56 Document Control: - Documents - - 0.50 - - - - 57 Attend Update Meetings: - Meetings 2.00 2.00 - - - - - 58 Prepare Status Reports: - Reports 2.00 - - - - - - 59 Total: - - - - 6061 ENGINEERING LABOR - PHASE THREE62 DESIGN DATA UNIT MANHOURS CALCULATED MANHOURS

TOTAL63 DESCRIPTION QTY UNITS MODIFIER ENGRG DESIGN CADD ENGRG DESIGN CADD

64 Construction Support: - Weeks 4.00 8.00 2.00 - - - - 65 Operations Training: - Class 2.00 8.00 2.00 - - - - 66 Maintenance Training: - Class 2.00 8.00 2.00 - - - - 67 Construction Management: - Weeks 4.00 40.00 2.00 - - - - 68 Checkout: - Days 1.00 8.00 - - - - - 69 Startup: - Days 12.00 12.00 - - - - - 70 Travel Time (En-Route): - Trips 2.00 4.00 - - - - - 71 Construction "Red-Lines": - Documents 10% 0.10 0.50 2.00 - - - - 72 Packaging for 'Issue for Record' - Documents 0.01 0.05 0.10 - - - - 73 Total: - - - - 7475 CONSTRUCTION LABOR - PHASE THREE76 DESIGN DATA UNIT MANHOURS CALCULATED MANHOURS

TOTAL77 DESCRIPTION QTY UNITS MODIFIER SUPV CRAFT CLERK ENGRG DESIGN CADD

78 Kickoff Meeting - Personnel 8.00 8.00 - - - - - 79 Craft 1 - Days 8.00 16.00 2.00 - - - - 80 Craft 2 - Days 8.00 16.00 4.00 - - - - 81 Craft 3 - Days 8.00 24.00 2.00 - - - - 82 Checkout: - Days 8.00 48.00 2.00 - - - - 83 Startup: - Task 8.00 48.00 2.00 - - - - 84 Travel Time (En-Route): - Trips 2.00 4.00 2.00 - - - - 85 Cleanup - Days 8.00 48.00 2.00 - - - - 86 - - - - 87 Total: - - - - 88

DIRECT ENGINEERING LABOR - PHASE ONE (INVESTIGATION)

DIRECT ENGINEERING LABOR - PHASE TWO (PRODUCTION)

H4
=Cover!D4
H5
=Cover!D5
B16
Project Transit Time is the billable time spent en-route to/from the site.
E22
Assume one record per drawing.
E24
Assume "x" records per I/O point, where "x" is the number in the "Modifier" block.
G24
Factor to apply to I/O count to approximate the size of the Instrument database.
G54
Enter the percentage of the job to set aside for this task
Page 8: File 1C BlankEstimate&Schedule

ARKANSAS ESTIMATE 04/07/2023 21:35:18

Page 8 Of 14 document.xls, Bulk Matl

BULK MATERIAL TAKEOFF WORKSHEET COST SUMMARY

Customer: 0 Charge No: 0 CABLE $0.00

Project: 0 Design Team 0 CABINET $0.00

CP No. 0 Revision: 0 CONDUIT $0.00

WBS No. 0 Date: 0 TUBING / DETAILS $0.00

Location: 0 By: 0 INSTR. AIR PIPING $0.00

GRAND TOTAL: $0.00

CONSTRUCTION LABOR DATA 75%0 Wiring Terminations0 Tubing Terminations0 Conduit Terminations

WIRE & CABLE CALCULATION TABLE0 FT Avg Homerun Dist 0 FT Average Local Run Distance

UNIT TOTALQTY. U/M PRICE PRICE DESCRIPTION STOCK NUMBER SOURCE

13 0 FT $0.39 $0.00 3/C #18 AWG UNSHLD CABLE, 300V0 FT $0.35 $0.00 2/C #18 AWG SHLD CABLE, 300V0 FT $0.30 $0.00 2/C #16 AWG UNSH CABLE, 300V0 FT $0.12 $0.00 1/c #16, 600V, Hookup Wire 0 FT $1.45 $0.00 24twpr #18, Unsh for Digital Ckt Homeruns0 FT $1.25 $0.00 16twpr #18, Indiv Shld for Analog Ckt Homeruns0 FT $1.25 $0.00 4-triad, Indiv Shld for RTD Ckt Homeruns0 FT $1.00 $0.00 2/C Thermocouple Extension Wire0 FT $0.60 $0.00 Network Communications Cable

SUB TOTAL $0

TERMINATIONS, JUNCTION BOXES & CABINETS0 Electrical Devices 50% Percentage of Devices Needing Fuses 8 AverageTerminals per Device

UNIT TOTALQTY. U/M PRICE PRICE DESCRIPTION STOCK NUMBER SOURCE

0 EA $5.00 $0.00 Fuseblocks0 EA $1.35 $0.00 Terminals0 EA $400 $0.00 Digital Junction box0 EA $400 $0.00 Analog Junction Box0 EA $1,200 $0.00 PLC Cabinet0 EA $1,200 $0.00 24VDC Power Supply0 EA $500 $0.00 Power Supply components 0 EA $1,000 $0.00 Power Supply Cabinet 0 EA $1,000 $0.00 Cabinet Air Condistioner

SUB TOTAL $0

I&C PROJECT ESTIMATE - INSTRUMENT AIR PIPING0 Instrument Air Users 10 Ft. (Average length of drop Per User)

UNIT TOTALQTY. U/M PRICE PRICE DESCRIPTION STOCK NUMBER SOURCE

0 FT $2.20 $0 1/2" Pipe, Stl, Galv, Sch 400 EA $0.40 $0 1/2" NPT, TEE, Iron, Galv, 150#0 EA $0.50 $0 1/2" NPT, Plug, Iron, Galv, 150#0 EA $0.58 $0 Hanger, Pipe, Adj.Clevis, 1/2", Grinnel Fig.2600 FT $0.15 $0 Rod, con't. Thd, Stl, Zinc-Coated0 EA $0.35 $0 1/2" NPT, Elbow, 90 Deg, Iron, Galv, 150#0 EA $0.02 $0 Nut, heavy Hex, Stl0 EA $0.50 $0 Clamp, Adj. Beam, 3/8"0 EA $0.50 $0 Bushing, Pipe, Iron, Galv, Scr, 150#, 1" x 1/2"

SUB TOTAL $0

Are there hazardous areas? If so, what percentage of the equipment will be in hazardous

locations?

C3
=Cover!D4
C4
=Cover!D5
B21
Enter the amount of inra-panel hookup wire that is likely to be needed.
B26
Enter the amount of communications cable that will be needed.
G31
Enter the average number of terminals per device. Include all field terminals that will need to be purchased.
Page 9: File 1C BlankEstimate&Schedule

ARKANSAS ESTIMATE 04/07/2023 21:35:18

Page 9 Of 14 document.xls, Bulk Matl

CONDUIT & FITTINGS - GENERAL PURPOSE25.0% Multiplier 0 Conduit Drops 10 Ft. (Avg drop Per User)

UNIT TOTALQTY. U/M PRICE PRICE DESCRIPTION STOCK NUMBER SOURCE

0 FT $0.45 $0.00 3/4" ,RIGID STL CONDUIT0 EA $11.60 $0.00 3/4" ,OUTLET BODY, TYPE C270 EA $12.60 $0.00 3/4" ,OUTLET BODY, TYPE T270 EA $11.60 $0.00 3/4" ,OUTLET BODY, TYPE L270 EA $4.25 $0.00 3/4" ,UNION,0 EA $1.00 $0.00 COVERS & GASKETS0 EA $0.97 $0.00 CONDIUT CLAMP, TYPE RC-3/40 FT $0.63 $0.00 1" ,RIGID STL CONDUIT0 EA $14.76 $0.00 1" ,OUTLET BODY, TYPE C370 EA $15.52 $0.00 1" ,OUTLET BODY, TYPE T370 EA $14.76 $0.00 1" ,OUTLET BODY, TYPE L370 EA $7.62 $0.00 1" ,UNION,0 EA $1.00 $0.00 COVERS & GASKETS0 EA $1.07 $0.00 CONDIUT CLAMP, TYPE RC-10 FT $0.93 $0.00 11/2",RIGID STL CONDUIT0 EA $49.55 $0.00 11/2",OUTLET BODY TYPE GUAC590 EA $54.37 $0.00 11/2",OUTLET BODY TYPE GUAT590 EA $49.55 $0.00 11/2",OUTLET BODY TYPE GUAN590 EA $12.60 $0.00 11/2",UNION,EXPLOSION PROOF ,UNF5050 EA $1.00 $0.00 COVERS & GASKETS0 EA $11.60 $0.00 CONDIUT CLAMP, TYPE RC-1-1/20 EA $61.80 $0.00 FLEX CONDUIT, ECLK1150 ft $12.00 $0.00 CABLE TRAY

SUB TOTAL $0

CONDUIT & FITTINGS - CLASS I DIV II75.0% Multiplier 0 Conduit Drops 10 Ft. (Avg drop Per User)

UNIT TOTALQTY. U/M PRICE PRICE DESCRIPTION STOCK NUMBER SOURCE

0 FT $0.45 $0.00 3/4" ,RIGID STL CONDUIT0 EA $11.60 $0.00 3/4" ,OUTLET BODY, TYPE GUAC260 EA $12.60 $0.00 3/4" ,OUTLET BODY, TYPE GUAT260 EA $11.60 $0.00 3/4" ,OUTLET BODY, TYPE GUAN260 EA $4.25 $0.00 3/4" ,UNION,EXPLOSION PROOF UNF2050 EA $8.00 $0.00 CONDUIT SEAL TYPE EYS21 3/4"0 EA $0.97 $0.00 CONDIUT CLAMP, TYPE RC-3/40 FT $0.63 $0.00 1" ,RIGID STL CONDUIT0 EA $14.76 $0.00 1" ,OUTLET BODY, TYPE GUAC360 EA $15.52 $0.00 1" ,OUTLET BODY, TYPE GUAT370 EA $14.76 $0.00 1" ,OUTLET BODY, TYPE GUAN360 EA $7.62 $0.00 1" ,UNION,EXPLOSION PROOF UNF3050 EA $1.07 $0.00 CONDIUT CLAMP, TYPE RC-10 EA $10.00 $0.00 CONDUIT SEAL TYPE EYS21 1"0 FT $0.93 $0.00 11/2",RIGID STL CONDUIT0 EA $49.55 $0.00 11/2",OUTLET BODY TYPE GUAC590 EA $54.37 $0.00 11/2",OUTLET BODY TYPE GUAT590 EA $49.55 $0.00 11/2",OUTLET BODY TYPE GUAN590 EA $12.60 $0.00 11/2",UNION,EXPLOSION PROOF ,UNF5050 EA $11.60 $0.00 CONDIUT CLAMP, TYPE RC-1-1/20 EA $28.00 $0.00 CONDUIT SEAL TYPE EYS21 11/2"0 EA $61.80 $0.00 FLEX CONDUIT, ECLK1150 ft $12.00 $0.00 CABLE TRAY

SUB TOTAL $0

Page 10: File 1C BlankEstimate&Schedule

PROJECT ENGINEERING SCHEDULE - PHASE ONETask Budget Spread Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22

Project Kickoff Meeting(s) 0.0 0.0

Travel Time: 0.0 0.0

Site Walkdown / Investigation 0.0 0.0

P&ID Dwgs [3]: 0.0 0.0

Control System Spec [5]: 0.0 0.0

Phase 2 Project Estimate [6]: 0.0 0.0

Phase 2 Project Schedule [6]: 0.0 0.0

Project Drawing List [7]: 0.0 0.0

Develop I/O Configuration [12]: 0.0 0.0

Instrument Database [13]: 0.0 0.0

Site Plan [15]: 0.0 0.0

Control Network Single-Line [16]: 0.0 0.0

Preliminary Bill of Material [21,22]: 0.0 0.0

Total Phase 1Manhours: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

PHASE TWO MANPOWER: Staff Allocation: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

PROJECT ENGINEERING SCHEDULE - PHASE TWOTask Budget Spread Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22

Instrument Specifications [14]: 0.0 0.0

Instrument Calculations [14]: 0.0 0.0

Instrument Plan Dwgs [15]: 0.0 0.0

Power Distribution Dwgs [17]: 0.0 0.0

Instrument Loop Sheets [17]: 0.0 0.0

Control Elementaries [17]: 0.0 0.0

Control Panel Arrangments [18]: 0.0 0.0

Field Junction Box Arrangements [18]: 0.0 0.0

Marshalling Panel Arrangements [18]: 0.0 0.0

Instrument Installation Details [19]: 0.0 0.0

Field Junction Box Wiring Dwgs [20]: 0.0 0.0

Marshalling Panel Connections[20]: 0.0 0.0

Final Bill of Material [21,22]: 0.0 0.0

Design Package Squad Check [23]: 0.0 0.0

Issue for Construction [24]: 0.0 0.0

O&M Manual: 0.0 0.0

Total Phase 2 Manhours: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Phase 2 Engrg Manpower: Staff Allocation: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

PROJECT SCHEDULE - PHASE THREETask Budget Spread Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22

Construction Support: 0.0 0.0

Operations Training: 0.0 0.0

Maintenance Training: 0.0 0.0

Construction Management: 0.0 0.0

Checkout: 0.0 0.0

Startup: 0.0 0.0

Travel Time (En-Route): 0.0 0.0

Construction "Red-Lines": 0.0 0.0

Packaging for 'Issue for Record' 0.0 0.0

Total Phase 3 Engrg Manhours: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Phase 3 Engrg Manpower: Staff Allocation: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Kickoff Meeting 0.0 0.0

Craft 1 0.0 0.0

Craft 2 0.0 0.0

Craft 3 0.0 0.0

Checkout: 0.0 0.0

Startup: 0.0 0.0

Travel Time (En-Route): 0.0 0.0

Cleanup 0.0 0.0

Total Phase 3 Construction Manhours: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Phase 3 Construction Manpower: Staff Allocation: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

P1 P1 P2 P2 P3 P3

E4
For all of these data cells, enter the number of hours you expect to spend per week.
Page 11: File 1C BlankEstimate&Schedule

PROJECT ENGINEERING SCHEDULE - PHASE ONEManhours per Unit of Time: 40 Units from "Schedule" Worksheeet: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22

Task Budget Start Finish Duration Resource 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22Project Kickoff Meeting(s) 0.0 - -

Travel Time: 0.0 - - Site Walkdown / Investigation 0.0 - -

P&ID Dwgs [3]: 0.0 - - Control System Spec [5]: 0.0 - -

Phase 2 Project Estimate [6]: 0.0 - - Phase 2 Project Schedule [6]: 0.0 - -

Project Drawing List [7]: 0.0 - - Develop I/O Configuration [12]: 0.0 - -

Instrument Database [13]: 0.0 - - Site Plan [15]: 0.0 - -

Control Network Single-Line [16]: 0.0 - -

Preliminary Bill of Material [21,22]: 0.0 - -

PROJECT ENGINEERING SCHEDULE - PHASE TWOTask Budget Start Finish Duration Resource 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Instrument Specifications [14]: 0.0 - - Instrument Calculations [14]: 0.0 - -

Instrument Plan Dwgs [15]: 0.0 - - Power Distribution Dwgs [17]: 0.0 - - Instrument Loop Sheets [17]: 0.0 - -

Control Elementaries [17]: 0.0 - - Control Panel Arrangments [18]: 0.0 - -

Field Junction Box Arrangements [18]: 0.0 - - Marshalling Panel Arrangements [18]: 0.0 - -

Instrument Installation Details [19]: 0.0 - - Field Junction Box Wiring Dwgs [20]: 0.0 - - Marshalling Panel Connections[20]: 0.0 - -

Final Bill of Material [21,22]: 0.0 - - Design Package Squad Check [23]: 0.0 - -

Issue for Construction [24]: 0.0 - -

O&M Manual: 0.0 - -

PROJECT SCHEDULE - PHASE THREETask Budget Start Finish Duration Resource 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Construction Support: 0.0 - - Operations Training: 0.0 - -

Maintenance Training: 0.0 - - Construction Management: 0.0 - -

Checkout: 0.0 - - Startup: 0.0 - -

Travel Time (En-Route): 0.0 - - Construction "Red-Lines": 0.0 - -

Packaging for 'Issue for Record' 0.0 - - Kickoff Meeting 0.0 - -

Craft 1 0.0 - - Craft 2 0.0 - - Craft 3 0.0 - -

Checkout: 0.0 - - Startup: 0.0 - -

Travel Time (En-Route): 0.0 - -

Cleanup 0.0 - -

P1 P1 P2 P2 P3 P3

Page 12: File 1C BlankEstimate&Schedule

Week 1

Week 2

Week 3

Week 4

Week 5

Week 6

Week 7

Week 8

Week 9

Week 10

Week 11

Week 12

Week 13

Week 14

Week 15

Week 16

Week 17

Week 18

Week 19

Week 20

Week 21

Week 22

0

1

1

PROJECT MANHOUR LOADING CHART

Phase 3 Constr Phase 3 Engr Phase 2 Engr Phase 1 EngrWEEKS

MA

NH

OU

RS

Page 13: File 1C BlankEstimate&Schedule

Week 1

Week 2

Week 3

Week 4

Week 5

Week 6

Week 7

Week 8

Week 9

Week 10

Week 11

Week 12

Week 13

Week 14

Week 15

Week 16

Week 17

Week 18

Week 19

Week 20

Week 21

Week 22

0

1

1

PROJECT MANHOUR LOADING CHART

Phase 3 Constr Phase 3 Engr Phase 2 Engr Phase 1 EngrWEEKS

MA

NH

OU

RS

Page 14: File 1C BlankEstimate&Schedule

DISCIPLINE TEAM WEEKLY MANHOURS - PHASE ONE DISCIPLINE TEAM TASK ASSIGNMENTS

In Row 5, Enter the Number of Manhours Charged to the Project for this time period

1.0% 1.0%

Me

mb

er

#1

Me

mb

er

#2

Me

mb

er

#3

Me

mb

er

#4

Me

mb

er

#5

Me

mb

er

#6

Me

mb

er

#7

Me

mb

er

#8

Me

mb

er

#9

Me

mb

er

#1

0

Me

mb

er

#1

Me

mb

er

#2

Me

mb

er

#3

Me

mb

er

#4

Me

mb

er

#5

Me

mb

er

#6

Me

mb

er

#7

Me

mb

er

#8

Me

mb

er

#9

Me

mb

er

#1

0

Task Budget Spent Remain Week 1 Current - - - - - - - - - - 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

Project Kickoff Meeting(s) 0.0 - - - 0.0 - - - - - - - - - -

Travel Time: 0.0 - - - 0.0 - - - - - - - - - -

Site Walkdown / Investigation 0.0 - - - 0.0 - - - - - - - - - -

P&ID Dwgs [3]: 0.0 - - - 0.0 - - - - - - - - - -

Control System Spec [5]: 0.0 - - - 0.0 - - - - - - - - - -

Phase 2 Project Estimate [6]: 0.0 - - - 0.0 - - - - - - - - - -

Phase 2 Project Schedule [6]: 0.0 - - - 0.0 - - - - - - - - - -

Project Drawing List [7]: 0.0 - - - 0.0 - - - - - - - - - -

Develop I/O Configuration [12]: 0.0 - - - 0.0 - - - - - - - - - -

Instrument Database [13]: 0.0 - - - 0.0 - - - - - - - - - -

Site Plan [15]: 0.0 - - - 0.0 - - - - - - - - - -

Control Network Single-Line [16]: 0.0 - - - 0.0 - - - - - - - - - -

Preliminary Bill of Material [21,22]: 0.0 - - - 0.0 - - - - - - - - - -

Instrument Specifications [14]: 0.0 - - - 0.0 - - - - - - - - - -

Instrument Calculations [14]: 0.0 - - - 0.0 - - - - - - - - - -

Instrument Plan Dwgs [15]: 0.0 - - - 0.0 - - - - - - - - - -

Power Distribution Dwgs [17]: 0.0 - - - 0.0 - - - - - - - - - -

Instrument Loop Sheets [17]: 0.0 - - - 0.0 - - - - - - - - - -

Control Elementaries [17]: 0.0 - - - 0.0 - - - - - - - - - -

Control Panel Arrangments [18]: 0.0 - - - 0.0 - - - - - - - - - -

Field Junction Box Arrangements [18]: 0.0 - - - 0.0 - - - - - - - - - -

Marshalling Panel Arrangements [18]: 0.0 - - - 0.0 - - - - - - - - - -

Instrument Installation Details [19]: 0.0 - - - 0.0 - - - - - - - - - -

Field Junction Box Wiring Dwgs [20]: 0.0 - - - 0.0 - - - - - - - - - -

Marshalling Panel Connections[20]: 0.0 - - - 0.0 - - - - - - - - - -

Final Bill of Material [21,22]: 0.0 - - - 0.0 - - - - - - - - - -

Design Package Squad Check [23]: 0.0 - - - 0.0 - - - - - - - - - -

Issue for Construction [24]: 0.0 - - - 0.0 - - - - - - - - - -

O&M Manual: 0.0 - - - 0.0 - - - - - - - - - -

Construction Support: 0.0 - - - 0.0 - - - - - - - - - -

Operations Training: 0.0 - - - 0.0 - - - - - - - - - -

Maintenance Training: 0.0 - - - 0.0 - - - - - - - - - -

Construction Management: 0.0 - - - 0.0 - - - - - - - - - -

Checkout: 0.0 - - - 0.0 - - - - - - - - - -

Startup: 0.0 - - - 0.0 - - - - - - - - - -

Travel Time (En-Route): 0.0 - - - 0.0 - - - - - - - - - -

Construction "Red-Lines": 0.0 - - - 0.0 - - - - - - - - - -

Packaging for 'Issue for Record' 0.0 - - - 0.0 - - - - - - - - - -

Kickoff Meeting 0.0 - - - 0.0 - - - - - - - - - -

Craft 1 0.0 - - - 0.0 - - - - - - - - - -

Craft 2 0.0 - - - 0.0 - - - - - - - - - -

Craft 3 0.0 - - - 0.0 - - - - - - - - - -

Checkout: 0.0 - - - 0.0 - - - - - - - - - -

Startup: 0.0 - - - 0.0 - - - - - - - - - -

Travel Time (En-Route): 0.0 - - - 0.0 - - - - - - - - - -

Cleanup 0.0 - - - 0.0 - - - - - - - - - -

Total Hours: 0.0 0.0 0.0 73.5### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Hours Deviation

"Earned" Hours: 0

"Actual" Hours: 0

"Deviation" Hours: 0 On Schedule

To capture each week's expenditures after the times have been entered, simply insert a new column to the left of Column G. Then "Select" the entire data range in the "Current" column "H". Once the entire row is selected, press "Ctrl-C" to copy all the data. Then select the top data cell in the new column. Once it is highlighted, with your cursor over the highlighted cell, right-click the mouse and select "Paste Special". Then select "Values". The current data will be copied as data, not as links, and the current week's expenditures will thus be saved.

Period%Comp

Current%Comp

In the Orange area, allocate the time by task for each Team Member. The time displayed on Row 5 should equal 100.0% when finished..

G4
Enter the current estimated % Complete value.
I5
Enter the number of hours charged to this project by this individual for this time period.
J5
Enter the number of hours charged to this project by this individual for this time period.
K5
Enter the number of hours charged to this project by this individual for this time period.
L5
Enter the number of hours charged to this project by this individual for this time period.
M5
Enter the number of hours charged to this project by this individual for this time period.
N5
Enter the number of hours charged to this project by this individual for this time period.
O5
Enter the number of hours charged to this project by this individual for this time period.
P5
Enter the number of hours charged to this project by this individual for this time period.
Q5
Enter the number of hours charged to this project by this individual for this time period.
R5
Enter the number of hours charged to this project by this individual for this time period.
S5
The number displayed here should either be zero (0.0%) or 100%. This is the sum of all the allocation values entered for this individual in the cells below.
T5
The number displayed here should either be zero (0.0%) or 100%. This is the sum of all the allocation values entered for this individual in the cells below.
U5
The number displayed here should either be zero (0.0%) or 100%. This is the sum of all the allocation values entered for this individual in the cells below.
V5
The number displayed here should either be zero (0.0%) or 100%. This is the sum of all the allocation values entered for this individual in the cells below.
W5
The number displayed here should either be zero (0.0%) or 100%. This is the sum of all the allocation values entered for this individual in the cells below.
X5
The number displayed here should either be zero (0.0%) or 100%. This is the sum of all the allocation values entered for this individual in the cells below.
Y5
The number displayed here should either be zero (0.0%) or 100%. This is the sum of all the allocation values entered for this individual in the cells below.
Z5
The number displayed here should either be zero (0.0%) or 100%. This is the sum of all the allocation values entered for this individual in the cells below.
AA5
The number displayed here should either be zero (0.0%) or 100%. This is the sum of all the allocation values entered for this individual in the cells below.
AB5
The number displayed here should either be zero (0.0%) or 100%. This is the sum of all the allocation values entered for this individual in the cells below.
S6
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T6
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U6
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V6
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W6
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X6
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y6
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z6
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA6
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB6
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S7
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T7
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U7
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V7
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W7
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X7
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y7
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z7
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA7
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB7
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S8
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T8
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U8
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V8
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W8
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X8
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y8
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z8
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA8
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB8
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S9
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T9
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U9
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V9
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W9
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X9
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y9
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z9
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA9
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB9
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S10
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T10
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U10
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V10
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W10
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X10
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y10
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z10
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA10
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB10
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S11
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T11
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U11
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V11
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W11
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X11
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y11
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z11
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA11
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB11
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S12
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T12
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U12
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V12
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W12
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X12
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y12
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z12
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA12
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB12
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S13
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T13
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U13
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V13
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W13
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X13
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y13
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z13
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA13
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB13
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S14
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T14
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U14
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V14
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W14
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X14
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y14
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z14
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA14
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB14
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S15
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T15
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U15
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V15
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W15
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X15
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y15
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z15
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA15
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB15
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S16
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T16
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U16
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V16
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W16
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X16
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y16
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z16
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA16
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB16
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S17
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T17
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U17
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V17
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W17
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X17
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y17
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z17
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA17
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB17
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S18
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T18
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U18
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V18
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W18
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X18
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y18
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z18
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA18
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB18
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S19
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T19
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U19
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V19
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W19
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X19
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y19
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z19
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA19
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB19
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S20
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T20
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U20
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V20
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W20
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X20
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y20
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z20
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA20
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB20
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S21
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T21
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U21
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V21
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W21
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X21
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y21
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z21
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA21
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB21
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S22
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T22
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U22
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V22
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W22
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X22
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y22
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z22
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA22
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB22
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S23
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T23
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U23
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V23
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W23
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X23
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y23
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z23
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA23
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB23
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S24
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T24
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U24
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V24
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W24
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X24
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y24
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z24
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA24
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB24
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S25
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T25
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U25
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V25
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W25
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X25
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y25
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z25
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA25
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB25
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S26
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T26
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U26
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V26
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W26
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X26
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y26
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z26
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA26
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB26
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S27
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T27
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U27
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V27
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W27
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X27
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y27
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z27
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA27
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB27
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S28
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T28
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U28
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V28
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W28
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X28
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y28
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z28
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA28
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB28
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S29
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T29
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U29
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V29
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W29
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X29
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y29
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z29
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA29
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB29
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S30
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T30
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U30
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V30
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W30
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X30
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y30
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z30
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA30
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB30
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S31
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T31
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U31
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V31
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W31
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X31
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y31
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z31
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA31
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB31
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S32
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T32
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U32
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V32
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W32
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X32
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y32
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z32
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA32
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB32
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S33
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T33
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U33
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V33
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W33
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X33
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y33
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z33
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA33
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB33
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S34
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T34
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U34
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V34
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W34
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X34
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y34
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z34
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA34
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB34
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S35
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T35
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U35
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V35
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W35
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X35
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y35
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z35
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA35
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB35
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S36
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T36
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U36
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V36
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W36
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X36
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y36
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z36
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA36
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB36
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S37
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T37
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U37
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V37
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W37
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X37
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y37
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z37
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA37
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB37
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S38
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T38
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U38
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V38
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W38
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X38
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y38
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z38
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA38
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB38
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S39
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T39
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U39
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V39
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W39
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X39
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y39
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z39
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA39
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB39
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S40
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T40
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U40
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V40
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W40
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X40
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y40
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z40
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA40
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB40
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S41
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T41
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U41
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V41
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W41
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X41
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y41
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z41
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA41
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB41
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S42
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T42
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U42
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V42
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W42
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X42
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y42
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z42
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA42
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB42
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S43
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T43
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U43
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V43
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W43
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X43
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y43
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z43
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA43
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB43
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S44
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T44
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U44
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V44
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W44
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X44
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y44
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z44
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA44
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB44
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S45
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T45
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U45
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V45
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W45
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X45
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y45
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z45
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA45
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB45
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S46
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T46
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U46
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V46
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W46
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X46
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y46
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z46
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA46
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB46
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S47
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T47
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U47
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V47
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W47
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X47
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y47
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z47
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA47
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB47
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S48
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T48
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U48
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V48
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W48
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X48
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y48
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z48
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA48
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB48
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S49
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T49
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U49
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V49
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W49
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X49
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y49
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z49
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA49
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB49
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S50
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T50
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U50
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V50
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W50
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X50
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y50
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z50
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA50
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB50
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
S51
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
T51
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
U51
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
V51
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
W51
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
X51
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Y51
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
Z51
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AA51
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.
AB51
Enter a number between one and ten to represent the percentage of time the individual in Row 4 will spend on this task.