Top Banner
February, 2012 NTHMP Warning Coordination Subcommittee Meeting
23

February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

Dec 26, 2015

Download

Documents

Antony Bryant
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

February, 2012NTHMP

Warning Coordination Subcommittee Meeting

Page 2: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

Agenda

• Introductions

• Action Item Review

• Exercises

• NTHMP Post-event Assessments

• TWC Products

• TWC Procedures

• NTHMP Measures and Milestones

• WCS Core Membership

Page 3: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

Action Item Review

• Tsunami Amplitude terminology– IOC PTWS User’s Guide Definition:

• Tsunami Height: Amplitude from predicted tide level to the crest of the maximum wave.

• EAS Activation for Tsunami Warnings

Page 4: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

Exercises

• West coast communications test– Move from Sept. to March in 2014?

• March, 2012 live code tests

• Sept., 2012 west coast EAS test

• 2014 USGS Exercise

• 2013 National Exercises – Date?

• Exercises– Pacifex/ Lantex/ PacWave Plans

Page 5: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

Lantex12

• Two separate options– GOM slide– Atlantic slide

Page 6: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

Pacifex12

• Similar to 1964 event

• KMZ overlays available

• Handbook at WCATWC web site

Page 7: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

Post-warning effectiveness survey

• Utilized 3 times in 2011– Japan Tsunami– June Aleutian Warning– September Aleutian Warning– Three Reports Available on NTHMP web site

Page 8: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

Post-warning effectiveness survey

• Results– ¾ Japan event responses from WA– 20-40% of responders had rec’d large amt. of training– 55-75% had been involved with tsunami warning– Almost all knew the correct TWC for their area– Most trusted dissem. systems – NWR - EAS –State – Local News– Least trusted – National News– Understanding of tsunamis – generally very good– Have safe shelter or area – 47 to 100%

Page 9: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

Post-warning effectiveness survey

• Results– How rec’d warning 1. Email

2. Web Sites

3. State system

4. Local News

5. National News

6. EAS

7. NWR

8. LETS

9. FAX

10.NAWAS

11.Other

12.CISN

13.EMWIN

Page 10: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

Post-warning effectiveness survey

• Results– Was risk to community Clear?

• Yes 59%• No 10% • Do Not Know 31%

– Was warning Timely?• Yes 59%• No 10%• Do Not Know 31%

– Was information updated regularly?• Yes 56%• No 13%• Do Not Know 31%

Page 11: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

Post-warning effectiveness survey

• Results– Was information clear and concise?

• Yes 57%• No 12% • Do Not Know 31%

– Did warning give proper response guidance?• Yes 50%• No 9%• Do Not Know 41%

– Did being TsunamiReady help response?• Yes 81%• No 2%• Do Not Know/NA 17%

Page 12: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

Post-warning effectiveness survey

• Lessons Learned– Need better participation!– Update questions

• Group as laid out in report• Change “trust” points with categories as in report• Don’t allow answers if question doesn’t pertain.• Use Survey Monkey?

– Report Writing

Page 13: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

Tsunami Products

• Last year’s updates

• Product Improvement Team

• Tsunami Travel Times… Include in TIS?

• Estimate of length of danger time

• Tsunami Local Statement

• PTWC Domestic Product update

• Inundation Map and Currents Update

Page 14: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

Forecast/Observation Table•  

• MEASUREMENTS AND/OR FORECASTS OF TSUNAMI ACTIVITY•  • SITE LAT LON ARRIVAL TIME FCST AMP OBS AMP• --------------------------------------------------------------------• CANADA• HALIFAX-NS 44.7N 63.6W 2018EDT JUL 27 6.6F/2.0M 6.8F/2.1M • LOCKEPORT-NS 43.7N 65.1W 2244ADT JUL 27 3.3F/1.0M• NEW YORK• MONTAUK 41.1N 72.0W 2150EDT JUL 27 1.2F/0.4M• VIRGINIA• VIRGINIA BCH 36.9N 76.0W 2150EDT JUL 27 1.5F/0.5M•  • LAT – LATITUDE/ N-NORTH, S-SOUTH/• LON – LONGITUDE/ E-EAST, W-WEST/• ARRIVAL TIME – EXPECTED TIME OF INITIAL TSUNAMI ARRIVAL• FCST AMP – FORECAST TSUNAMI AMPLITUDE ABOVE AMBIENT SEA LEVEL.• OBS AMP – OBSERVED TSUNAMI AMPLITUDE ABOVE AMBIENT SEA LEVEL.• IT IS ...NOT... CREST-TO-TROUGH WAVE HEIGHT.• VALUES ARE GIVEN IN BOTH METERS/M/ AND FEET/F/.

Page 15: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

Tsunami Procedures

• Tsunami Information Statements– When to Issue?

• Major Warning level of Alert

Page 16: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

WCS Milestone Status

• NTHMP strategic plan WCS items– Annual table top exercise by 2010

• DONE

– Develop decision support tools for emergency responders by 2013

• ONGOING WITH WEB SITE DEVELOPMENT• PROVIDE DIRECT DECISION SUPPORT FROM TWCs TO

PRIMARY CUSTOMERS DURING EVENT

Page 17: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

WCS Milestone Status

• NTHMP strategic plan WCS items– All states with high/very high hazard create high-level

structure to address tsunami response by 2012• Hawaii – Tsunami Technical Review Committee• California – Tsunami Steering Committee• Oregon - Yes• Washington – State/Local Working Group• Alaska• Puerto Rico – Tsunami Technical Review Committee• USVI - ???• American Samoa• Guam

Page 18: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

WCS Milestone Status

• NTHMP strategic plan WCS items– Increase percentage of monthly TWC comms test

responses to 90% by 2013 • 97% OVERALL IN 2011

– Conduct annual E2E comms test of the TWS• LIVE CODE TESTS CONDUCTED IN THREE STATES/TERR.

PRESENTLY

– Develop post-event review process by 2009• SURVEYS DEVELOPED BY WCS MEMBERS IN 2009• IMPLEMENTATION PLAN DEVELOPED

Page 19: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

WCS Milestone Status

• NTHMP strategic plan WCS items– Conduct post-event reviews within one year of a tsunami

warning• THREE SURVEYS CONDUCTED IN 2011

– Develop inventory of local warning dissemination capabilities by 2010

• INCLUDED IN MES SURVEY

– Develop inventory of local warning reception capabilities by 2010

• INCLUDED IN MES SURVEY

Page 20: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

WCS Milestone Status

• NTHMP strategic plan generic items– Annually increase to baseline developed above by 10%.

• TRACK WITH SEMI ANNUAL REPORTS

– Complete 90% of action items from subcommittee meetings• CLOSE THIS YEAR – 89%

– Conduct one in-person meeting per year• MEET AGAIN DURING NEXT ANNUAL MEETING

– Revise Terms of Reference to implement Strat. Plan measures and milestones by 2009.

• CONSIDER INCLUSION OF CTWP/ITIC MGRs.

– Funds Required• NONE REQUESTED

Page 21: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

New Actions– Special team for Tsunami Advisory EAS

• JS, KM, KR, MB, TN, CP, JL – Rizzo Lead• Provide rec. by May 1

– Product format changes• Implement 10-701 changes to message format• TWCs work ideas from PIT into messages and send prototypes to

WCS Core for review

– Amplitude to Tsunami Height• Proposed change sent to Core Members for review

– Kevin M to provide CA input on move of comms test to March,

• Depending on CA input, propose date for 2014

Page 22: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

New Actions

– Establish date and scenario for 2013 Exercises• Christa to suggest March 20, 2013 to Carib ICG and will

respond to co-Chairs• PW to suggest March 27, 2013 to WCS Core for review

– Create 2013 Exercise Handbooks – ITIC to keep WCS informed on plans for PacWave

2013– Re-post effectiveness survey (3/2011) around

anniversary– Implement update to survey process

Page 23: February, 2012 NTHMP Warning Coordination Subcommittee Meeting.

New Actions

– Posting Tsunami Travel Times during event:• Chris Gregg to question focus groups and respond to

WCS

– WCATWC to evaluate and propose updated TIS criteria for west coast/PR-VI

– Schedule conference calls at specific and predictable times