    THE HASHEMITE KINGDOM OF JORDAN

    MINISTRY OF PUBLIC WORKS AND HOUSING

    THE HASHEMITE KINGDOM OF JORDAN

    MINISTRY OF PUBLIC WORKS AND HOUSING

    BRIDGES MIDDLE EAST 2009

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    2/101

    Abdoun Bridge-Amman

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    3/101

    The Strategic Vision

    The Strategic vision of the Ministry of Public Works and

    Housing concerning Bridge construction and maintenance in

    Jordan can be summarized as follows: Achieving economic, feasible, durable and safe design and construction through the

    use of latest available international techniques in the design and construction

    Planning and applying a sustainable program of roads and bridges maintenance, repair

    and rehabilitation

    Applying an environmental friendly design and construction methodology

    Ensuring a successful and sustainable system of project management, construction

    monitoring, and quality enhancement

    Implementing a continuous and well elaborate program of training and technologytransfer

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    4/101

    The Strategic Vision

    Master Planning: A planned system of Bridge rehabilitation and

    maintenance is the main objective where it depends on the Strategic

    need and priorities, the current condition and the social /economic and

    environmental impacts. Analytical assessment are carried out

    culminating in optimal strategies to be implemented under conditions of

    budget restraint

    Inventory and condition surveys are carried out, recorded and enteredinto national database systems.

    Socio-Economic and Environmental assessment are carried out with the

    objective of ensuring the proper and best usage of in-country capacity

    Bridges construction, rehabilitation and maintenance strategies are

    appraised and prioritised using Multi Criteria Analysis

    Prioritised activities are effectively applied and managed.

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    5/101

    The Strategic Vision

    Environmental Impact: The overall objective of the Strategic Environmental

    Assessment is to demonstrate the effective

    integration and implementation of Bridge planning policies and programs under a

    given regulatory and administrative procedures.

    Construction Environment Management Guidelines are applied to ensure minimum

    adverse impacts and effective mitigation measures.

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    6/101

    Major Bridge Projects In Jordan

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    7/101

    Amman Development Corridor-Bridges

    Main Features:

    Environment Friendly Design

    Provision of Safety Features such as noise barrier and side fencing

    Relieving major traffic from city centre and helping in reducing

    congestion and pollution

    Serving the local communities by providing links to local

    developments.

    Minimizing disturbance to local community by adopting optimized

    alignment and design best fit with the local features and

    constraints. Provision of landscaping to make the road and bridges Aesthetic

    and in harmony with the surrounding

    Below are samples of Amman Development Corridor Bridges:

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    8/101

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    9/101

    Amman Development Corridor-Viaduct 2

    Bridge Description:

    Location : Viaduct 2, Amman Development corridor Section 3

    Zarqa Through Link

    Type: Post tension Pre-cast Girder Beams and steel beamsLength: 310 m.

    Width: 34.7 m to 49.47 m

    Span length,: 36 m post tension concrete beams, 50 m steel beams

    No. of Spans: 8Height of piers: 20 m

    Type of foundation: Pile foundation

    Construction cost: 8.9 M JD

    Designed By: Dar Al-Handasah ConsultantsMain Contractor: Group Five in Cooperation with MID Contracting

    Completion date: 2010

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    10/101

    Amman Development Corridor-Viaduct 2

    Sequence Of Work (19)

    Special environmental and safety features of the bridge:

    The provision of sound barrier to mitigate noise, and long steel beams to span overexisting roads and minimize disturbance to local traffic circulation

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    11/101

    Amman Development Corridor-Viaduct 2

    General Plan -Profile

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    12/101

    Amman Development Corridor-Viaduct 2

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    13/101

    Viaduct 2 Pictures

    Substructure Pier Construction

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    14/101

    Viaduct 2 Pictures

    Superstructure Construction

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    15/101

    Viaduct 2 Pictures

    Superstructure Construction

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    16/101

    Viaduct 2 Pictures

    Superstructure Construction

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    17/101

    Amman Development Corridor- OP 11

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    18/101

    Amman Development Corridor- OP 11

    Bridge Description:

    Location : Amman Development corridor Section 3 Overpass

    11

    Type: Post tension cast in situ Voided SlabLength: 72.4 m,

    Width: 10m

    longest Span length: 35.5 m

    No. of Spans: 3

    Height of piers: 10 mType of foundation: Concrete piles

    Construction cost: 0.9 M JD

    Designed By: Dar Al-Handasah Consultants

    Contractor : Group Five in Cooperation with MID Contracting

    Completion date: 2010

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    19/101

    Amman Development Corridor- OP 11

    Special environmental and safety feature of the bridge:

    Provision of special safety barrier and fencing for added environmentalprotection as the bridge is passing through environmental sensitive area thatrequired added safety measures

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    20/101

    Amman Development Corridor- OP 11

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    21/101

    Amman Development Corridor- OP 11

    Bridge at Completion

    Noise Barrier

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    22/101

    Amman Development Corridor- OP 11

    Substructure & Superstructure

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    23/101

    Amman Development Corridor- OP 11

    Superstructure Construction

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    24/101

    Amman Development Corridor- OP 8

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    25/101

    Amman Development Corridor- OP 8

    Bridge Description:

    Location : Amman Development corridor Section 2

    OP 8 over Madounah Road

    Type: Post tension cast in situ Voided Slab

    Length: 78 m,

    Width: 13m

    Longest Span length: 56 m

    No. of Spans: 3Height of piers: 9 m

    Type of foundation: Concrete footing

    Construction cost: 1.5 M JD

    Designed By: Dar Al-Handasah ConsultantsMain Contractor: China Chongqing International Corp. in

    Cooperation with United Massar

    Completion date: 2010

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    26/101

    Amman Development Corridor- OP 8

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    27/101

    Amman Development Corridor- OP 8

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    28/101

    Amman Development Corridor- Viaduct 1

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    29/101

    Amman Development Corridor- Viaduct 1

    Bridge Description:

    Location : Amman Development corridor Section 2 OP 8

    over Madounah Road

    Type: Post tension cast in situ Box Girder & precast beams

    Length, 235 m,

    Width 13m

    longest Span length: 57 m

    No. of Spans: 6

    Height of piers: 17 mType of foundation: Concrete footing

    Construction cost: 2.1 M JD

    Designed By: Dar Al-Handasah Consultants

    Constructed By: China Chnogqing International Corp in cooperationwith United Massar

    Completion date: 2010

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    30/101

    Amman Development Corridor- Viaduct 1

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    31/101

    Amman Development Corridor- Viaduct 1

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    32/101

    Amman Development Corridor- Viaduct 1

    Precast Girder Cast- in situ

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    33/101

    Amman Development Corridor- Viaduct 1

    Bridge at Completion

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    34/101

    Amman Development Corridor- Airport

    Interchange Bridges

    Amman Development Corridor Airport

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    35/101

    Amman Development Corridor- Airport

    Interchange Bridges

    Bridges Description:

    Location : Amman Development corridor Section 1

    Airport Interchange

    Type: Post tension cast in situ Box Girder

    Length: 160 m, (one bridge)

    Width : 13m

    longest Span length: 48 m

    No. of Spans: 5

    Height of piers: 10 mType of foundation: Concrete piles

    Designed By: Dar Al Handasah Consultants

    Main Contractor: Copri Construction Enterprises Est

    Bridge Subcontractor: Marwan Al Kurdi & Partners Co. Ltd.

    Completion date: 2011

    Amman Development Corridor Airport

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    36/101

    Amman Development Corridor- Airport

    Interchange Bridges

    Special environmental and safety features of the Interchange andbridges:

    The provision of environmental friendly design including fulllandscaping compatible with the surrounding and to ensure the leastintrusion .

    Amman Development Corridor Airport

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    37/101

    Amman Development Corridor- Airport

    Interchange Bridges

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    38/101

    Abdoun Bridge-Amman

    Abd B id A

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    39/101

    Abdoun Bridge-Amman

    Special environmental and safety features

    This bridge spans over major wadi in Amman and links the two sides of thecity with an aesthetically pleasing , economic and with minimum land

    acquisition requirement. This bridge has minimized the travel time and

    distance within Amman and provided a very attractive feature that is

    environmentally acceptable and socially desired

    Length:420 n, longest span length: 132 m

    Width: 27 m

    Designed by: Dar Al-Handasah Consultants

    Completion time: 2007

    Abd B id A

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    40/101

    Abdoun Bridge-Amman

    Abd B id A

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    41/101

    Abdoun Bridge-Amman

    Abd B id A

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    42/101

    Abdoun Bridge-Amman

    Precast Segment Installation

    Abdoun Bridge Amman

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    43/101

    Abdoun Bridge-Amman

    Bridge at completion

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    44/101

    Abu Alasal Bridge / Parkway

    Abu Alasal Bridge / Parkway

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    45/101

    Abu Alasal Bridge / Parkway

    Bridge Description:

    Location : Maeen Dead Sea

    Type: Post tension Precast Girder AASHTO Type

    Length: 91.2 m,Width: 12.8m

    longest Span length: 30 m

    No. of Spans: 3

    Height of piers: 26 m

    Type of foundation: Shallow Foundation.

    Construction cost: 2.4 M JD.

    Designed By: Pacific Consultant International & Yamasita

    Consultants Sekki Inc. & Consolidated Consultant.Main Contractor: Condotte

    Bridgework Subcontractor: Marwan A. Al-Kurdi & Part. Co. Ltd.

    Completion date: 2005.

    Abu Alasal Bridge / Parkway

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    46/101

    Abu Alasal Bridge / Parkway

    Abu Alasal Bridge / Parkway

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    47/101

    Abu Alasal Bridge / Parkway

    Abu Alasal Bridge / Parkway

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    48/101

    Abu Alasal Bridge / Parkway

    Abu Alasal Bridge / Parkway

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    49/101

    Abu Alasal Bridge / Parkway

    Precast Girder Installation & Substructure

    Ab Al l B id / P k

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    50/101

    Abu Alasal Bridge / Parkway

    Bridge During

    Construction

    Ab Alasal Bridge / Park a

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    51/101

    Abu Alasal Bridge / Parkway

    Substructure Works

    Abu Alasal Bridge / Parkway

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    52/101

    Abu Alasal Bridge / Parkway

    Precast Girder Installation using Launching Girder

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    53/101

    Himara Bridge / Parkway

    Himara Bridge / Parkway

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    54/101

    g y

    Bridge Description:

    Location : Maeen- Dead Sea

    Type: Post tension Precast Girder

    Length: 100 m,Width : 12.8m

    longest Span length: 32m

    No. of Spans: 3

    Height of piers: 32 m.

    Type of foundation: Shallow Foundation.

    Construction cost: 2.5 M JD.

    Designed By: Pacific Consultant International & Yamasita

    Consultants Sekki Inc. & Consolidated Consultant

    Main Contractor: Condotte

    Bridge Subcontractor: Marwan A. Al-Kurdi & Part. Co. Ltd.

    Completion date: 2005.

    Himara Bridge / Parkway

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    55/101

    g y

    Himara Bridge / Parkway

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    56/101

    Himara Bridge / Parkway

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    57/101

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    58/101

    Bridge Construction

    Himara Bridge / Parkway

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    59/101

    Precast Girder Installation

    Himara Bridge / Parkway

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    60/101

    Deck Slab Works

    Himara Bridge / Parkway

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    61/101

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    62/101

    King Hussein Bridge

    King Hussein Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    63/101

    g g

    Bridge Description:Location : Dead Sea Jordan RiverType: Extra Dose Bridge

    Length: 120 m,Width: 1.8mlongest Span length: 52 mNo. of Spans: 3

    Height of piers: 21 mType of foundation: Deep Foundation (Cast in-situ Piles) .

    Construction cost: 4.5 M JD.

    Designer : Nippon Koie

    Main Contractor : SumitomoBridge Subcontractor: Marwan A. Al-Kurdi & Part. Co. Ltd.

    Completion Date : 2001

    King Hussein Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    64/101

    g g

    King Hussein Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    65/101

    g g

    King Hussein Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    66/101

    Piling Works

    Scaffolding Works

    King Hussein Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    67/101

    Post Tensioning Works

    King Hussein Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    68/101

    Bridge at Completion

    King Hussein Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    69/101

    Bridge at Completion

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    70/101

    Mukharis Bridges/Dead Sea

    Mukharis Bridges

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    71/101

    Bridge Description:Location : Dead SeaType: Post tension Precast Girder AASHTO TYPE IV

    Length: 100 m.

    Width: 12.8m .longest Span length, 33 mNo. of Spans: 3Height of piers: 11 m.Type of foundation: Shallow Foundation.

    Construction cost: 3.5 M JD.

    Designer : Engicon

    Bridge Works By : Marwan A. Al-Kurdi & Part. Co. Ltd.

    Completion Date : 2004

    Mukharis Bridges

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    72/101

    Mukharis Bridges

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    73/101

    Substructure Works (Piers)

    Mukharis Bridges

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    74/101

    Bridge During Construction Superstructure

    Mukharis Bridges

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    75/101

    Bridge After Completion

    Mukharis Bridges

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    76/101

    Mukharis Bridges

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    77/101

    Zarka Interchange Bridge

    Zarka Interchange Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    78/101

    Bridge Description:

    Location : Zarqa Highway Zarqa

    Type: Post tension Solid Slab

    Length: 82.4 m,Width: 10.6m

    longest Span length: 42.4 m

    No. of Spans: 2

    Height of piers: 8 mType of foundation: Shallow FoundationConstruction cost: 2.1 M JD.

    Designed By: Engicon and Trois

    Main Contractor: Marwan A. Al-Kurdi & Part. Co. Ltd.Completion date: 2008

    Zarka Interchange Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    79/101

    Zarka Interchange Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    80/101

    Zarka Interchange Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    81/101

    Superstructure Works - Scaffolding

    Zarka Interchange Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    82/101

    Superstructure Works - Scaffolding

    Zarka Interchange Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    83/101

    Concrete Operation

    Zarka Interchange Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    84/101

    Post Tensioning Operation

    Zarka Interchange Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    85/101

    Zarka Interchange Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    86/101

    Karak Bridge

    Karak Entrance Bridge

    B id D i i

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    87/101

    Bridge Description:

    Location : Karak Entrance- KarakType: Post tension Precast Girder AASHOTO type IV

    Length: 177 m.

    Width: 20 m.longest Span length: 36 m.No. of Spans: 2Height of piers: 42 m.

    Type of foundation: Shallow FoundationEstimated Cost: 8.2 M JD

    Designed By: Engicon & Lotti

    Main Contractor: Marwan A. Al-Kurdi & Part. Co. Ltd.

    Completion date: 2010 ( Expected)

    Karak Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    88/101

    Karak Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    89/101

    Karak Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    90/101

    Karak Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    91/101

    Substructure Works

    Karak Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    92/101

    Preparation for Cap Beam

    Karak Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    93/101

    Substructure Works

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    94/101

    Baqa'a Camp Entrances

    Baqa'a Camp Entrances

    Bridge Description:

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    95/101

    Bridge Description:

    Location: Baqa'a camp

    Type: Post Tension (Girder)

    Length: 230 mWidth: 21 m

    Girder Length: 33.40 m, No. of Spans: 7

    Date of Completion: 15/11/2009

    Construction Cost: 15 Million JDDesigner: Engicon

    Contractor: United Enterprises Company

    Baqa'a Camp Entrances

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    96/101

    Bridge Special Features

    The objective of the bridge is to serve the local community ofBaqaa and the surrounding areas, spanning over the existingroads and bypassing all the local circulating traffic. It reducescongestion, enhances safety reduces noise and minimizesaccidents.

    Concrete barriers of 1.26 m height was provided to separate the

    bridge from the adjacent service roads to mitigate noise andenhance safety.

    Baqa'a Camp Entrances

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    97/101

    Baqa'a Camp Entrances

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    98/101

    Baqa'a Camp Entrances

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    99/101

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    100/101

    THANK YOU

    Index Page

    Stratgic Vision

    Zarqa Bridge

  • 7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02

    101/101

    g

    Abdoun Bridge

    Amman ring Road

    Kin Hussein Bridge

    Mukharis Bridge

    Parkway Bridges

    q g

    Baqa Bridge

    Karak Bridge