7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
1/101
NovemberNovember
20092009
THE HASHEMITE KINGDOM OF JORDAN
MINISTRY OF PUBLIC WORKS AND HOUSING
THE HASHEMITE KINGDOM OF JORDAN
MINISTRY OF PUBLIC WORKS AND HOUSING
BRIDGES MIDDLE EAST 2009
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
2/101
Abdoun Bridge-Amman
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
3/101
The Strategic Vision
The Strategic vision of the Ministry of Public Works and
Housing concerning Bridge construction and maintenance in
Jordan can be summarized as follows: Achieving economic, feasible, durable and safe design and construction through the
use of latest available international techniques in the design and construction
Planning and applying a sustainable program of roads and bridges maintenance, repair
and rehabilitation
Applying an environmental friendly design and construction methodology
Ensuring a successful and sustainable system of project management, construction
monitoring, and quality enhancement
Implementing a continuous and well elaborate program of training and technologytransfer
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
4/101
The Strategic Vision
Master Planning: A planned system of Bridge rehabilitation and
maintenance is the main objective where it depends on the Strategic
need and priorities, the current condition and the social /economic and
environmental impacts. Analytical assessment are carried out
culminating in optimal strategies to be implemented under conditions of
budget restraint
Inventory and condition surveys are carried out, recorded and enteredinto national database systems.
Socio-Economic and Environmental assessment are carried out with the
objective of ensuring the proper and best usage of in-country capacity
Bridges construction, rehabilitation and maintenance strategies are
appraised and prioritised using Multi Criteria Analysis
Prioritised activities are effectively applied and managed.
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
5/101
The Strategic Vision
Environmental Impact: The overall objective of the Strategic Environmental
Assessment is to demonstrate the effective
integration and implementation of Bridge planning policies and programs under a
given regulatory and administrative procedures.
Construction Environment Management Guidelines are applied to ensure minimum
adverse impacts and effective mitigation measures.
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
6/101
Major Bridge Projects In Jordan
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
7/101
Amman Development Corridor-Bridges
Main Features:
Environment Friendly Design
Provision of Safety Features such as noise barrier and side fencing
Relieving major traffic from city centre and helping in reducing
congestion and pollution
Serving the local communities by providing links to local
developments.
Minimizing disturbance to local community by adopting optimized
alignment and design best fit with the local features and
constraints. Provision of landscaping to make the road and bridges Aesthetic
and in harmony with the surrounding
Below are samples of Amman Development Corridor Bridges:
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
8/101
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
9/101
Amman Development Corridor-Viaduct 2
Bridge Description:
Location : Viaduct 2, Amman Development corridor Section 3
Zarqa Through Link
Type: Post tension Pre-cast Girder Beams and steel beamsLength: 310 m.
Width: 34.7 m to 49.47 m
Span length,: 36 m post tension concrete beams, 50 m steel beams
No. of Spans: 8Height of piers: 20 m
Type of foundation: Pile foundation
Construction cost: 8.9 M JD
Designed By: Dar Al-Handasah ConsultantsMain Contractor: Group Five in Cooperation with MID Contracting
Completion date: 2010
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
10/101
Amman Development Corridor-Viaduct 2
Sequence Of Work (19)
Special environmental and safety features of the bridge:
The provision of sound barrier to mitigate noise, and long steel beams to span overexisting roads and minimize disturbance to local traffic circulation
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
11/101
Amman Development Corridor-Viaduct 2
General Plan -Profile
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
12/101
Amman Development Corridor-Viaduct 2
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
13/101
Viaduct 2 Pictures
Substructure Pier Construction
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
14/101
Viaduct 2 Pictures
Superstructure Construction
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
15/101
Viaduct 2 Pictures
Superstructure Construction
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
16/101
Viaduct 2 Pictures
Superstructure Construction
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
17/101
Amman Development Corridor- OP 11
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
18/101
Amman Development Corridor- OP 11
Bridge Description:
Location : Amman Development corridor Section 3 Overpass
11
Type: Post tension cast in situ Voided SlabLength: 72.4 m,
Width: 10m
longest Span length: 35.5 m
No. of Spans: 3
Height of piers: 10 mType of foundation: Concrete piles
Construction cost: 0.9 M JD
Designed By: Dar Al-Handasah Consultants
Contractor : Group Five in Cooperation with MID Contracting
Completion date: 2010
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
19/101
Amman Development Corridor- OP 11
Special environmental and safety feature of the bridge:
Provision of special safety barrier and fencing for added environmentalprotection as the bridge is passing through environmental sensitive area thatrequired added safety measures
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
20/101
Amman Development Corridor- OP 11
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
21/101
Amman Development Corridor- OP 11
Bridge at Completion
Noise Barrier
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
22/101
Amman Development Corridor- OP 11
Substructure & Superstructure
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
23/101
Amman Development Corridor- OP 11
Superstructure Construction
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
24/101
Amman Development Corridor- OP 8
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
25/101
Amman Development Corridor- OP 8
Bridge Description:
Location : Amman Development corridor Section 2
OP 8 over Madounah Road
Type: Post tension cast in situ Voided Slab
Length: 78 m,
Width: 13m
Longest Span length: 56 m
No. of Spans: 3Height of piers: 9 m
Type of foundation: Concrete footing
Construction cost: 1.5 M JD
Designed By: Dar Al-Handasah ConsultantsMain Contractor: China Chongqing International Corp. in
Cooperation with United Massar
Completion date: 2010
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
26/101
Amman Development Corridor- OP 8
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
27/101
Amman Development Corridor- OP 8
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
28/101
Amman Development Corridor- Viaduct 1
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
29/101
Amman Development Corridor- Viaduct 1
Bridge Description:
Location : Amman Development corridor Section 2 OP 8
over Madounah Road
Type: Post tension cast in situ Box Girder & precast beams
Length, 235 m,
Width 13m
longest Span length: 57 m
No. of Spans: 6
Height of piers: 17 mType of foundation: Concrete footing
Construction cost: 2.1 M JD
Designed By: Dar Al-Handasah Consultants
Constructed By: China Chnogqing International Corp in cooperationwith United Massar
Completion date: 2010
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
30/101
Amman Development Corridor- Viaduct 1
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
31/101
Amman Development Corridor- Viaduct 1
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
32/101
Amman Development Corridor- Viaduct 1
Precast Girder Cast- in situ
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
33/101
Amman Development Corridor- Viaduct 1
Bridge at Completion
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
34/101
Amman Development Corridor- Airport
Interchange Bridges
Amman Development Corridor Airport
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
35/101
Amman Development Corridor- Airport
Interchange Bridges
Bridges Description:
Location : Amman Development corridor Section 1
Airport Interchange
Type: Post tension cast in situ Box Girder
Length: 160 m, (one bridge)
Width : 13m
longest Span length: 48 m
No. of Spans: 5
Height of piers: 10 mType of foundation: Concrete piles
Designed By: Dar Al Handasah Consultants
Main Contractor: Copri Construction Enterprises Est
Bridge Subcontractor: Marwan Al Kurdi & Partners Co. Ltd.
Completion date: 2011
Amman Development Corridor Airport
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
36/101
Amman Development Corridor- Airport
Interchange Bridges
Special environmental and safety features of the Interchange andbridges:
The provision of environmental friendly design including fulllandscaping compatible with the surrounding and to ensure the leastintrusion .
Amman Development Corridor Airport
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
37/101
Amman Development Corridor- Airport
Interchange Bridges
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
38/101
Abdoun Bridge-Amman
Abd B id A
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
39/101
Abdoun Bridge-Amman
Special environmental and safety features
This bridge spans over major wadi in Amman and links the two sides of thecity with an aesthetically pleasing , economic and with minimum land
acquisition requirement. This bridge has minimized the travel time and
distance within Amman and provided a very attractive feature that is
environmentally acceptable and socially desired
Length:420 n, longest span length: 132 m
Width: 27 m
Designed by: Dar Al-Handasah Consultants
Completion time: 2007
Abd B id A
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
40/101
Abdoun Bridge-Amman
Abd B id A
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
41/101
Abdoun Bridge-Amman
Abd B id A
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
42/101
Abdoun Bridge-Amman
Precast Segment Installation
Abdoun Bridge Amman
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
43/101
Abdoun Bridge-Amman
Bridge at completion
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
44/101
Abu Alasal Bridge / Parkway
Abu Alasal Bridge / Parkway
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
45/101
Abu Alasal Bridge / Parkway
Bridge Description:
Location : Maeen Dead Sea
Type: Post tension Precast Girder AASHTO Type
Length: 91.2 m,Width: 12.8m
longest Span length: 30 m
No. of Spans: 3
Height of piers: 26 m
Type of foundation: Shallow Foundation.
Construction cost: 2.4 M JD.
Designed By: Pacific Consultant International & Yamasita
Consultants Sekki Inc. & Consolidated Consultant.Main Contractor: Condotte
Bridgework Subcontractor: Marwan A. Al-Kurdi & Part. Co. Ltd.
Completion date: 2005.
Abu Alasal Bridge / Parkway
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
46/101
Abu Alasal Bridge / Parkway
Abu Alasal Bridge / Parkway
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
47/101
Abu Alasal Bridge / Parkway
Abu Alasal Bridge / Parkway
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
48/101
Abu Alasal Bridge / Parkway
Abu Alasal Bridge / Parkway
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
49/101
Abu Alasal Bridge / Parkway
Precast Girder Installation & Substructure
Ab Al l B id / P k
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
50/101
Abu Alasal Bridge / Parkway
Bridge During
Construction
Ab Alasal Bridge / Park a
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
51/101
Abu Alasal Bridge / Parkway
Substructure Works
Abu Alasal Bridge / Parkway
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
52/101
Abu Alasal Bridge / Parkway
Precast Girder Installation using Launching Girder
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
53/101
Himara Bridge / Parkway
Himara Bridge / Parkway
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
54/101
g y
Bridge Description:
Location : Maeen- Dead Sea
Type: Post tension Precast Girder
Length: 100 m,Width : 12.8m
longest Span length: 32m
No. of Spans: 3
Height of piers: 32 m.
Type of foundation: Shallow Foundation.
Construction cost: 2.5 M JD.
Designed By: Pacific Consultant International & Yamasita
Consultants Sekki Inc. & Consolidated Consultant
Main Contractor: Condotte
Bridge Subcontractor: Marwan A. Al-Kurdi & Part. Co. Ltd.
Completion date: 2005.
Himara Bridge / Parkway
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
55/101
g y
Himara Bridge / Parkway
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
56/101
Himara Bridge / Parkway
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
57/101
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
58/101
Bridge Construction
Himara Bridge / Parkway
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
59/101
Precast Girder Installation
Himara Bridge / Parkway
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
60/101
Deck Slab Works
Himara Bridge / Parkway
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
61/101
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
62/101
King Hussein Bridge
King Hussein Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
63/101
g g
Bridge Description:Location : Dead Sea Jordan RiverType: Extra Dose Bridge
Length: 120 m,Width: 1.8mlongest Span length: 52 mNo. of Spans: 3
Height of piers: 21 mType of foundation: Deep Foundation (Cast in-situ Piles) .
Construction cost: 4.5 M JD.
Designer : Nippon Koie
Main Contractor : SumitomoBridge Subcontractor: Marwan A. Al-Kurdi & Part. Co. Ltd.
Completion Date : 2001
King Hussein Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
64/101
g g
King Hussein Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
65/101
g g
King Hussein Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
66/101
Piling Works
Scaffolding Works
King Hussein Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
67/101
Post Tensioning Works
King Hussein Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
68/101
Bridge at Completion
King Hussein Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
69/101
Bridge at Completion
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
70/101
Mukharis Bridges/Dead Sea
Mukharis Bridges
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
71/101
Bridge Description:Location : Dead SeaType: Post tension Precast Girder AASHTO TYPE IV
Length: 100 m.
Width: 12.8m .longest Span length, 33 mNo. of Spans: 3Height of piers: 11 m.Type of foundation: Shallow Foundation.
Construction cost: 3.5 M JD.
Designer : Engicon
Bridge Works By : Marwan A. Al-Kurdi & Part. Co. Ltd.
Completion Date : 2004
Mukharis Bridges
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
72/101
Mukharis Bridges
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
73/101
Substructure Works (Piers)
Mukharis Bridges
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
74/101
Bridge During Construction Superstructure
Mukharis Bridges
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
75/101
Bridge After Completion
Mukharis Bridges
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
76/101
Mukharis Bridges
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
77/101
Zarka Interchange Bridge
Zarka Interchange Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
78/101
Bridge Description:
Location : Zarqa Highway Zarqa
Type: Post tension Solid Slab
Length: 82.4 m,Width: 10.6m
longest Span length: 42.4 m
No. of Spans: 2
Height of piers: 8 mType of foundation: Shallow FoundationConstruction cost: 2.1 M JD.
Designed By: Engicon and Trois
Main Contractor: Marwan A. Al-Kurdi & Part. Co. Ltd.Completion date: 2008
Zarka Interchange Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
79/101
Zarka Interchange Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
80/101
Zarka Interchange Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
81/101
Superstructure Works - Scaffolding
Zarka Interchange Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
82/101
Superstructure Works - Scaffolding
Zarka Interchange Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
83/101
Concrete Operation
Zarka Interchange Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
84/101
Post Tensioning Operation
Zarka Interchange Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
85/101
Zarka Interchange Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
86/101
Karak Bridge
Karak Entrance Bridge
B id D i i
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
87/101
Bridge Description:
Location : Karak Entrance- KarakType: Post tension Precast Girder AASHOTO type IV
Length: 177 m.
Width: 20 m.longest Span length: 36 m.No. of Spans: 2Height of piers: 42 m.
Type of foundation: Shallow FoundationEstimated Cost: 8.2 M JD
Designed By: Engicon & Lotti
Main Contractor: Marwan A. Al-Kurdi & Part. Co. Ltd.
Completion date: 2010 ( Expected)
Karak Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
88/101
Karak Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
89/101
Karak Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
90/101
Karak Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
91/101
Substructure Works
Karak Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
92/101
Preparation for Cap Beam
Karak Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
93/101
Substructure Works
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
94/101
Baqa'a Camp Entrances
Baqa'a Camp Entrances
Bridge Description:
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
95/101
Bridge Description:
Location: Baqa'a camp
Type: Post Tension (Girder)
Length: 230 mWidth: 21 m
Girder Length: 33.40 m, No. of Spans: 7
Date of Completion: 15/11/2009
Construction Cost: 15 Million JDDesigner: Engicon
Contractor: United Enterprises Company
Baqa'a Camp Entrances
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
96/101
Bridge Special Features
The objective of the bridge is to serve the local community ofBaqaa and the surrounding areas, spanning over the existingroads and bypassing all the local circulating traffic. It reducescongestion, enhances safety reduces noise and minimizesaccidents.
Concrete barriers of 1.26 m height was provided to separate the
bridge from the adjacent service roads to mitigate noise andenhance safety.
Baqa'a Camp Entrances
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
97/101
Baqa'a Camp Entrances
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
98/101
Baqa'a Camp Entrances
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
99/101
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
100/101
THANK YOU
Index Page
Stratgic Vision
Zarqa Bridge
7/29/2019 Eng Samihalasalehministryofpublicworksandhousingjordan 100913004857 Phpapp02
101/101
g
Abdoun Bridge
Amman ring Road
Kin Hussein Bridge
Mukharis Bridge
Parkway Bridges
q g
Baqa Bridge
Karak Bridge