DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT Project Expansion for Manufacture of Value Added Products In the Existing Pig Iron Complex Project Proponents M/s. SLR METALIKS LIMITED Narayanadevarakere Village, Hagaribommanahalli Taluk, Bellary District, Karnataka State Consultant M/s. ULTRA-TECH Environmental Consultancy & Laboratory Unit No. 206, 224-225, Jai Commercial Complex, Eastern Express High Way, Opp.Cadbury, Khopat, Thane (West)-400 601 & Under the guidance of VTU, Belgaum NABET Accreditation of Consultant Sl.No. 93 of List A of MoEF - O.M. No.J-11013/77/2004/IA II(I) Dated 30.09.2011, Sl.No. 132 of List of Consultants with Provisional Accreditation (Rev.02) Dated 01.11.2012 2013-2014
327

DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

Jul 04, 2018

Download

Documents

trankhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

DRAFTENVIRONMENTAL IMPACT ASSESSMENT REPORT

ProjectExpansion for Manufacture of Value Added Products

In the Existing Pig Iron Complex

Project ProponentsM/s. SLR METALIKS LIMITED

Narayanadevarakere Village, Hagaribommanahalli Taluk,Bellary District, Karnataka State

ConsultantM/s. ULTRA-TECH Environmental Consultancy & Laboratory

Unit No. 206, 224-225, Jai Commercial Complex,Eastern Express High Way, Opp.Cadbury,

Khopat, Thane (West)-400 601&

Under the guidance of VTU, Belgaum

NABET Accreditation of ConsultantSl.No. 93 of List A of MoEF - O.M. No.J-11013/77/2004/IA II(I) Dated 30.09.2011,

Sl.No. 132 of List of Consultants with Provisional Accreditation (Rev.02) Dated 01.11.2012

2013-2014

Page 2: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 3: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

CONTENTS

Chapters

Chapter.No.

Particulars Pg.no.

1.0 Introduction1.1 Project background 1

1.2 Purpose of environmental impact assessment 1

1.3 Background of the project proponent 2

1.4 Brief description of the project 3

1.4.1 Nature and size of the project 3

1.4.2 Features of the proposed project 6

1.4.3 Location of the project site 6

1.4.4 Approvals available for the exiting industry 11

1.5 Importance of the project to the country & region 11

1.5.1 Domestic steel demand 11

1.5.2 Demand supply gap, imports vs indigenous production 13

1.5.3 Employment generation due to the project 13

1.6 Objective and scope of EIA studies 13

1.7 Methodology of EIA studies 15

1.7.1 Existing environmental status 15

1.7.2 Identification of impacts and mitigation measures 18

1.8 Terms of References (TOR) from MoEF and their compliances 18

2.0 Project Description2.1 Type of project 19

2.1.1 Production capacity & product mix 19

2.1.2 Interlinked/interdependent projects 20

2.1.3 Categorization of the project 20

2.2 Need (justification) for expansion of the industry 20

2.3 Description of location 21

2.3.1 Basis for selection of the site 21

2.3.2 Location features of the project 22

2.3.3 Project lay out 31

2.4 Size and magnitude of operation (plant facilities & infrastructure) 31

2.4.1 Land area 31

Page 4: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

2.4.2 Activities during construction phase 32

2.4.3 Manpower 33

2.4.4 Project investment 33

2.5 Proposed schedule for approval & implementation 33

2.6 Technology & process description 34

2.6.1 Manufacturing process for steel mill 34

2.6.2 Manufacturing process for rolling mill 35

2.6.3 Manufacturing process for metallurgical coke 37

2.6.4 Power generation process (based on coke oven off–gas) 43

2.6.5 Producer gas plant 43

2.6.6 Pulverized coal injection system 46

2.7 Raw material & products 47

2.8 Transportation of raw material & products 50

2.9 Power requirement, source & utilization 51

2.10 Fuel requirement 51

2.11 Water requirement, source & utilization 53

2.12 Source of pollution & their management / disposal 54

2.12.1 Waste water management 55

2.12.2 Gaseous emissions and APC measures 55

2.12.3 Solid waste management 56

3.0 Description of environment3.1 Introduction 59

3.1.1 Methodology 59

3.1.2 Study area 60

3.1.3 Study period 60

3.2 Establishment of baseline 613.2.1 Meteorological data 613.3 Air quality 70

3.3.1 Analytical techniques for air quality monitoring 70

3.3.2 Air quality monitoring 70

3.3.3 Methodology adopted for the study 70

3.3.3.1 Air quality at the project site 74

3.3.3.2 Air quality in the downwind direction (Rajapura) 75

3.3.3.3 Air quality at other locations 76

3.3.3.4 Observations 77

Page 5: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

3.4 Noise environment 77

3.4.1 Observations 79

3.5 Water environment 80

3.5.1 Reconnaissance survey 80

3.5.2 Analytical techniques for water quality monitoring 81

3.5.3 Surface water 83

3.5.4 Ground water 83

3.5.5 Observations 84

3.6 Soil quality 92

3.7 Land use pattern 94

3.8 Geology 95

3.8.1 Mineral resources 96

3.8.2 Geomorphology 96

3.9 Hydrology profile 97

3.9.1 Hydrogeology 97

3.9.1.1 Occurrence and movement of ground water in rock formations 97

3.9.1.2 Depth of groundwater and seasonal variation 97

3.9.1.3 Litholog 98

3.9.1.4 Drawdown and recovery 98

3.9.1.5 Geophysical investigations 98

3.9.1.6 Pathways of pollutants 99

3.9.1.7 Drainage and water bodies 101

3.9.1.8 Ground water potential 101

3.10 Ecology 102

3.10.1 Flora and fauna 102

3.10.1.1 Floristic analysis 102

3.10.1.2 Agricultural pattern 106

3.10.2 Faunal composition 106

3.10.2.1 Fishes 109

3.11 Socio-economics of the study area 109

3.11.1 Demography and social status 109

3.11.2 About Hagari Bommanahalli taluk 110

3.11.3 Cultivation 110

3.11.4 Industrialization 111

Page 6: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

3.11.5 Statistics at a glance 111

3.11.6 Places of interest 116

4.0 Anticipated environmental impacts & mitigation measures

4.1 Introduction 117

4.2 Identification & characterization of impacts 118

4.2.1 Construction Phase 118

4.2.2 Operation phase 118

4.2.3 Impact Matrix 120

4.3 Impact during construction phase 123

4.3.1 Land environment 123

4.3.2 Water environment 123

4.3.3 Air environment 124

4.3.4 Impact on noise level 124

4.3.5 Impact on Biological environment 126

4.3.6 Impact on Socio-Economic status 126

4.4 Operational phase impact 126

4.4.1 Impact on air quality 135

4.4.1.1 Source of air pollution 126

4.4.1.2 Fugitive emissions 128

4.4.1.3 Fugitive emission control 128

4.4.1.4 Preproject air quality 131

4.4.1.5 GLC emissions 132

4.4.1.6 Dispersion studies 132

4.4.2 Water environment 174

4.4.2.1 Source of water 175

4.4.2.2 Discharge rate 175

4.4.2.3 Distance of project from water tap point 175

4.4.2.4 Surface hydrology 175

4.4.2.5 Water usage 176

4.4.2.6 Impact of water withdrawl from river 176

4.4.2.7 Water conservation plan 177

4.4.2.8 Treatment and utilization of effluent 178

4.4.2.9 Rain water harvesting system 181

4.4.2.10 Aquafier management plan 182

4.4.2.11 Leachate study for the stock piles 183

Page 7: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

4.4.2.12 Flood hazard 183

4.4.2.13 Management plant to prevent the water pollution due to proposedactivity

184

4.5 Noise environment 189

4.6 Solid waste management 190

4.7 Soil quality 192

4.8 Biological environment 192

4.9 Socio-economic impact 193

4.10 Green belt development 195

4.10.1 Selection of species 196

4.10.2 Specific location of plantations 196

4.11 Storm water management and rain water harvesting 198

4.11.1 Storm water gutters 198

4.11.2 Storm water reservoir 198

4.11.3 Rain water harvesting 200

4.12 Occupational health care 201

4.13 Traffic density and survey 203

4.14 CREP norms and compliance 206

4.15 Carbon credit project 208

5.0 Analysis of alternatives

5.1 Sitting of project 209

5.1.1 Environment guidelines 209

5.1.2 General criterion for selection of location 210

5.1.3 Site requirement and proposed location 210

5.2 Environmental features of site 211

5.3 Technology process 212

5.4 No project option 2126.0 Environment monitoring program6.1 Introduction 2136.2 Environmental monitoring and reporting procedure 2136.3 Objectives of monitoring 2146.4 Monitoring methods and data analysis 2146.4.1 Air quality monitoring 2146.4.2 Noise levels 2156.4.3 Water and wastewater quality monitoring 2156.4.4 Land environment 216

Page 8: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

6.4.5 Biological environment 2166.4.6 Socio-economic environment 2166.5 Reporting schedules of the monitoring data 2176.6 Infrastructure for monitoring of environmental protection measures 2176.7 Sampling schedule and locations 2186.8 Compliances to environmental statutes 2206.9 Monitoring of compliances to statutory conditions 2206.10 Financial allocation for environmental aspects 2216.11 Success indicators 2217.0 Additional studies7.1 Public hearing and consultation 2227.2 Risk assessment 2227.2.1 Purpose 2237.2.2 Objectives 2237.3 Disaster management plan (DMP) 2237.3.1 Objectives 2237.3.2 Elements of on-site emergency plan 2237.3.3 Organization 2247.3.4 Duty allocation 2247.4 Industrial hazards and safety 2267.4.1 Hazard identification 2267.4.2 Fire fighting facilities 2277.5 On-Site Management Plan 2287.5.1 Structure of On-site management plan 2287.5.2 Scope of onsite emergency plan 2297.6 Emergency 2297.6.1 Methodology 2307.6.2 Structure of emergency management 2317.6.3 Infrastructure at emergency control centre 2317.6.4 Emergency medical facilities 2327.7 Identification and assessment of hazards 2327.8 Risk Analysis 2357.9 Risk management measures 2387.9.1 Furnace 2387.9.2 Hot metal & slag 2397.9.3 Respiratory hazards 2407.9.4 Heat and hot liquid 2417.9.5 Physical Hazards 2417.9.6 Heavy Loads / Grinding & Cutting / Rolling 242

Page 9: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

7.9.7 Musculoskeletal Disorders 2437.9.8 Control Hazards, Preferably At Their Source 2437.9.9 Noise 2437.10 Health And Safety Measures For The Workers 2447.10.1 Safety Of Personnel 2457.11 Following Safety Slogans Will Be Displayed 2477.12 Emergency Action Plans 2477.12.1 Emergency action plan for cylinder fire: 2487.12.2 Emergency action plan for electric fire: 2487.12.3 Emergency action plan for office fire 2487.12.4 Emergency action plan for oil fire: 2487.12.5 Emergency action plan for medical aid: 2487.13 Natural hazards 2507.13.1 Emergency action plan for tornado/high winds 2517.13.2 Emergency action plan for earthquakes 2517.13.3 Emergency action plan for bomb threat 2517.14 Social impact assessment, R & R action plan 2527.14.1 Existing social status 2527.14.2 Economic status in the region: land use pattern 2538.0 Project benefits8.1 Improvements In Physical Infrastructure 2558.2 Site area improvement 2558.2.1 Industrial area (processing area)/ residential area (non processing area) 2568.2.2 Green-Belt 2568.3 Improvements In The Social Infrastructure 2568.3.1 Connectivity 2578.4 Employment Potential – Skilled, Semi-Skilled And Unskilled 2578.5 Other Tangible Benefits 2589.0 Environmental cost benefit analysis 244

10 Environmental management plan 261

10.1 Introduction 26210.2 Need 26210.3 Objectives 26310.4 Environment Components 26310.4.1 Air Environment 26310.4.2 Water Environment 26310.4.3 Solid waste 26410.4.4 Aesthetic (Noise & Odour) Environment 26410.4.5 Biological Environment 264

Page 10: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

10.4.6 Work-zone Comfort Environment 26510.4.7 Socio-Economic Environment 26510.5 Environment management Hierarchy 26610.6 Checklist Of Statutory Obligations 26610.7 Records Of Waste Generation To Be Maintained As Per Following: 27010.8 Environmental Organization 27010.8.1 Environment Management Cell 27110.9 Environmental Monitoring Schedule 27310.10 Schedules 27410.10.1 Daily Compliance 27410.10.2 Monthly Compliance 27410.10.3 Quarterly Compliance 27410.10.4 Yearly Compliance 27410.10.5 Consent Compliance 27510.11 Steering Committee 27510.12 Construction phase Management 27611 Summary and conclusions 27912 Disclosure of consultants 281

Page 11: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

ANNEXURES

Annexure Particulars

1 Executive summary

2 TOR issued by MoEF, New Delhi

3 List of TOR and their compliances

4 Layout of proposed projects

5 Topo map of 10 km radius, 1:50,000 Scale

6 Land use & Land cover map of the stud area

7 Environmental Monitoring reports for the existing industry

8 CREP Norms

9 KIADB land allotment copy

10 Water with-drawl permission letter

11 1. MOU with coal suppliers

12 CFO from KSPCB & its compliances for the existing industry

13 EC from MoEF & its compliances for the existing industry

14 Certified copy of EC compliance

15 Certified copy of CFO compliance

16 Recent monitoring report from KSPCB

17 Site location map with contours of 10km radius , 1:50,000 scale

18 DEM map of 10 km radius, 1:50,000 Scale

19 2. Energy balance for the manufacturing activities

20 Hydro geomorphology map

21 3. Groundwater level map

Page 12: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

22 1. Occupational health monitoring statistics

23 2. Quality, Environment, Safety and Health policy

TABLES

Sl.No.

Particulars Pg.no.

1.1 Salient Features of the proposed Project 3

1.2 List of industries around 25km of site 7

1.3 Environmental attributes and frequency of monitoring 17

2.1 Products and Capacity of the Existing Industry 19

2.2 Proposed Plants and their Capacities 19

2.3 Co-ordinates of the project site 22

2.4 Environmental Features of the proposed project site 22

2.5 Land Area Utilization 32

2.6 Project Schedule for Approval & Implementation 34

2.7 Characteristics of coking coal 38

2.8 Capacity of Coke Oven batteries 39

2.9 Characteristics of coke oven off gas 41

2.10 Specification of metallurgical coke 41

2.11 Specification of B grade coal 45

2.12 PCI coal specification 47

2.13 Characteristics of raw materials & additives 47

2.14 Raw materials Requirement, transportation & Storage details 48

2.15A Material balance for energy optimising furnace 48

2.15B Material balance for ladle refining furnace 492.15C Material balance for rolling mill 49

2.15D Material balance for continous casting machine 49

2.16 Transportation of raw materials 50

2.17 Power Requirement for Expansion Project 51

2.18 Furnaces & Utilization of Fuels 51

2.19 Furnace oil specification 52

2.20 HSD specification 52

2.21 BF gas specification 52

Page 13: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

2.22 Water Balance with Water Consumption and Waste WaterGeneration

54

2.23 Waste Water Treatment and Discharge 55

2.24 Gaseous Emissions APC Measures 55

2.25 Solid waste characteristics and storage 57

2.26 Solid Waste Management 58

3.1 Meteorological data of project site for the year 2013 63

3.2 Predominant wind directions 65

3.3 Techniques adopted/Protocols for ambient air quality monitoring 70

3.4 Ambient Air Sampling Stations 72

3.5 Air quality data analysis at the project site 74

3.6 Air quality data at Rajapura, A9 (downwind direction) 75

3.7 Air quality data analysis 76

3.8Ambient air quality standards – MoEF as per the notification dated16th November 2009 for industrial, residential & rural areas

77

3.9 Noise level monitoring stations 78

3.10 Noise level Limits as per Environmental Protection Rules 79

3.11 Water sampling stations 80

3.12 Protocol for surface water quality monitoring 81

3.13 Protocol for ground water quality monitoring 81

3.14 Analysis of surface water samples 84

3.15 Ground water quality 88

3.16 Observations 92

3.17 Soil sampling stations 92

3.18 Physico-chemical characteristics of soil 93

3.19 Land utilization pattern of the Bellary District 94

3.20The main Rock types noticed in the study area and their

succession

96

3.21 Pumping recovery test 98

3.22 Geophysical investigation 99

3.23 Resistivity data 99

3.24 List of Wild Mammals Found in the Study Area 107

3.25 List of Birds Commonly Found in the Area 108

Page 14: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

3.26 Fish Fauna observed in the Study Area 109

3.27 Demographic Details 110

3.28 Taluk Statistics 111

4.1 Impact Identification Matrix 120

4.2A Characteristics of Environmental Impacts from Construction Phase 121

4.2B Characteristics of Environmental Impacts from Operational Phase 122

4.3 Noise levels generated from construction equipments 1254.4 Noise of different equipments 125

4.5 Details of Stack & Gaseous Emissions from point source 127

4.6 Sources of Fugitive emissions 128

4.7 Dust extraction system 129

4.8 Fugitive emission sources 132

4.9 A &4.9 B Air pollution sources 134

4.10 Air pollution sources with emission rates in g/s 135

4.11 Predicted incremental short-term concentrations due to theproposed project (existing + proposed)

140

4.12 Predicted incremental short-term concentrations due to theproposed project (proposed)

141

4.13 Resultant maximum concentration 24 hr max (Existing + proposed) 170

4.14 Resultant maximum concentration 24 hr max (proposed) 171

4.15 Characteristics of untreated effluent 179

4.16 Treatment and utilization of efflluents 179

4.9 Characteristics of untreated and treated effluents 165

4.10 Treatment and utilization of Effluents 166

6.1 Post project monitoring schedule 219

6.2Financial allocation/budgetary provisions for environmentalmanagement aspects

221

7.1 Organization chart of onsite emergency plan 229

7.2 Identified hazards 233

7.3 Identification of health hazards 234

7.4 Risk analysis 237

7.5 Health register 246

7.6 Comparitive occupations 256

Page 15: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

8.1 Budget for Corporate Social Responsibility Activities 259

10.1 Environment Management Cell 271

10.2 Job of Environment Management Cell 271

10.3 Monitoring Schedule 273

10.4 Consent Compliance 273

12.1 List of functional area experts 282

12.2 Laboratories details 283

FIGURES

Sl.No.

Particulars Pg.no.

1.1 Location of Project Site in Bellary District 102.1 Location of Project Site in Bellary District 242.2 Location of the proposed project site on the Toposheet 252.3A Google Map of Project Location 262.3B Google Map of Project Location 272.4 Proposed Project Site Photographs 282.5 Site Surroundings Photographs 292.6 Existing plant photos 312.7 Process flow chart of Steel Making Unit 362.8 Process flow chart of Rolling Mill 372.9 Process flow chart for Coke Oven plant 422.10 Flow chart of power generation scheme 432.11 Process flow chart for Producer gas 452.12 Flow diagram of pulverized coal injection 463.1 Topo map showing 10 km radius around the project site 613.2 Wind rose diagram at Bellary IMD (0830 HRS IST) 663.3 Location of Ambient Air Quality Monitoring Stations 73

3.4 Location of Ambient Noise Level Monitoring Stations 79

3.5 Location of Water Quality Sampling Stations 82

3.6 Location of Soil sampling stations 93

3.7 Land Use Map of the Bellary District 95

Page 16: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

4.1 Google map showing stacks- existing & proposal 138

4.2 Google map showing baseline monitoring locations 139

4.3Suspended Particulate Matter (PM10) isotherms for the proposedproject (existing + proposed)

142

4.4Suspended Particulate Matter (PM10) isotherms for the proposedproject (existing + proposed)

145

4.5Sulfur di-oxide (SO2) isotherms for proposed project (existing+proposed) 148

4.6Sulfur di-oxide (SO2) isotherms for proposed project (proposed)

151

4.7Oxides of nitrogen (NOx) isotherms for proposed project (existing +proposed) 154

4.8 Oxides of nitrogen (NOx) isotherms for proposed project (proposed) 157

4.9Carbon monoxide (CO) isotherms for proposed project (existing +proposed) 160

4.10 Carbon monoxide (CO) isotherms for proposed project ( proposed) 165

4.11 Treatment Scheme for Domestic Effluent Stream 180

10.1 Structures of EMP 265

Page 17: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

CHAPTER -1

INTRODUCTION

Page 18: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 19: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

1

CHAPTER - 1INTRODUCTION

1.1 PROJECT BACKGROUND

M/s SLR Metaliks Ltd have already established and operating an iron making industry

consisting of 262 m3 blast furnace with 2,00,000 TPA capacity, 33 m2 sinter plant

(3,31,000 TPA) and 6 MW B.F. off gas based power plant at Narayanadevarakere

Village, Hagaribommanahalli Taluk, Bellary District, Karnataka State. Presently, the

pig iron produced in the industry is sold to other industries for use in steel making and

foundries. Granulated slag is sold for use as raw material to cement industries.

Granulated slag is used internally for civil works as a replacement to sand. Un-

granulated slag is used again in civil works as a replacement to aggregate. Sinter

produced is completely utilized as a captive source of blast furnace raw material.

Power generated from captive source is completely utilized in the industry it-self.

All the existing units are fully operational. Now M/s SLR Metaliks Ltd propose to

improve viability of the plant by value addition to the existing hot metal production by

installing additional and balancing facilities to produce more valuable downstream

products with ready market opportunity. Towards this objective, the company

proposes establish 3.0 Lakh TPA steel plant, 3.2 Lakh TPA rolling mill, 1.2 Lakh TPA

Coke oven plant, 9.0 MW coke oven off gas based power plant, 120 TPD oxygen

plant , 10 TPH Pulverized coal injection and 15000NM3/hr Producer gas plant in the

existing plant.

1.2 PURPOSE OF ENVIRONMENTAL IMPACT ASSESSMENT REPORT

Every developmental activity invariably has some impact and more often adverse

consequence to the environment. Mankind as it is developed today cannot live

without taking up these developmental activities for his food, security or other needs.

Consequently, there is a need for harmonious developmental activities with the

environmental concern. EIA is one of the tools available with the planners to achieve

the above goal. It is desirable to ensure that the developmental options under

consideration are sustainable. Hence, the environmental consequence must be

characterized early in the project cycle and accounted for in the project design. The

objective of EIA is to foresee the potential environmental problems that would arise

out of the proposed development and address them in the project planning and

design stage. This can often prevent future liabilities and expensive consequences of

Page 20: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

2

the project activity. The EIA process should allow for communication of this

information to:

1. Project proponent

2. The regulatory agencies

3. All stake holders and interest groups

EIA study is in particular essential for the industries causing significant environmental

impacts. Ministry of Environment and Forests (MoEF), Government of India has

issued EIA Notification dated 14-09-2006 in which guidelines are given for conduct of

EIA study and also the list of industries attracting the said notification.

The proposed industry is listed under EIA Notification dated 14-09-2006 and as

amended in December 2009 of Ministry of Environment and Forests (MoEF),

Government of India. As per this notification the industry is categorized under

Schedule 3(a), for Primary Metallurgical Industries (Ferrous & Non Ferrous) and

Category-A. As per the notification, prior Environmental Clearance (EC) from MoEF

is mandatory before establishment of this industry. Hence, the industry has to follow

due course of procedure to secure EC including application to MOEF for EC

clearance, terms of references from MOEF for conduct of EIA studies, public

hearing/consultations and deliberation of project at Expert Appraisal Committee of

MOEF. Accordingly, the project proponents have submitted prescribed application

along with pre-feasibility report to the MOEF New Delhi seeking terms of references

for conduct of EIA studies. MOEF New Delhi has deliberated the project in the 13th

EAC meeting dated 18.11.2013 and specified the TOR for conduct of EIA studies and

preparation of EIA report. Accordingly, EIA studies were conducted and the report is

prepared for submission to authorities. With EIA report and other documents the

industry has to approach KSPCB to conduct public hearing/consultations.

Final EIA report is to be prepared based on draft EIA report accommodating the

compliances to the observations made during public hearing/consultations. The report

will then be submitted to MOEF New Delhi for final environmental clearance.

1.3 BACK GROUND OF PROJECT PROPONENT

M/s SLR Metaliks Ltd incorporated on 17.11.2005 for manufacture of steel and allied

products. They have already set up and operating a 33 m2 Sinter Plant, 262 m3 Blast

Page 21: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

3

Furnace with Waste gas based Captive Power Plant (CPP) of 6 MW capacity at Sy

Nos. 633, 646, 643 & others, Narayanadevarakere Village, Hagaribommanahalli

Taluk, Bellary District, Karnataka State. The other group of companies of M/s SLR

are M/s A.R. Co-extruded Films Ltd., A.R. Plastics Pvt. Ltd., Raj Polypack Pvt. Ltd.,

Goel Polypack Pvt. Ltd., M/s Uttar Bharat Hydro Power Projects and INS Finance and

Investment Pvt. Ltd. M/s SLR are already engaged in the business of manufacturing

and selling of Pig Iron.

1.4 BRIEF DESCRIPTION OF THE PROJECT1.4.1 NATURE AND SIZE OF THE PROJECT

The salient features of the proposed project are given in Table-1.1.

Table-1.1 Salient Features of the proposed Project

Sl.No. Parameter Details

1 Project Expansion for utilization of the existing pig iron capacityfor the production of downstream high value products.

2ProjectProponents

M/s S L R METALIKS LIMITED NarayandevarakereVillage- 583 222, Lokappanahola NearMariyammanahalli, Hagaribommanahalli Tq. BellaryDist., Karnataka State.

3 Location of the site

Plot / Survey No. R.S. No.:633,646, 643 &others

VillageNarayandevarakere,Lokappanahola- 583 222,

Tehsil Hagaribommanahalli

District Bellary

State Karnataka

4 Proposed capacity

Steel plant 3,00,000 TPA

Rolling mill 3,20,000 TPA

Coke oven plant 1,20,000 TPA

Coke oven off gasbased power plant 1 x 9.0 MW

Air separation plant 120 TPD Oxygen capacity

Producer gas plant 15000 Nm3/hr

Page 22: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

4

Pulverized coal injection 10 Ton/Hr

5 Existing capacity

PRODUCTS QUANTITYPig Iron 2,00,000 TPAGranulated Slag 60,000 TPAUNITS CAPACITYBlast Furnace 1 x 262 m3

Sinter Plant 1 x 33 m2

Pig Casting Machine 2 x 500 TPD

BF Gas based captivePower Plant 1 x 6 MW

6Sl. No. in theSchedule

Schedule-3(a) for Metallurgical industries (ferrous & nonferrous) as per EIA Notification dated 14th September2006 and as amended in December 2009.

7 Location Features

The location of the proposed site and its immediatesurroundings is a barren land and moderately undulatedwith shrubs. It is consisting of rocky & sandy soil, notsuitable for cultivation. Nearest village Lokappanahola is1.5km, nearest town Hospet is 9.2 km and nearest highway SH-25 is 4.29 km from the site.

8 Total man power Construction phase : 400 NosOperation phase : 950 Nos

9 Land area

The industry possesses 50 acres land for the existingactivities. Expansion is proposed in the additionallyprocured land. 90 acres of land is already allocated byKIADB and another 100 acres is under process by KIADBfor establishment of the proposed plants.

10Basic Raw material

requirement

Plant Raw material Quantity

Steel plant

1. Hot Metal from BF

2. Pig /PI Scrap

3. Plant Return

Scrap

4. DRI

5. Fe-Alloys

6. Lime &Dolomite

2,33,000,TPA

12,000, TPA

16,000, TPA

40,000 TPA

39,68,130,

TPA

36,000, TPA

Page 23: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

5

Rolling millSteel shop Billetsand purchased

3,20,000,TPA33,000 TPA

Coke oven plant Coking Coal1,71,428,TPA

Pulverized coalinjection

Anthrasite &bituminous coal

16,800 TPA

Producer gasplant

Thermal Coal – Bgrade

47,000 TPA

Coke oven offgas based powerplant

Coke oven off gas 125, TPH

11Water requirement& Source

Requirement : 3005 KLPD,

Source : Tungabhadra river

12Power requirement& source

Total power requirement : 20 MWSource-1. Captive power from Coke oven gas waste heatbased power plant : 9.0 MW,

Source-2. KPTCL supply- 11 MW

Source-3. 3 x 1250 kVA D.G. set for emergencypurpose for supply of cooling water/lighting in case ofpower failure.

13 Project Investment INR 482 Crores (for expansion)

14Investment forEMP

Capital investment on EMP : Rs. 3174.00 Lakhs

Operating/running cost on EMP : Rs. 318.00 Lakhs

15

Effluent and theirtreatment &utilization

Domestic effluent: 32 KLPD, stabilized in septic tank,treated in STP and then utilized for dust suppression orgreenery development. Industrial effluent is mainly thepurge from circulating cooling water and Boiler blowdown.

16

Sources of airpollution & controlmeasures

1. Flue gases from 45 T/h boiler at coke oven waste gasbased power plant and 50T/H reheating furnace. Thesegases are vented through stacks of adequate height.

2. Vent gases from furnaces present in steel plant, rollingmill, and Coke oven. These are dedusted in venturi wetscrubbers, cyclone separators or in bag filters and thenvented through stack of adequate height.

3. Fugitive emission at pulverizers, screens, conveyors,furnace charging and discharging etc. These are suckedthrough vacuum suction hoods, dedusted and ventedthrough stacks of sufficient height.

Page 24: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

6

1.4.2 FEATURES OF THE PROPOSED PROJECT

1. The proposed plant will be cost effective, environmentally friendly & energy

efficient. This will help in making liquid steel efficiently & economically of best

quality.

2. All safety aspects will be addressed as per the statutory laws applicable to PCI,

steel melting shop, rolling mill. Safety acts, environment acts, factory acts etc. will

be strictly followed.

3. Hospet-Bellary region in Karnataka State is a high potential zone in terms of iron

and steel and allied industries because of the accessibility to raw material like rich

iron ore and dolomite.

4. M/s SLR Metaliks Ltd. are conscious of the importance of environmental aspects

to the project and thus have implemented all the environmental guidelines in the

forefront in maintaining high environmental quality in the industry as exemplified in

various certifications received.

1.4.3 LOCATION OF THE PROJECT SITEThe proposed project is proposed to be located at Sy No. 633, 646, 643 and others

Narayanadevarakere Village, Hagaribommanahalli Taluk, Bellary District, Karnataka

State. The location of project site in the district map of Bellary is shown in Figure-1.1.

17Sources of solidwaste &management

Solid waste obtained are,

1. Slag from steel mill furnace. Will be used for civilworks & bricks manufacturing after metal recovery.

2. Scraps, cut ends steel mill, rolling mill. These arerecycled to SMS.

3. Ash from PGP will be used for brick manufacturing

4. Coke fines and coal fines will be reused in coke ovenplant or sinter plant.

5. Mill scale from caster and rolling mill: this is used insinter process.

Page 25: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

7

Raw material availability at competitive price around the proposed project.

Port facilities at Chennai, Mangalore and Goa which are well connected by rail

route.

Tungabhadra river water availability.

Railway facilities within 10 kms.

Availability of sufficient land to cater to all needs of pig iron and associated

steel industry.

Availability of skilled man power.

Schools, Colleges, Training Institutions, Hospitals, etc. are at 4 – 15 km radius

of the site.

Statutory permissions are available for the existing industry at the proposed

site

List of industries in 25km radius from the project site is given in Table- 1.2

Table -1.2 List of Industries in 25km radius of the project site

Sl no Project Sector Location

1. BMM Integrated Steel Plant Iron and Steel Dhanapur, Bellary,Karnataka

2. Kej Minerals Iron ore beneficiation &Pelletization plant Iron and Steel Taranagar, Bellary,

Karnataka

3. Rukminirama Integrated Steel Plant Iron and Steel Harabbihalu, Bellary,Karnataka

4. Donimalai Iron Ore Mine Expansion Iron Ore Mining Donimalai, Bellary,Karnataka

5. S.J. Harvi Iron Ore Mine Iron Ore Mining Lakshmipura, Bellary,Karnataka

6. Thimmappanagudi Iron Mine Iron Ore Mining Thimmappanagudi,Bellary, Karnataka

7. Janekunta Iron Ore Mine Iron Ore Mining Janekunta, Bellary,Karnataka

8. Subbarayanahalli Iron Ore Mine Expansion Iron Ore Mining Bellary, Karnataka

9. Donimalai Iron Ore Mine Expansion Iron Ore Mining Bellary, Karnataka

Page 26: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

8

10. Jaisingpur Iron Ore Mine Expansion Iron Ore Mining Bellary, Karnataka

11. Ramgad Iron Ore Mine Expansion Iron Ore Mining Bellary, Karnataka

12. Dhruvdesh Integrated Steel Plant Iron and Steel Hirebangal, Koppal,Karnataka

13. Trivista Sponge Iron Plant Iron and Steel Koppal, Karnataka

14. Aditya Pig Iron Plant Iron and Steel Koppal, Karnataka

15. Kirloskar Pig Iron Plant Expansion Iron and Steel Bevinpalli, Koppal,Karnataka

16. Gallant Integrated Steel Plant Iron and Steel Halvarthi, Koppal,Karnataka

17. Kirloskar Pig Iron Plant Expansion Iron and Steel Bevinhalli, Koppal,Karnataka

18. Xindia Steel Plant Iron and Steel Koppal, Karnataka

19. Kalyani Steels Ltd. (Hospet division) Iron and Steel Ginigera, Koppal,Karnataka

20. Mukand Steels Ltd. Iron and Steel Ginigera, Koppal,Karnataka

21. Kirloskar Ferrous Industries Ltd. Iron and Steel Benihavalli, Koppal,Karnataka

22. ILC steels Iron and Steel Koppal, Karnataka

23. HRG alloy and steels Iron and Steel Koppal, Karnataka

24. Coca cola Iron and Steel Koppal, Karnataka

25. RBSSN mining & benification plant Iron and Steel Hospet karnataka

26. MSPL mining site Iron and Steel Hospet karnataka

27. Swastik steels Iron and Steel Hospet karnataka

28. M/S venkatagiri iron ore mines Iron and Steel Hospet karnataka

Page 27: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

9

29. Hare Krishna metaliks Iron and Steel Koppal, Karnataka

30. Ultratech cement Cement plant Koppal, Karnataka

31. K.O.F. limited Oil, Oilcake,Oils Seeds), Hospet

32. Pumpasara distillery ltd. Rectified spiritand I.M.FI, Hospet

33. India Sugar’s and Refinance Sugar Hospet

34. Minerals Sales private ltd. Sponge Iron Hospet

35. Kariganur Iron& Steel Pvt. Ltd. Hospet. Sponge Iron Hospet

36. M.S.P.L Ltd. (Vijaya Oxygen) Gas plant Hosalli

37. Tungabhadra Fertilisers & Chemicals Pvt Ltd, Fertilizer Munirabad RS

38. Bhoruka Power Corporation Ltd, Power plant Shivapura

39. Scan Ispat Limited Sponge iron Ginigera Village

40. K.P.R. Fertilizers Ltd Fertiliser Halavarthi village

Page 28: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

10

Figure - 1.1: Location of Project Site in Bellary DistrictM/s S L R Metaliks Limited, Narayanadevarakere, Lokappana Hola, H.B Halli Tq., Bellary Dist

Page 29: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

11

1.4.4 APPROVALS AVAILABLE FOR THE EXITING INDUSTRY

1. Consent for operation from KSPCB for the year 2013-2014.

2. Authorization for handling hazardous waste from KSPCB up to 30-06-2015.

3. Permission from Water resource dept GOK for withdrawal of water from TungabhadraRiver.

4. License from Chief Controller of explosives for storage & handling of liquid Nitrogen.

5. License from village Panchayath.

6. Approval from Single window agency, KUM, GOK.

7. Layout approval from Director of Factories & Boilers, GOK.

8. Sanction of power from KPTCL.

9. Approval for electrical installations by CEIG, GOK.

10.Approval for boiler from Director of Factories & Boilers, GOK.

1.5 IMPORTANCEOF THE PROJECT TO THE COUNTRY &REGION

1.5.1 DOMESTIC STEEL DEMAND

In India, a major part of steel is consumed in engineering applications, followed by

automobiles and construction. The growth of steel, as is well known, is dependent

upon the growth of economy, industrial production and infrastructure sectors. The

automobile industry is on a growth path and this is likely to continue. The two-

wheeler, four-wheeler and commercial vehicle sector are all doing well. Therefore

demand for steel from these sectors is likely continue in future.

In India, apparent consumption of steel increased from 14.8 million tonnes in 1991-92

to 43.5 million tonnes in 2006-07. As per the National Steel Policy - 2005 of Govt. of

India, the demand-supply scenario for steel up to 2020 is as given below:

National Steel Policy of Government of India have considered growth rate of 7.3% per

annum. The actual growth of consumption during 2005-2006, according to Steel

Ministry, was 13.88%. Even if we assume a lower growth rate of 10% per annum, the

demand for the year 2014-15, it will be 97.67 million tons. In terms of crude steel, the

demand works out 105.5 million tons for 2015. Production of crude steel during 2005-

06 was 42.1 million tonnes. It can be seen from the above that demand is likely to be

Page 30: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

12

more than double in the next ten years. Based on the assessment of steel market

(considering the boom in construction sector and industrial applications) and the

resources available to the promoters, it is recommended to set up a 0.2 Mt/yr pig iron

plant.

The domestic demand of steel is to increase 13.3% in 2011. The global steel demand

this year is expected to increase by 5.9%, according to the data made available by

the World Steel Association (WSA). India, with an expected growth in steel demand

of 13.3%, will lead the steel demand in the world.

The association (WSA), whose members produce 85% of the total steel made in the

world, in its newsletter about the ‘short range outlook’ on steel in 2011 and 2012,

said, “India is expected to show strong growth in steel use in the coming years due to

its strong domestic economy, massive infrastructure needs and expansion of

industrial production.” It further says that in 2012, India’s steel demand will touch

14.3%, reaching 79 million tonnes (mt) per year. In 2010, India produced 67 mt steel

and is the fifth-largest steelmaker in the world with China as the leader, followed by

Japan, US and Russia.

It is clear from the data that the steel demand will continue to be driven by the

growing economies, led by India. Even as the consumption is growing in the western

world, WSA predicts that by 2012, steel use in the developed world will still be at 14%

below the 2007 level whereas in the emerging and developing economies, it will be

38% above. In 2012, the emerging and developing economies will account for 72% of

world steel demand in contrast to 61% in 2007, WSA noted.

State-owned Steel Authority of India, too, is ramping up production to reach 24 million

tons from a shade under 14 million tons, currently. The capacity will come in phases

over the next little years. The demand for alloy and special steels in the country is

increasing in the last few years as the consumption of steel has increased by 12%

since year 1998. It finds major use in the forging, automobile, auto component,

railway etc. There is huge domestic demand for alloy and special steels and this

demand is likely to continue in future.

In view of the present encouraging industrial trend for use of steel in the country ,

which is likely to continue in future, M/s. SRL have proposed to expand its activity in

steel production capacity at economical cost.

Page 31: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

13

1.5.2 DEMAND SUPPLY GAP, IMPORTS vs INDIGENOUS PRODUCTION

The scope for raising the total consumption of steel is huge in India, given that per

capita steel consumption is only 40 kg – compared to 150 kg across the world and

250 kg in China.

The National Steel Policy has envisaged steel production to reach 110 million tons by

2019-20. However, based on the assessment of the current ongoing projects, both in

greenfield and brownfield, Ministry of Steel has projected that the steel capacity in the

county is likely to be 124.06 million tons by 2011-12. Further, based on the status of

MOUs signed by the private producers with the various State Governments, it is

expected that India’s steel capacity would be nearly 293 million tons by 2020.

India has been a net importer of steel but in recent years due to the commissioning of

capacities in the range of 8-10 million tons, we might become a net exporter.

Therefore production of steel at the regional level will be highly beneficial & help in

reduction of imports.

1.5.3 EMPLOYMENT GENERATION DUE TO THE PROJECT

The total direct employment potential during operational phase of the proposed

project is about 950 people. However, the commencement of this industry will create

indirect employment opportunities to more than 1,000 people in terms of

transportation, vehicle maintenance, petty shops etc. In addition, about 400 persons

will be employed during the construction phase of the project.

1.6 OBJECTIVE AND SCOPE OF EIA STUDIES

The overall objective of any EIA studies is to identify and assess the adverse and

beneficial impacts of the project in the planning stage itself, so that necessary

mitigation measures to prevent or minimize these adverse impacts could be planned

early and cost effectively. In view of this objective, the scope of EIA study broadly

includes:

i. Introduction along with scope of EIA studies (Chapter-1).

ii. Preliminary details of project including type, need and location of project and

the magnitude of project activities (Chapter-2).

Page 32: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

14

iii. Project description including process, resource required and products formed

along with sources of pollution and built in mitigation measures with respect to

wastewater, gaseous emissions and solid wastes (Chapter-2).

iv. Existing baseline status of the relevant environmental parameters in the

specified study area through primary and secondary source. The

environmental parameters include meteorology, air, water, land, soil, noise,

ecology and socio economics (Chapter-3).

v. Anticipated environmental impacts of the proposed project on environment and

measures for mitigation of the predicted adverse impacts, air pollution

dispersion modeling studies (Chapter-4).

vi. Analysis of alternatives for the technology & site (Chapter-5)

vii. Technical aspects of monitoring the effectiveness of mitigation measures. It

includes laboratory and other facilities monitoring facilities, environmental

parameters to be monitored, data to be analyzed and sampling location and

schedule. It also includes budgetary provision and procurement schedule for

the monitoring facilities (Chapter-6).

viii. Additional studies relevant to the project such as public consultation, risk

assessment and social impact assessment with R.R. Action plan (Chapter-7).

ix. Project benefits in terms of improvement in social and physical infrastructures

in the region of the proposed project (Chapter-8).

x. Environmental cost benefit analysis of the project (Chapter-9).

xi. Administrative aspects of environmental management plan to ensure that the

mitigation measures implemented and their effectiveness monitored (Chapter-

10).

xii. Summary and conclusions consisting of overall justification of project. It also

includes the summary of significant adverse effects along with the measures to

overcome the same (Chapter-11).

xiii. Preparation of EIA document as per MoEF guidelines. It includes all the above

Information of items from i to xii.

Page 33: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

15

1.7 METHODOLOGY OF EIA STUDIES

1.7.1 EXISTING ENVIRONMENTAL STATUS

The environmental influence due to the project is likely to cover a radial distance of

about 10 km around the factory premises. Therefore, the study area for monitoring of

environmental parameters covers 10 km distance from the project site.

The environmental parameters, which are likely to be affected by the activities of the

project, were identified. They include air, noise, water, soil, land use, ecology, socio-

economics etc. The existing status of these environmental parameters for study area

is collected from both primary and secondary sources. Primary source data were

collected through environmental monitoring survey of representative locations of the

study area during the post monsoon period of 11th December 2013 to 11th March

2014. The reconnaissance survey was conducted and the sampling locations were

identified based on:

i. Existing topography and location of surface water bodies like ponds and

steams.

ii. Meteorological conditions (predominant wind directions).

iii. Location of towns, villages and other sensitive areas present in the vicinity of

the proposed project site.

iv. Representative areas for baseline conditions

v. Accessibility, power availability and security to the monitoring equipment.

Secondary data were collected from various organizations to substantiate the primary

data. The data thus collected was compared with the standards prescribed for the

respective environmental parameters. The environmental parameters monitored and

the frequency of monitoring is given in Table-1.3. The methodologies adopted for

studying individual components of environment are briefly described below.

1. MICRO METEOROLOGY

A temporary automatic weather monitoring station was installed to record

meteorological parameters at plant site. The parameters like hourly wind speed, wind

direction, temperature and relative humidity were recorded on hourly basis

continuously during the study period. Wind speed and wind direction data recorded

were used for computation of relative percentage frequencies at different wind

directions. The meteorological data thus collected has been used for interpretation of

Page 34: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

16

the existing Ambient Air Quality status, and the same data has been used for

prediction of impacts on future scenario due to the activities of the project.

2. AMBIENT AIR QUALITY

The status of the existing ambient air quality in the study region has been assessed

through a network of 12 air monitoring locations with one AAQM location in down

wind direction during the study period within a radial distance of 10 km distance from

the project site. The monitoring network was so designed that a representative

baseline scenario is obtained in upwind, downwind and crosswind directions. These

monitoring sites have been established keeping in view the available data on

predominant wind direction and wind speed of this particular region. The existing

ambient air quality status (AAQ) has been monitored at each station on 24 hourly

basis. The monitoring was done as per NAAQ standards-2009 and CPCB guidelines.

Maximum, minimum and average values have been computed from the data

collected at all individual sampling stations to represent the ambient air quality status.

3. NOISE ENVIRONMENT

Noise monitoring has been carried out at 10 different locations to identify the impact

of project activities on the surroundings in the study area. Noise levels were recorded

at an interval of 10 s for about 30 minutes during the day and night times to compute

the day equivalent, night equivalent and day-night equivalent level.

4. LAND ENVIRONMENT

Field surveys were conducted to delineate classification of land use pattern, cropping

pattern, vegetation cover in the study area. Representative soil samples were

collected from 3 different sampling locations within an area of 10 km radius around

the plant site. They were analyzed to assess their physico-chemical characteristics.

Standard procedures were followed for sampling and analysis. The samples collected

were assessed for their suitability for the growth of plant species and crops.

5. SOCIO-ECONOMIC ENVIRONMENT

Socio economic data including demographic pattern, population density, education

and medical facilities, livelihood, economic and health status, transport facility were

Page 35: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

17

collected for the study area from primary and secondary sources for the study area

and analyzed.

Table1.3 Environmental attributes and frequency of monitoring

Sl.No

Attribute Parameters Frequency of Monitoring

1 Micrometeorology

Wind speed (hourly) &direction, temperature,relative humidity and rainfall

At project site continuous for 3months hourly recording.

2 Ambient airquality

PM10, PM2.5, SO2, NOx &PAH At 12 locations

24 hourly samples twice aweek for the project site

3 Gaseousemissions

PM, SO2, NOx, Fortnightly

4 Surface (river)water quality

Physical, chemical &bacteriological parameters

Grab samples have beencollected once during thestudy period.

5 Ground waterquality

Physical, chemical &bacteriological parametersfor 8 locations.

6 Ecology Terrestrial and aquatic floraand fauna in the region.

Secondary data.

7 Noise levels Noise levels in dB (A) at 10locations.

Recording at hourly interval for24 hrs, once a month perlocation during study period.

8 Soilcharacteristics

Parameters related toagriculture potential at 3locations.

Once during the study period.

9 Land use Trend of land use change fordifferent categories.

Based on data published indistrict census handbook.

10 Socio- economicaspects

Socio-economic parameters Based on the data collectedfrom the secondary source.

11 Geology Geological history Based on the siteinvestigation.

12 Hydrology Drainage area and patternnature of streams. Aquifercharacteristics recharge anddischarge areas.

Based on the siteinvestigation.

13 Risk assessment To identify areas wheredisaster can occur due to fire& explosives & release oftoxic substance.

Identification of possible risksat the proposed project,quantification of risk throughmodeling.

Page 36: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

18

1.7.2 IDENTIFICATION OF IMPACTS AND MITIGATION MEASURES

The likely impacts of various activities of the proposed project on the environment

were identified. These impacts were assessed for their significance based on the

background environmental quality in the area and the magnitude of the impact. All

components of the environment were considered and wherever possible impacts

were evaluated in quantitative / qualitative terms. Estimated impacts have been

superimposed over the baseline (pre-project) status of environmental quality. The

resultant (post-project) quality of environmental parameters is reviewed with respect

to the permissible limits. Thereby, the preventive and mitigation measures were

formulated and incorporated in the environmental plan.

1.8 TERMS OF REFERENCES (TOR) FROM MOEF AND THEIR COMPLIANCES

Terms of References for conduct of EIA studies were specified to this project by

Environmental Appraisal Committee, MoEF New Delhi during their 13th meeting

(Proceedings No. 13.2.17) held on 18/11/2013 & subsequently TOR was issued on

16/1/14. Copy of the TOR is given as Annexure-2. The EIA studies were conducted

based on these TOR and accordingly the EIA report is prepared. The list of TOR and

their compliances is given in Annexure-3. Additional considerations are also made

based on site conditions.

Page 37: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

CHAPTER -2

PROJECT DESCRIPTION

Page 38: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 39: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

19

CHAPTER - 2

PROJECT DESCRIPTION

2.1 TYPE OF PROJECT

2.1.1 PRODUCTION CAPACITY & PRODUCT MIX

The present proposal is for expansion of the existing iron making industry for

manufacture of downstream and associated products. M/s SLR has finalized the

capacities of plant facilities based on product mix of the proposed expansion project.

The production capacity and the plant facilities established in the existing industry

and those proposed for expansion are given in Table-2.1 and Table-2.2, respectively.

Table-2.1 Products and Capacity of the Existing Industry

Table-2.2 Proposed Plants and their Capacities

Steel plant will be added in the industry to convert hot metal produced from blast

furnace into special steel, a high value and much needed product. Similarly the rolling

mill based on steel plant capacity will be established to cater additional market and to

realize higher returns to the product. Coke oven plant will be established to

manufacture metallurgical coke for captive utilization in BF plant. Further an air

separation plant will be established for generation of oxygen and nitrogen for their

captive use in steel plant. In addition, a captive power plant based on coke oven off

Products Quantity1. Pig Iron 2,00,000 TPA2. Granulated Slag 60,000 TPA

Plants Capacity1. Blast Furnace 1 x 262 m3

2. Sinter Plant 1 x 33 m2

3. Pig Casting Machine 2 x 500 TPD4. BF Gas based captive Power Plant 1 x 6 MW

Sl. No. Plant Capacity

1 Steel plant 3,00,000 TPA2 Rolling mill 3,20,000 TPA3 Coke oven plant 1,20,000 TPA4 Coke oven off gas based power plant 1 x 9.0 MW5 Pulverized coal injection 10 TPH6 Air separation plant 120 TPD Oxygen capacity7 Producer gas plant 15000 Nm3/hr

Page 40: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

20

gas will also be established along with coke oven plant. Producer gas is used in

Reheating furnace of rolling mill. Pulverized coal injection will be used in Mini blast

furnace to decrease coke consumption.

2.1.2 INTERLINKED/INTERDEPENDENT PROJECTS

The power generated from coke oven plant is based on waste heat present in coke

oven off gas and the power generated is used only for captive consumption.

2.1.3 CATEGORIZATION OF THE PROJECT

The proposed industry is listed under EIA Notification dated 14-09-2006 and as

amended in December 2009 of Ministry of Environment and Forests (MoEF),

Government of India. As per this notification the industry is Classified under Schedule

3(a), for Primary Metallurgical Industries (Ferrous & Non Ferrous) and Category-A.

2.2 NEED (JUSTIFICATION) FOR EXPANSION OF THE INDUSTRY

The industry M/s. SLR Metaliks ltd with its present operational capacity is not

economically viable. There is huge demand for steel in the country. Further, the

Bellary region in Karnataka State is a potential zone for establishment of iron and

steel industries because of its accessibility to natural resources including water and

raw material like rich iron ore, dolomite, manganese ore etc. Establishment of the

steel industry with its own resources will meet the national interest of development

through self-realization. Further, it helps to enhance the status of this underdeveloped

rural area through improvement in roads, communication, job opportunities and other

infrastructural facilities. The Government of Karnataka envisaged the policy to

encourage iron and steel industries in the state. Hence, M/s. SLR proposes to

increase the production activity of the industry by establishing facility for manufacture

of downstream and associated products.

The expansion will be done in the vicinity of the existing premises. Administrative and

ancillary infrastructure facility will be made use of in expansion of the project. Hence,

the expansion will be achieved with minimum resources.

In these days of high competition, escalating cost of production, power and raw

materials it is essential to produce steel at economic cost. In the present industry this

Page 41: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

21

is to be achieved by modernization of technology, value addition, recovery and use of

wastes and enhancement of capacity with minimal resources.

2.3 DESCRIPTION OF LOCATION

2.3.1 BASIS FOR SELECTION OF THE SITE

The proposed project is expansion of the existing project and therefore associated

with activities of the existing industry. The proposed steel plant will utilize the hot

metal produced in the existing pig iron plant. Similarly the coke produced from the

proposed coke oven will be utilized in the existing blast furnace. Hence, the proposed

facility is essentially to be located adjacent to the existing project site. Hence, no

alternate sites are considered.

The expansion project is proposed to be located East side of the existing industrial

premises. 90 acres of land is already allotted by KIADB for the proposed expansion

project and another 100 acres is under process by KIADB. Expansion is proposed in

the additionally allotted land for the proposed plants.

No significant change expected in land cover or topography. The proposed land is

non-agriculture, rocky, sandy, un-cultivated barren land. It does not require clearance

of existing land, vegetation or buildings. The choice of the land confers several

advantages, which are summarized below.

1. The site is connected to mines through rail-line and highways. SH- 25 is 4.29 km

South East from the site and NH 13 at a distance of 6.5 km East from the project

site. Railway line is at 7.2 km NE from the site.

2. Ecologically sensitive areas like forest land, national park, heritage location etc are

not in the vicinity. T.B. dam back water is at a distance of 700m to 3000m from the

proposed facilities depending upon the water level.

3. Water has been allocated form T.B. Board by GOK.

4. Housing facilities, educational facilities, recreational facilities and other amenities

are available at Hosapete located at 9.2 km NE.

5. No incidence of cyclones, earth quake, floods or landslides in the region.

Considering the above, the site adjacent to the existing industry located at

Narayanadevanakere village is selected for the expansion project.

Page 42: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

22

2.3.2 LOCATION FEATURES OF THE PROJECT

The proposed site for the expansion is located at Sy Nos. 633, 646, 643 and others,

Narayanadeverakere Village, Hagaribommanahalli Taluk, Bellary District, Karnataka.

SH-25 joining Harihar and NH-13 is located at a distance of about 4.29 kms

SouthEast, NH-13 joining Hospet and Chitradurga is located at a distance of about

6.5 km East. District head quarter Bellary town is located at 85 km E from the site.

District Bellary has rich deposits of Iron ore. Hospet & Sandur area provide an

assured and continuous supply of raw materials. The location is very well connected

by Road & Rail. Environmental features of the site are given in Table-2.4.

The altitude of the site is in the range of 505 m above MSL. The co-ordinates of the

site are given in Table-2.3. Land-use pattern around the project site is basically rural

& agrarian with few scattered industries. The land is nearly plane sloping towards

north. The proposed land is un-cultivated or barren rocky,sandy land. It is free from

trees or other vegetation of any worth. It is covered with only the shrubs and bushes.

District Bellary has rich deposits of Iron ore. Hospet & Sandur area provide an

assured and continuous supply of raw materials.

Table-2.3 Co-ordinates of the project site

Direction East Longitude North Latitude

North- West(p1) 76°19'04.44"E 15°11'09.36"N

North-East (p2) 76°19'23.18"E 15°11'9.51"N

East (p3) 76°19'29.35"E 15°10'56.84"N

South-East(p4) 76°19'21.66"E 15°10'47.85"N

South-West(p5) 76°19'15.22"E 15°10'59.31"NWest(p6) 76°19'5.03"E 15°11'2.70"N

The ash pond is located at 76°19'22.22"E, 15°10'59.31"N

Table 2.4 Environmental Features of the proposed project site

Sl.No.

Features Particulars

1 Location Sy Nos. 633, 646, 643 and others,Narayanadevarakere Village,HagaribommanahalliTaluk, Bellary District,Karnataka.

2 Present land use Barren uncultivated land

Page 43: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

23

3 Latitude/Longitude 15°11'8.15" N / 76°19'13.57" E

4 Average altitude 505 m above MSL

5 Topography Nearly plain, free from trees or any richvegetation, sloping towards NE.

6 Soil type Red soil mixed loamy

7 Temperature range Max. : 270C to 420C and Min. : 140C to 260C

8 Average humidity 65 %

9 Annual normal rain fall 760 mm (average of 10 Years)

10 Average wind speed 5.3-7.8 km/hr

11 Predominant winddirection

NE and SW

12 Present land use Barren vacant land

13 Nearest village Lokappanahola village at 1.5 km S.E.from theproposed site. No settlement in predominant winddirection ie NE & SW

14 Nearest high ways S.H.-25 : 4.3 km SE. and NH-13 : 6.5 km E

15 Nearest Railway station S C Railway Line (Vyasanakere Railway station) :7.2 km, NE

16 Nearest air strip Hubli, 170 km W

17 Nearest town Hospet, 9.2 km NE

18 Nearest industries BMM Ispat Steel Ltd, 6.9 km E,Sandur Manganese & Iron Ore (closed unit) &Star Metaliks & Power 7.12 km ERukmini rama steels ltd. 3.6km SW

19 Nearest water body /river Tungabhadra river: 5 kmTungabhadra reservoir back water: 700m NWfrom the expansion project site.Dhayanakere : 8.6 km SE

20 Nearest Archaelogicalplace

Hampi (world Heritage site) : 25 km, NE

21 Nearest National park /Reserved Forest

Gunda Reserved Forest : 7.5 km, NENandi Banda Reserved Forest : 6.2km, SRamgad Reserved Forest : 9.5 km, E

22 Ecologically sensitivelocations

Tungabhadra reservoir back water: 700mm NWfrom the expansion project site andTungabhadra river : 5 kmGunda Reserved forest : 6.2 km, NEThere are no Defence installation, no Nationalpark, no wild life sanctuary and no BiosphereReserve within 25 km from the site

Page 44: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

24

Location of proposed unit is shown in figure 2.1

Figure - 2.1: Location of Project Site in Bellary District

Page 45: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

25

Figure - 2.2: Location of the proposed project site on the Toposheet(Toposheet: 57A/4, 57A/7, 57A/8, Scale–1:50,000)

Page 46: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

26

Figure - 2.3A: Google Map of Project Location

Page 47: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

27

Figure - 2.3B: Google Map Existing & Proposed Sites

The photographs of proposed expansion site are shown in figure 2.4 to 2.6

North Direction North Direction

South Direction South Direction

Proposed site

Existing plant

Page 48: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

28

East Direction East Direction

West Direction West Direction

Figure - 2.4: Proposed Project Site Photographs

North Direction North Direction

South Direction South Direction

Page 49: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

29

West Direction West Direction

East Direction East Direction

Figure - 2.5: Site Surroundings Photographs

Existing plant photos is given in fig 2.6

North Direction South Direction

Page 50: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

30

East Direction West Direction

Greenbelt Greenbelt

Greenbelt MBF

Power Plant Sinter Plant

Page 51: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

31

Dry GCP in MBF ESP in sinter plant

Fig 2.6 Existing plant photos

2.3.3 PROJECT LAY OUT

The project site layout is enclosed as annexure-4

2.4 SIZE AND MAGNITUDE OF OPERATION (PLANT FACILITIES &INFRASTRUCTURE)

2.4.1 LAND AREA

The proposed site is located at Narayandevarakere, Lokappanahola Village, Near

Hagaribommanahalli Tq., Bellary Dist., Karnataka State. The industry possesses 50

acres land for the existing activities. The extent land provided for the proposed

project is 190 acres. 90 acres of land is already acquired through KIADB for the

proposed expansion project and another 100 acres is under acquisition through

KIADB. 65 acre land will be utilized for green belt and greenery development, 76

acres will be built up area for establishment of project facility and 49 acre will be

vacant open land for future development. The utilization of land for different

applications is given in Table-2.5.

The proposed land is barren uncultivated rocky,sandy land. It is covered with only the

scanty shrubs and bushes. It does not require clearance of existing land, vegetation

or buildings. No significant change in land cover or topography. Land-use pattern

around the project site is basically rural & agrarian with few scattered industries.

Page 52: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

32

Table-2.5 Land Area Utilization

Land Utilization Present,Acres

After expansion,Acres

Built up area 33 76Green belt and greenery area. 17 65Open vacant area for future use 0 49Total 50 190

2.4.1.1 LAND DEVELOPMENT

The proposed land area is lightly undulated within ± 2m. The land will be leveled and

compacted utilizing gravel available in the site itself. No filling material is needed and

no muck or waste material needed to be disposed off.

2.4.2 ACTIVITIES DURING CONSTRUCTION PHASE

2.4.2.1. ACTIVITIES

Civil construction activities include the following.

1. Extent of built up area in expansion: 76 acres.2. Construction works: foundations, floorings, buildings, boiler house, turbine

house, godowns.

3. Above ground building / structures: 6 to 15 m height for buildings / structures.

4. Height of chimney/stack: 30 to 75 m from ground level.

5. Excavations: 1 to 3 m foundations machinery such as turbine, water storage

tank.

6. Constructed floor area of buildings & other structures: 8000 m2.

7. Construction period: 6 months.8. Construction material

Size stone & boulders : 10000 T (1000 loads)

Stone gelly : 20000 T (2000 loads)

Sand : 10000 T (1000 loads)

Bricks ; 500 m3 (100 loads)

Cement : 5000 T (250 loads)

Steel :1000 T (25 loads)

9. Transportation of Construction Material

Steel and cement are available from manufacturers located in Karnataka at

100 to 150 km. They are transported through rail and lorry transport. Other

Page 53: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

33

construction material sand, stone and gravel are available with in 20 km

source from the project site. They are transported through lorry transport.

2.4.3 MANPOWER

2.4.3.1. Requirement of Personnel

A maximum of 400 persons will be engaged during construction period and 950

persons during operation period of the proposed project. More than 90 % of the

persons employed in the industry will be employed from the local area. Hence the

influence of influx on environment is insignificant.

2.4.3.2. Residential Quarters

Most of the workers will be residing at nearby villages. The company has already

provided residential facilities to the essential employees. A total of 60 quarters are

already present in the existing project. In addition, 20 nos of residential quarters will

be provided during expansion of the project.

2.4.3.3. Transportation of Personnel

A maximum of 400 persons will be engaged in construction works. Construction

period is about 14 months. They use company vehicle facilities, public transportation

and own vehicles. A total of about 10 visits will be made by the motor vehicles to the

industry for transportation of personnel.

During operation a maximum of about 950 persons will be employed in the industry. A

total of about 40 visits by four/six wheelers and about 160 visits by two wheelers will

be made to the industry for transportation of personnel.

2.4.4PROJECT INVESTMENT

Total investment for the proposed project is estimated as Rs. 482 Crores. Investment

on Pollution Control facility will be is Rs. 3174.0 lakhs

2.5 PROPOSED SCHEDULE FOR APPROVAL & IMPLEMENTATION

The tentative project schedule is given below. The implementation of the project will

be taken up after receipt of Consent to establish from Karnataka State Pollution

Control Board and Environmental clearance from the Ministry of Environment &

Page 54: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

34

Forests, Government of India. Time schedule for Approval & implementation of the

project is given in Table-2.6.

Table 2.6 Time schedule for Approval & implementation of the project

1. Submission of final EIA report and Public hearingproceedings to MOEF GOI New Delhi July 2014

2. EIA deliberations and grant of EC Sept. 2014

3. Submission of CFE application to KSPCB Bengaluru Oct. 2014

4. Deliberation of the proposal and grant of CFE to theindustry. Dec. 2014

5. Commencement of proposed project construction Dec. 2014

6. Completion of project construction and submissionof CFO application to KSPCB Bengaluru August 2015

7. Grant of CFO from KSPCB and the Commencementof commissioning and production Sept. 2015

2.6 TECHNOLOGY & PROCESS DESCRIPTION

The list of products proposed to be manufactured along with their capacity is given in

Table-2.2. A brief information on manufacturing process of these products is given

below.

2.6.1 MANUFACTURING PROCESS FOR STEEL MILL

A Steel making unit with Energy Optimizing Furnace (EOF) /LRF/VD is proposed. A

flow chart for manufacture of steel is given in Figure-2.7.

2.6.1.1. ENERGY OPTIMIZING FURNACE (EOF)

The oxygen process is the most common process for producing steel. The Energy-

optimizing oxygen furnace (EOF) involves this process using combined submerged

(bottom) and atmospheric (top) blowing. The hot metal from blast furnace is taken into

the EOF, 20-22% scrap / DRI is then added into the hot metal. The necessary fluxes

(ferro-alloys, calcined lime and iron ore) are also added to the bath. Oxygen is blown

into the bath through water-cooled lances using combined bottom and top blowing.

During blowing operation, oxygen oxidizes iron into iron oxide and carbon into carbon

monoxide. The iron oxide immediately transfers the oxygen to the tramp elements,

which leads to formation of reactive slag. As blowing continues, there is a continuous

Page 55: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

35

decrease of carbon, phosphorous, manganese and silicon within the melt. The refining

process is completed when the desired carbon content is attained. The steel is tapped

into the ladle furnace by a transfer trolley. The slag is discharged into the slag pot.

2.6.1.2. LADLE FURNACE AND VACUUM DEGASSING UNIT

The ladle furnaces are used to refine steel & VD furnace helps in degassing steel and

they act as a buffer between EOF and continuous casting machine. It is utilized to

maintain high levels of steel cleanliness, de-sulfurisation and accurate temperature

control. The required temperature is maintained with the help of small electrodes, while

the melt is homogenized by introduction of inert nitrogen/argon gas. The ladle is then

lifted and taken to vacuum degassing unit. Vacuum degassing refines the molten steel

by removing unwanted hydrogen and nitrogen gases. The molten metal ladle from LF

is placed under vacuum generated by multiple stage steam ejectors. After sampling of

the steel and temperature measurement, the ladle is shifted to continuous casting

machine. The vacuum-degassing unit utilizes steam generated by a boiler (run by

furnace oil).

2.6.1.3. BILLET/BLOOM CASTERS

During continuous casting, the refined liquid steel passes from the pouring ladle, with

the exclusion of air, via a tundish with an adjustable discharge device (nozzles) into

the short, water-cooled mould. The shape of the mould defines the shape of the steel

i.e blooms or billets. The red-hot strand, solidified at the surface zones, is drawn from

the mould by driving rolls. Once it has completely cooled and solidified by carefully

spraying water, the strand is divided by mobile gas cutting torches. The cut pieces are

then allowed to cool and sent to stacking/ storage yard/rolling. A third strand of

casters and a strand EMS has been proposed for each of the bloom and billet casters.

This will reduce the casting time and also give better quality of blooms and billets.

2.6.2 MANUFACTURING PROCESS FOR ROLLING MILL

Steel manufactured in the steel shop will be sent to rolling mill unit for products of

specified sizes. The process includes pre-heating in the furnace and hot rolling

followed by shot blasting, mechanical surface finishing before inspection and

stacking. A flow chart for manufacture of steel making and rolling mill is given in Figure-

2.7 & 2.8.

Page 56: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

36

Figure - 2.7: Process Flow Chart of Steel Making Unit

Energy Optimizing Furnace

Ladle Refining Furnace

Vacuum Degasing

Continuous Casting

Gas Cutting & Cooling

Stacking & Inspection(Blooms & Billets)

Dispatch

Rolling Mill

Ferro alloys

Conditioning andinspection

Dispatch

HotMetal

DRIScrap

FerroAlloys Fluxes

Ferro alloysPlant returns

Page 57: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

37

Figure – 2.8: Process Flow Chart of Rolling Mill

2.6.3 MANUFACTURING PROCESS FOR METALLURGICAL COKE

The manufacturing of metallurgical coke and its process are enumerated as under and

the flow diagram for the proposed Coke Oven Plant is given in Figure-2.8 later in the

section.

2.6.3.1 COAL HANDLING AND PREPARATION

Coal from different sources will be brought to the factory site by trucks and unloaded

on to the raw material stockyard. The coal will be have moisture of around 8%,

therefore, reduces the risk of fugitive emissions. In the stock yard it will be blended to

optimum composition required for coking. After blending it will be crushed to 100%

Reheating Furnace

Blooming Mill

Hot Saw

Cooling & Stacking

Shot Blasting

Magnetic Particle Inspection

Stacking

Mech. Surface Finishing

Band Saw

Non Destructive Testing

Dispatch

Induction Heating

Bright bar

Dispatch

Plant Return toEOF/BOF

Blooms / Billets from SteelMill

Page 58: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

38

through 1 mm by suitable crushers. The crushed coal falls directly into the coal

charging Car and is stamped suitably. Water is the sole binder to form the coal cake.

The Charging car is of about 24 ton capacity and will move on rail tracks for charging

the ovens. The empty Car after charging is brought back to the crusher/coal bunker

for further loading of coal. The specifications of coal used in coke oven plant is given

in table 2.7

Table 2.7 Characteristics of Coking Coal

Sl. No Parameter Value1 Total 8% max2 Ash content 8% max3 Volatile matter 24% max4 Sulphur 0.5% max5 Phosphorus 0.02%6 MMR of vitrinite 1.2-1.3%7 Vitrinite percentage 70% max8 CSN 6-89 Fluidity 1000ddpm10 Size >50mm

2.6.3.2 COMPACTING STATION

During the Stamp Charging, the water content serves as a binder. However, the

density of stamped coal cake is about 1100 kg/m³ (wet) against 750 kg/m³ of coal in

Beehive Ovens. The increase in bulk density is about 40%. The dimension of coal

cake is slightly lesser than the opening dimension of the coke oven. It will help in

easier pushing process.

2.6.3.3 CHARGING CAR

The compacted coal cake shall be freely rested on top of the charging plate in the

compacting box at the compacting station and shall be transferred from the

compacting box by transfer drive of Charging Car and thus charged into the oven.

When the coal cake reaches its end position inside the coke oven chamber, the

charge trestle shall hold the cake in position and the plate will be withdrawn. After

extraction of charging plate, the car shall be ready for the next charging operation.

2.6.3.4 COKE OVEN BATTERIES

Page 59: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

39

It has been proposed to install two batteries of 30 Ovens each with a level coal

charge capacity of 23 to 25 tons with coking cycles of 65 to 70 hours. This will have

an annual production capacity of 1,20,000 MTPA of coke. Two sets of 30 ovens shall

be connected to a chimney.

The ovens are constructed with alumina bricks of different sizes, shapes and

specifications. The mosaic of bricks of different specification ensures that high

alumina bricks are used in the areas of oven that calls for higher and more expensive

specifications. The areas subjected to less stringent thermal requirements shall have

bricks of less expensive specifications. The capacity of coke oven battery is given in

Table-2.8.

Table-2.8 Capacity of Coke Oven Batteries

No. of batteries 2Ovens per battery 30

Chimney per battery 1Height of chimney 30 mCoke per ton of coal 0.700 TGas generation 5.25 T /T of CoalAir for carburization 4.94 T/T of coalTotal Coal charge per oven 23 to 25 TCoking Cycle 65 to 70 hrLevel coal charge capacity of oven 10 TOperating days of coke ovens 300 d/yrPlant capacity in each phase 120 000 T/a of CokeOperating temp. of oven 1230-1250 0CGas temp. at battery outlet 1000-1050 0C

2.6.3.5 PUSHER CAR

Coke pushing operation after 65 to 70 hrs cycle from oven will be done with the help

of a separate coke push car, which pushes the hot coke cake into the hot coke car.

Pusher car shall have pusher beams, which shall rest on guide rollers driven by

motor, gearbox and rack & pinion arrangement. The pusher shield, which will push

the hot coke cake from the ovens, shall be fixed to the pusher beams along with

vertical rollers and cold air ducts. The carriage will have four wheel bogies and each

will be driven by electric motors, gearbox, coupling and brakes. The pusher car shall

Page 60: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

40

be positioned on the pusher side of the oven and the hot coke car shall be positioned

on the coking side. Coke oven doors of both sides shall be opened and the pusher

beams shall slowly push the hot coke cake from the oven to the hot coke car.

The hot coke cake pushed from the oven by the pusher shall slide into the hot coke

car at the same horizontal level to avoid potential emission arising out of coke falling

and disintegrating during the pushing operation.

2.6.3.6 HOT COKE CAR

The hot coke car shall have a long travel car, which travels lengthwise along the

coking side of the coke ovens. On this trolley a hot coke tray is fixed to receive the

hot coke cake from the ovens and bring the same to the quenching tower for

quenching operations. The long travel car shall be a four wheel bogie traveling on

longitudinal rails. The four wheel bogie shall be driven by an independent drive

motor, gearbox, couplings and brakes. Hot coke tray shall be hydraulically operated

with guide wheels which shall be rested on support beams of the long travel car.

When the hot coke cake is ready in a particular oven to push the same to the hot

coke car, the long travel car shall be taken to that particular oven and hot coke tray

shall be fixed near the oven floor. The hydraulic cylinder shall operate and fix the hot

coke tray near the oven keeping the trolley level and oven floor level at the same

level. When the hot coke cake slides into the hot coke tray, the long travel car shall

travel and bring the cake to the quenching tower for quenching operation.

2.6.3.7 QUENCHED COKE PUSHER

This is a stationary machine located in the compacting station adjacent to the

quenching tower. The pusher ram shall empty out the quenched coke from the hot

coke car.

2.6.3.8 QUENCHING TOWER

Quenching Tower shall have equipment to quench the hot coke cake with water and

push the same to coke hoppers for further processing.

When hot coke car comes to the quenching tower, the car shall be positioned so that

the hot coke cake is quenched by dousing large quantity of water. The quantity of

water required for this operation shall be of the order of about 70 T for each

quenching operation. But the loss of water through evaporation shall be in the range

Page 61: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

41

of 0.70 T of water per ton of coke. In order to limit SPM emissions in the plume the

quenching tower shall be fitted with a system of grit arresters, which shall entrap

suspended particulate matter and make it fall back to the bottom of the tower.

A mild steel water tank of sufficient capacity forms a part of the quenching process

along with necessary pipes and spray nozzles which are fitted in the quenching

tower.

2.6.3.9 COKE SIZING

After quenching the hot coke shall be pushed from the hot coke tray to the coke

hoppers for further processing, particularly, for screening and coke cutting operations.

First it will be cut into required size of 30-80 mm and will be fed to vibrating screen

having 3 Decks. From first Deck, the oversize coke will go back to cutter. From 2nd

deck sized coke will directly go to Trucks for dispatch and from 3rd deck, the fines will

be taken away by a separate conveyor and stored at separate place. The

characteristics of coke oven gas and quality of metallurgical coke is given below.

Table 2.9 Characteristics of Coke oven off-gas

Table 2.10 Quality of Metallurgical CokeSl.No. Parameter Value1 Ash 8-10%2 Moisture 4% max3 Sulphur <0.7%4 Phosphorous <0.03%5 Volatile 1% max6 Carbon Balance7 M10 <7%8 M40 >80%9 CSR +65min10 CRI 23-26

2.6.3.10 SALIENT FEATURES OF COKE OVEN PLANT

Coke is required for captive consumption as a reducing & heat sourcing agent in

the blast furnaces to reduce Fe2O3/Fe3O4 ores to Fe.

Sl.No Parameter value1 Oxygen 9-11%2 CO2 8% max3 CO 0.01%4 SO2 0.0010%max5 Steam 2 to 3%6 Nitrogen 76 – 78%

Page 62: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

42

Low ash metallurgical non recovery coke oven plant will reduce the dependency

on imported costly coke, generate coke using Indian & imported coal and

generate power based on waste heat recovery. It will also be cost effective,

environment friendly and energy efficient. This will help to meet the market

competition in steel sector.

“Non recovery” type coke making technology is practiced with provision for the

heat recovery from the waste gases. The technology is developed indigenously by

“The Central Fuel Research Institute, Dhanbad” and is comparable with the best

in the world.

Coke making is environmentally friendly. It is completely pollution free, as it works

on negative pressure in the ovens.

The power generated will be utilized to meet the captive requirement in the coke

oven as well as in the associated steel plant.

Figure - 2.9: Process flow Chart for Coke Oven Plant

Stacking ofdifferent qualitiesof Coal

Blending Silo withweigh feeders

Crushing /Pulverizing

Stamping Oven Charging Coal Hoppers

Carbonization

LAMCoke

Pusher /Discharge

QuenchingTower

CokeCutter

Screening

Off-gases

45 TPH Waste Heat RecoveryBoiler

To Blast Furnace

Steam

9 MWPowerGeneration

Return Fines

To SinterPlant

Page 63: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

43

2.6.4 POWER GENERATION PROCESS (BASED ON COKE OVEN OFF–GAS)

This Coke Oven Off–Gas flow rate is estimated to be 1,22,500 kg/hr from the Coke

oven plant of 1,20,000 T/a capacity having temperature around 950 0C is proposed to

be used in waste heat boiler for the production of high pressure steam. Super-

heated steam 45 T/hr, generated at a temperature of 485 ºC and a pressure of 65

kg/cm2 is used in Turbo Generator to generate 9 M.W. power. The power will be

utilized to meet the captive requirement in the coke oven as well as in the associated

steel plant. The exhaust gas from the plant is relatively clean and free from SPM and

hydrocarbons. The exhaust gas from boiler is vented through chimney of adequate

height. Flow chart for 9.0 MW power plant based on coke oven off gases is given in

Figure-2.10

Figure - 2.10: Flow Chart of Power Generation Scheme

2.6.5 PRODUCER GAS PLANT

2.6.5.1 BACKGROUND OF PRODUCER GAS

1. Producer gas is generated through thermal coal by heating and mixing water with

coal.Producer Gas has been in use in many industries as a cheap Gaseous Fuel

since Mid-nineteenth Century. The flow diagram of producer gas plant is given in

GENERATOR

BLENDEDCOAL CAKE

OVEN

COKEAIR

FEEDWATERSTEAM

FANBOILER S

TACK

FLUE GAS

STEAMTURBINE

Page 64: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

44

Figure-2.10. It was a development over use of solid‐fuel which had several dis

advantages, viz, lower thermal efficiency due to use of too much excess air,

difficulty in smooth control of furnace or kiln temperature, limited area of

application etc.

2. Right from the inception, Producer Gas was generated from the reaction of Air +

Steam with coal‐bed in single‐stage generators either made of bricks in the initial

stages or steel with water jacket or refractory lining in the later versions. The grate

was also initially fixed but later on developed to Rotary Grate with better

throughput, easy movement of ash etc.

3. Before extensive production of Natural Gas and other Petro fuels at a moderately

lower cost, Producer Gas had been a versatile fuel owing to several advantages

over the solid fuels, viz, ease of production, better thermal efficiency in the

application, ease of control of furnace temperature, smoother flame etc. As a result

many industries all over the world have been using Producer Gas as a cheaper

energy in various field of applications viz, glass and ceramics, Refractories,

Lime‐klins, Dryers, Heating furnaces etc but with limited flame temperature up to

1000°C to 1100°C.

4. But the producer Gas from earlier 19th

Century conventional Single stage design

has several disadvantages also. In these Gasifiers, the product gas comes out

from the top at a temperature of 470o to 500oC at which tar contained in the gas

cracks to soots and gummy maters, which deposit in the pipe lines, burner nozzles

etc, intern schocking them. This necessitates frequent ‘Burning Out’ operation

store move the deposits which in turn results in interruptions and reduced stream–

days. The sketch of such a system has been shown in Figure1. Here the

consistency of operation and production can be achieved with the installation of

elaborate cleaning and detarring system at a high cost. At the same time Calorific

value of Gas also comes down owing to condensation of tar vapour and other

volatile matters to whatever extent it might be present in the gas. Due to the above

short comings, the various dis advantages which are normally faced in single stage

gasifiers are summarized below:

i. The Calorific value of Producer Gas is lower (1000 to 1250 kcal/Nm3)

ii. There is no consistency in Gas quality.

iii. There are frequent interruptions in the process due to de choking operations.

Page 65: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

45

iv. These producers can perform better only with high grade of coal with very low

ash content which is rarely found in the country.

v. Also clean gas from this Single stage Producers can be obtained only after

thorough cleaning in the elaborate cleaning facilities at a cost of Rs. 1.0 to 1.5

crore.

vi. As a result of Condensation and de tarring and unproductive generation of

soots, the gas make as well as calorific value of gas and thermal efficiency

becomes poorer (65% to 75%).

vii. Limited use in industries requiring lower flame temperature.

viii.These gasifiers are not pollution free which is a serious draw back under the

present day circumstances.

Table 2.11 PGP COAL CHARACTERISTICS

Sl no Parameter Unit Value

I Ash + moisture % (Wt/Wt) 28.7 to 34.0

ii Calorific value Kcal/kg 3360 to 4200

iii Coal size mm +25 to +40

Figure - 2.11: Process Flow Chart of Producer Gas Plant

GASIFIER FUEL

FUELPREPARATION

RAW FUEL

CONDENSATE

ASH & CHAR

AIR

RAW GAS

FUELFEEDER

GASIFIER

ASHDISCHARGE GAS

CLEANINGGAS

COOLINGREHEATINGFURNACE

ASH & CHAR CONDENSATE

Page 66: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

46

2.6.6 PULVERZED COAL INJECTION SYSTEMPulverized Coal injection (PCI) is a process that involves blowing large volumes of

fine Coal granules in to the BF. This provides a supplemental carbon source to speed

up the production of metallic iron, reducing the need for coke production. As a result

energy use and emissions can be reduced. However, as coke provides physical

support and gas permeability in the BF, its complete substitutions is not possible. The

amount of coal that can be injected will depend on the coal and coke quality, furnace

geometry, and operational practices. The flow diagram of pulverized coal injection

system is given in figure 2.12

Figure - 2.12: Flow diagram of pulverized coal injection system

Page 67: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

47

Table 2.12 PCI COAL SPECIFICATIONS

Sl no Parameter unit ValueI Moisture % (Wt/Wt) 7.5 to 9.5

ii Calorific value Kcal/kg 6400 to 6600

iii Ash % (Wt/Wt) 14 to 18

iv Volatile material % 23 to 30

2.7 RAW MATERIAL & PRODUCTS2.7.1.1. REQUIREMENT, STORAGE & HANDLINGThe quantity of raw materials required by the industry is in the Table 2.13 below. Raw

materials as listed will be procured as per the production requirement.

TABLE 2.13: CHARACTERSTICS OF RAW MATERIALS AND ADDITIVES

Sl.no.

Materials &source

Plant QuantityT/A

Composition Storage

1 Ferro silicon

From local market

Steel mill 768180 Si- 70-75 %Al-2%C-0.15%S-0.05%Phosphate-0.05%

Stored insidethe closedshed.

2 Lime

From BagalkotDist.

Steel mill 16500 CaO- 45%MgO- 5%Al2O3-15%SiO2-5%

Preparedclosed shed

3 Dolomite

From BagalkotDist.

Steel mill 1521 CaO- 30%MgO- 18%Al2O3-1.5%SiO2-3%

Preparedclosed shed

4 Silicon

manganese

From local market

Steel mill 1280700 Mn-66%Si-16%C- 2%Fe-16%

Stored inside

the closed

shed.

5 DRI

From BMM Ispat,DruvadeshMetasteels etc

Steel mill 42300 Fe- 91%C-2.5%P-0.05%S- 0.05%Gangue- 4.8%

Stored inside

the closed

shed.

6 Ferro manganese

From local market

Steel mill 1535400 Mn- 80%C-6%Fe- 14%Si-0.27%

Covered plantarea

8 Ca Silicon

From local market

Steel mill 383850 Si-52-65%Ca-30-33%Al-2%C-1.5%P-0.05%

Stored insidethe closedshed.

Page 68: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

48

Table-2.14 Raw materials Requirement, transportation & Storage detailsSl.No.

Raw material RequirementTPA

Transportation Storage

1.0 STEEL MILL

1 Hot metal from BF plantfrom captive source 2,33,000 In plant

movement Nil

2 Scrap & Pigs fromcaptive source 14,100 Lorry Covered plant

area

3 Direct reducediron(DRI) 42,300 Covered trucks Storage shed

4 Ferro alloys andadditives 3968130 Trucks Covered plant

area

5 Plant return scrap 15000 Trippers Nil

6 Oxygen 34000 Closed pipeline Storage tanks

7 Lime/Dolo 36,000 Trucks Prepared closedshed

2.0 ROLLING MILL8 Steel Billets from steel

mill, captive source

3,20,000 EOTcranes/roller

tables

Internal plantstorage

9 Purchased billets/blooms

33,000 Trucks Storage yard

3.0 COKE OVEN PLANT10 Coking coal 1,71,428 Railway/trucks Storage shed

4.0 COKE OVEN OFF GAS BASED CAPTIVE POWER PLANT

11Coke oven off gas at1050 0C, captivesource,

8,99,999 Insulated duct Nil

5.0 PRODUCER GAS PLANT AND PULVERIZED COAL INJECTION12 Coal 77,000 Railways/trucks Storage shed

Table-2.15A MATERIAL BALANCE FOR ENERGY OPTIMISING FURNACE

Sl. No. Input/Output

Type of material Description ofmaterial

Sp.Cons/D

Sp.Cons/Annum

1.1 Input Fe bearing material Hot metal, T 750 2250001.2 DRI, T 141 423001.3 Scrap, T 47 141002.1 Fluxes & ferro alloys

alloys alloysBurnt lime, T 55 16500

2.2 Burnt dolomite,T 5 15212.3 Carbon injection,T 4 12002.4 Ferro silicon,T 2 480

Page 69: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

49

2.5 Silicon manganese,T

4 12003.1 Utilities Oxygen, Kg/T 59850 1795500

03.2 Nitrogen, Kg/T 5586 1675800TOTAL INPUT 66443 3773601

1.1 Output Liquid metal, T 853 2559001.2 Slag, T 52 153541.3 Sludge, T 17.06 51181.4 Off gases,Nm3/h 150000 4500000

01.5 Runner & ladle skull,T

1.706 511.8TOTAL OUTPUT 150922

.944776883.8

Table-2.15 B MATERIAL BALANCE FOR LADLE REFINING FURNACE

Sl. No. Input/Output

Type of material Description ofmaterial

Sp.Cons/D

Sp.Cons/Annum

LADLE REFINING FURNACE1.1 Input Fe bearing material Liquid metal, T 853 2559001.2 Ferro silicon, T 2559 7677001.3 Ferro manganese,T 5118 15354001.4 Silico manganese,T 4265 12795001.5 Sulphur ,T 1706 5118001.6 Electrodes, T 6824 2047200

TOTAL INPUT 21325 63975001.1 Output Slag, T 102 327551.2 Ladle skull, T 210 6824

TOTAL OUTPUT 312 39579

Table-2.15C MATERIAL BALANCE FOR ROLLING MILL

Sl. No. Input/Output

Type of material Description ofmaterial

Sp.Cons/D

Sp.Cons/Annum

1.1 Input Fe bearing material Billets, T 1067 3200001.2 PGP gas,Nm3/h 15000 4500000

TOTAL INPUT 16066 48200001.1 Outpu

tMill scale,T 21 6397

1.2 Billet cut ends, T 34 10918TOTAL OUTPUT 55 17315

Table-2.15 D MATERIAL BALANCE FOR CONTINOUS CASTING MACHINE

Sl.No. Input/Outpu

Type of material Description ofmaterial

Sp.Cons/D

Sp.Cons/Annum

1.1 Input Fe bearing material Liquid metal,T 853 255900

Page 70: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

50

TOTAL INPUT 853 2559001.1 Outpu

tMill scale, T 2559 818

1.2 Billet cut ends, T 818 262041TOTAL OUTPUT 3377 262860

Coking coal is obtained either from indigenous source and transported through rail or

lorry transport or import source & transported through rail, road & sea. The other raw

materials (other than captive) are either obtained from local suppliers (Gujarat,

Maharashtra, Karnataka, and Andhra Pradesh) by rail, road.

2.8 TRANSPORTATION OF RAW MATERIAL & PRODUCTS

Transportation of raw materials is shown in table 2.16

Table 2.16: Transportation of raw materials

Sl.No.

Raw material RequirementTPA

Transportation Storage

1.0 STEEL MILL

1 Hot metal from BF plantfrom captive source 2,33,000 In plant

movement Nil

2 Scrap & Pigs fromcaptive source 14,100 Lorry Covered plant

area

3 Direct reducediron(DRI) 42,300 Covered trucks Storage shed

4 Ferro alloys andadditives 3968130 Trucks Covered plant

area

5 Plant return scrap 15000 Trippers Nil

6 Oxygen 34000 Closed pipeline Storage tanks

7 Lime/Dolo 36,000 Trucks Prepared closedshed

2.0 ROLLING MILL8 Steel Billets from steel

mill, captive source

3,20,000 EOTcranes/roller

tables

Internal plantstorage

9 Purchased billets/blooms

33,000 Trucks Storage yard

3.0 COKE OVEN PLANT10 Coking coal 1,71,428 Railway/trucks Storage shed

4.0 COKE OVEN OFF GAS BASED CAPTIVE POWER PLANT

Page 71: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

51

11Coke oven off gas at1050 0C, captivesource,

8,99,999 Insulated duct Nil

5.0 PRODUCER GAS PLANT AND PULVERIZED COAL INJECTION12 Coal 77,000 Railways/trucks Storage shed

The finished products like billets, rolled products will be transported through trucks orby rail.

2.9 POWER REQUIREMENT, SOURCE & UTILIZATION

The proposed industry is power intensive and needs assured power at economical

cost. The total power requirement of the industry is 20MW. The source availability

power is given below. Power requirement for the expansion project is as tabulated

below.

Table-2.17 Power Requirement for Expansion ProjectSl.No. Area Power required

(MW)1 SMS plant. 9.732 Rolling Mill 3.53 Oxygen plant 3.3754 Coke oven 0.4005 Coke oven gas based power plant 1.356 Pulverised coal injection 0.657 Producer gas plant 0.995

Total 20 MW

Sl. No. Source Power (MW)8 Captive power plant based on

coke oven off gas.9.0

9 KPTCL supply 11 MWTotal 20 MW

2.10 FUEL REQUIREMENT

Coal is pulverized and used for injection in blast furnace. Coal is also used in

preparation of producer gas. Furnace oil and diesel are used in furnaces. The

quantity, utilization and storage of these fuels is given below.

Table 2.18: Furnaces & Utilization of Fuels

Sl.No.

Fuel Application Utilization Storage & capacity

1 HSD/LDO Turndish Preheating, 2 nos.

600 KL/Yr 22 Kl X 2, M.S.underground tank

2 Furnace oil VD Boiler / Re 3000 KL/Yr 70KL X 2 tanks, M.S.

Page 72: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

52

heating furnace above ground tank.3 B Grade coal PCI Unit/

producer gasplant

30,000 TPA Concrete yard, 2 acre

4 BFG Ladlespreheating, 4nos./reheatingfurnace.

30000NM3/hr. Captive source directlyfrom BF

Table 2.19: Characteristics of furnace oil

Table 2.20: Characteristics of HSD

Table 2.21: Characteristics of Blast Furnace Gas

Sl no Parameter Unit Value1 Ash % by mass 0.01

2 Cetane no Min 51

3 Total sulphur Mg/kg max 50

4 Water content Mg/kg max 200

5 Kinematic viscosity CST at 40 deg C 2-45

6 Flash point (Pensky martin) Deg C 66

Slno

Parameter Unit Value

1 Gross calorific value Kcal/kg 100002 Carbon % 843 Moisture % 14 Sulphur % 4

Slno

Parameter Unit Value

1 Gross calorific value Kcal/Nm3 6502 Oxygen % 1.2

3 Hydrogen % 21.5 to 5.5

4 Nitrogen % 55.3 to 57.3

5 Carbon monoxide % 19.5

6 Carbon dioxide % 21

Page 73: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

53

2.11 WATER REQUIREMENT, SOURCE & UTILIZATION

2.11.1. REQUIREMENT & SOURCES OF WATER

The source of water for the proposed plant will be Tungabhadra River. The

infrastructure facilities for supply of water from the source to the plant water reservoir

includes provision of intake structure and pumps at the reservoir and laying of piping

main from reservoir up to the plant. Water will be stored in an earthen reservoir of

capacity 0.6 million m3 approx. Raw water treatment plant will be installed for

pretreatment of raw water and the clarified water will be pumped through MS pipe

line to the proposed units.

The fresh water requirement for the proposed project will be about 3005 m3/d

including 2965 and 40 m3/d for domestic use. This will be met from Tungabhadra

river source. Water will be drawn only during rain and flood period from the

backwater of the river and stored in the water reservoir of 0.6 million m3 capacity.

The water from the reservoir will be used in the industry.

Government of Karnataka through its High Level Single Window Committee has

allotted 9012 m3/d (2 MGD) of water from Tungabhadra river. Further, the permission

from Irrigation Department for drawl 0.19TMC of water from the river is obtained.

2.11.2. UTILIZATION OF WATER AND WATER BALANCE

Iron and steel making and also the power plants are energy intensive where materials

undergo various cycles of heating and cooling. Water is predominantly used for

equipment and material cooling. In order to conserve freshwater, water economy

has been an underlying criterion for selection of plant and equipment. Open-circuit

industrial water re-circulation systems with evaporative cooling towers have been

planned for the secondary side of heat exchangers as well as for direct cooling

circuits. Process water losses will be compensated by adding make-up water of

respective qualities. In addition, it is used for steam rising in boilers, dust

suppression, domestic, fire fighting and greenery development. Fresh water is

needed in cooling systems to compensate evaporation losses and blow down. Water

balance for the industry is given in Table- 2.22.

Page 74: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

54

Table 2.22 Water Balance with Water Consumption and Waste WaterGeneration

Water consumed for Consumption(KLD)

Discharge (KLD)Evaporation& drift loss

Discharge/blowdown

DOMESTICToilet, Canteen and Washing 41 8 32

INDUSTRIAL1. STEEL PLANT

1 Cooling blow down 1432 1169 2632. ROLLING MILL

1. Cooling blow down 712 618 943. COKE OVEN PLANT

1. Quenching blow down 289 235 532. Stamp charge spraying

blow down3.

29 25 44. COKE OVEN GASBASED POWER PLANT

1. Boiler blow down 55 39 162. Cooling blow down 76 63 13

5.PRODUCER GAS PLANT

1 cooling 190 180 06. AIR SEPARATION PLANT1.Cooling 192 157 35Total Water blow down 473

Total(domestic + industrial)

2826 2494 510

2.11.3. WATER TREATMENT PLANT

The water treatment plant already present will be upgraded and utilized. The plant

consists of chemical mixing unit, flocculator and clarifier. The clarified water is

treated in sand pressure filter, carbon filter and the disinfected by chlorine treatment.

The treated water is demineralised in ion exchange unit for use in boiler.

2.12 SOURCE OF POLLUTION & THEIR MANAGEMENT / DISPOSAL

Liquid, gaseous and solid wastes generated from the industry are likely to cause

environmental pollution. A suitable waste management system including reduce,

recycle and reprocess techniques is adopted in the industry to control pollution on the

Page 75: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

55

environment. The waste generation and inbuilt pollution control measures are given

below.

2.12.1 WASTE WATER MANAGEMENT

Table- 2.23 Waste Water Treatment and DischargeSewage/effluentgenerated from

Treatment units provided Final disposal point

Domestic effluent

Total: 32 m3/d

Existing Sewage TreatmentPlant of 60 KLD capacity will beutilized for treating the Sewagefrom the existing and proposedexpansion activities.

Re-used for green-beltdevelopment.

(b) Industrial

Blow down fromcirculatingcooling &process water

Total : 473 m3/d

The wastewater is equalizedand collected in the guard pond.The pond has a capacity to holdwastewater for about 30 days.The guard pond is of earthenwork impervious construction &located at ground level. Thetank interior is suitablycompacted and finished. Thesize of guard pond is as givenbelow.

Re-used for green-beltdevelopment, dustsuppression & road cleaninginside the plant premises.

2.12.2 GASEOUS EMISSIONS AND APC MEASURES

2.12.2.1. GASEOUS EMISSIONS

The gaseous emission sources with flow rate, characteristics and its controlledmeasures are given in table 2.24

TABLE 2.24 GASEOUS EMISSIONS APC MEASURESSl.No.

Source of emission Characteristics,Composition,

APC measures,& Stack ht, m

1. STEEL PLANT

1

EOF ( Flue gas), Flow: 81000m3/hTemp. : 60-800C.

CO :100 mg/Nm3

PM : 2000mg/Nm3

GCP, Venturiscrubber,Stack ht : 45 m

2

LRF ( Flue gas), Flow: 16000m3/hTemp: 40-600C.

CO2: 100mg/Nm3

PM :2000mg/Nm3

Fume extractionsystem withstack Stack ht :30 m

Page 76: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

56

3

Caster(Steam Exhaust),Flow : 15000m3/hTemp: 40-600C

CO2: 100mg/Nm3

PM :2000mg/Nm3

Steam exhaustthrough stack.Stack ht : 30m

4

Vacuum degassing unit,Flow: 25000m3/hTemp: 170-2000C

CO2: 100mg/Nm3

PM : 2000mg/Nm3

NOx: 200mg/Nm3

Sox :100 mg/Nm3

Stack ht : 52 m

2. ROLLING MILL

5

Reheating furnace ( fumes),Flow: 21000m3/hTemp: 100 -1200C

CO :100 mg/Nm3

PM: 50 mg/Nm3

NOx: 100mg/Nm3

Stack ht : 45 m

3. COKE OVEN PLANT (NON RECOVERY TYPE)

6Coke oven battery exhaust gasses,Flow: 630000 m3/hTemp: 40-600C

CO2 100 mg/Nm3

PM :2000mg/Nm3

NOx: 200mg/Nm3

Sox :100 mg/Nm3

Stack ht : 42m

4.COKE OVEN GAS BASED CAPTIVE POWER PLANT7

Boiler emissions

CO2 30 mg/Nm3

PM : 100mg/Nm3

Sox :10 mg/Nm3

Stack ht : 52 m

5. PRODUCER GAS PLANT8 PGP,

Flow:15,000 Nm3./hTemp: 40-600C. (withB grade coal)

GCV of 1500kcal/nm3

Sox

Stack ht : 30m

6. PULVERIZED COAL INJECTION

9 PCI,Flow : 35,000nm3/hrTemp : 40-600C

NOx: 200mg/Nm3

Sox :100 mg/Nm3

stack ht : 30m

2.12.3 SOLID WASTE MANAGEMENT

Solid wastes are generated at various stages & units in the manufacturing process

their characteristics are provided in the table 2.25. Some of them are proposed to be

recycled & re-used. The solid waste quantity generated from the process and its

management is provided in Table 2.26. About 8-10% metal is recovered from the

EOF slag by magnetic separation, 25-30% powder rich lime is used for brick

manufacturing, remaining portion is used for civil works and road works. LRF slag will

be used for brick manufacturing. Ash generated from the producer gas will be used

Page 77: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

57

for brick manufacturing and sold to brick making industries near Harihar area when

there is excess storage.

TABLE: 2.25 SOLID WASTE CHARACTERISTICS AND STORAGE

Sl.No.

Solid waste Composition Storagefacility

Quantity T/A

1. STEEL PLANT1. EOF sludge Fe- 45% Settling

tanks

16320

2. EOF slag CaO- 40-52%SiO2-10-19%Fe2O3-10-40%MnO-5-10%Al2O3-1-3%

Slag cooling

pit 60000

3 Ladle slag CaO-30-60%SiO2-2-35%FeO-0-15%MgO-1-10%Al2O3-5-35%

Dumping

pits

15040

4 Cut end from

caster

Iron bearingmaterial

Reused in

EOF

6300

5 Mill scale from

caster

Iron bearing

material

reused in

sinter plant

1500

2. ROLLING MILL

6 Cut ends/coblings

Iron bearingmaterial

reused in

EOF

12800

7Mill scale

Iron bearingmaterial

reused in

sinter plant

3200

3. COKE OVEN PLANT

8 Coke fines/ nutcoke from cokescreen

<10mm dia Sinter plant13200

9 Coal fines fromcoal crushers

Carbon

material

Recirculated

in coke oven

1280

3. PRODUCER GAS PLANT/PULVERIZED COAL INJECTION PLANT

10Ash

Carbonresidue

Used forbrickmanufacturing

16000

11Tar

Complexmixture ofhydrocarbons

Mixed withFO & usedas fuel

7700

Page 78: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

58

TABLE- 2.26SOLID WASTE MANAGEMENT

Sl.No. Solid waste Quantity

(TPA) Utilization/ Disposal

1. STEEL PLANT

1 EOF GCP sludge 5118 Reused in sinter plant

2 EOF slag 15354 Used for civil works, road worksafter metal recovery

3 Ladle slag 32755 Used for civil works, road works

4 Cut end from caster 6300 Reused in EOF5 Mill scale 4200 Reused in sinter plant

2. ROLLING MILL6 Cut ends/ coblings 8700 Reused in EOF/BOF7 Mill scale 6500 Used in sinter plant

3. COKE OVEN PLANT

8 Coke fines/ nut cokefrom coke screen 13200 Coke fines used in sinter plant

9 Coal fines from coalcrushers 1283 Recycled as coke oven feed

4. PRODUCER GAS PLANT/PULVERIZED COAL INJECTION PLANT

10 Ash 16000 Will be used for brickmanufacturing

11 Tar 7700Used as fuel along with FO &residue sold to Koramandelrefractories, Hubli

Page 79: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

CHAPTER -3

DESCRIPTION OF

ENVIRONMENT

Page 80: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 81: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

59

CHAPTER – 3

DESCRIPTION OF ENVIRONMENT

3.1 INTRODUCTION

This chapter illustrates the description of the existing environmental status

of the study area with reference to the prominent environmental attributes. The

existing environmental setting is considered to establish the baseline conditions

which are described with respect to physical environment, air environment, noise

environment, traffic pattern and density, water environment, land environment,

biological environment, socio economic environment.

3.1.1 METHODOLOGY

The data was collected from both primary and secondary sources. The

data thus collected was compared with the standards prescribed for the

respective environmental parameters.

Secondary data was assessed by literature review of studies conducted in

the past by various private and government publications. The data thus collected

were compared with the standards prescribed for the respective environmental

parameters. Topography of the study area is given in Figure-3.1.

Primary data sources include the data collected through environmental

monitoring/ survey of the study area during the study period. The studies involved

conducting field studies and analyzing various parameters that might be affected

due to the industry and conducting socio-economic survey among the people. For

reconnaissance survey the sampling locations were identified based on:

Existing topography and meteorological conditions

Locations of water intake and waste disposal points.

Location of human habilitation and other sensitive areas present in the

vicinity of the proposed project site.

Representative areas for baseline conditions.

Accessibility for sampling

Page 82: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

60

The scoping and the extent of data generation were formulated based on

interdisciplinary team discussions, and professional judgment keeping in view of

TOR assigned by MOEF. The base line studies started with reconnaissance

survey and the site visits in the study area for fixing the monitoring locations for

collection of the primary data. Various Government and other organizations were

approached for getting information for the secondary data generation. The

various parameters surveyed and studied for the baseline study are discussed

in the following components.

Physical environment

Air environment

Noise environment

Traffic pattern and density

Water environment

Land environment

Biological environment

Socio economic environment.

3.1.2 STUDY AREA

The environmental impact due to the project is likely to affect the project site

and its surroundings consisting of about 10 km region around the factory

premises. Therefore, the study area for monitoring of environmental parameters

covers 10 km distance around the project site. The topography map of the study

area is given in Figure- 3.1.

3.1.3 STUDY PERIOD

The studies were carried out for one season during post-monsoon period

for 3 months from 11.12.2013 to 11.03.2014.

Page 83: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

61

3.2 ESTABLISHMENT OF BASELINE

3.2.1 Meteorological data

Assessment of the micro and macro meteorology is important from thestandpoint of understanding the nature and extent of air pollution in the study area.Climate has an important role in the build-up of pollution levels. The climaticcondition of the area may be classified as moderately or seasonally dry, tropical ortemperate savanna climate with four seasons in a year. Winter is critical for airpollution build-up because of frequent calm conditions with temperature inversionsresulting in poor atmospheric mixing, natural ventilation and high emission loads.

Figure - 3.1: The Topography Map of the Study Area (10 km around Project Site)Source: GSI; Scale: 1:50000

10 Kms Radius

Page 84: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

62

The classification of months according to the seasons is given in the following table

Season PeriodSummer March to MayMonsoon June to September

Post monsoon October to NovemberWinter December to February

The metrological data reflecting minimum, maximum temperature in 0C,relative humidity in %, rainfall in mm/hr, wind speed in m/s, mixing height in m,cloud cover in tenths and atmospheric pressure in mb for the year 2013 obtainedfrom modeling studies carried out using U.S. EPA AERMOD dispersion model,1996 – 2013 Lakes Environmental Software, Version 7.1.0 has been appendedas table 3.1.

Page 85: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

63

Table 3.1: Meteorological data of site for the year 2013

Month Temperature0C

Relativehumidity %

Precipitationrate (mm/hr)

Atmosphericpressure

(mb)

Windspeed(m/s)

Winddirection(from)

Inversion/ mixingheight(m -max)

Cloudcover

(tenths)Min Max Min Max Ave Min Max Min Max Min Max

Jan 14.6 26.2 36 65 1.52 947 957 0 5.1 NE 652 2 10Feb 16.1 27.5 42 59 0.76 946 955 0 4.6 NE 594 2 10Mar 18.8 31

33 631.02 946 956 0 6.2 NE &

NW681 2 10

Apr 18.6 33.8 33 71 2.29 944 954 0 5.7 SW 783 2 7May 20.8 33.9 32 55 4.32 944 952 0 5.7 SW 783 2 10June 21.1 32.4 40 59 3.56 943 950 0 8.7 SW 1324 2 10July 20 30.9 46 74 3.3 942 952 1.5 9.8 SW 1563 3 10Aug 20.2 30.4 50 79 6.1 942 951 1.5 9.8 SW 1421 3 10Sept 17.2 31 31 76 2.29 943 953 1 8.2 SW 1210 2 10Oct 20.4 31.6 34 69 18.03 946 954 0 6.7 NE 762 2 10Nov 17.2 28.4 38 58 Nil 948 956 0 7.7 NE 1051 2 10Dec 13.1 28 37 56 Nil 949 956 0 7.7 NE 1057 2 10

Page 86: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

64

3.2.1.1 Temperature

The mean maximum temperature is observed at (33.9°C) in the month of Mayand the mean minimum temperature at (13.1°C) is observed in the month ofDecember.

In the summer season the mean minimum temperature is observed during themonth of April (18.6°C). During the monsoon the mean maximum temperature isobserved to be 32.4°C in the month of June with the mean minimum temperature at17.2°C during September. By the end of September with the onset of post monsoonseason (October - November), day temperatures drop slightly with the meanmaximum temperature at 31.6°C in October and mean minimum temperature isobserved at 17.2°C in November. The values are presented in table 3.1.

3.2.2.2 Relative humidity

Minimum and maximum values of relative humidity have been recorded. Theminimum humidity is observed to be at 31% in the month of September and themaximum is 79% in the month of August. The mean minimum values of humidityduring summer, monsoon, post-monsoon and rainy seasons are 32%, 31%, 34% &36% during the months of May, September, October and January respectively.Similarly the maximum values are 79%, 76%, 74%, 71% in the months of August,September, July & April during the summer, monsoon, post monsoon & winterseasons. The values are presented in table 3.1.

3.2.2.3 Rainfall

The monsoon in this region usually occurs twice in a year i.e. from June toSeptember and from October to November. The maximum annual rate ofprecipitation over this region an average 18.03 mm/hr.

3.2.2.4 Atmospheric pressure

The maximum and the minimum atmospheric pressures are recorded duringall seasons. In the summer season, the mean maximum and minimum pressurevalues are observed to be 956 mb in the month of March and 944 mb in the monthsof April & May. During monsoon season, the maximum pressure is 953 mb andminimum 942 mb. The maximum pressure during the post-monsoon season isobserved to be 956 mb in November and minimum pressure is 946 mb in the monthof October. During the winter season the minimum atmospheric pressure is 946 mbin February and the maximum is 957 mb in the month of January. The values arepresented in table 3.1.

Page 87: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

65

3.2.2.5 Inversion height

The maximum inversion heights at the project site for all the months of the year is asgiven in the table 3.1. The maximum mixing height of 1563 m is observed during themonth of July and the minimum inversion height is 594 m in the month of February.

3.2.2.6 Cloud cover

The minimum cover measured in the unit of tenths is 2 and the maximum observedcloud cover is 10.

3.2.2.7 Wind

The data on wind patterns are pictorially represented by means of wind rosediagrams for the entire year as figure 3.2 (1-4) (for four different seasons).

Table :- 3.2 Predominant wind directions

Season Period Wind direction (from)Summer March to May South to WestMonsoon June to September South to WestPost monsoon October to November North to EastWinter December to February North to East

Page 88: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

66

Fig 3.2: Wind rose diagrams

3.2.A March to May (summer season)

WRPLOT View - Lakes Environmental Software

WIND ROSE PLOT:

Summer Season - March to May

COMMENTS:

MODELER:

DATE:

8/18/2012

PROJECT NO.:

NORTH

SOUTH

WEST EAST

3%

6%

9%

12%

15%

WIND SPEED(m/s)

>= 11.1

8.8 - 11.1

5.7 - 8.8

3.6 - 5.7

2.1 - 3.6

0.5 - 2.1

Calms: 8.51%

TOTAL COUNT:

2208 hrs.

CALM WINDS:

8.51%

DATA PERIOD:

2011Mar 1 - May 3100:00 - 23:00

AVG. WIND SPEED:

2.60 m/s

DISPLAY: Wind SpeedDirection (blowing from)

2013

Page 89: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

67

3.2B. June to September (monsoon Season)

WRPLOT View - Lakes Environmental Software

WIND ROSE PLOT:

Monsoon Season - June to September

COMMENTS:

MODELER:

DATE:

8/18/2012

PROJECT NO.:

NORTH

SOUTH

WEST EAST

14%

28%

42%

56%

70%

WIND SPEED(m/s)

>= 11.1

8.8 - 11.1

5.7 - 8.8

3.6 - 5.7

2.1 - 3.6

0.5 - 2.1

Calms: 0.17%

TOTAL COUNT:

2928 hrs.

CALM WINDS:

0.17%

DATA PERIOD:

2011Jun 1 - Sep 3000:00 - 23:00

AVG. WIND SPEED:

4.57 m/s

DISPLAY: Wind SpeedDirection (blowing from)

2013

Page 90: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

68

3.2C October to November (post monsoon season)

WRPLOT View - Lakes Environmental Software

WIND ROSE PLOT:

Post-monsoon Season - October to November

COMMENTS:

MODELER:

DATE:

8/18/2012

PROJECT NO.:

NORTH

SOUTH

WEST EAST

6%

12%

18%

24%

30%

WIND SPEED(m/s)

>= 11.1

8.8 - 11.1

5.7 - 8.8

3.6 - 5.7

2.1 - 3.6

0.5 - 2.1

Calms: 11.54%

TOTAL COUNT:

1464 hrs.

CALM WINDS:

11.54%

DATA PERIOD:

2011Oct 1 - Nov 3000:00 - 23:00

AVG. WIND SPEED:

2.77 m/s

DISPLAY: Wind SpeedDirection (blowing from)

2013

Page 91: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

69

3.2D December to February (winter season)

WRPLOT View - Lakes Environmental Software

WIND ROSE PLOT:

Winter Season - December to February

COMMENTS:

MODELER:

DATE:

8/18/2012

PROJECT NO.:

NORTH

SOUTH

WEST EAST

6%

12%

18%

24%

30%

WIND SPEED(m/s)

>= 11.1

8.8 - 11.1

5.7 - 8.8

3.6 - 5.7

2.1 - 3.6

0.5 - 2.1

Calms: 13.75%

TOTAL COUNT:

2160 hrs.

CALM WINDS:

13.75%

DATA PERIOD:

2011Check Date Range Report00:00 - 23:00

AVG. WIND SPEED:

2.38 m/s

DISPLAY: Wind SpeedDirection (blowing from)

2013

Page 92: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

70

3.3 AIR QUALITY

3.3.1 ANALYTICAL TECHNIQUES FOR AIR QUALITY MONITORING

PM10 and PM2.5 have been estimated by gravimetric method. Modified

West and Gaeke Method (IS: 5182 Part – II, 1969) has been adopted for

estimation of SO2. Jacobs – Hochheiser Method (IS: 5182 Part-VI, 1975) has

been adopted for the estimation of NOx. NDIRS (Non-Dispersive Infra-Red

Spectroscopic) Method (IS: 5182 Part-X, 1999) has been adopted for the

estimation of CO and Electrochem sensor method has been adopted for the

estimation of Ozone. Spectrophotometric method for ammonia, AAS (Atomic

Absorption Spectrophotometry) method for lead. Summary of the analytical

techniques and their references are as given in Table: 3.3

Table: 3.3: Techniques adopted/Protocols for ambient air quality monitoring

SL.No Parameters Techniques Technical

Protocol

Minimumdetectablelimits asprovided by lab

1 Sulphur Dioxide (SO2) West & Gaeke IS:5182 (P2) 4 mcg2 Nitrogen Dioxide (NO2) Jacob & Hochheiser IS:5182 (P6) 1 mcg3 Particulate Matter PM10 Gravimetric IS:5182 (P15) 5 mcg4 Particulate Matter PM2.5 Gravimetric - 5 mcg5 Ozone (O3) Electrochem sensor - NIL6 Ammonia as NH3 Spectrophotometric Handbook of

air pollutionanalysis

NIL

7 Carbon monoxide asCO

NDIR IS: 5182 (P-10) 10 mcg

8 Lead as Pb AAS IS:5182 (P22) 0.01 mcg

3.3.2 AIR QUALITY MONITORING

The baseline air quality was established by monitoring major air pollutants like

suspended particulate matter, oxides of sulfur, nitrogen etc. at various locations

near the project site.

High volume samplers were used for ambient air sampling. Samples were

collected continuously from all the stations for 24 hours. Samples thus collected

were analyzed for various pollutants.

Page 93: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

71

Baseline data for ambient air quality was collected at 12 locations ( including one

in down ward direction) within the study area during the period of December 11,

2013 to March11, 2014. The sampling stations along with their distance and

direction from the project site, ambient air quality monitoring stations, wind rose

diagram showing the direction of the blowing wind during the analysis period,

ambient air quality analysis data for various parameters, National Ambient Air

Quality Standards specified by MoEF are detailed in the report

To study the existing ambient air quality, monitoring was done by Bangalore Test

House, Bangalore, NABL Accredited lab with the frequency of two days/week for

the project site and weekly for other locations.

The observations made during the study period are presented under the

forthcoming sub-sections.

3.3.3 METHODOLOGY ADOPTED FOR THE STUDY

The baseline status of the ambient air has been established through a

scientifically designed ambient air quality monitoring network. The following

criteria were taken into account during selection of the sampling stations:

Topography of the area

Human settlements within the study area

Safety, accessibility and non-interference with general routine of the people

residing near the station

Prediction of maximum concentration of the air pollutants through dispersion

modeling for the proposed source details using prevailing meteorological

conditions in the region

Page 94: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

72

Table 3.4: Ambient Air Sampling Stations

Sl.No.

Codeno.

Name of thestation

Direction fromthe site

Distancefrom site

(km)

1 A 1 Vasthu Building South-West SLR PlantPremises

2 A 2 Near Guard Pond North-West -

3 A 3 Near Weigh bridgeNo. : 01 North -

4 A 4 Nearer to 66 KVelectric tower no 20 East 0.2

5 A 5 Near AdministrationBuilding South-East -

6 A 6 Project site North-east -7 A7 Lokappanahola S-E 2.08 A8 Mariyammanahalli S-E 5.09 A9 Devalapura SS-E 7.410 A10 Nagalapura S-EE 9.511 A11 MarabbihaluTanda S-W 7.3

12

A12DownWind

Direction

Rajapura N-E 9.0

Page 95: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

73

Figure - 3.3 : Location of Ambient Air Quality Monitoring StationsM/s S L R Metaliks Limited, Narayanadevarakere, Lokappana Hola, H.B Halli Tq., Bellary

Dist

A4A1A2 A3

A5A6

A7

A9

A8

A100

A11

A12

Page 96: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

74

3.3.3.1 AIR QUALITY AT THE PROJECT SITE

Air quality at the project site: Ambient air quality analysis was conducted at the project site by-weekly for 3 months from11.12.2013 to 11.03.2014. The analysis reports are appended in the table 3.5 below.

Table 3.5: Air quality data analysis at the project site

Note:

PM10 & PM2.5 - Particulate matter; SO2 – Sulfur dioxide; NOx– Oxides of nitrogen; NH3 – Ammonia ; C6H6 –Benzene; As – Arsenic; Ni – Nickel; Pb – Lead; O3 – Ozone; CO – Carbon monoxide; ND – not detected

Air quality data analysis reports are for 24 hourly average

Sampleno.

PM2.5 PM10 SO2 NOx NH3 Pb O3 C6H6 Benzo(a)pyrene inparticulat

e phase

As Ni CO Hydro-corbons in

ppm

µg/m3 ng/m3 mg/m3

A1 30.11 62.35 9.3 10.3 NIL NIL NIL ND ND NIL ND 0.12 NILA2 29.25 61.44 8.3 9.4 NIL NIL NIL ND ND NIL ND 0.13 NILA3 23.67 53.11 8.5 9.1 NIL NIL NIL ND ND NIL ND 0.12 NILA4 22.58 60.02 9.2 8.4 NIL NIL NIL ND ND NIL ND 0.16 NILA5 21.13 57.78 8.4 8.9 NIL NIL NIL ND ND NIL ND 0.13 NILA7 20.29 53.44 5.3 6.5 NIL NIL NIL ND ND NIL ND 0.05 NILA8 29.32 61.78 5.4 6.1 NIL NIL NIL ND ND NIL ND 0.06 NILA9 21.25 45.88 6.3 6.9 NIL NIL NIL ND ND NIL ND 0.07 NIL

A10 20.65 46.68 6.8 6.4 NIL NIL NIL ND ND NIL ND 0.05 NILA11 22.65 46.89 5.9 6.2 Nil NIL NIL ND ND NIL ND 0.09 NIL

Page 97: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

75

3.3.3.2 AIR QUALITY IN THE DOWNWIND DIRECTION (RAJAPURA)

Ambient air quality analysis was conducted at Rajapura weekly for 3 months from 11.12.2013 to 11.03.2014. Theanalysis reports are appended in the table below.

Table 3.6: Air quality data at Rajapura, A9 (downwind direction)Sample no.

PM2.5 PM10 SO2 NOx NH3 Pb O3 C6H6 Benzo(a) pyrenein particulate

phase

As Ni CO HC -methane

µg/m3 ng/m3 mg/m3 ppmA12.1 25.1 36.1 10.7 11.6

ND Nil Nil ND ND ND ND

0.13

ND

A12.2 24.8 34.0 10.3 11.2 0.12

A12.3 26.2 34.5 10.2 12.9 0.12A12.4 24.6 35.2 10.4 11.8 0.11A12.4 27.4 35.7 11.3 12.3

0.14A12.5 26.5 38.4 11.6 12.4

0.13A12.6 25.6 37.2 11.9 11.9

0.12A12.7 27.1 35.9 12.6 11.6

0.11A12.8 34.1 42.5 13.9 11.5

0.10A12.9 33.5 41.4 13.2 11.1

0.13A12.10 31.5 41.6 13.0 12.3 0.12A12.11 32.9 40.5 11.9 12.2 0.11

Page 98: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

76

3.3.3.3 AIR QUALITY AT OTHER LOCATIONS

Air quality at the project site: Ambient air quality analysis was conducted at the project site by-weekly for 3 months from11.12.2013 to 11.03.2014. The analysis reports are appended in the table 3.7 below

Table 3.7: Air quality data analysis

Sample no.

PM2.5 PM10 SO2 NOx NH3 Pb O3 C6H6 Benzo(a)pyrene inparticulate phase

As Ni CO Hydro-corbons in

ppmµg/m3 ng/m3 mg/m3

A2 30.11 62.35 9.3 10.3 NIL NIL NIL ND ND NIL ND 0.12 NILA3 29.25 61.44 8.3 9.4 NIL NIL NIL ND ND NIL ND 0.13 NILA4 23.67 53.11 8.5 9.1 NIL NIL NIL ND ND NIL ND 0.12 NILA5 22.58 60.02 9.2 8.4 NIL NIL NIL ND ND NIL ND 0.16 NILA6 21.13 57.78 8.4 8.9 NIL NIL NIL ND ND NIL ND 0.13 NILA7 20.29 53.44 5.3 6.5 NIL NIL NIL ND ND NIL ND 0.05 NILA8 29.32 61.78 5.4 6.1 NIL NIL NIL ND ND NIL ND 0.06 NILA9 21.25 45.88 6.3 6.9 NIL NIL NIL ND ND NIL ND 0.07 NIL

A10 20.65 46.68 6.8 6.4 NIL NIL NIL ND ND NIL ND 0.05 NILA11 22.65 46.89 5.9 6.2 Nil NIL NIL ND ND NIL ND 0.09 NIL

Page 99: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

77

Table 3.8: Ambient air quality standards – MoEF as per the notification dated16th November 2009 for industrial, residential & rural areas

Air quality parameter Concentration24 hrs Annual

1 Particulate matter (size lessthan 10 µm), PM10, µg/m3

100 60

2 Particulate matter (size lessthan 2.5 µm), PM2.5 ,µg/m3

60 40

3 Sulfur-di-oxide, µg/m3 80 504 Nitrogen dioxide, µg/m3 80 405 Ammonia (NH3), µg/m3 400 1006 Benzene (C6H6), µg/m3 - 57 Benzo(a) pyrene in particulate

phase, ng/m3- 1

8 Arsenic (As), ng/m3 - 69 Nickel (Ni), ng/m3 - 20

10 Lead (Pb), µg/m3 1 0.511 Ozone (O3), µg/m3 180 – 1 hr 100 – 8 hrs12 Carbon monoxide, mg/m3 4 – 1 hr 2 – 8 hrs

Note:

8 hourly or hourly monitored values, as applicable, shall be complied with 98% of

the time in a year. 2% of the time, they may exceed the limits but not on two

consecutive days of monitoring.

Whenever and wherever monitoring results on two constitutive days of monitoring

exceed the limits specified above for the respective category, it shall be

considered adequate reason to institute regular or continuous monitoring and

further investigation.

3.3 3.4 ObservationsIt has been observed that the maximum concentration of all the parameters

monitored at all the locations are within the limits specified by MoEF (as per the

notification dated 16th November 2009 for industrial, residential & rural areas).

Marginally high values at Vasthu Building are due to the frequent movement of

vehicles.

3.4 NOISE ENVIRONMENT

The proposed project is an integrated steel industry and hence requires movement

of raw materials, products, fuels, tools & tackles required for its manufacturing

process and also transportation of finished products to its destination. The

Page 100: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

78

movement of personnel from their residence to industry would also result in a

moderate increase in the traffic, which would not result in any drastic change in

either the existing traffic pattern or noise levels of the area as accommodation

facilities are proposed within the project site for most of the employees.

Background noise levels were measured using integrated sound level meter in 9

locations (table 3.9). Monitoring locations were located within the study area (fig 3.4).

A sound level meter was used for measuring the noise level at one-hour interval

continuously for 24 hrs at 1.5 m above ground level, about 3 m from walls, buildings

or other sound reflecting sources.

The measurements were carried out in such a way that the monitoring locations

were 1 m away from the sources and 1 m away from the edge of the roads. The

maximum and minimum noise levels are presented in table 3.9 and the limits as per

Environmental Protection Rules, 1986 for industrial, commercial & residential areas

are presented in table 3.10 as under.

Table 3.9: Noise level monitoring stationsSl.No.

CodeNo. Location Direction

from siteDistancefromsite, km.

dB(A)max.

dB(A)min.

Industrial Limits 751 N 1 Project site - - 62.3 48.72 N 2 Vasthu Building SW - 66.9 49.73 N3 Near

AdministrationBuilding

SouthEast

- 65.4 47.69

4 N4 Nearer to 66Kvelectric towerno.20

East 0.2 62.3 46.8

Residential Limits 555 N 5 Lokappanahola S-E 2.0 54.9 41.46 N 6 Mariyammanahalli S-E 5.0 51.5 38.97 N 7 Devalapura SS-E 7.4 52.4 39.18 N 8 Nagalapura S-EE 9.5 53.7 38.39 N9 MarabbihaluTanda S-W 7.3 53.6 41.210 N10 Rajapura N-E 9.0 52.2 39.7

Page 101: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

79

Figure - 3.4: Location of Ambient Noise Level Monitoring Stations

Table 3.10: Noise level Limits as per Environmental Protection Rules

Limits as per Env. Protection Rules, 1986 in dB(A)Leq

Industrial area Commercial area Residential areaDay Night Day Night Day Night75 70 65 55 55 45

3.4.1 OBSERVATIONS

The baseline noise levels have been monitored at different locations as indicated in

the table above. The noise level in the study area varies between 38.3 – 66.9. It has

been observed that the maximum noise levels at all the locations are within the limits

specified for industrial/residential areas.

N1N2N3 N4

N5 N6

N7

N9

N10

N8

Page 102: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

80

3.5 WATER ENVIRONMENT

3.5.1 Reconnaissance survey

The impact has been assessed on randomly selected surface and ground watersources falling within the impact zone.

In order to assess the existing water quality, the water samples were collected fromEight different locations within the study area and analyzed as per the procedurespecified in standard methods for examination of water and wastewater published byAmerican Public Health Association and Bureau of Indian Standards (APHA/BIS).Name of the locations, orientation with respect to the project site along with the typeof source sampling stations are provided in table 3.11 and the analytical data forsurface water quality and ground water quality at all locations has been depicted inthe following tables 3.14 and 3.15 respectively.

Table 3.11: Water sampling stationsSl.No.

CodeNo.

Name of the Station Directionfrom site

Distancefrom

site (km)

Source/ Type

1 1 GW 1 Project site Within theproject

premises

- Bore well2 2 GW 2 Near Chemical lab Bore well

3 3 GW 3 Lokappanahola S-E 2.0 Bore well4 4 GW 4 Venkatapuram E 3.5 Bore well5 5 GW 5 Mariyammanahalli S-E 5.0 Bore well6 6 GW6 Ayanahalli S-E 2.5 Bore well

7 7 GW7 Dhanapura colony S-E 4.7 Bore well

8 8 GW8 Varadapura S 4.5 Bore well

9 9 LW 1 DhanayakanaKere S-E 7.2 Lake water10 LW 2 Ayanahalli Lake

Water

S-E 2.5 Lake Water

11 RW 1 Reservoir water(Tungabhadra)

S-W 1.5 Reservoir

10 12 RW 2 Reservoir BackWater

N 1.5 Reservoir

Page 103: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

81

3.5.2 ANALYTICAL TECHNIQUES FOR WATER QUALITY MONITORING

Table: 3.12: Protocol for surface water quality monitoring

Sl.No. Parameter/Test Protocol

Physical parameters1 pH IS: 3025 (P 11)2 Suspended solids IS: 3025 (P 17)3 Color & odor IS: 3025 (P 4&5)4 Oil & grease IS: 3025 (P 39)

Chemicals parameters5 Total dissolved solids IS: 3025 (P 16)6 Ammoniacal nitrogen, as N IS: 3025 (P 34)7 Total kjeldahl nitrogen, as N IS: 3025 (P 34)8 Biochemical Oxygen Demand

at 270 C for 3 daysIS: 3025 (P 44)

9 Chemical Oxygen Demand APHA10 Chlorides, as Cl IS: 3025 (P 32)11 Sulfates, as SO4 IS: 3025 (P 24)12 Nitrates, as NO3 IS: 3025 (P 34)13 Phosphates, as PO4 IS: 3025 (P 31)14 Phenolic compounds, as

C6H5OHIS: 3025 (P 43)

15 Total hardness, as CaCO3 IS: 3025 (P 21)16 Calcium, as Ca IS: 3025 (P 40)17 Magnesium, as Mg IS: 3025 (P 46)18 Nitrates, as NO2 IS: 3025 (P 34)19 Alkalinity, as CaCO3 IS: 3025 (P 23)20 Fluoride, as F IS: 3025 (P 60)21 Electrical conductivity APHA22 Dissolved oxygen, mg/L -

Table: 3.13: Protocol for ground water quality monitoring

Sl.No. Parameter/Test Unit Protocol

1 Color True color units IS: 3025 (P 4)2 Odor - IS: 3025 (P 5)3 Taste - IS: 3025 (P 8)4 Turbidity NTU IS: 3025 (P 10)5 pH - IS: 3025 (P 11)6 Chlorides as Cl mg/L AN-S-0037 Total hardness as CaCO3 mg/L IS: 3025 (P 21)8 Calcium as Ca mg/L IS: 3025 (P 40)9 Magnesium as Mg mg/L IS: 3025 (P 46)

10 Total dissolved solids mg/L IS: 3025 (P 16)11 Sulfates as SO4 mg/L AN-S-00312 Copper as Cu mg/L IS: 3025 (P 42)13 Iron as Fe mg/L IS: 3025 (P 53)

Page 104: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

82

14 Manganese as Mn mg/L IS: 3025 (P 59)15 Nitrate as NO3 mg/L AN-S-00316 Fluoride as F mg/L AN-S-00317 Phenolic compounds as

C6H5OHmg/L IS: 3025 (P 43)

18 Mercury as Hg mg/L IS: 3025 (P 48)19 Cadmium as Cd mg/L IS: 3025 (P 41)20 Selenium as Se mg/L IS: 3025 (P 56)21 Arsenic as As mg/L IS: 3025 (P 37)22 Cyanide as CN mg/L APHA23 Lead as Pb mg/L IS: 3025 (P 47)24 Zinc as Zn mg/L IS: 3025 (P 49)25 Anionic detergents as MBAS mg/L Annex K of

IS:1342826 Chromium as Cr+6 mg/L IS: 3025 (P 52)27 Residual free chlorine mg/L IS: 3025 (P 26)28 Alkalinity as CaCO3 mg/L IS: 3025 (P 23)29 Aluminum as Al mg/L IS: 3025 (P 55)30 Boron as B mg/L APHA

Figure - 3.5: Location of Water Quality Sampling Stations

GW1 GW2GW3

GW 7GW5

RW1 LW2,GW6

LW1

RW2

GW8

Page 105: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

83

3.5.3 SURFACE WATER

The fresh water source within the study zone is Tungabhadra River. The water

requirement for the proposed steel unit will be sourced from Tungabhadra river. The

supply of water to the industry will be metered for its quantification. The results of the

analysis of surface water samples are as given in table 3.14.

3.5.4 GROUND WATER

Ground water occurs under water table conditions in the weathered mantle of granite

gneisses and in the joints, cracks and crevices of the basement rock. The depth of

water is also dependent on topography and varies depending on the depth of

weathering. Groundwater samples collected from 8 different sources is analysed as

per drinking water standard.

Page 106: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

84

Table :-3.14 Analysis of surface water samplesSl.No.

Tests Unit Results MaximumAcceptable

Limits As perIS:10500-2012

MaximumPermissible Limitsin the Absence of

Alternate Source AsPer IS:10500-2012

LW1Dhanana

yakanaLake

LW2Ayyanhall

i Lake

RW1Reservoir

water(Tungabh

adra)

RW2Reservoi

r BackWater

1 1 Color Truecolorunits

7.0 15.0 9.0 10.0 Max.5 Max.15

2 2 Odor - Agreeable

Agreeable

Agreeable

Agreeable

Agreeable --

3 3 Taste - NotAgreeabl

e

NotAgreeabl

e

NotAgreeabl

e

NotAgreeabl

e

Agreeable --

4 4 Turbidity NTU 2.5 1.9 2.2 2.1 Max.1 Max.55 5 pH - 8.64 8.57 8.71 8.63 6.50 to 8.50 No relaxation6 6 Chloride

s as Clmg/L 22.9 57.4 14.9 16.8 Max. 250 Max.1000

7 7 Totalhardness asCaCO3

mg/L 87.1 89.1 90.2 88.3 Max. 200 Max.600

8 8 Calcium mg/L 25.4 19.8 29.6 30.1 Max.75 Max.200

Page 107: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

85

as Ca9 9 Magnesi

um asMg

mg/L 5.8 9.6 10.3 10.1 Max.30 Max.100

10 10 Totaldissolved solids

mg/L 182.0 260.0 293.0 278.2 Max.500 Max.2000

11 11 Sulfatesas SO4

mg/L 11.3 5.8 15.6 14.3 Max.200 Max.400

12 12 Copperas Cu

mg/L <0.05 <0.05 <0.05 <0.05 Max.0.05 Max.1.5

13 13 Iron asFe

mg/L 0.09 0.08 0.08 0.07 Max.0.30 No relaxation

14 14 Manganese asMn

mg/L <0.1 <0.1 <0.1 <0.1 Max.0.1 Max.03

15 15 Nitrateas NO3

mg/L 0.1 0.1 0.1 0.1 Max.45 No relaxation

16 16 Fluorideas F

mg/L 0.4 0.5 0.4 0.5 Max.1.0 Max.1.5

17 17 Phenoliccompounds asC6H5OH

mg/L Absent Absent Absent Absent Max.0.001 Max.0.002

18 18 Mercuryas Hg

mg/L <0.001 <0.001 <0.001 <0.001 Max.0.001 No relaxation

19 19 Cadmium as Cd

mg/L <0.003 <0.003 <0.003 <0.003 Max.0.003 No relaxation

Page 108: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

86

20 20 Selenium as Se

mg/L <0.01 <0.01 <0.01 <0.01 Max.0.01 No relaxation

21 21 Arsenicas As

mg/L <0.01 <0.01 <0.01 <0.01 Max.0.01 Max.0.05

22 22 Cyanideas CN

mg/L Absent Absent Absent Absent Max.0.05 No relaxation

23 23 Lead asPb

mg/L <0.01 <0.01 <0.01 <0.01 Max.0.01 No relaxation

24 24 Zinc asZn

mg/L 0.02 0.03 0.03 0.03 Max.5 Max.15

25 25 Anionicdetergents asMBAS

mg/L <0.2 <0.2 <0.2 <0.2 Max.0.20 Max.1.0

26 26 Chromium asCr+6

mg/L <0.01 <0.01 <0.01 <0.01 Max.0.05 No relaxation

27 27 Residualfreechlorine

mg/L <0.05 <0.05 <0.05 <0.05 Min.0.20 Min 1.0

28 AlkalinityasCaCO3

mg/L 117.7 146.0 148.0 136.5 Max.200 Max.600

29 Aluminum as Al

mg/L 0.01 <0.01 <0.01 <0.01 Max.0.03 Max.0.2

30 Boron asB

mg/L <0.1 <0.1 <0.1 <0.1 Max.0.5 Max.1.0

Page 109: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

87

31 ColiformOrganisms

/100 ml Absent Absent Absent Absent Less than 1

32 E.coliBacteria

/100 ml Absent Absent Absent Absent Absent

Page 110: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

88

Table 3.15: Ground water qualitySl.No.

Tests Unit

Results Maximum

Acceptable

LimitsAs perIS:10500-2012

Maximum

Permissible

Limitsin the

Absence of

Alternate

SourceAs PerIS:10500-2012

Projectsite

NearChemical lab

Lokappanahola

Venkatapuram

ayyanhalli

Mariyammanahalli

Varadhapura

Dhanapura

colony1 Color Tru

ecolor

units

<2.0

<2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 5 25

2 Odor - Agreeabl

Agreeable

Agreeable Agreeable

Agreeable

Agreeable Agreeable

Agreeable

Un-objectionable

Un-objectionable

Page 111: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

89

e3 Taste - Agr

eeable

Agreeable

Agreeable Agreeable

Agreeable

Agreeable Agreeable

Agreeable

Agreeable

Agreeable

4 Turbidity NTU

0.1 0.1 0.4 0.3 0.3 0.2 0.2 0.2 5 10

5 pH - 7.61

7.34 7.83 7.91 7.76 7.13 7.3 7.43 6.50-8.50

Norelaxatio

n6 Chloride

s as Clmg/

L59.2

85.3 128 110 124 96.3 76.3 92.3 250 1000

7 Totalhardness asCaCO3

mg/L

267.3

425.7 216.1 281.1 203.1 296.3 286.3 265.3 300 600

8 Calciumas Ca

mg/L

55.6

65.3 50.1 52.6 48.1 59.3 54.3 58.3 75 200

9 Magnesium asMg

mg/L

31.3

31.3 25.9 29.5 23.9 28.4 23.4 24.4 30 100

10 Totaldissolved solids

mg/L

580.0

1054.0 564 558 534 592 526 492 500 2000

11 Sulfatesas SO4

mg/L

29.0

107.1 34.6 39.6 31.6 38.5 40.5 28.5 200 400

12 Copper mg/ <0. <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 0.05 1.5

Page 112: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

90

as Cu L 0513 Iron as

Femg/

L0.09

0.07 0.3 0.01 0.3 0.01 0.01 0.01 0.30 1.0

14 Manganese asMn

mg/L

<0.1

<0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.3

15 Nitrateas NO3

mg/L

27.5

28.0 9.1 9.8 4.1 15.6 12.6 14.6 45 Norelaxatio

n16 Fluoride

as Fmg/

L1.1 1.3 1.0 0.32 0.2 0.5 0.5 0.5 1.0 1.5

17 Phenoliccompounds asC6H5OH

mg/L

Absen

t

Absent Absent Absent Absent

Absent Absent Absent 0.001 Norelaxatio

n

18 Mercuryas Hg

mg/L

<0.001

<0.001 <0.001 <0.001 <0.001

<0.001 <0.001 <0.001 0.001 Norelaxatio

n19 Cadmiu

m as Cdmg/

L<0.003

<0.003 <0.003 <0.003 <0.003

<0.003 <0.003 <0.003 0.01 Norelaxatio

n20 Seleniu

m as Semg/

L<0.01

<0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.01 Norelaxatio

n21 Arsenic

as Asmg/

L<0.01

<0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.01 Norelaxatio

n22 Cyanide mg/ Ab Absent Absent Absent Absen Absent Absent Absent 0.05 No

Page 113: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

91

as CN L sent

t relaxation

23 Lead asPb

mg/L

<0.01

<0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.05 Norelaxatio

n24 Zinc as

Znmg/

L0.01

0.05 0.01 0.01 0.01 0.01 0.01 0.01 5 15

25 Anionicdetergents asMBAS

mg/L

<0.2

<0.2 <0.2 <0.2 <0.2 <0.2 <0.2 <0.2 0.2 1.0

26 Chromium as Cr+6

mg/L

<0.01

<0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.05 Norelaxatio

n27 Residual

freechlorine

mg/L

<0.05

<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 0.2 min -

28 AlkalinityasCaCO3

mg/L

359.7

327.0 359.7 359.7 349.7 359.7 324.7 339.7 200 600

29 Aluminum as Al

mg/L

<0.01

<0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.03 0.2

30 Boron asB

mg/L

<0.1

<0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 1.00 5.0

Note: A – Agreeable; NA – Not agreeable; UO – Un-objectionable

Page 114: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

92

3.5.5 OBSERVATIONS

The physicochemical quality of the ground water sources at and around the plant

site has been analyzed, which indicates that almost all the parameters analyzed are

within “Maximum Acceptable Limits As per IS: 10500-2012.

The analysis of samples collected from rivers & canals for various parameters also

reveals that the quality of water is fairly potable to meet the quality requirement for

human use.

The observations made are tabulated below

Table :- 3.16 Observations

Sl.no. Parameter

Surface water Ground waterLake water River Water Project

siteOther

locations1 pH 8.57-8.64 8.63-8.71 7.34-7.61 7.13-7.91

2 Total dissolved solids,mg/L 182.0 - 260.0 278.2-293.0 580.0-

1054.0 558-592

3 Total hardness, mg/L 87.1 - 89.1 88.3-90.2 267.3-425.7 216.1-296.3

4 Fluoride, mg/L 0.4 - 0.5 0.4-0.5 1.1-1.3 0.32 -1.0

5 Nitrates, as NO3 , mg/L 0.1 0.1 27.5-28.0 9.1-15.6

3.6 SOIL QUALITY

The proposed project site has red soil mixed loamy soil and also having partly red

sandy suitable for agriculture and horticulture crops. The taluk is having few Rocky

Mountains with exrophytic vegetation.

The soil samples collected from the proposed project site and within the study area

too were analyzed for important parameters and the results of the soil quality are

tabulated in Table 3.17.

Table 3.17: Soil sampling stations

Sl.No.

Code No. Name of theStation

Direction fromsite

Distance from site(km)

1 S 1 Project site - -2 S 2 Lokappanahola S-E 2.03 S3 Venkatapuram E 3.5

Page 115: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

93

Figure - 3.6: Location of Soil sampling stations

Table - 3.18 Physico-chemical characteristics of soil

Parameter Results (on dry basis)

S1 S2 S 3

Description Red soil mixedloamy

Browncolored soil

Brown coloredsoil

pH 20% suspension 7.33 8.60 8.36Organic solids, % 3.8 4.6 10.0

Inorganic solids, % 96.2 95.4 89.9Chlorides as Cl, % 0.005 0.0018 0.0015

Phosphorous as P, % 0.004 0.011 0.077Nitrogen as N, % 0.052 0.09 0.44

S1

S2S3

Page 116: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

94

Potassium as K, % 0.14 0.0038 4.7Iron as Fe, % 1.53 8.5 0.0045

Sulfates as SO4, % 0.01 0.01 0.31Calcium as Ca, % 0.31 0.32 0.19

Magnesium as Mg, % 0.11 0.08 396.0Conductivity, microomhos/cm

(20% suspension)164.0 153.0 39.

Moisture, % 0.14 2.0 1.5

3.7 LAND USE PATTERN

An area covering 10 km radius, with project site as center, is considered as the

study area.

The major occupation of district is agriculture and 75 p.c. total labour force is

dependent on agriculture for its livelihood. The important crops grown are Cotton,

Jowar, Groundnut, Paddy, Sunflower and Cereals. The net irrigated area is 37 p.c

.to the net area sown. The pattern of land utilization in the district is as under (1997-

98):

Table 3.19: Land utilization pattern of site around 10km radius

Sl.No.

Land Use Pattern Areacovered in

Sq km

Percentage ofTotal areaoccupied

1 Reservoir & Water bodies 135.11 43.0

2 Reserved Forest 52.47 16.7

3 Cultivable land 45.56 14.5

4 Cultivable waste land 19.17 6.1

5 Waste land 16.65 5.3

6 Settlements & Road network 12.25 3.9

7 Rocky area 32.99 10.5

Page 117: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

95

Figure - 3.7: Land Use Map of the Bellary District

3.8 GEOLOGY

More than 55% of the geographical area of Karnataka is covered by Granitic gneiss

and Granitoids of Archaean age and the study area i.e. 10km radius of the SLRM &

its surroundings is largely covered by Granitic gneiss and Granites with a small

patch of Schists belong to Sandur Schist belt of Dharwar origin. The majority of the

study area is highly undulating and dotted with hard rock masses. The north

eastern portion of the study area is covered by Schists of various compositions and

forming as a hill range.

Page 118: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

96

Table 3.20: The main Rock types noticed in the study area and their

succession

Geological Succession (Age) Details

Pleistocene to Recent Alluvial deposits of Reddish, Reddishbrown, Black soil

Cenozoic Quartzite

Cambrian Dolerite dykes

Precambrian Dharwad Schist – Sandur Schist belt,Ferruginous quartzite, Amphibolite etc.

ArchaeanPeninsular Complex – Granitic Gneiss,Granitoids, Grey & Pink Granites

3.8.1 MINERAL RESOURCESThe important minerals found in the vicinity of the study area are quartz, feldspar,

quartzite, opalescent quartz, hornblende, felsites, building stone etc. On the other

hand, banded ferruginous quartzite, banded hematite quartzite, chlorite rich

formations noticed towards north eastern part of the study area at a distance of

7 to 8km.

3.8.2 GEOMORPHOLOGYThe area is predominantly covered by Pediment Inselberg Complex (PIC), and

dotted with Inselbergs (I) of smaller scale. The fringe of the Tunga Bhadra water

spread area is covered by the geo-morphological units like Valley Fill Shallow

(VFS), Pediplain Moderate (PPM) and Pediplain Shallow (PPS). Another major unit

noticed in the area is Pediment (PD) and is seen as a rolling pediment in the area.

A major Structural Hill (SH) is also conspicuously covered the north eastern part of

the study area at a distance of 7 to 8km, and a small Structural Valley (SV) can be

seen at the fringe of north eastern portion. The linear patches of Quart ridge (LR)

and dykes (DD) are also noticed sporadically within the study area. In general, the

topography is of highly undulating and looks like a rolling land with dotted mounds.

The average ground level of the plain portion is between 500 and 550 m above

MSL and that of hills at north eastern portion is between 560 m and 800 m above

MSL.

Page 119: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

97

3.9 HYDROLOGY PROFILE

Two fifth of the study area is covered by the backwater of Tunga bhadra reservoir.

However, there are many manmade water bodies (tanks) seen all along the south,

south eastern and eastern portion of the study area and are dry in most of the

period of the water year. Due to high temperature and low rainfall in the region, the

existing water bodies remain dry during non monsoon seasons.

3.9.1 HYDROGEOLOGY

3.9.1.1 OCCURRENCE AND MOVEMENT OF GROUND WATER IN ROCKFORMATIONSThe occurrence of groundwater is mainly controlled by joints and fractures

developed within the rock strata of granitic gneiss, granitoids and alluvial tracts of

the terrain. The occurrence of ground water is very limited in certain pockets of the

terrain as the area is covered by hard rocks and acts as runoff zone for larger

extent.

The recharge of the groundwater is mainly due to natural rainfall, which is less and

sometimes scanty in the region. Therefore, the depth of water table level in the area

noticed is between 25-50m below ground level. By considering overall features and

prospects of the terrain, it can be assessed that the ground water movement is from

south to north, south to north west and from east to west towards Tungabhadra

River.

3.9.1.2 DEPTH OF GROUNDWATER AND SEASONAL VARIATION

The area is a rugged and undulating terrain with an average elevation of 525m

above MSL with the general slope towards north. In general the slopes are

moderate. However, the steep slopes are observed very close to the hill ranges, i.e.

at the foot hills of isolated mounds or rocky knobs, rising to a height ranging from

75 to 100m above the regional ground level. The groundwater level in the region

varies between 7 to 15m in monsoon season and 25 to 50m in summer season and

forms a number of groundwater pockets in the entire region with varied water

qualities. The groundwater table level is purely depending on the undulating

topography of the terrain. Ground water in the region occurs in unconfined

conditions in shallow weathered portions and in semi confined condition in

Page 120: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

98

fractured horizon. Examination of the data collected from these bore wells indicate

that the depth to water table varies from 7 to15m and the water has been struck at

the depths of 35m to 55m below ground level.

3.9.1.3 LITHO- LOGS

Surface – Red Loamy Sandy Soil Soil

0-5.5 ft – Red Loamy Sandy Soil

5.5 – 40 ft – Highly weathered rock

40-135 ft – Weathered rock with intermittent fractured rock

135-190 ft – Hard rock with minor framed rock.

3.9.1.4 DRAWDOWN AND RECOVERY TESTS or PUMPING & RECOVERYTEST:

Pumping and recovery test has been conducted for two bore wells namely BW-4 &

BW-6 of SLRM and the details of pumping and recovery test is furnished in Table 5f.

Table 3.21– Pumping & Recovery Test details of the Bore wellsSl.

No.

Location Latitude &Longitude

StaticWater

Level in M.

Drawdown in M.

Discharge(Q) (M3/day)

Transmissibility (T) M2/day

1 OppositeLab. (BW-

4)

N 150 18'49.6" E 760

32' 18.7"

24 18.50 72.00 0.713

2 Colonycompound

(BW-6)

N 150 18’41.5” E 760

33’ 30.8”

17 21.00 84.00 0.733

3.9.1.6 GEOPHYSICAL INVESTIGATION

As a part of field studies, meticulous geophysical investigations (Vertical ElectricalSoundings - VES) were conducted in the vicinity of SLRM plot, in order to know thedetails of subsurface formation, thickness of overburden, presence of fracture zonesetc. Geophysical tests were conducted based on the prevailing hydro-geologicalconditions at study area, giving importance to the lithology, groundwater movement,drainage pattern, structural influence etc. Schlumberger configuration was adoptedand VES data were analysed both by curve matching and curve break techniques

Page 121: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

99

Table 3.22 – Geophysical Interpretations and Recommendation for freshdrilling

Recommendations VES Number VES Number VES NumberSLRM - 2 SLRM - 3 SLRM - 5

Depth recommended in m. 125 120 120

Anticipated Casing in m. 22-25 28-30 20-25

Estimated Yield in LPH. 5500-7500 6000-7000 5000-6000

Occurrence of fracturesbelow ground level in m.

30-40, 60-70, 110-120

25-30, 60-70, 100-110

12-15 (?), 70-80,90-100

RemarksYield graduallyincreases withdepth. PRS is

must forsustainable yield.Standby point in

case of anyeventuality.

Yield graduallyincreases with

depth. PRS is mustfor sustainable

yield. Standby pointin case of any

eventuality.

Yield graduallyincreases with

depth. PRS is mustfor sustainableyield. Standbypoint in case ofany eventuality.

3.9.1.6 PATHWAYS OF THE POLLUTANTS

Geotechnical investigations were carried out by using Resistivity meter to know the

sub surface.

Table – 3.23 Resistance data

Depth (H) Apparent ResistanceVES –I VES –II VES –III

5 8.4 5.7 5.17 9.71 8.12 7.3

10 11.6 9.43 8.215 14.83 11.61 10.6020 18.92 12.92 11.1330 20.31 14.96 14.2840 24.05 15.05 14.4850 63.64 51.92 46.4870 104.80 95.86 86.32

100 119.07 109.27 99.47125 146.9 135.22 121.0150 172.41 159.0 157.21

Page 122: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

100

Point 1 or VES –I – Area shows 0-7 ft - Red soil7-40 ft - Weathered rock40-100 ft - Fragmented rocks100-150 ft - Hard massive rock

Point 2 or VES –II – subsurface 0-10 ft - Red sandy loamy soil10-40 ft - Highly weathered rock40-125 ft - Highly fractured rock125-150 ft - Hard rock

Point 3 or VES – III – subsurface 0-12 ft – Red Sandy loamy soil12-43 ft – Highly weathered rock43-125 ft – Highly fractured Rock125- 150 ft – Hard rock

Resistance shows the sub-surface formation and its nature. Percolation (seepage)

depends on the formation having more porosity. Porosity of a rock or soil is a

measure of the contained interstices. It is expressed as the percentage of void

space to the total volume of the mass,

α = Porosity then,α = 100W/ VW- volume of water required to fillV- total volume of the rock

Porosity range from zero to more than 50 percent. It directly depends upon the grain

size shape and arrangement of individual particles, distribution by size and degree of

cementation and compaction. In consolidated formations, removed of mineral matter

by solution and degree of fracture are also important.

Vertical distribution of ground water is primarily important in study of pollution and its

pathway. The substance occurrence of ground water may be divided into zones of

saturation and aeration .In the zone of saturation all interstices are filled with water

under hydrostatic pressure .In the zone of aeration all the interstices occupied

partially by water and partially by air.

Water in the soil water zone exists at less than saturation except temporarily when

excessive water reaches the ground surface as from rainfall or irrigation. The zone

extends from the ground surface down through the major root zone .Gravitational

water is excess soil water which drain through the soil under the surface of gravity.

Topography, soil structure, rock formation and vegetation plays an important role for

the passage of the pollutants to the sub surface. In the study area, run-off is more

Page 123: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

101

than infiltration and soil structure is of finite in size and compact because of the

industrial activities. Further, soil is cemented by a fine clay & hence it will not permit

to the sub surface. Area is devoid of any thick vegetation which can allow to

percolate pollutants to the sub surface by means of root system. Hence topography,

soil and vegetation in the plant area will not permit any pollutants to the sub-surface.

3.9.1.7 DRAINAGE AND WATER BODIES

The drainage system noticed in the region is almost dendritic and small portion of

the region is in parallel form and the drainage density is low to moderate forms the

network of several streams originating from the mounds & hillocks. The

Tungabhadra River, which is a prominent water body, flows at northern part of the

study area from northwest to eastern part of the region.

The rest of the water bodies/ tanks in the region were formed by the construction

of bunds across the minor streams (above 3rd & 4th order) for storage of water for

irrigation. The Dhanayakana Kere is the largest among the water bodies and is

located at southeastern part of the site. Several smaller lakes exist throughout the

area and cater to command areas for irrigation during monsoon season. However,

most of the water bodies in the vicinity go dry during summer due to zero inflow

from the drainage system.

3.9.1.8 GROUND WATER POTENTIALGround Water potential has been assessed by site investigation & as per the data

collected from the Central Ground Water Board/ Department. The entire region is

mainly underlined by granitic gneisses and Dharwar schists that are known to be

hard rocks, which have least porosity and permeability. Ground water is found in

pockets in the area in the zones of weathered, jointed and fractured rocks.

Bore wells in the area are of 152 to 165mm dia. and are normally have a depth of

70 m to 120 m. The maximum yield of the bore well in the region recorded is

15m3/hr., and the pumping period varies from 6 to 8 hours/day. The bore well data

from State Panchayat Raj Engineering Department (PRED) indicates that about

80% of the bore wells yield between 0.6 to 5m3/hr and maximum depth of high

yielding bore wells is between 75 to 90m below ground level. Most of the bore wells

deeper than 50m, tap the water from fractured zones encountering between 35m to

Page 124: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

102

90m depth and forms medium to deep aquifers.

3.10 ECOLOGY

3.10.1 FLORA AND FAUNA

It is necessary to know the configuration of vegetation, plantation, animals, birds,

aquatic life, wildlife features, bird sanctuaries, national parks, reserved forests etc.,

in the study area in order to assess the probable effect likely to be reflected on the

existence of these features after the commissioning of the proposed project.

Presently the proposed site is a plain land with less vegetation cover mainly herbs.

In the Ramagad Reserve forest which is dry deciduous in nature. It consists of

bare residual hill containing hard rock formation enriched with iron ore as such

the conditions are not much favorable for tree growth as very little soil exist on the

hill. The flora does not contain much timber yielding species nor do they have

good green cover. List of flora found in the Ramgad Reserved Forest,

Mariyammanahalli tanda Village, Mariyammanahalli, Nandibanda, Dhanapura

Village and TB Dam area are tabulated below.

3.10.1.1 FLORISTIC ANALYSIS

Ramgad Reserved Forest

Ruelliapatula, Jacq. Duranta repence.Ruelliaprostrate, Poir Nerium odorum,soland.Tridaxprocumbens, L. Exotic shrubsTridax Sp. Prosopis spicigera. LTriphyllus oxalis Lantana camara, L

Climbing medicinally important herbsAbrus precatoriuos , L treesGymnema sylvestre, R,br Azadirachta indica, A. juss.Pergularia pallid, W.&A. Bambusa arundinacea, willd.Ttinospora cordifolia, miers. Bassia bassia lattifolia, roxb.Tylophara asthmatica, w. &A Bauhinia purpurea,L.Wattacaca volublis Borassus flabelliformis, Lshrub Crataeva riligeosa, fourst.Leea sp. Dalbergia sissoo, roxb.Crotalaria juncea,L. Hardwica binata, roxb.Dichrostachys cinerea, w. &A. Kigelia pinnata, dcGlycine pentapylla ,dalz. Maba buxifolia, cl.Lantana indica,roxb. Mangifera indica,L.

Page 125: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

103

Pavvetta indica, L. Morinda tinctoria, roxb.Strobilanthes sp Pongamia glabra , vent.Tecoma stans Santalum album,L.Ipomea sp. Swietania mahagoni, l.Zizyphus jujuba, lam Syzigium alterniforium, walp.Medicinally importants Termilania catappa,L.Shrubs Tinospora cardifolia, miers.Anona squamosa, L. Zizyphus jujuba var.Carrissa diffusa,L. Dominate plantsFluggea leucopyrus, willd. cassia auriuilta,L.Glycosmis cochinchinensis, R,br. Techoma stansJatropha glandulifera,roxb. Hardwicka binata ,roxb.Phylanthus reticulates, poir. Kiegelia pinnata, R.brTodonia viscosaIpomaea sp. Rare occurrence

Bambusa arundinacea, willd.Oranamental shrubs Dendrocalamus strictus, nees.Dendrocalamus strictuse, nees. Leea sp

mariyammana halli tanda village aquatickHerbs Hygrophilia angustifolia,R.br. typha

angustata, B. &chAbutilon indicum, g.don.Amarnaths sp Food cropsCommelina sp.L. Oryze sativa, L.Cymbopogen citrates, stapf. Gajanus gajan,L.Cyperius sp.l. Dolichos lablab, LEragostistis sp. Cucurbeta melo, L.Justicia simplex, D. don. Arachis hypogaea, willedLaganaria vulgarious, ser. Zea mays, L.Mimosa pudica, L. ShrubsMirabilis jalaba, L. Cactus sp.Osmium canum,L Discrostachys cineria, w&A.Sida acuta,L. Zizyphus jujube LamSida rhombifolia,L. Medicinal shrubsStachytarpheta indica, Vahl colotrophis gigantea,R.br.Teliocora acumunata,L. Carrissa diffussa, roxb.Vernonia cinerea, less. Cassica quariculata, L.Climbing herbs Phyllantus reticulates,poirAntigonan leptopus, HK&A. Todonia viscosa, linn.Lpomaea staphylina R.&S. Vitex negundo,L.Medicinal herbs Ornamental shrubsAcalypha indica ,L.Andropogon nodus,linn Excotic shrubsCroton sparsiflours, mor Prosopis spicigera,L.Cyanodon doctylon, sper. Lantana camara,L.Datura stramonium,LOcimum sanctum,l. Excotic invasive weedPhylanathus neruri,l. Parthenium hysterophorus L.

treesAcasia leicophloea, willt

Page 126: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

104

Albizzia lebeck, benth Thesphesia popunea, cav.Borassus flabelliformis,L.Cassia fisthula L. Dominate plantsCocos nucifera ,L. Erogostists sp.Dalbergia sisso,roxb. Abutilon indicum,G.don.Mangifera indica,l. Sida acuta,L.Morinda tinctoria,roxb. Sida cordifolia,l.Moringa olefera,lam Sida rhombifolia,L.Muraya koniggi,sprPavetta hispidula,W&A Rare occurrencePavetta indica,L. Phoenix sylvestris,roxb.Phoenix sylvestris,roxb. Strobilanthus spPithocelobium saman, nees. Hygrophilla angustifolia,R.br.Pongamia glabra ,ventStrobilathus spTamarindus indica,L. Endangered flora-nilmariyammanahalli Marselia spHerbs Typha angustata,B&chAchyranthes aspera,L Food cropsClerodendron sp Cucumis melo,L.Cyphrus sp.L. Zea mays.L.Gomphrena sp,jacq. Sacharum officinarum,L.Sida acuta,L. Exotic invasive weedSida cordifolia,L. parthenium hysterophrous L.Sida rhombifolia,L. Kyllinga sp.

ShrubsMedicinal herbs Cactus sp.aerva tomentosa,forsk. Cassia allata,L.Catheranthus roseus Cassia tara,LOcimum sanctum,L. Medicinal shrubsTridax procumbencse,ham Canthium parviflorum,lamSolanum nigrum,L. Carissa diffusa,roxb.Climbing medicinal herbs Narium odorum, soland.Coccinia indica,W&A. Randia dumetorum,lamSolanum nigrum,L. Ricinus communis,L.Aqutic herbs. Jatropha glandulifera,L

Excotic shrubs Strobilanthus spLantana camara,L Tectona grandis,L.treesAcasia Arabica,willd Dominant plantsAzadiracta indica,A.juss Amaranathus viridis,L.Bassia latifolia,roxb. Cassia quariuilata,L.Cassia fisthula,L. Parthenium hysterophrorusl.Euphorbia anti quorum,linn. Rare occurrenceFicus religiosa,l Marselia spPhoenix sylvestris,roxb.Polyyalthia longifolia,HK.F&T. Endangered flora-nilNandibanda

herbs foodcropsAbutilon indicum, G. don. Arachise hypogaea,willd

Page 127: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

105

Achyranthes aspera,L Lycopersisum esculantum.mill.Clerodendron spGomphrena procumbence ,jacq Exotic invasive weedAmaranthus viridis ,L Parthenium hysterophrous L.Ipomaea sp.Sida rhombifolia ,L ShrubsStachyrtapheta indica ,vahl. Cassica allata,L.Tephorsia pupurea ,pers Cassia quriqulata,L.

Clerodendron sp

Medicinal shrubsMedicinal herbs Caltrophis gigantean,Rbr

Tomentosa,forsk Euphorbia tirucalli,L.Ecipta alba,hassk.Evolvalues alsinoider,L. Exotic shrubTridax procumbence,ham Prosopis spicigera ,Llantana camara,L

Climbing medicinal herbs treesLogenaria vulgeris ,ser Acasia leaucophoea,willt.Coccinia indica,W&A. Albizzia lebeck,benth.Tinospora cardifolia,meirs. Azadiracta indica,A,jussBorassus flabelliformis,L Amaranathus viridis,L.Cocos nusifera,L. Cassia quariuilata,L.Euphorbia antiquorum,linn. Parthenium hysterophorous L.Ficus religiosa,L. Sida cordifolia,L.Wrightia tinctoria,R.br.

Rare occurrenceLogeneria vulgaris, ser.

Dhanapura village herbs Lantana camara,LAbutilon indicum,G.don. TreesAcanthus sp. Aegle marmelos,corr.Achyranthus aspera,L. Albizzia lebeck,benth.Amaranathus sp. Atlantia sp.Crotoloria ternatea,L. Azadiracta indica, A.jussDolichos lablab,L. Carica papaya,L.Paspalum longifolium ,roxb. Cocos nucifera,LSalvia sp. Dalbergia sissoo,roxb.Sida acuta,L. Eucalyptus,willd.Climbing medicinal herbs Syzigium jambolanum,DC.Tinospora cordifolia,miers Tamarindus indica,L.Pergularia damea Tectona grandis,L.shrubsCrtoloria ternatea,L. Dominant plants

Paspalum longifolium.roxbMedicinal shrubsFluggea leucopyrus,willd Rare occurrenceRicinus communis,L. Aegle

Exotic invasive weed Endangered flora - NilParthenium hysterophorose L.

Page 128: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

106

3.10.1.2 AGRICULTURAL PATTERN

The main land use in and around the area is farming mainly cultivated with crops like

Sugarcane (Sachharum officinarum), Rice (Oryza sativa), Wheat (Triticum aetivum),

Red gram (Cajanus cajan) and Groundnut (Arachis Hypogea)as cash crops. The

other crops taken are Sunflower (Helianthus Annuus), Bajara (Pennisettum sp,) and

Jawri (Sorghum vulgare). The vegetable are tomato (Lycopersicon esculenta),

Brinjal (Solonum Melongea) and Capsicum annum.

The important fruit plants are Musa paradisica (Banana), Mangifera indica (Mango),

Carica papapya (Papita), Psidium guyaya and Syziguim cumini (Jamun).

3.10.2 FAUNAL COMPOSITIONFauna of a particular region indicates environmental conditions and the wellbeing of

the population residing in the region. Faunal studies help to understand the wellbeing

of a nature and functioning of ecosystems. It helps to monitor pollution levels,

biological richness or heritage quality, habitat change and quantifying threatening

species. The faunal components such as Arthropods, Molluscs, Pisces, Birds and

Mammals are very sensitive to the change in the ecosystem, therefore are best used

as indicators of the ecosystem function and considered crucial in the ecology and

management of the Acquatic and Terrestrial Ecosystems.

In the Ramgad Reserved Forest commonly found animals are crow, pheasant, green

bee eater, red vented bulbul, house crow, and house sparrow. The mammals found

are Wild boar, Fox, mongoose, Peacock, common mouse. The reptiles found are

cobra, common krait and lizard. In the Gunda and Nandi Danda Reserve Forest,

most of the Ramgad Reserve Forest fauna also spread. The other faunal animals are

Wild cat, Hare, Wild boar, leopard, Fox, rat snake, Bennet Macaque, Common

langur, Porcupine, Jackal etc.

Animals and Birds in the study area other than forest area were documented using

following means:

Secondary sources and published literature

By interviewing local people

Nesting (Birds), borrows for small mammals

Page 129: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

107

Table 3.24: List of Wild Mammals Found in the Study AreaCommon name Scientific Name Schedule of

Protection Act inwhich listed

A.Mammals

Common jungle cat Felis chans II

Common mongoose Herpestres edwardsii -

Jackal Canis aureus II,V

Wild dog Cuon alpinus II

Fox Vulpes bengalensis II

Porcupine Hystrix indica IV

Common hares Lepas sp. IV

Wild boar Sus scrofa III

Barking deer Muntiacus muntiacus III

Sambar Cervus unicolor III

Spotted deer Axis axis III

Sriped Palm Squirrel Funambulus palmatum IV

Rhesus monkey Macaca mulata II

B.Reptiles

Indian Cobra Naja naja II

Yellow rat Snake Ptyas mucosus II

Common Krait Bungarus caeruleus IV

Russel’s Viper Vipera russelii II

Checkered Keelback Xenochropis piscator II

The common snakes found in the region are Kraits and Cobras. The birds found in

the area are given in Table 3.25

Page 130: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

108

Table 3.25: List of Birds Commonly Found in the Area

Common name Scientific name Schedule of wildlifeprotection Act in which

listedPaddy Bird Ardeola grayii IVLarge Indian Parakeet P.eupatria IVRose Ringed Parakeet P.krameri IVBrahminy Duck Tadorna ferrugninea IVRed Wattled Lapwing Vannelus indicus IVCrow pheasant Centropus sinesis IVKoel Eudynamis scolopacea IVWhite Breasted Kingfisher Halcyon smyrnansis IVSmall green Bee-eater Merops orientalis IVCoot Fulica atra IVCommon Crow C.splendens VHill Mynah Gracula religiosa IVCommon Mynah Acridotheres tristis IVHouse Sparrow Passer domesticus -Golden Backed Woodpecker Dinopium benghalense

IVRed vent Bulbul Pycnonotus cafer IVSpotted Dove Streptopelia chinesis IV

Spur Fowt Galloperdix spp IV

The main water body in the area is T.B. Dam. The data on ecology of the aquatic

ecosystem in the study area is based on literature and field survey.

There are a number of ponds in the villages in the study area. On visual observation

these ponds seems to be oligo-trophic to mesotrophic in nutrients status. The

common rooted plants and hydrophytes on the edges of these ponds are Nelumbo

sp, Potamogeton sp, Aponogeton sp., Ipomea sp., Dichanthium sp., etc. The water

in these ponds is colorless to slight greenish in color. The Phytoplanktons in the

rivers are basically dominated by filamentous forms. The dominant ones are

Chaetophora sp, Cladophora sp, Pithephora sp, Oscillatoria so., Spirogyra sp,

Cymbella sp, etc. The Zooplanktons are basically dominated by Crustaceans

and Rotifers. The dominant ones are Crustaceans: Crustacean eggs,

Moinodaphina, Chydorus, Cyclops. Rotifers: Brachionus, Rotiferan, etc. Others:

Nematodes, Dipteran larvae, etc.

Page 131: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

109

3.10.2.1 FISHES

The T.B. Dam Is the main ecosystem supporting fishes in the area. The maximum

abundance of fishes was reported during April to July. The fishes observed in the

T.B. Dam and the nearby reservoirs is given in Table 3.26

Table 3.26: Fish Fauna observed in the Study Area

No endangered and endemic species (flora & fauna) recorded in the project site and

its surroundings; hence conservation plan is not required.

3.11 SOCIO-ECONOMICS OF THE STUDY AREA

The proposed project is located at Sy Nos. 633, 646, 643 and othersNarayanadevevanakere Village, Hagari bommanahalli Taluk, Bellary District,Karnataka.

3.11.1 DEMOGRAPHY AND SOCIAL STATUS

The information on present status of the human settlements was collected from the

secondary sources such as census book, official websites and concerned

SlNo.

Name of fish Sl No. Name of fish

1 Catla catla 18 Gudusia chapra2 Labeo fimbriatus 19 Rohtee cotio3 Labeo calbasu 20 Pama pama4 Cirrhinus mrigala 21 Glossogobius guiris5 C.reba 22 Rhinomugil corsula6 Barbus tor 23 Xenentodon cancila

7 Puntius sarana 24 Chela sp.8 Mystus seenghala 25 Chela bacailla

9 Mystus sor 26 Ailea nama10 Silonia silondia 27 Ambassis nama11 Wallago attu 28 Ambassis sp12 Pangasius pangasius 29 Puntius sophore13 Rita chrysea 30 Puntius ticto14 Eutropiichthys vacha 31 Puntius chola15 Bagrius bagarius 32 Puntius dorsalis16 Notopterus notopterus 33 Mastacembelus armatus17 Notopterus chitala 34 Mastacembelus pancalus

Page 132: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

110

government departments.

The base line status refers to:

1. Demography structure

2. Infrastructure resource base in the area

3. Economic attributes

3.11.2 ABOUT HAGARI BOMMANAHALLI TALUK

Hagari Bommanahalli (HB Halli) taluk is the headquarters town of the taluk of the

same name, at a distance of 110 Kms from Bellary city. Incidentally this is only taluk

with no urban areas in its jurisdiction in the state. A number of families from the

submerged villages of the Tungabadhra project have been rehabilitated here.

The taluk is bounded on the north by the Koppal district on the south by Kudligi taluk,

On the east by the Hospet taluk and on the west by Hadagali taluk. HB Halli taluk

occupies 5th place in area and last place in population among seven taluks. The

geographical area of the taluk is 974 sq.km and population is 1,59,886 as per 2001

census. This accounts for 8 p.c. of district’s population and its area accounts for

11.50 p.c. HB Halli comes under the jurisdiction of Hospet revenue sub-division with

4 RI circles.

3.11.3 CULTIVATIONThe normal rainfall is 554.5 mm. The major crops grown are maize, jowar, bajra,

sunflower, groundnut and cotton. The net irrigated area constitutes only 16,820 hec.

(32 p.c.).

Table 3.27 Demographic DetailsDetails of Irrigated Land Under Different Water Sources in H.B. Halli Taluk

Sl.No Particulars Area(Hectares) Percent1 Tunga Bhadra Project-High Level Canal - -

2 Tunga Bhadra Project-Low Level Canal - -

Total Tunga Bhadra Project - -

3 Malvi Project 2887 17.16

3 Lift Irrigation 3408 20.26

4 Tanks 1491 8.86

5 Wells/Bore wells 9034 53.72

Total area under irrigation 16820 100.00

Page 133: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

111

Net Cultivable Area (in Hectares)

Irrigated Rainfed Total

16820(32p.c) 35526(68p.c) 52346(100p.c)

3.11.4 INDUSTRIALIZATION

Industrialization is one of the important means of promoting economic

development of the country. H.B.Halli taluk is another taluk in the district where

industrialization is making progress at snail’s pace. In this taluk there are 869

industrial units with an investment of Rs.746.28 lakh. These units provide

employment to 3,141 persons.

There are 1,085 Rural artisans whose activity comprises of Carpentry, Black

smith, Barbers, Goldsmith, Pottery, Cotton weaving, Mat weaving and Mirror

Embroidery.

3.11.5 STATISTICS AT A GLANCE

Table 3.28 Taluk Statistics

CENSUS OF INDIA - 2001Results H.B. Halli taluk vis-à-vis District vis-à-vis State

Subject H.B. Halli Taluk Bellary District Karnataka State

1991 2001 1991 2001 1991 2001Number ofrevenueVillages

55 53 542 524 29193

Number ofhoblies

4 4 27 27 745 745

Number ofGramPanchayats

- 22 - 189 - 5689

Corporations - - - 1

218 228

CMC's - - 2 1

Town MuncipalCouncil - - 1 1

TownPanchayats

- - 7 7

ZP Members - 4 - 32 - 890

Page 134: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

112

TPMembers - 14 - 112 - 3288

GP Memebrs - 348 - 2856 - 80073

Area in Sq. Km 974 974 8447 8447 191792 191792

Total Population

(in lakhs)1.35 1.60 16.56 20.27 449.77 528.51

Male Population

(in lakhs)0.68 0.81 8.42 10.29 229.52 268.99

FemalePopulation(in lakhs)

0.67 0.79 8.14 9.98 220.25 259.52

Decadal GrowthRate-p.c 36.00 18.52 26.84 22.30 21.12 17.25

PopulationDensity(Per Sq. Km)

138 164 196 240 235 275

Sex Ratio

(females per

1000 males)

992 975 966 969 960 964

0-6 Population-p.c

20.89 15.76 19.35 14.87 16.63 12.94

Rural Population(in Percent)

135026

(100.00)

159900

(100.00)

1125746

(67.98)

1320290

(65.13)

31069412

(69.07)

34889033

(66.01)

UrbanPopulation(in Percent)

Nil Nil53024

(32.02)

706850

(34.87)

13907788

(32.93)

17961529

(33.99)

SC Population

(in percent)

25028

(18.53)

29941

(18.72)

311252

(18.79)

374218

(18.46)

7369279

(16.38)

8563930

(16.20)

ST Population

(in percent)

1210

(0.89)

21716

(13.58)

147569

(8.91)

364638

(17.99)

1915691

(4.25)

3463986

(6.55)

Literacy-p.c 37.00 58.58 45.89 58.55 56.04 67.04

Male Literacy- p.c 49.00 71.25 59.11 70.20 67.26 76.29

Female Literacy-p.c

26.00 45.73 32.24 46.16 44.34 57.25

Page 135: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

113

Sl.No Infrastructure Stats Unit Number

Education

1 Lower Primary Schools Number 59

2 Higher Primary Schools Number 63

3 High Schools Number 07

4 PU Colleges Number 03

5 Moaraji Desai Schools Number 01

6 Residential Schools Number 250

7 Beneficiaries under Akshara Dasoha Number 20121

8 Enrolment in schools (6-14) children Percent 99

9 Engineering Colleges Number -

10 Polytechnic Colleges Number -

11 Medical Colleges Number -

12 Ayurvedic Colleges Number -

13 Pharmacy Colleges Number -

Note: Dr.Nanjundappa Committee report says H.B.Halli taluk is a developed taluk asfar as infrastructure development related to Education sector is concerned. Howeverthis taluk is either more backward or most backward at literacy levels and pupilteacher ratio. Because of various interventions under SSA program the dropout rateshave considerably come down in this taluk.

Health

1 Medical College Hospitals Number -

2 Primary Health Centres Number 07

3 Health Sub-Centres Number 37

4 Primary Health Units Number 01

5 Govt. Ayurvedic Hospitals Number -

6 Govt. Ayurvedic Dispensaries Number 06

11 Govt. Homeophathy Dispensaries Number 01

Page 136: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

114

Women and Child

1 Anganwadi Centers Number 131

2 Anganwadi centers with own buildings Number 131

3 Nutrition-beneficiaries-(0-6)children Number 10263

4Nutrition - beneficiaries - pregnant

and mothers Number 2475

5 Stree Shakthi groups Number 408

6 Members in Stree Shakthi groups Number 6120

7 Bank linkages provided No.ofgroups 250

8 Savings Rs.lakhs 76.02

8 Govt. Unany Dispensaries Number -

9 Fogging Machines Number 01

10 Ambulances Number 02

Note: According to Dr. Nanjundappa’s committee report this taluk in the district is

termed as most backward as far as infrastructure development is concerned.

However the health conditions status in the taluk / district causing concern. The

incidence of Aids, Polio, JE and Dengue fever etc., the most un common diseases

are prevalent in this district.

Social Welfare

1 Pre-metric hostels for boys Number 07

2 Pre-metric hostels for boys-strength Number 515

3 Pre-metric hostels for girls Number 02

4 Pre-metric hostels for girls-strength Number 140

5 Post-metric hostels for boys Number 01

6 Post-metric hostels for boys-strength Number 50

7 Post-metric hostels for girls Number -

8 Post-metric hostels for girls-strength Number -

9 Residential Schools Number 01

10 Residential Schools- strength Number 250

Page 137: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

115

Note: The members of Shree Shakthi groups are preferred for assigning

responsibilities like cooking jobs under Akshara Dasoha, Tax Collection at Grama

Panchayat Level.

Agriculture

1 Cultivators-Male(2001census) Number 17786

2 Cultivators-Female(2001census) Number 3546

3 Cultivators-Total(2001census) Number 21332

4 Agriculture Laborers- Male Number 10773

5 Agriculture Laborers- Female Number 12744

6 Agriculture Laborers- Total Number 23517

Animal Husbandry

1 Veternary Hospitals Number 01

2 Dispensaries Number 07

3 Primary Vet. Centers Number 04

4 Mobile Vet. Dispensaries Number 01

5 Total Animal population Number 130645

Fisheries

1 Irrigation tanks Number 22

2 Fish ponds Number 09

3 Fisher men Number 5010

4 Average annual production M.Tones 750

Forest

1 Area under forest Hectares 4482

2 Area under forest to Total Area Percentage 05

Roads

1 National Highways Km -

2 State Highways Km 31

3 District Roads Km 156

Page 138: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

116

4 Other district roads Km 30

5 Rural Roads Km 331

6 TDB Roads Km 141

7 Irrigation Roads Km 08

Total Length Km 6978 Length of Railway line Km 30

Rural Drinking Water1 Fluoride affected villages Number 28

2 Bore wells Number 309

3 Mini Water Supply schemes Number 115

4 Piped Water Supply schemes Number 73

Note: One third of villages in the district are fluoride affected. Alternative proposed are

surface water and de-fluoride filters

Below Poverty Line (BPL)1 BPL households as per 1997 Census Number 12811

2 BPL households as per 1997 Census percent 48.40

3.11.6 PLACES OF INTEREST

(a) Ambli:This village is famous for Black stone Chalukyan temple dedicated to

Kalleswara.

(b) Holalu:This village which is 32 km away from Hadagali is famous for the beautiful image of

Ananthashayana which is carved in black stone.

Page 139: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

CHAPTER -4

ANTICIPATED

ENVIRONMENTAL IMPACTS &

MITIGATION MEASURES

Page 140: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 141: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

117

CHAPTER – 4

ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES

4.1 INTRODUCTION

Environmental impact in the study area is any alteration of environmental conditions

or creation of new set of environmental conditions, adverse or beneficial, caused or

induced by the impact of project. Prediction involving identification and assessment

of potential impacts of the project on surrounding environment is a significant

component of REIA studies. The likely Impacts of various activities of the proposed

project on the environment were identified. These impacts were assessed for their

significance based on the background environmental quality in the area and the

magnitude of the impact. All components of the environment were considered and

wherever possible impacts were evaluated in quantitative/qualitative terms. Several

scientific methods are available to qualify and predict the impact of project on

environmental factors such as water, air, noise, land ecological socio economic.

Such predictions are superimposed, over base line environmental status to derive

post project scenario of the environmental conditions. The resultant (post-project)

quality of environmental parameters is reviewed with respect to the permissible limits.

Based on the impacts thus predicted preventive and mitigation measures were

formulated and incorporated in the environmental management plan to minimize

adverse impacts on environmental quality during and after project execution.

The environmental impacts can be categorized as primary and secondary. Primary

are those which are directly attributed to the project and secondary impacts are those

which are indirectly induced due to primary impacts and include those associated with

investment & socio-economic status. The project impact may be broadly divided into

two phases.

During construction phase: These may be regarded as temporary or short term

and ceases with implementation of the project.

During operation phase: These impacts are continuous warranting built in

permanent measures for mitigation and monitoring.

Construction and operation phase of the project comprises of various activities, each

of which will have an impact on some or other environmental parameters. Impacts on

environmental parameters during construction and operational phase have been

studied to estimate the impacts on environment.

Page 142: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

118

The impacts have been predicted for the proposed industrial project assuming that

the pollution due to the existing activities has already been covered under baseline

environmental monitoring.

4.2 IDENTIFICATION & CHARACTERIZATION OF IMPACTS

The wastes and pollutants generated due to various activities of the project cause

impacts on different environmental attributes. The major project activities and the

affected environmental parameters are given below.

4.2.1 CONSTRUCTION PHASE

Construction activity includes foundation works, fabrication of storage tanks and

erection of plant-machineries. The construction phase is expected to be about three

months. The major activities during construction phase are given below.

Project Activities

1. Site preparation and development

2. Civil construction work

3. Vehicular movement

4. Loading and unloading civil items and plant machineries

5. On site storage of civil items & plant machineries.

6. Erection of plant and civil structures

7. Power supply

8. Maintenance of construction machinery

9. Disposal of solid wastes

4.2.2 OPERATION PHASE

The major activities at SLR Metaliks Ltd site in the operational phase involves

storage & handling of ore, coal, coke, associated raw materials, captive power

production etc. These activities may affect the environment in varying degrees

through natural resources depletion viz. water consumption, release of

particulates and gaseous emissions, contamination of water body, run-off from

waste storage area etc. During operation air, water and noise may be affected

due to material usage and processing for steel and associated activities in

Page 143: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

119

general. Associated activities e.g. transportation of materials, operations of

workshop and garage, canteen etc., may also affect air, water and noise

environment. Green belt development will have a positive impact not only on flora

and fauna but also on air quality, noise and soil characteristics. Positive impacts on

socio- economic environment are expected due to employment, further

infrastructure development and also due to socio-economic welfare developmental

activities to be taken up. The major project activities and the affected environmental

parameters are given below.

Project Activities

i. Manufacturing activities of various plants including steel plant, rolling mill, coke

oven plant and air separation unit.

ii. Operation of power plant including boiler and turbine

iii. Storage and handling of raw material and products

iv. Transportation of raw materials, products and personnel.

v. Water supply, storage and treatment

vi. Solid wastes management.

vii. Waste water management

viii.Gaseous emission management

Pollution Sources:i. cooling water blow down, boiler blow down.

ii. Flue gases from furnaces, boiler.

iii. Fugitive emission .from process, movement of vehicles and handling of raw

material

iv. Noise from turbine, D.G. set, fans, and vehicular movement.

v. Storage and handling of solid wastes.

Affected Environmental Parametersi. Air quality

ii. Water resources & quality

iii. Noise level

iv. Soil quality

v. Biological

vi. Socio-economics

Page 144: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

120

4.2.3 IMPACT MATRIX

Environmental impacts could be positive or negative, direct or indirect, local or

regional and also reversible or irreversible. The primary function of an environment

impact assessment study is to predict and quantify the magnitude of these impacts,

evaluate and assess the importance of the identified changes, present information

and monitor actual changes. The activities of the proposed project are studied. The

impacts of various activities of the proposed project are identified and presented as

matrix in Table-4.1. Further the characteristics of these impacts have been evaluated

and they are presented as matrix in Table- 4.2A, 4.2B.

Table-4.1 Impact Identification Matrix

Activities

Environmental AttributeAir Noise Surface

Water

Ground

Water

Climate Land

& soil

Ecology Socio

Economics

Aesthetics

Construction PhaseSite Clearing

Quarrying (indirect)

Ready-mix concretepreparation (indirect)

Transportationof raw materials

Constructionactivities on land

Laying of roads

Operational phase

Operation of DGs

Solid wastedisposal(indirect)

Wastewaterdisposal

Buildings

Storage andhandling of Ore,coke and otherraw materials

Page 145: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

121

Table-4.2A Characteristics of Environmental Impacts from Construction Phase

Activity Environmental

AttributesCause

Impact characteristics

Nature Duration Reversibility Significance

Site clearing

Air Quality(SPMand RSPM)

Dislodging ofparticles from theground

Direct

Negative

Short

TermReversible

Low, if PersonnelProtectiveEquipment (PPE)are used

Noise levels

Noise generationfrom earthexcavatingequipment

Direct

Negative

Short

TermReversible

Low, if PPE areused by workers

Land UseIndustrial landuse

Direct

Negative

Long

TermIrreversible Low.

Ecology

Removal ofvegetation andloss of flora andfauna

Direct

Negative

Long

TermReversible

Low. No cutting oftrees.

Transportation

of construction

materialsAir Quality

(SPM, SO2,

NOx, CO)

Transport ofconstructionmaterial in trucks& Exhaustemission fromvehicles

Direct

Negative

Short

TermReversible Medium if regular

emission checksare performed

Noise levelsNoise generationfrom vehicles Direct

Negative

Short

Term

ReversibleLow if regularvehiclemaintenance isdone.

RiskRisk of accidentsduring transit Direct

Negative

Long

Term

IrreversibleLow, if safetymeasures aretaken to preventaccidents

Construction

activities

/ Laying of

roads

Air Quality(SPM, SO2,NOx, CO)

Operation ofconstructionmachinery,welding activitiesand others

Direct

Negative

Short

TermReversible

Low, if PPE areused by workers

Noise levelsNoise generationfrom use ofmachinery

Direct

NegativeShort

TermReversible Low, if PPE are

used by workers

Processing of ore

VehicularMovement

Air Emissionsfrom Stack andother Unitprocesses

Page 146: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

122

Land use Setting up ofProject

Direct

Negative

Long

TermIrreversible

The area isdesignated asIndustrial area

Ecology Loss ofvegetation

Direct

Negative

Long

Term

ReversibleLow. No cutting oftrees and greenbelt developmentis envisaged

Table-4.2 B Characteristics of Environmental Impacts from Operational Phase

ActivityEnvironmental

AttributesCause

Impact characteristics

Nature Duration Reversibility SignificanceGaseousemissions fromfurnaces,boiler, Vehicles

Air Quality(SPM, SO2,NOx, CO, HC)

Fuel combustion,Vehicle operation

DirectNegative

LongTerm

Reversible Ambient and Stackmonitoring, roadwaterspr ink l ing onroad

Fugitiveemission

SPM

Wastewaterdischarge

Water quality Generation ofwaste water

DirectNegative

Shortterm

Reversible Low, as SepticTank and soak pitwill be provided

Solid wastedisposal

Land and soil Generation ofsolid wastes

DirectNegative

ShortTerm

Reversible Low, propercollection anddisposal

Turbine,Crusher,Screen,vehicles

Noise levels Noise generationfrom vehicles

DirectNegative

Shortterm

Reversible Low, withperiodicalmaintenance ofvehicles

Socio-economic

Employmentgeneration

Direct andindirectemployment

DirectPositive

LongTerm

Irreversible High, newopportunities ofsteady income formany families

Quality of life In-flow of fundsin theregion/nation

DirectPositive

LongTerm

Irreversible High, the projectwill generateemployment

Afforestation /Green beltdevelopment

Ecology Planting of trees DirectPositive

LongTerm

Reversible High positiveimpact

Page 147: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

123

4.3 IMPACTS DURING CONSTRUCTION PHASE

4.3.1 LAND ENVIRONMENT

With land development and leveling, the site may have better landscape. However

this is restricted only to the factory boundary. There are no major trees or crops in the

site. Hence there will be no change in land use pattern or soil quality.

4.3.2 WATER ENVIRONMENT

Construction activities for the proposed development can have minor impact on

hydrology and ground water quality of the area if the construction waste leaches into

the ground water source. Potential sources of impacts on the hydrology and ground

water quality during the construction phase are as follows:

Soil runoff from the site leading to off-site contamination (particularly during

rainy season).

Improper disposal of construction debris leading to off-site contamination of

water resources.

Spillage of oil and grease from the vehicles and waste water generated on site

activities such as vehicles washing, workshop etc.

Following precautions and preventive measure will be taken at the site during

construction to avoid any ground and surface water contamination.

Not allowing water to leave the construction site.

Disposal of construction debris in approved areas.

Construction of storm water diversion channels to divert storm runoff from

flowing over the construction areas.

Installing oil and grease traps in construction workshop and vehicle parking

areas.

Due to civil construction activities, during rainy season the surface run off may

contain more of eroded soil and other loose matter. Construction activities will

be avoided during rainy days to mitigate the small impacts on soil quality

caused due to construction activity.

With segregation of construction area and proper drainages provided prevents

the contamination of water due to soil erosion.

Page 148: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

124

4.3.3 AIR ENVIRONMENT

During construction phase, SPM is expected to be the main pollutant, which is

associated with general construction activity including excavation, leveling and

material handling. In this case, pollution emission sources are distributed throughout

the project site and shall fall under the category of area source. The project site is

slightly undulated, so extensive formation work is not expected during this phase.

Surplus excavated material shall be used for road construction and for land leveling

and landscaping activities besides for backfilling. Concentration of SO2, NOX and CO

may slightly increase due to increased vehicular traffic. The approach roads will be

paved or tarred and vehicles will be kept in good order to minimize the pollution due

to vehicular traffic. The impact of such activities would be temporary and restricted to

the constructed phase. The impact will be confined within the project boundary and is

expected to be negligible outside the plant boundaries. Proper upkeep and

maintenance of vehicles, sprinkling of water on roads and construction site, providing

sufficient vegetation all-around are some of the measure that would greatly reduce

the impacts during the construction phase. With the emission factor and the phased

manner in which construction activity is to be carried out, it is likely that increase in

SPM levels due to construction would mainly be confined to the project site.

Thus, it is inferred that minor negative impact within a few 100 meters from the

source within the site would occur on the ambient air quality under the worst

conditions, which are mitigated by implementing environmental management plan.

However, no significant impacts are expected on the overall ambient air quality due to

construction activities, at the sensitive receptors outside the project premises.

4.3.4 IMPACT ON NOISE LEVEL

The major source of noise generation during the construction phase are vehicular

traffic, construction equipment like dozers, scrapers, concrete mixer, cranes,

generators, compressors, vibrators etc. is given below. The operation of these

equipments will generate noise ranging between 70-85 dB (A). The noise produced

during the construction will have significant impact on the existing ambient noise

levels. The construction equipments have high noise levels which can affect the

personnel, operating the machines. Major construction work will be carried during the

daytime. Use of protective equipments like mufflers will reduce noise generated by

Page 149: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

125

such equipments. Personnel protective such as earplugs shall be used by the

operators of these machineries.

Table 4.3 Noise levels generated from construction equipments

SI.NO NAME OF THE SOURCE NOISE LEVELS FROM SOURCE(DBA)AT ADISTANCE OF50 FT.(16M)

AT ADISTANCE OF1 M.

1 Air compressor 87 1112 Back hoe/loader 81 1053 Concrete mixer truck 85 1094 Concrete pumper 70 945 Concrete vibrations 77 1016 Cranes-mobile 81 1057 Dump truck 83 1078 Hammering 86 1109 Jack hammer 88 11210 Pile driver 100 12411 Radial arm saw 88 104

(Source: CPCB domestic appliances and construction equipments at the

manufacturing stage to be achieved by the year 1993).

4.3.4.1 NOISE LIMITS FOR APPLIANCES AND EQUIPMENTS DURINGCONSTRUCTION STAGE

Table 4.4 Noise levels generated from construction equipments

SI.NO.

EQUIPMENT NOISE LIMIT,db(A)

1 Air conditioner -window 68

2 Air cooler 60

3 Diesel generator 85-90

4 Compactors(rollers),concretemixers, cranes, vibrators, etc

75

Page 150: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

126

4.3.5 IMPACT ON BIOLOGICAL ENVIRONMENT

Construction activities at the site involving human and vehicular movement will

disturb aril and wild animals in the area. Terrestrial micro flora and fauna at the site

are also affected. However, the adverse effect are reduced by shortening the

construction phase period and development of greenery in the site. Further, there are

no sensitive locations within the study area. Hence, no significant adverse impacts

are expected on biological environment.

4.3.6 IMPACT ON SOCIO-ECONOMIC STATUS

The construction phase induces employment opportunities for the local people. Up to

400 persons will be employed during peak construction phase. In addition to the

opportunity of getting employment in construction work, the local population would

also have employment opportunities in related activities like petty commercial

establishments, small contracts and supply of construction materials etc.

The dwelling of construction workers at the site may cause sanitation and other

problems. As the villages are nearby and staying facilities are readily available in

these villages. The construction and other workers will not be permitted to reside at

the project site.

Safety and health care of workers is also an important factor to be considered during

construction phase. Hazards expected are electrocution, vehicular accident, fall of

personnel from overhead works, high level noise due to construction machinery,

centering failure and exposure of eyes to dust and welding rays. Constructional and

occupational safety measures will be adopted during construction phase of the

industry.

4.4 OPERATIONAL PHASE IMPACT

4.4.1 IMPACT ON AIR QUALITY

4.4.1.1. SOURCES OF AIR POLLUTIONThe gaseous emissions are generated as flue gases at furnaces in steel plant, rolling

mill and producer gas unit. Gaseous emissions are also generated from waste

heater boiler in coke oven plant. Fugitive emissions are generated in the industry

during storage and handling of coal and coke and other solid raw materials. Dust is

generated during loading and unloading, movement in conveyors, crushing and

Page 151: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

127

screening operations of these products. Fugitive emission is also generated on due to

vehicular movement in the premises. The information on gaseous emission from

project activities is furnished in Chapter-2. and in Table-2.13. The details of gaseous

emissions discharged from point source in the proposed steel industry is given in

Table- 4.5

The air pollution control equipments will be operated to achieve maximum pollution

control efficiency the typical efficiency of different APC’s are ESP- 95-99%, bag filter

– 98-99%, venture scrubber- 95-98%,cyclones- 75-80%.

Table – 4.5 Details of Stack & Gaseous Emissions from Point SourceSl.No.

Stackattachedto

Stackht

Emission concentrationwithout APC, mg/Nm3

APCmeasure

Emissionconcentration withAPC , mg/Nm3

In m PM10 SO2 NOX CO PM10 SO2 NOX CO1 EOF

furnace

51 600-1000

400-800

0-60 450-1120

GCP,venturescrubber

60-100

50-100

0-15 50-

120

2 LRF

Furnace

30 560-850

40-60

0-20 100-200

Fumeextractionsystemwith bagfilter.

70-90 10-20

0-15 50-100

3 Caster(Fumeexhaust)

30 480-800

0-20 0-25 0-50 Fumeextractionsystemwith bagfilter.

60-100

0-10 0-15 0-15

4 VacuumdegassingBoiler

42 60-

100

0-30 5-10 50-

100

Stack 50-80 0-15 3-8 30-

70

5 Reheating

furnace

45 50-80 0-15 0-8 30-

70

stack 50-80 0-15 3-8 30-

70

6 PCI

furnace

30 300-350

10-20

3-8 30-70

Fumeextractionsystemwith bagfilter.

30-35 1-10 1-5 30-

70

7 Coke oven

battery

42 300-

400

25-

35

10-

15

100-

150

Stack 60-

120

1-10 1-5 30-

50

8 Coke ovenoff –gasboiler

52 40-50 1-10 1-5 50-

100

Stack 30-35 1-10 1-5 30-

50

9 PGPfurnace

30 400-500

25-35

1-5 50-80

ESP 30-35 1-10 1-5 30-

40

Page 152: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

128

4.4.1.2. FUGITIVE EMISSIONSFugitive emissions are generated in the industry mainly due to the handling of coal,

solid raw material and solid waste products and also due to vehicular movement.

Dust emissions also arise during loading and unloading of solid material. The

location and source of fugitive emission is given below.

Table :- 4.6 Sources of Fugitive dust

Sl No Area Monitoring Location

1 Raw Material Handlingarea

Tippler, Screen area, transfer points,stock bin area

2 Crusher area Coal crusher plant, vibrating screen , transferpoints

3 Raw material feed area Coal feeder area, mixing area, transferpoints

4 Product processing area Intermediate stock bin area, screening plant,separation unit, transfer points, dischargearea, product separation area, bagging area

4.4.1.3 FUGITIVE EMISSIONS CONTROL MEASURES

4.4.1.3.1 AT EOF FURNACE

The EOF furnace will be provided with a dust catcher and venture type gas cleaning

system. The outgoing gas from the EOF will be routed through uptakes, down

comer to the dust catcher for the primary dust separation.

The dust generated in the raw material storage area and on roads will be

suppressed by sprinkling water at regular intervals. Chemical will be added to this

water for dust agglomeration and enhanced suppression.

To maintain work zone air quality within the permissible limits , a number of pollution

control system have been envisaged. Various dust extraction and dust suppression

systems envisaged at location/ shops are indicated below.

Page 153: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

129

Table 4.7 Details of Dust Extraction System

Sl.No. Location / shop Facilities1 EOF stack house Dust extraction system comprising of pulse jet type, bag

filter, centrifugal fan and motor, duct work includingsuction hoods, duct supports, stack , dust hopper,rotary air lock valves, dust conditioner etc.

2 Rolling mill Fume & dust extraction system comprising of pulse jettype , bag filter, centrifugal fan and motor, duct workincluding suction hoods, duct supports, stack , dusthopper, rotary air lock valves, dust conditioner etc.

3 EOF furnace GCP GCP & its sludge disposal system4 Raw material

handling area,material transferpoints

Dust suppression system comprising of spray nozzles,piping network, valves, solenoid valves, pumps ,instrumentation and controls , electrics, water tank etc.

The dust collected from bag filters and scrubbers shall be used in sinter plant of

SLR Metaliks to reuse.

To maintain working environment in the above mentioned areas following measures

will be taken.

1. All dust suppression systems will be maintained to work up to satisfactory level .

2. All de-dusting systems will be maintained to run satisfactorily.

3. Leakage from equipment and ducts will be checked and stopped.

4. Encourage workers to understand the importance of these systems so they payadequate attention towards the functioning of these systems.

5. Enhancing tree plantations within the plant

4.4.1.3.2 AT COKE OVEN BATTERY

The coke oven will work under negative pressure which will limit gas leakage from the

battery doors and while charging. Hot coke discharged from oven will be cooled in

quench tower by quenching with water. Water vapors produced during quenching are

vented. Quench tower will be provided with grit arrestors. Quench time is small and is

less than 5 minutes.

Page 154: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

130

Table-4.8 Sources of Emissions from the Plant

Sl.No. Source Pollutants

1 Fugitive emissionsi. At coal charging in ovens SPMii. At coal and coke storage yards SPMIii Crushing, screening and conveying of coal SPMiv. Grading of coke SPMiii. Vehicular movement in the premise SPM, SO2 CO & NOX

2 Off gases from coke oven battery PM10,SPM, SO2 & NOx

3 Exhaust gases from waste heat boiler PM10 ,SPM, SO2 & NOx

4.4.1.3.4 DURING TRANSPORTATION

Coal will be transported by trucks or railway wagons to the plant. During

transportation, coal will be moistened and covered by tarpaulin to prevent coal

particles to fly out. The lorries are moving through national or state high ways and

they are well developed. Further inside the plant, the road will be of concrete/bitumen

top. Thus the coal/coke trucks will move on concrete/bitumen roads only. Hence

there will not be any significant increase in generation of dust due to transportation in

the surrounding area.

4.4.1.3.5 DURING STORAGE & HANDLIND OF COAL AND COKE

Coal will be unloaded in the coal storage area, which is having concrete floor. Water

spraying will be provided during the unloading to minimize the fugitive emission. The

dust generated during coke and coal handling, crushing and screening will be

captured by suction hoods and then collected in the bag filters. The coal/coke fines

will be recycled for coke making.

Areas of fugitive emissions where de-dusting suction hoods cannot be provided due

to physical constraints will be provided with dust suppression systems. Dust

suppression systems with water spray will be provided for coal storage yard, junction

houses and coke storage yard. This system will suppress the generation of fugitive

dust from material transfer, junction houses and coal/coke storage yard. Water spray

nozzles will be provided over dust generation points. In the stock pile area, water will

be sprayed by a sufficient number of sprinklers suitably installed in the water header.

Page 155: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

131

4.4.1.3.6 GENERAL MITIGATION MEASURES

The impacts of fugitive emissions in the industry are controlled by following

measures:

Haulage roads are sprinkled with water at regular intervals for which water tankers

with sprinkler arrangement are deployed.

Trucks carrying coal and other raw material are covered with tarpaulin to prevent

spreading of dust during transportation.

Green belt and greenery development around storage yards, around plants, either

side of roads and around the periphery of the industry.

Water spray and sprinkling is practiced at loading unloading locations.

The conveyors of fuel are suitably covered with hood or enclosures to control

fugitive emissions.

Dust respirators are provided for the people working dust generating locations.

All internal roads in the premise are paved /tarred.

Speed limit of 10 km/h is enforced for vehicles in the plant premises to prevent

road dust emission.

Regular sweeping of roads is practiced with vacuum sweeping machine or water

flushing to minimize dust.

The air pollution control measures will ensure the ambient air quality to be within

the NAAQ standards for industrial areas as indicated below.

Sl. No Pollutants Concentration µg/m3

(Annual)1 Suspended Particulate Matter (SPM) 602 Sulphur Dioxide 503 Nitrogen Oxides 40

4.4.1.4. PRE-PROJECT AIR QUALITY

The ambient air quality monitoring data for the study area of 10 km around project

site is furnished in Annexure.7, Table 7C, 7D.1,7D.2. The air quality monitoring data

for stack emission, fugitive emission in the plant premise is enclosed in Annexure-

7.Table 7A.1, 7A.2, 7A.3, 7A.4, &Table 7B respectively. The ambient air quality with

in the project premise and around the premise is within the permissible limits.

Page 156: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

132

4.4.1.5. GROUND LEVEL CONCENTRATION (GLC) OF EMISSIONS

The prediction of impact due to project activities on air environment was based on

1. Source, quantity and quality of emissions

2. Pre project ambient air quality

3. Air quality modeling

The impact on air quality from the proposed integrated steel industry is discussed

below.

4.4.1.6. AIR POLLUTION DISPERSION MODELING STUDIES

4.4.1.6.1 INTRODUCTION

Atmospheric dispersion modeling is the mathematical simulation of how air pollutants

disperse in the ambient atmosphere. It is performed with computer programs that

solve the mathematical equations and algorithms which simulate the pollutant

dispersion. The dispersion models are used to estimate or to predict the downwind

concentration of air pollutants emitted from sources such as industrial plants and

vehicular traffic. Such models are important to governmental agencies tasked with

protecting and managing the ambient air quality. The models are typically employed

to determine whether existing or proposed new industrial facilities are or will be in

compliance with the National Ambient Air Quality Standards (NAAQS). The models

also serve to assist in the design of effective control strategies to reduce emissions of

harmful air pollutants.

In the present study prediction of impacts on the air environment has been carried out

employing U.S. EPA AERMOD dispersion model, 1996 – 2011 Lakes Environmental

Software, Version 6.2.0 and designed for multiple sources for predicting the

maximum ground level concentration (GLC).

4.4.1.6.2 MODEL INPUT DATA

The major air emissions at the site of M/s. SLR Metaliks Ltd. are SPM, SO2 and NOx

from boilers & DGs. The Proponents have proposed to install electrostatic precipitator

with the boiler to control SPM in flue gas emissions. The site specific monitored data

was used as input to the software AERMOD view by Lakes Environmental is used for

prediction of GLC emission in ambient air. The stack and emission data for model

study is given in Table-4.8.

Page 157: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

133

Table – 4.9A Existing air pollution sources

Sl.No.

Stack attached to Stackht

Dia

area

Exitgasvelocity

GasflowNm3/ h

Temp Temp in APCmeasure

Emission concentration

g/s g/s g/s g/sm m m/s 0C 0K PM SOX NOX CO

1 MBF stove 50 2.5 4.90625 6.5 56700 80-100 353.15-373.15

gas cleaningplant with dustcatcher

0.4725

0.39375

0.189 0.4725

2 Power plant BF gasbased

48 2.5 4.90625 6.8 58500 100-110

373.15-383.15

No APC 0.52 0.13 0.0325 0.40625

3 Sinter plant head end 45 2.5 4.90625 8.5 76500 60-65 333.15-338.15

Gravityseparatorfollowed by ESP

0.595 0.10625

0.02125

0.02125

4 Sinter plant tail end 45 2.5 4.90625 8.4 75600 60-65 333.15-338.15

ESP 0.672 0.105 0.021 0.021

5 Finished sinterdedusting chimney

30 0.8 0.5024 7.2 21600 30-32 303.15-305.15

Bag filter 0.192 0 0 0

6 sinter fuel,flux crushing& screening dedustingchimney

30 1.2 1.1304 7.5 32400 30-32 303.15-305.15

Bag filter 0.288 0 0 0

Page 158: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

134

Table 4.9B -Proposed air pollution sources

Sl. No. Stack attachedto

Gasflow

Nm3/h

Exit gasvelocity

m/s

Emission concentration without APCg/s

APCmeasure

Emission concentration with APC g/s

PM SOX NOX CO PM SOX NOX CO1 EOF furnace 80,000 14.6

1.975311 1.481478 0.179576 1.786712GCP, Venturi

scrubber, 1.77778 1.33333 0.17778 1.777778

2 LRF Furnace 16,000 10

0.370367 0.179576 0.050505 0.312674

Fumeextraction

system withbag filter

0.33333 0.17778 0.05 0.311111

3 Caster (Fumeexhaust)

15,000 12.3

0.324078 0.02104 0.042091 0.029314

Fumeextraction

system withbag filter

0.29167 0.02083 0.04167 0.029167

5 Reheating furnace 21,000 10 0.388889 0.471384 0.070707 0.234506 Stack 0.35 0.46667 0.07 0.233333

6 PCI 35,000 12.5

0.345678 0.049101 0.019636 0.023116

Fumeextraction

system withbag filter

0.31111 0.04861 0.01944 0.023

7 Coke oven battery 21,000 11.8 0.518522 0.029465 0.011788 0.023116 Stack 0.46667 0.02917 0.01167 0.023

8 Coke oven off –gasboiler

28,000 12.60.276544 0.039283 0.015717 0.023116

Stack0.24889 0.03889 0.01556 0.023

9 PGP furnace 15,000 13.8 0.148144 0.02104 0.008414 0.023116 ESP 0.13333 0.02083 0.00833 0.023

Page 159: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

135

Table 4.10 Proposed pollution sources

Sl.No. Stack attached to

Gasflow

Nm3/ h

Stackht Dia

Temp temp

Exitgas

velocity

APC measure Emission concentration, g/s

m m 0C 0K m/s PM SOX NOX CO

1 EOF furnace 80,000 51 3 40-60 313.15-333.15 14.6

GCP, Venturi scrubber,1.77778 1.33333 0.17778 1.777778

2 LRF Furnace 16,000 30 1.2 40-60 313.15-333.15 10

Fume extraction system withbag filter 0.33333 0.17778 0.05 0.311111

3Caster (Fume

exhaust) 15,000 30 1.2 40-50 313.15-323.15 12.3

Fume extraction system withbag filter 0.29167 0.02083 0.04167 0.029167

5 Reheating furnace 21,000 45 180-150 353.15-423.15 10

Stack 0.35 0.46667 0.07 0.233333

6 PCI 35,000 30 0.8 40-50 313.15-323.15 12.5

Fume extraction system withbag filter 0.31111 0.04861 0.01944 0.023

7 Coke oven battery 21,000 42 2.2 950 313.15-323.15 11.8Stack 0.46667 0.02917 0.01167 0.023

8 Coke oven off –gas boiler 28,000 52 2.5 60 323.16 12.6

Stack0.24889 0.03889 0.01556 0.023

9 PGP furnace 15,000 30 2.2 60-70 323.15-383.17 13.8ESP 0.13333 0.02083 0.00833 0.023

Page 160: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

136

4.4.1.6.3 Meteorological data

Data recorded at the site for 3 months period (11th December 2013 to 11th March

2014) for wind speed, direction, temperature etc. has been used for computations. In

order to conduct a air dispersion modeling Short Term Air Quality Dispersion Models,

the site specific hourly meteorological data measured at the site is pre-processed

using U.S. EPA AERMET program.

4.4.1.6.4 Presentation of results

The simulations were made to evaluate incremental short-term concentrations due to

proposed project.

In the short-term simulations, the incremental concentrations were estimated to

obtain an optimum description of variations in concentrations within study area of 10

km radius. The predicted (maximum) concentration levels & the incremental

concentrations at various locations due to the proposed industry are tabulated in the

following tables. Also Google maps showing stack locations & baseline monitoring

locations are appended subsequently.

Figure 4.1 Google map shows the stacks of existing and proposed along with table as

under. The figure 4.2 shows the Google map for the baseline ambient air quality

monitoring locations and also in table under the respective figure.

Table 4.11 is presented the Predicted incremental short-term concentrations due to

the proposed project – existing with proposed

Table 4.12 is presented the Predicted incremental short-term concentrations due to

the project – proposed

Fig 4.3 is presented Suspended Particulate Matter (PM10) isotherms for the

proposed project (existing proposed) for i) 24 hours – 1st highest value, ii) 24 hours –

98 percentile, iii) Annual

Fig 4.4 is presented the Suspended Particulate Matter (PM10) isotherms for the

proposed project (proposed) for i) 24 hours – 1st highest value, ii) 24 hours – 98

percentile, iii) Annual

Fig 4.5 is presented the Sulfur di-oxide (SO2) isotherms for proposed project (existing

+ proposed) for i) 24 hours – 1st highest value, ii) 24 hours – 98 percentile, iii) Annual

Page 161: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

137

Fig 4.6 is presented the Sulfur di-oxide (SO2) isotherms for proposed project

(proposed) for i) 24 hours – 1st highest value, ii) 24 hours – 98 percentile and iii)

Annual

Fig 4.7 is presented the Oxides of nitrogen (NOx) isotherms for proposed project

(existing+proposed) for i) 24 hours – 1st highest value, ii) 24 hours – 98 percentile

and iii) Annual.

Fig 4.8 is presented the nitrogen oxide (NOx) isotherms for proposed project

(proposed) for i) 24 hours – 1st highest value, ii) 24 hours – 98 percentile and iii)

Annual

Fig 4.9 is presented the Carbon monoxide (CO) isotherms for proposed project

(existing + proposed) for i) 1 hour – 1st highest value, ii) 1 hour – 98 percentile, iii) 8

hours – 1st highest value, iv) 8 hours – 98 percentile.

Fig 4.10 is presented the carbon monoxide (CO) isotherms for proposed project

(proposed) for i) 24 hours – 1st highest value, ii) 24 hours – 98 percentile and iii)

Annual

Table 4.13 is presented the Resultant maximum 24 hourly concentrations (existing +

proposed)

Table 4.14 is presented the Resultant maximum 24 hourly concentrations (proposed)

Page 162: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

138

Fig 4.1: Google map showing stacks – existing & proposed

Sl.No.

Stackno.

Name of the stack1 1. MBF stove2 2. Power plant Blast furnace gas based3 3. Sinter plant head end4 4. Sinter plant tail end5 5. Finished sinter dedusting chimney6 6. Sinter fuel,flux crushing & screening dedusting chimney7 7. EOF furnace8 8. LOF Furnace9 9. Vacuum degassing unit10 10. Reheating furnace11 11. PCI furnace12 12. PGP furnace13 13. Coke oven battery14 14. Coke oven off –gas boiler

Page 163: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

139

Fig 4.2: Google map showing baseline monitoring locations

Sl.No.

Code no. Name of the station Direction fromthe site

Distance fromsite (km)9 A 1 Vasthu Building South West SLR PlantPremises10 A 2 Near Guard Pond North West corner -11 A 3 Near Weigh bridge -1 North -12 A 4 Electric tower no 20 South East -13 A 5 Near AdministrationBuilding South East -14 A 6 Project site North east -15 A7 Lokappanahola S-W 2.016 A8 Mariyammanahalli S-E 3.09 A9 Devalapura SS-E 5.610 A10 Nagalapura S-EE 7.511 A11 MarabbihaluTanda S-W 8.012 A12 Down WindDirection Rajapura N-E 9.0

Page 164: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

140

Table 4.11 Predicted incremental short-term concentrations due to theproposed project (Existing + Proposed)Time Maximum predictedconcentrations, µg/m3 Direction and distance ofoccurrence24 hour Annual 24 hour Annual1SThighestvalues 98percentile 1SThighestvalues 98percentileSuspendedParticulateMatter(PM10)

10.37986 8.77263 3.60172 0.3 km –SouthWest 0.2 km –South West Southwestboundaryof theprojectsiteSulfur di-oxide (SO2) 10.89629 7.23341 2.79066 0.26 km –East 0.06 km –West Westernboundaryof theprojectsiteOxides ofnitrogen(NOx) 1.90936 1.4481 0.52739 0.1 km –southeast 0.42 km –south east 0.26 km –southeastCarbonmonoxide(CO) 1 hr –8.173708 hrs –16.14136

1 hr –7.192918 hrs –10.734062.5134 1 hr – 0.1km –North8 hrs -0.15 km –North

1 hr – 0.1km – southwest8 hrs –0.165 km –south east0.1 km –southeast

Page 165: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

141

Table 4.12: Predicted incremental short-term concentrations due to the project –proposed

Time Maximum predictedconcentrations, µg/m3

Direction and distance ofoccurrence24 hour Annual 24 hour Annual1SThighestvalues 98percentile 1SThighestvalues 98percentileSuspendedParticulateMatter(PM10)

4.02998 3.27781 1.54641 0.12 km– North 0.11 km –North Southwestboundaryof theprojectsiteSulfur di-oxide (SO2) 5.96634 4.2283 1.43039 0.10 km– NorthEast 0.14 km –North East 0.15 km– SouthwestOxides ofnitrogen(NOx) 1.59765 1.11872 0.3859 0.03 km -NorthEast 0.06 km –South West 0.07 km –SouthwestCarbonmonoxide(CO) 1 hr –7.061538 hrs –19.63727

1 hr –5.443868 hrs –9.456711.68377 1 hr –0.213 km– NorthEast8 hrs -0.05 km– NorthEast

1 hr – 0.3km – NorthEast & southwest8 hrs –0.05km – NorthEast

0.2 km –southWest

Page 166: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

142

Fig 4.3 Suspended Particulate Matter (PM10) isotherms for the proposed project (existing+ proposed)

i) 24 hours – 1st highest value

Page 167: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

143

ii) 24 hours – 98 percentile

Page 168: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

144

iii) Annual

Page 169: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

145

Fig 4.4: Suspended Particulate Matter (PM10) isotherms for the proposedproject (proposed)i) 24 hours – 1st highest value

Page 170: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

146

ii) 24 hours – 98 percentile

Page 171: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

147

iii) Annual

Page 172: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

148

Fig 4.5: Sulfur di-oxide (SO2) isotherms for proposed project(existing+proposed)

i) 24 hours – 1st highest value

Page 173: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

149

ii) 24 hours – 98 percentile

Page 174: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

150

iii) Annual

Page 175: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

151

Fig 4.6: Sulfur di-oxide (SO2) isotherms for proposed project (proposed)

i) 24 hours – 1st highest value

Page 176: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

152

ii) 24 hours – 98 percentile

Page 177: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

153

iii) Annual

Page 178: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

154

Fig 4.7: Oxides of nitrogen (NOx) isotherms for proposed project (existing +

proposed)

i) 24 hours – 1st highest value

Page 179: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

155

iii) 24 hours – 98 percentile

Page 180: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

156

iv) Annual

Page 181: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

157

Fig 4.8: Oxides of nitrogen (NOx) isotherms for proposed project (existing +

proposed)

i) 24 hours – 1st highest value

Page 182: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

158

ii) 24 hours – 98 percentile

Page 183: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

159

iii) Annual

Page 184: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

160

Fig 4.9: Carbon monoxide (CO) isotherms for proposed project (existing +

proposed)

i) 1 hour – 1st highest value

Page 185: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

161

ii) 1 hour – 98 percentile

Page 186: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

162

iii) 8 hours – 1st highest value

Page 187: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

163

iv) 8 hours – 98 percentile

Page 188: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

164

v) Annual

Page 189: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

165

Fig 4.10: Carbon monoxide (CO) isotherms for proposed project (proposed)

i) 1 hour – 1st highest value

Page 190: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

166

ii) 1 hour – 98 percentile

Page 191: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

167

iii) 8 hours – 1st highest value

Page 192: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

168

iv) 8 hours – 98 percentile

Page 193: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

169

v) Annual

4.4.1.6.5 COMMENTS

The maximum short-term incremental ground-level concentrations aresuperimposed on the baseline data to get the likely resultant levels after theestablishment of the proposed project as tabulated below.

Page 194: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

170

Table 4.13: Resultant maximum 24 hourly concentrations (existing +proposed)

Pollutant Incrementalconcentrations,µg/m3

Max. baselineconcentrations,µg/m3

Resultantconcentrations,µg/m3

Limits asper MoEF,µg/m3 forindustrialareas (24hrs)

Vasthu building (1)PM10 8.77 62.35 71.12 100SO2 7.23 9.3 16.53 80NOx 1.44 10.3 11.74 80CO 7.19 – 1 hr

10.73 – 8 hrs0.12 7.31 – 1 hr

10.85 – 8 hrs4,000 – 1 hr2,000 – 8hrs

Near Guard Pond (2)PM10 8.77 61.44 70.21 100SO2 7.23 8.3 15.53 80NOx 1.44 9.4 10.84 80CO 7.19 – 1 hr

10.73 – 8 hrs0.13 7.32 – 1 hr

10.86 – 8 hrs4,000 – 1 hr2,000 – 8hrs

Near weigh bridge - 1 (3)PM10 8.77 53.11 61.88 100SO2 7.23 8.5 15.73 80NOx 1.44 9.1 10.54 80CO 7.19 – 1 hr

10.73 – 8 hrs0.12 7.31– 1 hr

18.16– 8 hrs4,000 – 1 hr2,000 – 8hrs

Electric tower no 20 (4)PM10 8.77 60.02 68.79 100SO2 7.23 9.2 16.43 80NOx 1.44 8.4 9.84 80CO 7.19 – 1 hr

10.73 – 8 hrs0.16 7.35 – 1 hr

10.89 – 8 hrs4,000 – 1 hr2,000 – 8hrs

Near administration building (5)PM10 8.77 57.78 66.55 100SO2 7.23 8.4 15.63 80NOx 1.44 8.9 10.34 80CO 7.19 – 1 hr

10.73 – 8 hrs0.13 7.32– 1 hr

10.86– 8 hrs4,000 – 1 hr2,000 – 8hrs

Project site (6)

Page 195: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

171

PM10 8.77 60.89 69.66 100SO2 7.23 13.1 20.33 80NOx 1.44 13.9 15.34 80CO 7.19 – 1 hr

10.73 – 8 hrs0.15 22.68– 1 hr

10.88– 8 hrs4,000 – 1 hr2,000 – 8hrs

Lokappanahola (7)PM10 8.77 53.44 62.21 100SO2 7.23 5.3 12.53 80NOx 1.44 6.5 7.94 80CO 7.19 – 1 hr

10.73 – 8 hrs0.05 7.24 – 1 hr

18.02 – 8 hrs4,000 – 1 hr2,000 – 8hrs

Mariyammanahalli (8)PM10 8.77 61.78 70.55 100SO2 7.23 5.4 12.63 80NOx 1.44 6.5 7.94 80CO 7.19 – 1 hr

10.73 – 8 hrs0.06 7.25 – 1 hr

10.79– 8 hrs4,000 – 1 hr2,000 – 8hrs

Devalapura (9)PM10 8.77 45.88 54.66 100SO2 7.23 6.3 13.53 80NOx 1.44 6.9 8.34 80CO 7.19 – 1 hr

10.73 – 8 hrs0.07 7.26– 1 hr

10.8– 8 hrs4,000 – 1 hr2,000 – 8hrs

Nagalapura (10)PM10 8.77 46.68 55.66 100SO2 7.23 6.8 14.03 80NOx 1.44 6.4 7.84 80CO 7.19 – 1 hr

10.73 – 8 hrs0.05 7.24– 1 hr

10.78 – 8 hrs4,000 – 1 hr2,000 – 8hrs

Marabbihalu Tanda (11)PM10 8.77 46.89 55.66 100

SO2 7.23 5.9 13.13 80NOx 1.44 6.2 7.64 80CO 7.19 – 1 hr

10.73 – 8 hrs0.09 7.28– 1 hr

10.82– 8 hrs4,000 – 1 hr2,000 – 8hrs

Rajapura (12)PM10 8.77 42.5 51.27 100SO2 7.23 13.9 21.13 80

Page 196: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

172

NOx 1.44 12.4 13.84 80CO 7.19 – 1 hr

10.73 – 8 hrs0.14 7.33– 1 hr

10.87– 8 hrs4,000 – 1 hr2,000 – 8hrs

Table 4.14: Resultant maximum 24 hourly concentrations (proposed)

Pollutant Incrementalconcentrations,µg/m3

Max. baselineconcentrations,µg/m3

Resultantconcentrations,µg/m3

Limits asper MoEF,µg/m3 forindustrialareas (24hrs)

Vasthu building (1)PM10 3.27 62.35 65.62 100SO2 4.22 9.3 13.52 80NOx 1.11 10.3 11.41 80CO 5.44– 1 hr

9.45 – 8 hrs0.12 – 1 hr

– 8 hrs4,000 – 1 hr2,000 – 8hrs

Near Guard Pond (2)PM10 3.27 61.44 64.71 100SO2 4.22 8.3 12.52 80NOx 1.11 9.4 10.51 80CO 5.44– 1 hr

9.45 – 8 hrs0.13 5.57– 1 hr

9.58 – 8 hrs4,000 – 1 hr2,000 – 8hrs

Near weigh bridge - 1 (3)PM10 3.27 53.11 63.29 100SO2 4.22 8.5 12.72 80NOx 1.11 9.1 10.21 80CO 5.44– 1 hr

9.45 – 8 hrs0.12 5.56– 1 hr

9.57– 8 hrs4,000 – 1 hr2,000 – 8hrs

Electrical tower no 20 (4)PM10 3.27 60.02 63.29 100SO2 4.22 9.2 13.42 80NOx 1.11 8.4 9.51 80CO 5.44– 1 hr

9.45 – 8 hrs0.16 5.6 – 1 hr

9.61 – 8 hrs4,000 – 1 hr2,000 – 8hrs

Near administration building (5)PM10 3.27 57.78 61.05 100SO2 4.22 8.4 12.62 80NOx 1.11 8.9 10.01 80

Page 197: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

173

CO 5.44– 1 hr9.45 – 8 hrs

0.13 5.57 – 1 hr9.58 – 8 hrs

4,000 – 1 hr2,000 – 8hrs

Project site (6)PM10 3.27 60.89 64.16 100SO2 4.22 13.1 17.32 80NOx 1.11 13.9 15.01 80CO 5.44– 1 hr

9.45 – 8 hrs0.15 5.59– 1 hr

9.6– 8 hrs4,000 – 1 hr2,000 – 8hrs

Lokappanahola (7)PM10 3.27 53.44 56.71 100SO2 4.22 5.3 9.52 80NOx 1.11 6.5 7.61 80CO 5.44– 1 hr

9.45 – 8 hrs0.05 5.49 – 1 hr

9.5 – 8 hrs4,000 – 1 hr2,000 – 8hrs

Mariyammanahalli (8)PM10 3.27 61.78 65.05 100SO2 4.22 5.4 9.62 80NOx 1.11 6.5 7.61 80CO 5.44– 1 hr

9.45 – 8 hrs0.06 5.5 – 1 hr

9.51 – 8 hrs4,000 – 1 hr2,000 – 8hrs

Devalapura (9)PM10 3.27 45.88 49.15 100SO2 4.22 6.3 10.52 80NOx 1.11 6.9 8.01 80CO 5.44– 1 hr

9.45 – 8 hrs0.07 5.51 – 1 hr

9.52– 8 hrs4,000 – 1 hr2,000 – 8hrs

Nagalapura (10)PM10 3.27 46.68 49.95 100SO2 4.22 6.8 11.02 80NOx 1.11 6.4 7.51 80CO 5.44– 1 hr

9.45 – 8 hrs0.05 5.49– 1 hr

9.5– 8 hrs4,000 – 1 hr2,000 – 8hrs

Marabbihalu Tanda (11)PM10 3.27 46.89 50.16 100SO2 4.22 5.9 10.12 80NOx 1.11 6.2 7.31 80CO 5.44– 1 hr

9.45 – 8 hrs0.09 5.53– 1 hr

9.54– 8 hrs4,000 – 1 hr2,000 – 8

Page 198: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

174

hrsRajapura (12)PM10 3.27 42.5 45.77 100SO2 4.22 13.9 18.12 80NOx 1.11 12.4 13.51 80CO 5.44– 1 hr

9.45 – 8 hrs0.14 5.58– 1 hr

9.59– 8 hrs4,000 – 1 hr2,000 – 8hrs

According to MoEF air quality standards (as per the notification dated 16th November2009 for industrial, residential & rural areas) 24 hourly or 8 hourly or 1 hourlymonitored values, as applicable, shall be complied with 98% of the time in a year; 2%of the time, they may exceed the limits but not on two consecutive days of monitoring.

Therefore the 98% values are considered for estimation of the incrementalconcentration.

The above table indicates that the cumulative resultant ambient air quality afterproposed project operation will be within the ambient air quality limits specified byMoEF as per the notification dated 16th November 2009 for industrial, residential &rural areas.

The above table indicates that the cumulative resultant ambient air quality after

proposed project operation will be within the ambient air quality limits specified by

MoEF as per the notification dated 16th November 2009 for industrial, residential &

rural areas.

4.4.2 WATER ENVIRONMENT

Potential impacts of withdrawal of water and wastewater discharges from the

proposed industry on land or water body is an important factor in EIA Studies. The

quantitative and qualitative information on water utilization and waste water

generation in the proposed industry is presented in Chapter-2, 2.10. The information

also includes the built in facilities and measures for treatment and disposal waste

water proposed to be incorporated in the project. The impacts expected from

withdrawal water from river and disposal of waste water on land is discussed in this

section.

Page 199: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

175

4.4.2.1 SOURCE OF WATER

The source of water for the project is Tungabhadra Dam. The Salient features ofTungabhadra project are as follows,

1. River – Tungabhadra

Village - Mallapujam

Taluka – Hospet

District - Bellary

State - Karnataka

Longitude – 76 0 – 20 1 -10” E

Latitude - 15 0 – 15 1 -19” E

2. Reservoir

Catchments area - 28177 sq km.

Gross storage (1953) – 132.471TMC

Live storage (Year 1953) – 131.312 TMC

Dead Storage (Year 1953) – 1.159 TMC

Gross storage (Year 2010) – 101.107 TMC

Water spread – 3781Sq.Km

Length of Reservoir – 80km.

Estimated annual yield – 407.107 TMC

Maximum discharge flood – 3,69,152 cusecs (Nov 92)

Designed flood discharge – 6,50,000 cusecs

Rain fall in the catchment area of Tungabhadra river in the western Ghats receives

about 4500mm.

The project proponents have permission to draw 0.19 TMC of water only when the

water level in the dam is reached highest level i.e when the dam is full.

4.4.2.2 DISCHARGE RATE

Agreement made between Executive Engineer Munirabad and SLR metaliks Ltd to

draw 0.19TMC in 30 to 40 days when the dam level is full.

4.4.2.3 DISTANCE FROM THE PROJECT

The approximate distance of tapping point from the project is 2km.

4.4.2.4 SURFACE HYDROLOGY AND WATER REGIME

Page 200: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

176

Tungabhadra River is one of the major tributaries of Krishna. Tungabhadra desires its

name from the confluence of two streams, the Tunga and the Bhadra both of which

rise in the wooded eastern slopes of the Western Ghats in the state of Karnataka and

flow eastward. The river runs 382 kms in Karnataka. Catchment area of the

Tungabhadra reservoir is 28177 sqkm .The river basin is influenced by the southwest

monsoon with copious inflow during monsoon which dwindles to few cumecs in

summer months .Tungabhadra reservoir impounds 3766 mm3(133TMC) of water in

the reservoir.

4.4.2.5 WATER USAGE

0.19TMC w a t e r from Tungabhadra reservoir will be taken. The water will be

stored in a reservoir tank and pumped to the plant for treatment and utilization as

make up cooling water and other applications. In the unlikely event of a power failure

an overhead tank of sufficient height & Capacity has been provided to ensure

nonstop supply as continuous water flow is as must to cool the system. The water

softener is provided to avoid scaling in the pipelines, which will reduce the

efficiency of the whole system.

The quantitative and qualitative information on water utilization and waste water

generation in the proposed industry is presented in Chapters – 2,9. The information

also includes the built in facilities and measures for treatment and disposal waste

water. The impacts expected from withdrawal water from river and disposal of waste

water on land is discussed in this section.

4.4.2.6. IMPACT OF WATER WITHDRAWAL FROM RIVER

Fresh water requirement to the proposed project will be 3005 m3/d. This will be met

from the back water source of Tungabhadra river and dam. The Tungabhadra river is

a perennial river and joins to the dam. The water from river and dam are mainly used

for agriculture uses and also to meet domestic needs of downstream towns and

villages. Drawl of water from river, especially during summer and lean flow period is

likely to affect the competitive users river water. However, the industry will draw water

only from the back water source of the river mainly during flood period. The

government has allowed drawing water up to reservoir level + 1633 feet if when the

reservoir level goes below 1633 feet the firm will not be permitted to draw water. The

Page 201: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

177

drainage area of the Tungabhadra river in the western ghats receives about 4500mm

of rainfall while the project area and rivers running in the peninsula receives about

480-760mm rain fall.

Water AccountYield

1 Opening balance 1.294 TMC ft

2 Inflow recoded at T.B. Dam 316.786 TMC ft

Total 318.080 TMC ft

Utilization1. Drawls for irrigation by both states 151.501 TMC ft

2. Spillovers surpluss 119.411 TMC ft

3. Power generation 30.435 TMC ft

4. System losses 5.234 TMC ft

5. Evaporation losses 9.298 TMC ft

6. Closing balance (residual storage) 2.141 TMC ft

Total 318.080 TMC ft

During the lean season also there will be minimum flow of water in the upstream as

well in the downstream. There will be discharge of water by upstream projects like

tunga, varadha and hirehall projects which will ensure the availability of water for

drinking water and other projects.

The water, thus drawn will be stored in a huge reservoir of 6 lakh m3 capacity for

subsequent use in the industry. Storm water gutter net work and water harvesting is

practiced in the industry and water realized during rainy period from them is stored in

the above reservoir to augment the water source.

4.4.2.7. WATER CONSERVATION PLAN

The following steps are comprehensively foreseen for optimizing the water

consumption in the expansion project,

1. Effectively monitoring and control of water consumption on day to day basis .

2. Water meters will be installed at all consumption and make up water points to

monitor and control the water consumption.

Page 202: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

178

3. All sumps and transfer canals in the plant will be provided with the adequate

RCC and PCC bases to avoid water seepage losses.

4. The drip irrigation system and spray fountain systems shall be adopted

wherever applicable to reduce water consumption for horticulture and

gardening.

5. STP treated water will be re-used for maintenance of garden and green belt

development.

6. Rain water harvesting will be employed for storm water to collect and conserve

the water for future usage.

7. Roads will be asphalted and yards shall be concreted to avoid water sprinkling

needs to keep the emission levels of ambient air low.

8. Necessary caution and educative boards , slogans related with water

conservation will be displayed at vantage points to create awareness among

entire workforce.

9. Plant water balance will be reviewed periodically by top management to

effectuate all steps for continuous improvements on water conservation front.

4.4.2.8 TREATMENT & UTILIZATION OF EFFLUENT

4.4.2.8.1 WASTE WATER MANAGEMENT

The source and quantity & utilization of domestic and trade effluents generated in the

industry are given in Table 4.12.

4.4.2.8.2 DOMESTIC EFFLUENT

The domestic effluents are generated from rest rooms and canteen. They are treated

in septic at the source location and over flow from septic tank is treated sewage

treatment plant. Total employees in the industry for the present activities are 450 and

additional employees for proposed activities will be 500. Domestic effluent generated

from existing and proposed units will be 22.5 m3/d and 32 m3/d respectively. The

sewage treatment plant consisting of bar screen, oil grease separator, neutralizer,

equalizer, aeration tan and secondary clarifier is designed for 60 m3/d capacity. The

characteristics of untreated and treated effluent are given in Table-4..15Treated

effluent is collected in a sump and then sent for use on land for greenery and green

belt development. The flow chart of STP is given in Figure-4.11.

Page 203: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

179

TABLE 4.15 CHARACTERISTICS OF UNTREATED AND TREATED EFFLUENTS

Sl.No. Parameters Domestic Effluent Trade EffluentUntreated Treated Untreated Treated

1 Flow rate.m3/d 33 33 473 4732 Temperature ° c 40 38 38 383 pH 6.5 7.4 6.8 7.44 Dissolved solids 1250 840 1860 13405 Suspended solids 148 35 200 406 BOD, ppm 280 65 40 207 COD, ppm 430 135 120 908 Oil, ppm 34 Nil 10 Nil

4.4.2.8.3 INDUSTRIAL EFFLUENTThe industrial effluents, 473 m3/d generated in the industry are manly blow down

from circulating cooling water and circulating scrubber and quenching water. They

contain mainly the suspended and dissolved inorganic matter, The presence of BOD,

COD or organic matter is insignificant. The purge and blow down waters are

neutralized and settled in the guard pond of about 100 d capacity. The over flow from

guard pond will be utilized on land for greenery development. It will also be used for

spraying on roads and land for dust suppression. This will be also be used in the

plant for makeup of cooling water loss. The guard pond is of earthen impervious

construction & located at ground level. The tank interior is suitably compacted and

finished.

Wastewater from slab caster and rolling mill complex are likely to contain suspended

solids and oil & grease. These effluents will be routed to settling pits fitted with oil &

grease trap. The clarified water is reused in the process.

Table- 4.16 Treatment and utilization of Effluents

Parameter Trade effluent treatment UtilizationTrade effluentBlow down from

circulating cooling &process water

Total : 473 m3/d

The waste water isequalized and collected inthe guard pond. The pondhas a capacity to holdwastewater for about 30days. The guard pond is ofearthen work imperviousconstruction & located atground level. The tankinterior is suitablycompacted and finished.The size of guard pond is

Re-used for green-beltdevelopment, dustsuppression & roadcleaning.

Page 204: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

180

as given below.

Parameter Raw effluent treatment UtilizationDomestic effluent

Total: 33 m3/d

Existing SewageTreatment Plant of 60 KLDcapacity will be utilized fortreating the Sewage fromthe existing and proposedexpansion activities.

Re-used for green-beltdevelopment

Figure 4.11 Treatment Scheme for Domestic Effluent Stream

Treated water will be utilized forgardening

Filter cake

Recycle to diffusedaeration

P

P

Oil and Grease Tank

Clarifier Filter

Sump

PSF & ACF

Treated water sump

Diffused aeration tank

Equalization cum neutralization tank

Bar screen

Page 205: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

181

4.4.2.9. RAIN WATER HARVESTING SYSTEM

A combination of recharge pits with bore well & holding ponds with recharge

facility have been proposed for this project.

4.4.2.9.1. UNDERGROUND TANKS

Total yield from roof areas was calculated based on 90% dependability rainfall

(760 mm) & 0.90 runoff coefficients.

Roof top rain water down take pipe is further connected to sand bed filter for

filtration.

Filter needs to be cleaned periodically during the rainy season to remove the

filtered material and to keep the filtration system clean.

The filter water is proposed to be stored in existing cluster wise underground

water tanks.

This would provide additional benefit of flood management via storm water

detention for RWH.

Rooftop downspouts from the respective unit will be designed to drain to main

storm drain system with a flow splitter arrangement for drainage to the

proposed underground storage tank.

During the storm events of the wet season, valve located at the flow splitter will

be operated to direct water to the tank.

This stored water is recommended to be used for gardening and housekeeping

purposes.

4.4.2.9.2. RECHARGE PITS AND HOLDING PONDS

Recharge pits of size 3.0x3.0x3.0 m with bore well and 2 existing holding

ponds have been proposed for recharging at various locations to enable

ground water recharge.

Rain water from storm drain will enter the recharge pit through filter media and

then to bore wells through slotted casing pipes.

Feasibility of recharge through bore wells is based on geotechnical report.

Four holding tanks are proposed to harvest the runoff from the landscaped

area.

13 recharge pits around existing bore well are proposed.

Page 206: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

182

4.4.2.10. AQUIFER MANAGEMENT PLAN

The rock formations occurring in the area fall under category of hard rocks. They

are the oldest rock belongs to ARCHEAN age. They lacks primary inter granular

porosity. They are characterized by secondary porosity through weathering and

fracturing. The thickness of the soil and depth of weathering vary from place to

place.

As per the topographical survey of the area , terrain in North , south west and

south are relatively at higher elevation of granitic and schistose formations

showing a first stage of formation of water table where run-off is more than

infiltration , an impervious and poor aquifer because of scanty rain fall (760

mm)and higher temperature (38-46°c ).ground water in zone of vegetation, which

is partially filled up with water and air will be dried up during summer season . so

ground water table fluctuation is more during the summer period . thus the above

area comes under poor aquifers. Only small portion of the area towards north

&north east showing feasibility of aquifer nature. A seasonal nalla which is running

from west to north and north east showing presence of aquifer.

4.4.2.10.1 MANAGEMENT PLAN FOR RECHARGING THE AQUIFER

Due to rapid urbanization (industrial) activities, infiltration of rain water into the sub

soil has decreased resulting in lesser recharging of grounded water. The scenario

requires an alternative source to bridge the gap. Rain water which is available and

is purest form of water would be an immediate source of water supply by catching

water wherever it falls.

Rain water harvesting (RWH) is the process of collection and storing of water in a

scientific and controlled use. It includes,

RWH in paved and unpaved areas (open fields,parks,pavement,land

scapes etc)

RWH in large areas with open ponds, lakes, etc.

Capturing rain water in situ.

Replenishing ground water through recharging of rain water by using soil

column.

Check dam across the seasonal nalla.

STEP wells

Page 207: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

183

Lake culture i.e. chain of water storage structures recharged to ground

through recharge pits, dug wells, soak pits etc.

4.4.2.11. LEACHEATE STUDY FOR THE STOCK PILES

The raw materials and finished product are insoluble in nature. There will be nocharge in Chemical composition of the water .These will not be any waste disposalsite in the project area. The possibility of pollution due to seepage or percolation tothe sub surface will be controlled by constructing shed to the stock piles where everpossible and the flooring will be made impervious by concreting with water proofplastering.

4.4.2.12. FLOOD HAZARD

River Tungabhadra a tributary to the major River Krishna is with in 10km radius from

the SLR Metaliks project site. Tungabhadra river derives its name from the

confluence of two stream the Tunga and the Bhadra both of which rise in the wooded

eastern slopes of the western ghats in the state of Karnataka and flow eastward. After

confluence of these two streams at Kudali near Shimoga, the Tungabhadra runs for

about 531kms and joins the River Krishna at Sangameshwaram near Kurnool in the

state of Andhra Pradesh .The catchment area of Tungabhadra reservoir is 28,177

km2. The river basin is influenced by the southwest monsoon with copious inflows

during monsoon which dwindles to few cumecs in summer months.The drainage area

of the Tungabhadra river in the western ghats receives about 4500mm of rainfall

while the project area and rivers running in the peninsula receives about 480-760mm

rain fall.

Water AccountYield

1 Opening balance 1.294 TMC ft

2 Inflow recoded at T.B. Dam 316.786 TMC ft

Total 318.080 TMC ft

Utilization1. Drawls for irrigation by both states 151.501 TMC ft

2. Spillovers surpluss 119.411 TMC ft

3. Power generation 30.435 TMC ft

4. System losses 5.234 TMC ft

5. Evaporation losses 9.298 TMC ft

6. Closing balance (residual storage) 2.141 TMC ft

Page 208: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

184

Total 318.080 TMC ft

The Tungabhadra reservoir has not been provided with flood storage capacity for

flood absorption .The full reservoir level and maximum water level of the reservoir are

same and is at 1633 ft. Therefore the entire flood impinging the reservoir has to be

either stored to the extent possible or passed over the spillway. The spillway with 33

gates is designed to allow a maximum discharge of 6,50,000 cuses at full reservoir

level. The operation of spillway gates is carried out in accordance with approved

schedules duly ensuring the safely of the dam and is maintained by CENTRAL

WATER COMMISSION.

The proposed project viz SMS plant, rolling mill, coke oven plant, coke oven power

plant, producer gas plant, PCI plant, oxygen plant are part of integrated steel

industry. In the integrated steel industry air pollution is a major concern than the

water pollution. The proposed projects will be designed by keeping the zero

discharge policy or no discharge policy.

Topography of the proposed Project site is at higher level with respect to Temporary

Bench Mark (TBM) compared to the TBM of the river so there will be no flood effect

during the river flooding. The industry is located at a distance of 600 to 700m from the

high flood level (HFL) of the dam. The lowest level in the project site is 504(1653 ft) m

above MSL and HFL level or full supply level is 497m, However the dam gates will

be opened even before reaching 497 (1633 ft) m above MSL. The satellite imagery

showing the water levels of different season is given below which clearly shows that

the water does not enter into the project site.

4.4.2.13 MANAGEMENT PLAN TO PREVENT THE WATER POLLUTION DUE

TO PROPOSED PROJECTS ON TUNGABHADRA DAM.

The existing plant consists of 262m3 blast furnace, 33m2 sinter plant and

6MW blast furnace off gas based power plant. Now it is proposed to install value

addition units to the existing product viz 0.30 MTPA steel plant, 0.32 MTPA rolling

mill, 0.12 MTPA coke oven plant, 9 MW coke oven off gas based power plant, 120

TPD oxygen plant, 10 TPH pulverised coal injection plant (PCI) and 15000 Nm3/Hr

Page 209: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

185

producer gas plant. As the proposed units require prior Environmental Clearance

(EC ) from MoEF as per EIA notification Act 2006, we have submitted the form-1 ,

prefeasibility report and proposed TOR’s to MoEF. The Proposal was considered by

reconstituted Expert Appraisal Committee (Industry) in its 13th meeting held during

18th to 20th November,2013 and TOR for EIA studies was deliberated &

accordingly EIA studies were conducted.

The proposed project viz SMS plant, rolling mill, coke oven plant, coke oven power

plant, producer gas plant, PCI plant, oxygen plant are part of integrated steel

industry. In the integrated steel industry air pollution is a major concern than the

water pollution. The proposed projects will be designed by keeping the zero

discharge policy or no discharge policy. The wastewater streams will be in

closed circuit.

Proposed project sites are located at a distance of 600-700m from the HFL of the

Tungabhadra Dam, considering the distance of water body from the proposed

expansion site, SLR Metaliks has proposed management plan to eliminate the

water pollution on Tungabhadra river.

No manufacturing units will be located near water body, north side will be covered

dense vegetation lalyer.

4.4.2.13.1.STORM WATER MANAGEMENTTopography of the proposed Project site is at higher level with respect to HFL/FSL of

the river .The lowest level in the project site is 504(1653 ft) m above MSL and HFL

level or full supply level is 497m, the storm water generated in the proposed site will

be collected through efficient drainage system and stored in 3 number guard ponds

for reuse.

Strom water gutters will be constructed in the premise as per the standards taking

into peak runoff factor and flash flood rate. The storm water drains will lead to rain

water reservoirs/ guard ponds constructed at the lowest level of the premise as

shown in the layout plan. The annual rainfall in the region is about 759 mm and is

spread from June to November. The maximum monthly rainfall is about 287 mm. The

unit posses a total of 190 acres land. The area consists of 76 acre built up plant area,

57 acres open area and 57 acres green belt area. The guard ponds will be designed

Page 210: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

186

by considering the worst case scenario peak monthly rainfall for 12 months and there

is no consumption of collected storm water in process or for other activity. However in

reality The stormwater/ runoff collected in reservoir will be used for process, dust

suppression & greenery development in the factory. The storm water collected from

other premises is given below.

Slno Location

AreaAcres (m2)

AverageRun-offFactor

Rain fallIn

m/month

Rain watercollected ,

m3/yr

1.

Built up area(including roads,plant and parkingplaces)

76(304000) 0.7 0.287 61074

2. Green belt area 57(228000) 0.4 0.287 261743 Open area 57(228000) 0.6 0.287 39262

Total 190(760000) _ 126510

Storm water storage tanks will be constructed with impervious concrete lining work

as per standard practices. The capacity and size of the reservoir is given below:

Guard pond Location Capacityin m3

Averagedepth, m Area in m2

Guard pond (I)At Lower levelof the factorypremises

47000 5 9400

Guard pond (II) At Lower levelof the factorypremises

47000 5 9400

Guard pond (III) At Lower levelof the factorypremises

33000 5 6600

The guard ponds will act as a buffer system to handle peak discharges, the waterfrom this facility is used in the process, dust suppression & greenery developmentthus storm water is completely reused.

Guard ponds will be taken for de-silting annually. The silt is being used for gardening,as our area is rocky/ sandy in nature; the silt is used as manure for gardendevelopment.

Double hight compound walls compound will be constructed towards the north side of

plant.

Page 211: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

187

WATER CONSERVATION PLAN

The following steps are comprehensively foreseen for optimizing the water

consumption in the expansion project,

Schematic plan of storm water management plan

4.4.2.13.2. RAIN WATER HARVESTING

Rain harvesting fits will be constructed along rain water gutters at a distance of about

60-100 m. A total of about 40 pits will be constructed as per practice. Each pit will be

Proposed project Area

Guard Pond-1

47,000 m3

Guard Pond-2

47,000 m3

Production units

Storm water

GREEN BELT

Guard Pond-3

33,000 m3

Storm water

Page 212: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

188

of size 3.0 m X 2.0 m X 3.0 M. They are filled with small boulders, pebbles, and

coarse sand.

Well designed storm water drainage system consisting of open surface drains, catch

pits will be provided to keep the entire plant free from water logging. The area of

coal/coke storage and handling are concreted and drains are provided. Water

collected in these drains may contain suspended solids. The rain water collected at

coal/coke stock yard will be led to settling tanks/catch pits to remove suspended

particles. The coal/coke particles are recycled to the plant. The rain water after

settling is collected in to rain water storage pond for use in the plant, dust

suppression and greenery development.

4.4.2.13.3. WATER CONSERVATION

1. Adaptation of less water consuming technologies/ dry processes like air cooled

condenser (ACC) in place of water cooled condenser in proposed captive

power plant, thereby reducing the wastewater generation.

2. Effectively monitoring and control of water consumption on day to day basis .

3. Water meters will be installed at all consumption and make up water points to

monitor and control the water consumption.

4. All sumps and transfer canals in the plant will be provided with the adequate

RCC and PCC bases to avoid water seepage losses.

5. The drip irrigation system and spray fountain systems shall be adopted

wherever applicable to reduce water consumption for horticulture and

gardening.

6. STP treated water will be re-used for maintenance of garden and green belt

development.

7. Rain water harvesting will be employed for storm water to collect and conserve

the water for future usage.

8. Roads will be asphalted and yards shall be concreted to avoid water sprinkling

needs to keep the emission levels of ambient air low.

9. Necessary caution and educative boards , slogans related with water

conservation will be displayed at vantage points to create awareness among

entire workforce.

10. Plant water balance will be reviewed periodically by top management to

effectuate all steps for continuous improvements on water conservation front.

Page 213: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

189

4.4.2.13.4. GARLAND DRAINS

Garland drains will be constructed in the proposed industry to make sure that all the

storm water generated will be collected and diverted to guard pond. Hence there is

water is permitted to go out of the plant premises.

4.4.2.13.5. AIR POLLUTION CONTROL MEASURES

The industry will adopt effective air pollution measures to minimize the dust

generation, by installing APC like ESP, Cyclone, scrubber, bag filters, dedusting

systems, water sprinklers and developing greenbelt around the premises.

Water conservation plans, rainwater harvesting measures and storm water

management system will effectively reduces the impact on Tungabhadra dam due to

proposed integrated steel project.

4.5 NOISE ENVIRONMENT

4.5.1. SOURCE OF NOISE

During the operation phase of the project, major sources of noise pollution are

expected to be from various machines used for production and vehicular traffic. The

principle source of noise from industry are from fans, centrifuge, turbine, steam traps,

steam vents etc., the observed noise level of these machineries in existing Iron

making factories is given below.

i. Steam turbine - 90 – 95 dB(A)

ii. Diesel Generator - 80- 85 dB(A)

iii. Fans, compressors and blowers - 85-90 dB (A)

iv Crusher - 80-90 dB (A)

vi. Vibratory screen & conveyors - 85-90 dB(A)

Most of these generate higher noise. The movement of vehicles like trucks & tractors

has noise level of 70-80 dB (A). The machinery and techniques used for

manufacturing proceed would be such that there is minimal nuisance of noise in the

surrounding region. However as a precautionary measure, enclosures will be

provided where ever possible for all the major mechanical units to arrest the sound

waves travelling outside the plant area.

4.5.2. IMPACTS & MITIGATION MEASURES

Page 214: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

190

The assessment of the impacts due to noise pollution on the surrounding community

depends upon characteristics of noise source (instantaneous, intermittent, or

continuous in nature), period and duration and the location of noise source with

respect to noise sensitive receptor.

Efforts shall be done to bring down the noise level due to the D. G. set, with in the

allowable limits of about 70 dB(A) by sitting and control measures. The D.G. set is

provided with acoustic treatment for minimum 25 dB (A) insertion loss exhaust muffler

of suitable quality is provided to offer an insertion loss of about 25 dB(A). Steam

turbine is located in the separate building and acoustic treated premise. Workers at

these equipments are provided with noise control appliances. The noise impact of the

industrial activity is insignificant at the boundary level of the industry. The noise level

due to project activity is limited to the project site only and little impact on surrounding

area. However, movement of vehicles will increase noise levels on the roads and

their near vicinity. Suitable measures have to be adopted for occupational noise

safety in factory and good maintenance of vehicles. The expected noise level from

proposed project activities at project boundary would be less than the statutory

requirement, ie. Less than 75 db (A) during day time and 70 db (A) during night time.

4.5.3. NOISE QUALITY STANDARDS

The permissible occupational noise level and exposer time is given below.

Standards for Occupational Noise ExposureTotal Time of Exposure per day in hours(Continuous or short term Exposure)

Sound pressurelevel in dB (A)

8 906 924 953 972 100

3/2 102

1 105

¾ 107

½ 1101/4 115

NEVER 115

Page 215: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

191

Note:- No exposure in excess of 115 of dB(A) is to be permitted. For any

period of exposure falling in between any figure and the next higher or lower figure or

indicated in column (1). The permissible level is to be determined by extrapolation on

a proportionate scale. Similarly, the standards for ambient noise level are given

below.

Standards for Ambient noise levelCategory of area dB (A) Day dB (A) NightIndustrial Area 75 70Commercial Area 65 55Residential Area 55 45Silence Zone 50 40Day Time : 8 am to 9 pm Night time : 9 pm to 6 am

To meet these limits, noise abaterment measures as indicated in EMP will be

incorporated with the project.

4.6 SOLID WASTE MANAGEMENT

4.6.1 IMPACT OF METALLURGICAL WASTE AND FINES

In an integrated steel plant , the sources of fine dust generation are as under:

i. Raw materials handling plant.ii. EOF plant

Metallurgical waste and fines are carried with the fugitive gases, scrubber water and

quenching water.

Metallurgical waste and fines are generated at furnace, crushers, charging and

unloading, quenching of hot material etc. These are collected at dust arresters and

settling tank of circulating quench and scrubber water. The fumes and exhaust gases

carrying dust are generated at furnace and quenching operations. The

characteristics of metallurgical waste generated in the proposed project is given

below

Page 216: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

192

Table 4.14 characteristics of solid waste

Sl.No

Source Composition of Metallurgical waste and finesFe CaO Mg

O

SiO2 Al2O3 C1 Flue dust 34 7 2 12 3 252 Settling tank

dust29 22 10 8 8 10

3 GCP sludge 36 6 1 9 14 19

The detailed solid waste generated and its disposal handling is given insection 2.12.3.

4.6.2 HANDLING AND UTILIZATION OF COAL ASH

Coal ash is produced in producer gas plant (PGP) where in 220 T/d of B- gradeIndian coal is used as an input. The coal contains about 33% ash. Hence, ashproduced from PGP will be 53 T/d. The ash discharged from the unit will be collectedin a shallow pit of size 20m x 30m x 1.0m depth, 4 nos. The ash is sprayed with waterto quench the hot ash and also to prevent dust evolution.

The moistened and cooled ash is then used for brick making. Each pit has a capacityto hold about 10 d production of ash from the PGP and lined with geo-membrane toprevent the seepage.

The pit is produced with the arrangement to collect the leachate if any. The leachatethus collected will be reused for quenching of hot ash. The capacity of leachate pit is20 m3/d (Size 3m x 3m x 3m). The location of ash pit is shown in lay out plan.

4.7 SOIL QUALITY

The soil characteristics in the study area are given in Chapter-3. It is seen that the

soil quality is of low fertility. Waste water and solid waste if discharged with out

control on land are likely to affect soil quality. Factory effluent, mainly the purge from

circulating cooling water is treated to standards and then utilized on land.

4.8 BIOLOGICAL ENVIRONMENT :

The study area is mainly barren vacant land. There are no forests and ecosensitive

sites in the vicinity of the site except the river Tungabhadra which is at 5 km north

from the site. The backwater of TB reservoir is about 600-700m which goes on

increases upto 3km. No human habilitate within 1.5 km from the site. There are no

endangered flora and fauna species in the region. Vehicular movement during night

Page 217: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

193

will be restricted to avoid adverse consequence to birds and wide animals in the

region. The project activities are restricted to the factory site except the

transportation of raw material and products. There is no discharge of solid or liquid

wastes to the environment. Green belt and greenery will be developed in the premise

covering more than 33% of area. The plantation will comprise of fruiting trees, soil

improving and air pollution abatement tress. No eco sensitive receivers or rare /

endangered species of fauna were observed in the study area.. Thus, the impacts on

flora and fauna will be insignificant.

4.9 SOCIO-ECONOMIC IMPACT

This section discusses the project activities and the extent of the potential impacts

anticipated on socio-economic status in the region. Based on the nature and type of

impacts, the assessment has been divided into 3 category i.e. positive, negative and

negligible impacts. For example, the positive impacts include job opportunities for

men and women, better utilization of land, preservation of environment, infrastructural

development, etc. Long term impacts are also taken into account i.e. relocation,

democracy, aesthetics, accessing utilities, impact on archeological sites, etc.

Negative impacts include adverse impacts on health, air pollution including noise,

road safety, odors etc.

4.9.1. POSITIVE IMPACTS

Job opportunity: during the social impact assessment process, locals raised the

question regarding more job opportunities. The benefit relate to direct employment

associated with the construction of the facility. Jobs would be given to unskilled, semi

skilled as well as skilled labor category, for which locals would be given preference

and thereby the overall development of the region is envisaged.

Wider economic growth: this project will increase the economic activities around the

area, creating avenues for direct/indirect employment in the post project period.

There would be a wider economic impact in terms of generating opportunities for

other business like workshops, repair and maintenance tasks etc.

Infrastructural development: this project would enhance the infrastructure in the

vicinity, which also involves road upgrading.

Aesthetics environment: the architectural character of the new building, the vistas and

landscaped areas created would improve the aesthetics of the area.

Page 218: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

194

Additional revenues: the development of land for any purpose creates both an

immediate demand for services and a flow of revenues to the community from a

variety of sources, for example property tax, licenses and permits fee etc.

4.9.2. NEGATIVE IMPACTS

Additional traffic in the area is a matter of concern to the local people. This effect

would be prominent during construction as well as operation phase. The probability of

inconvenience faced due to frequency of truck movement during construction phase

and operation phase would be minimized by better control of traffic movement in the

area. Noise levels expected from the planned operating conditions have been

assesses and are likely to be within acceptable levels. The impacts have been

mitigated by the suggested measure in the “air control and management section”.

Transient labor population from the surrounding areas might come and work at the

site. Though majority of population would be recruited locally, limited labor with

specific skills will be recruited from outside the region. Therefore, no significant

pressure on local infrastructure is envisaged. All environment health &safety (EHS)

practices will be followed according to labor commissions notification.

4.9.3. NEGLIGIBLE IMPACTS

As there is no existing settlement on the proposed project area, there are no issues of

resettlement or rehabilitation.

4.9.4. CONCLUSION

Overall, the project will have major positive impacts on the region in sense of

environment as well as social. Negative effects are not expected if there is dedicated

environmental planning and if at the same time the interests of population and the

areas directly adjacent to the project site are considered.

Establishment of project will enhance the transportation activity. This will create

opportunities to the localites to start vehicle garages. With development of the

industry the roads and communication facilities will be enhanced. The expansion of

integrated steel unit will also create job opportunities to the local mass.

Presently the educational facilities in the study area are limited to primary and high

school. With establishment of this industry the transportation, public mobility and job

Page 219: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

195

opportunity along with associated activities in the region may increase. These

activities will improve economic condition of the local population. The presence of

the industry will enhance commercial activities, which inturn will improve the

economic conditions of the population. Service infrastructure like transportation,

health care, education, communication facilities may improve considerably. The

availability of power from the industry will help to reduce the power scarcity and

frequent power failures in the region by stabilization of the power in the grid, which

will improve power supply to irrigation pump sets and house hold requirements.

4.10 GREEN-BELT DEVELOPMENT

Green belt and greenery will be developed in about 65 acres of land. The species

developed will be as per CPCB guide lines. Assistance and guidelines will also be

availed in development of greenery in the industry.

All the premise green belt of about 20 m will be developed. Line trees will be

developed on either side of the internal roads as well on all approach roads to the

industry,

Lawns will be developed around plant and administrative buildings. Green belt of 10

to 20 m will be developed around open bulk storage yards.

A green belt helps to reduce the pollutant level in the ambient air by preventing the

fugitive dust being carried away by wind. They not only act as a pollution sink for

variety of air pollutants but also replenish the air with much needed oxygen. These

can help to reduce the pollutant level in the air environment. The degree of pollution

attenuation by a green belt depends on its height and width, foliage surface area,

density, dry deposition, velocity of pollutants and the average wind speed through the

green belt. The main objective of green belt around the factory is:

1. Mitigation of impacts due to fugitive emissions

2. Attenuation of noise levels

3. Ecological restoration

4. Improvement in aesthetic environment quality

5. Waste water reuse and re-cycling..

6. Soil erosion prevention

The proposed plant will be located adjacent to the existing steel unit. A very

Page 220: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

196

elaborate green belt is already developed by industry at the existing steel unit.

Greenery and green belt will be developed in the proposed project promise as per

CPCB guidelines. Necessary help and guidelines will be availed from the

departments of Karnataka State nurseries and forest to get suitable species of plants.

Keeping in view of the soil and water quality available in and around the project site

and the topography of land, following species are considered for green belt

development.

4.10.1 SELECTION OF SPECIES

The species for plantation have been selected on the basis of soil quality , place of

plantation , chances of survival , growth rate, timber value, etc. The area wise

distribution of species proposed is as follows:

i. Road side plantation:

Avenue plantation should include following species:

Albezzia lebbeck

Azadirachta indica

Tamarindus indica

Delonix regia

Lencaena lencocepha

Acacia nilotica cassia siamea

Ficus benbalensis

ii. Around various shops:

As there will be limited space due to various overhead pipelines, thus small and

medium sized species are suggested and they should be planted depending on the

vertical height available for plant growth.

Small speciesDodonia viscose

Cocoloba prosopis juliflora

Cassia auriculata

Medium size species:Prosopis cineraria

Page 221: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

197

Erythroxylum monogynum

Cassia fistula

Acacia Arabica

Loucaenalencocephala

Cassia alta.

Around office and other buildings:Cassia siamea

Ailanthus excels albezzia amera

Albezzia lebbeck

Cassia fistula

Cassia javanica erythrina indica

Lagerstroemia flosreginea

Peltophorum feruginium

Delonix

4.10.2 SPECIFIC LOCATION OF PLANTATIONSThe areas which need special attention regarding green belt development are:

i. Along road side

ii. Around various shops and solid storage yards

iii. Around the periphery of premises.

The width of green belts and type of plant species to be developed in the premises

includes the following .

i. 20m width green belt all along the periphery of the site

ii. 10m width green belt all along the border of solid storage yards including coal &

coke.

iii. Tree plantation on both sides of interior roads in the premise.

iv. lawn with aesthetic plants around shops and other buildings.

Open industrial area will be covered with plantation . An average of about 400 plants

will be maintained per acre of the area. 65 acres of project site will be covered with

green belt and its amounts to about 33% of total area. Plantations will also be

provided along the internal & external roads and also around factory buildings.

The plantations will be watered regularly . wherever possible, treated waste water is

used. Regular monitoring of the plants is carried out to record mortality rate, growth

rate, overall appearance , symptoms of disease, etc.

Page 222: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

198

4.11 STORM WATER MANAGEMENT AND RAIN WATER HARVESTING

4.11.1 STORM WATER GUTTERS

Large quantity of storm water will be generated during rainy days. Rain water

collection and harvesting plan will be implemented to conserve the water resources

and to improve the underground water table. The project site area will be segregated

into different premises for effective management of storm water. Strom water gutters

will be designed and constructed based on contour data of the premise and rainfall

data of the region. The project site area of 190 acre is segregated into different

premises such as fuel storage yard, manufacturing plant area, lawn and green belt

area for effective management of storm water. Necessary measures shall be taken to

control the quality of the storm water.

4.11.2 STORM WATER RESERVOIR

Strom water gutters are constructed in the premise as per the standards. The storm

water drains are lead to rain water reservoirs constructed at the lowest level of the

premise as shown in the layout plan. The quantity of storm water collected from

different locations of the factory premise is given below.

The annual rainfall in the region is about 759 mm and is spread from June to

November. The maximum monthly rainfall is about 287 mm. The unit posses a total of

190 acres land. The area consists of 76 acre built up plant area, 57 acres open area

and 57 acres green belt area. The rainwater thus collected in reservoir will be used

for greenery development in the factory. The storm water thus collected can also be

used as a source of water for the industry.

Page 223: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

199

The storm water collected from other premises is given below.

Slno Location

AreaAcres (m2)

AverageRun-offFactor

Rain fallIn

m/month

Rain watercollected ,

m3/yr

1.

Built up area(including roads,plant and parkingplaces)

76(304000) 0.7 0.287 61074

2. Green belt area 57(228000) 0.4 0.287 261743 Open area 57(228000) 0.6 0.287 39262

Total 190(760000) _ 126510

Storm water storage tanks will be constructed with impervious concrete lining work

as per standard practices. The capacity and size of the reservoir is given below:

Guard pond Location Capacityin m3

Averagedepth, m Area in m2

Guard pond (I)At Lower levelof the factorypremises

47000 5 9400

Guard pond (II) At Lower levelof the factorypremises

47000 5 9400

Guard pond (III) At Lower levelof the factorypremises

33000 5 6600

The guard ponds will act as a buffer system to handle peak discharges, the waterfrom this facility is used in the process, dust suppression & greenery developmentthus storm water is completely reused.

Guard ponds will be taken for de-silting annually. The silt is being used for gardening,as our area is rocky/ sandy in nature; the silt is used as manure for gardendevelopment.

Page 224: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

200

WATER CONSERVATION PLAN

The following steps are comprehensively foreseen for optimizing the water

consumption in the expansion project,

Schematic plan of storm water management plan

Double hight compound walls compound will be constructed towards the north side of

plant.

4.11.3 RAIN WATER HARVESTING

Rain harvesting fits will be constructed along rain water gutters at a distance of about

60-100 m. A total of about 40 pits will be constructed as per practice. Each pit will be

of size 3.0 m X 2.0 m X 3.0 M. They are filled with small boulders, pebbles, and

coarse sand.

Proposed project Area

Guard Pond-1

47,000 m3

Guard Pond-2

47,000 m3

Production units

Storm water

GREEN BELT

Guard Pond-3

33,000 m3

Storm water

Page 225: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

201

Well designed storm water drainage system consisting of open surface drains, catch

pits will be provided to keep the entire plant free from water logging. The area of

coal/coke storage and handling are concreted and drains are provided. Water

collected in these drains may contain suspended solids. The rain water collected at

coal/coke stock yard will be led to settling tanks/catch pits to remove suspended

particles. The coal/coke particles are recycled to the plant. The rain water after

settling is collected in to rain water storage pond for use in the plant, dust

suppression and greenery development.

4.12 OCCUPATIONAL HEALTH CARE

Safety officer will be appointed in the industry. He will co-ordinate and manage

occupational health management. A medical facility with qualified doctor and clinical

facilities will be created in the industry to meet the factory and residential colony

requirement of the health services. Higher medical services shall be availed from the

hospitals present in H.B. Halli and Hospet. Health care aspects to be practiced in the

industry are indicated bellow.

4.12.1. CLEAN TECHNOLOGY

Clean Technology will be adopted in the industry to achieve highest performance in

production, energy and environment. Good housekeeping is practiced in the industry.

Prime importance is given for safety and occupational health. Energy audit is also

under implementation. An effective monitoring programme as discussed in Chapter-

10 followed in the industry.

4.12.2. PLANT OPERATION

Regular inspection and maintenance of pollution control plants

Regular cleaning of dusts from floor, roads and other lplaces.

Heat insulation of hot surfaces

Wherever necessary, personnel protective appliances will be used by the

workers.

Availability of spray water system for moistening the coal yard/dump.

All pollution control and dust suppression systems shall be interlocked with

operation of process equipment or are run along with process equipment

Page 226: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

202

4.12.3. HOUSE KEEPING

Good housekeeping is a must to maintain proper working conditions. The following

housekeeping measures will be implemented in the industry.

Regular cleaning of plant roads.

Regular cleaning of shop floors and flat roofs with trolley/truck mounted

type vacuum cleaners.

Regular wetting of roads with water.

Keeping all dedusting systems of the coke oven in good working order.

Keeping ventilation systems in good working order to avoid accumulation of

dust on equipment inside the room. The air filters will be regularly cleaned

as per the manufacturer's instructions.

Maintaining adequate green belts inside and along the plant for not only

suppression of noise and pollutant transportation but also for better

aesthetics.

Proper control of fugitive dust from sources inside coke oven plant including

open stock piles by spraying water.

4.12.4. MEDICAL FACILITIES

M/s SLR limited has occupation health center to provide following medical services to

the employees

Health and safety related displays will be exhibited at strategic locations in the

industry.

Workers are educated workers on health, hygiene and safety and trained in

occupational health safety.

General treatment and advice to the employee.

Maintenance of Medicines.

Spirometry, Pulse-oxyeometry, X-rays and other routine and specific tests will

be conducted and submitted to authorities.

First aid facilities will be provided at different locations. Further first aiders will

be trained from refuted training institute.

Workers are trained to assist emergency management in case of any such

incidences

Page 227: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

203

House keeping in the industry and sanitation in utility rooms, canteen. Rest

rooms and other places will be given top priority.

House Keeping Training will be imparted to 10 workers and 5 supervisors from

refuted management institute.

The workers exposed to noisy equipment shall be provided with ear muffs. If

necessary, the duty hours will be rotated, so that noise exposure time is kept

within specified limits.

Regular health check up of the workers will be carried out and health records

of individual workers in form No.16 as per factory Act will be maintained. Each

worker will have a baseline medical check up at the time of joining followed by

annual medical check up.

Maintaining hygienic conditions in areas like canteen, drinking water sources

and toilets.

Keeping all dedusting systems of the plant in good working order.

The coke oven roof courses will be provided with insulation materials.

As specified by MOEF, the Life Cycle Assessment (LCA) study will be

conducted for the workers.

4.13 TRAFFIC DENSITY AND ITS IMPACT ON ENVIRONMENT

After expansion of the project the transportation of material to and from industry will

be enhanced. Expansion is basically a production of down stream or associated

products with out the use of additional ore or other raw materials. Earlier coke was

imported and used in the blast furnace. In the proposed plant coke is manufactured

from coking coal. Hence, Coal will be procured to the industry instead of Coke.

Additional low grade coal is also procured for use in producer gas plant and other

furnaces. Liquid fuels needed in heating furnace are procured from refineries located

in Mangalore. In the present plant pig iron is manufactured and sent to the consumers

through lorry transport. After expansion, instead of pig iron rolled and casted steel

products will be sent to the consumers through lorry transport. Hence, the quantity of

product transported from the industry will be nearly same even after expansion of the

project.

The materials from and to the site are transported mainly through lorry vehicles.

These vehicals move mainly through Hospet-Harihar State high way and Chitradurga-

Solapur national high way (NH-13). These high ways consists of 4/6 lines and well

Page 228: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

204

developed. The traffic density on this road is much less than its allowable limits. The

existing traffic and additional traffic due to expansion are given below.

4.13.1. TRAFFIC SURVEY

Traffic survey is the study of flow of traffic/vehicles, designing and operating traffic

system to achieve safe and efficient movement of vehicles, persons and goods.

Traffic studies are carried out to analyse the traffic characteristics. These surveys are

conducted to assess the impact of traffic with reference to road safety and carrying

capacity of roads. This will help to in deciding the geometric design feature and traffic

control for safe and efficient traffic movements. The density of vehicles on the road is

given in Table-4.14.

Passenger Car Unit ( PCU)

PCU different classes of vehicles such as cars, vans, buses, trucks, auto rickshaws,

motor cycles, pedal cycles, bullock carts, etc are found to use the common road way

facilities without segregation on most of the roads in developing countries like India.

The flow of traffic with unrestricted mixing of different vehicle classes on the road

ways forms the heterogeneous traffic flow or the mixed traffic flow. It is a common

practice to consider the passenger car as the standard vehicle unit to convert the

other vehicle classes and this unit is called as Passenger Car Unit or PCU. Thus in

mixed traffic flow, the traffic volume and capacity are generally expressed as PCU per

hour or PCU/lane/hour and the traffic density as PCU per km length of lane.

Recommended PCU units for the practiced purposes are given below.

Types of vehicles Equivalent PCUPassenger car 1.00

Motorcycle 0.33Light van 1.25

Medium Lorry 1.75Heavy Lorry 2.25

Bus 2.25Trailer 2.25

3-Wheeler 0.55

Table-4.14 Data of Traffic Survey on Chitradurga-Solapur HighWay

Page 229: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

205

Date Time Twowheeler

Threewheelers

Light

vehicles

Heavyvehicles

Total

26.12.2013 08AM to 10AM 322 52 207 102 68326.12.2013 11AM to 01PM 229 61 240 177 70726.12.2013 02PM to 04PM 160 45 260 196 66126.12.2013 05PM to 07PM 296 49 296 208 849

Total 1007 207 1003 683 2990Total in P.C.U. 538 114 1134 1762

08.01.2014 08AM to 10AM 311 48 225 120 70408.01.2014 11AM to 01PM 289 69 248 147 75308.01.2014 02PM to 04PM 296 43 266 194 79908.01.2014 05PM to 07PM 315 51 236 165 767

Total 1211 211 975 626 3023Total in P.C.U. 532 116 1375 1847

05.02.2014 08AM to 10AM 336 58 216 199 80905.02.2014 11AM to 01PM 291 57 258 171 77705.02.2014 02PM to 04PM 306 47 249 198 80005.02.2014 05PM to 07PM 328 44 231 213 816

Total 1261 206 954 781 3202Total in P.C.U. 548 68 1354 1757

4.13.2. TRANSPORTATION DUE TO THE PROPOSED PROJECT

4.13.2.1 PERSONNEL

A maximum of 300 persons will be engaged in construction works. Construction period is

about 3 months. They use company vehicle facilities, public transportation and own vehicles.

During operation a maximum of about 450 persons (inclusive of employees and visitors) are

attending the industry. A total of about 8 visits by buses, 40 visits by four wheelers and about

60 visits by two wheelers will made to the industry for transportation of personnel.

4.13.2.2. MATERIAL

A maximum of construction material including gravel, sand, stone, steel, bricks and

other construction material & machinery etc. transported per day will be about 40.

During operation, additional transportation of goods will be relatively as explained in

section 7.1. Additional transportation of goods will be about 40 lorry transports per

day. Additional traffic due to the proposed expansion project is given below.

ADDITION OF TRAFFIC DUE TO THE PROPOSED EXPANSION PROJECT

Page 230: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

206

Traffic Vehicle

Daily max.

Hourly max

Two wheelers 40 8

Light vehicles (CPU) 60 10

Heavy vehicles 48 6

4.13.3. IMPACTS

The transportation density on the road is likely to increases by about 5 %. The road is

a major double/four line road and has adequate capacity to take the additional

vehicular load.

Lorries carrying solid material will be covered with tarpaulin. Road side tree plantation

is already present. The industry will take measures to plant additional plantation on

road sides. Bell mouth shape geometry will be provided at entry and exit gates.

Considering the facilities as above the impact of additional transportation on road will

be insignificant.

4.14 CHARTER ON CORPORATE RESPONSIBILITY FOR ENVIRONMENTALPROTECTION (CREP) (Evolved by CPCB, MOEF-2003 for 17 Categories ofIndustries)

CREP Norms applicable to integrated steel industries is given in Annexure--8

Compliance to CREP norms by the present Integrated Steel Industry consisting of

existing Blast furnace and Sinter plant and the proposed Steel plant, Rolling mill and

Non recovery type Coke oven plant are given below.

4.14.1. COKE OVEN PLANTS

The proposed non recovery type coke oven plant will be designed to meet the notified

standards under EPA for the parameters PLD ( % leaking doors), PLL ( % leaking

lids), PLO ( % leaking off take).

Page 231: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

207

4.14.2. STEEL MELT FURNACE

Fugitive emissions will be completely removed in the proposed SMS by installation of

secondary de-dusting facilities including collection hood, ID fan, Bag filter, duct and

stack.

4.14.3. BLAST FURNACE

The existing blast furnace is incorporated with direct injection of reducing agents.

4.14.4. Solid Waste / Hazardous Waste Management

A. Utilization of Steel Melting Shop (SMS) / Blast Furnace (BF) slag,

B.F. slag is completely utilized in preparation concrete mix for use in the production of

concrete blocks, concrete road and other concrete works in the industry. This is also

sent to other consumers for use in cement making, concrete block, concrete roads.

B. Hazardous Waste

The tar produced in producer gas plant will be used as fuel in the proposed cokeoven plant.

The hazardous wastes such as coal tar ( 77 T/yr) from producer gas plant and usedoil generated from gears, hydraulic machine and diesel engine ( 36 T/yr ) areinventoried as per Hazardous Wastes (M. & H.) Rules-1989 (and as amended in2000).

4.14.5. Water Conservation/Water Pollution

After proposed expansion, the total production of plat products will be 900 T/d and

the water consumption will be 4626 m3/d. This amounts to the specific water

consumption of 4.7 m3/d. This is well within the limits for long products. The water

consumption given above includes the water usage in power plant, coke oven plant,

oxygen plant and producer gas plant.

Continuous stack monitoring system with with periodic calibration has already been

installed in the existing project. Similar systems will be installed in the proposed plant.

It is proposed to implement Life Cycle Assessment (LCA) study as sponsored by

MOEF during execution of the proposed project..

The industry will adopt the following clean technologies measures in the proposedproject to improve the performance of industry towards production, energy landenvironment.

Page 232: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

208

Energy recovery of top Blast Furnace (BF) gas.

Use of Tar-free runner linings.

De-dusting of cast house at tap holes, runners, skimmers ladle and charging

points.

Suppression of fugitive emissions using nitrogen gas or other inert gas.

To study the possibility of slag and fly ash transportation back to the abandoned

mines, to the abandoned mines, to fill up the cavities through empty railway

wagons while they return back to the mines and its implementation.

Processing of the waste containing flux and ferrous wastes through waste

recycling plant.

To implement rainwater harvesting.

Reduction Green House Gasses by:

- Reduction in power consumption.

- Use of by-products gases for power generation.

- Promotion of energy Optimization technology including energy/audit.

To set targets for Resources conservation such as Raw material, energy and

water consumption to match international standards.

Up gradation in the monitoring and analysis facilities for air and water pollution.

Also to impart elaborate training to the manpower so that realistic data is obtained

in the environmental monitoring laboratories.

To improve overall house keeping.

4.15 FEASIBILITY OF CARBON CREDIT SCHEME FOR THE PROJECT

The 6 MW power plant based on B.F gas in the existing project and the 9 MW power

plant based on coke oven off-gas in the proposed project will come under Clean

Development Mechanism (CDM) and therefore eligible for carbon credit. The

management has approached qualified consultants to conduct study and prepare

documents for CDM rating to the industry. The CDM project will be implemented

along with the execution of the proposed project.

Page 233: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

CHAPTER -5

ANALYSIS OF ALTERNATIVES

Page 234: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 235: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

209

CHAPTER-5

ANALYSIS OF ALTERNATIVES

(TECHNOLOGY AND SITE)

5.1 SITING OF PROJECT

M/s. SLR Metaliks Ltd. Has already established and operating an Iron making plant

at Narayanadevarakere village, Hagaribommanahalli Taluk, Bellary District,

Karnataka State to manufacture pig iron along with sinter product as input to pig iron

unit and blast furnace off-gas based power plant. All the units are fully operational

and running successfully. Now, the company propose to improve viability of the

existing project by the addition of facilities for the production of value added

downstream products with ready market opportunity such as alloy steel, rolled steel

products, metallurgical coke, coke oven gas based power plant, producer gas plant,

pulverized coal injection and oxygen plant in the existing Iron industry. Hence, the

location of the proposed project has necessarily to be at or adjacent to the existing

Iron industrial complex and therefore alternative sites are not considered.

The technology adopted will be more advanced with respect to resource consumption

and environmental sustainability.

5.1.1 ENVIRONMENTAL GUIDELINES Setting restrictions for the project depend on the sensitivity of the surrounding

environment. Sensitivity of the project site should be assessed in relation to its

proximity to the ecologically sensitive places. As per MoEF guidelines, following

aspects are to be considered while selecting the site:

i. Land procured should be minimum but sufficient to provide greenbelt. If treated

effluent is to be utilized for irrigation, additional agricultural land is to be made

available.

ii. Enough space for storing solid waste.

iii. Layout and form of the project must confirm to the landscape of the area

without affecting the existing scenic features.

iv. If associated township of the project is to be created, it must provide space for

phyto-graphic barrier between project and township and also should take into

account of wind direction.

v. The site should not be in migration route.

Page 236: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

210

vi. It should not interfere with the natural water course

vii. Forest, agriculture and fertile and other specified lands to be avoided.

viii. The following distances maintained between the project and specified location

Estuaries: 200 m

Flood plains of riverine systems: 500 m

Highways and Railways: 500 m

Streams and rivers used for drinking water supply: 1500 m

Ecological and/or otherwise sensitive areas: 15 km

5.1.2 GENERAL CRITERION FOR SELECTION OF LOCATION The general criterion for site selection is:

Accessibility for easy disposal of effluents.

Proximity to availability of perennial water supply, raw materials, skilled and

unskilled manpower.

Access to power supply from KPTCL/ own captive generation.

Further important details to be checked up about the site are:

Soil conditions

Contour survey

Rainfall in the area

Ground water resources / potential

Weather conditions, maximum and minimum temperature, humidity etc.

Seismographic soundness of the place.

5.1.3 SITE REQUIREMENT AND PROPOSED LOCATION The Company has obtained environmental clearance from MOEF, GOI, New Delhi

and CFO from KSPCB Bangalore for the existing project. The proposed project is

expansion of the existing industry and therefore no alternate sites are considered.

The proposed project is to be located East side of the existing industrial premises. 90

acres of land is already allocated by KIADB for the proposed expansion project and

another 100 acres is under process through KIADB. Expansion is proposed in the

additionally procured land for the proposed plants.

5.1.3.1 AVAILABILITY OF RAW MATERIAL/FUEL

Fluxes and additives will be purchased from local market

Page 237: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

211

Metallurgical Coke –will be imported/ procured from Indian Sources.

Scrap,billets, blooms, DRI will be purchased from nearby pig iron plant & steel

plants.

5.1.3.2. AVAILABILITY OF WATER SUPPLY

The industry has obtained permission to draw water from the Tungabhadra river

back water source. A water reservoir of about 8 months capacity is provided and this

is filled up during river flood period. The availability of water from the source is found

to be adequate to meet the requirement of the industry.

5.1.3.3. EFFLUENT DISPOSAL

The effluent generated from the steel industrial complex will be treated to standards

and the treated effluent used on land for development of greenery and green belt.

The treated effluent is also used to spray on land and roads for dust suppression.

5.1.3.4. AVAILABILITY OF INFRASTRUCTURAL FACILITY

Industrial infrastructural facilities such as roads, transport, security, water, power,

administration etc. are available at the site. Community facilities such as quarters,

medical services, education and training facility etc. are available in the vicinity of the

site.

5.2 ENVIRONMENTAL FEATURES OF SITE

The area experiences a dry climate. Summer temperature is high touching 420C.

There are no eco-sensitive locations such as bio-sphere, mangrove, protected forest,

National parks etc. or environmental sensitive locations such as protected

monuments, historical places within 25 km from the site. However, Tungabhadra river

is at 5 km and back water of Tungabhadra dam is at 600-700 m from the site. The

industry has taken protective measures as per MOEF guide lines to avoid adverse

environmental consequence of the project activities on river or dam.

Page 238: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

212

5.3 TECHNOLOGY/ PROCESS The process selection is done based on the following considerations:

i. Least stress on resources including raw materials and utilities

ii. Reduce, Recycle and Reuse of wastes

iii. Least or no pollution from the industry

iv. Least or no risk to human and property

v. Least or no adverse impacts on environment

The technology options for the proposed plant were considered based on efficient

utilization of raw materials, fuel, power and water.

5.4 NO PROJECT OPTION No project option is considered mainly with respect to:

i. Utilization of natural resources

ii. Environmental impacts, harmful or beneficial

iii. Benefits of the industry to the society

The project is proposed mainly for the purpose of best utilization of existing

infrastructural facilities including land, water, manpower, roads etc. The expansion

project does not involve any additional ore. The project is mainly for value added

products such as steel and rolled products utilizing already available B.F iron. Coke

will be produced to meet the its requirement in the existing Blast furnace plant.

Oxygen and nitrogen requirement to the steel plant will be met from the proposed air

separation unit. Power plant is based on waste heat available in coke oven off-gas.

The proposed project will not cause depletion of natural resources or the significant

adverse impacts on environment. On the contrary, it will produce value added

products of national importance resources such as steel with low resource utilization.

Hence, “No Project Option” is not considered.

Page 239: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

CHAPTER -6

ENVIRONMENT MONITORING

PROGRAM

Page 240: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 241: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

213

CHAPTER – 6

ENVIRONMENTAL MONITORING PROGRAM

6.1 INTRODUCTION

The Environmental Management Plan as presented in the previous sections for

various components of the environment needs to be monitored for its effectiveness.

Regular monitoring of environmental parameters is of immense importance to assess

the status of environment during project operations. With the knowledge of baseline

conditions, the monitoring programmed will serve as an indicator for any deterioration

in environmental conditions due to operation of the project, to enable taking up

suitable mitigation steps in time to safeguard the environment. Monitoring is as

important as that of control of pollution since the efficiency of control measures can

be determined by monitoring.

6.2 ENVIRONMENTAL MONITORING AND REPORTING PROCEDURE

M/s SLR Metaliks Ltd has set up Environmental Monitoring Cell (EMC) to review the

effectiveness of environment management system during construction and

operational phase of proposed integrated steel and other associated facilities. EMC

will work out a schedule for monitoring and will meet regularly to review the

effectiveness of the EMP implementation. The data collected on various EMP

measures would be reviewed by EMC and if needed corrective action will be

formulated for implementation.

Monitoring shall confirm that commitments are being met. This may take the form of

direct measurement and recording of quantitative information, such as amounts and

concentrations of discharges, emissions and wastes, for measurement against

corporate or statutory standards, consent limits or targets. It may also require

measurement of ambient environmental quality in the vicinity of a site using

ecological / biological, Physical and chemical indicators. Monitoring may include

socio-economic interaction, through local liaison activities or even assessment of

complaints.

The preventive approach to management may also require monitoring of process

inputs, for example, type and stocks of chemical use, resource consumption,

equipment and plant performance etc.

Page 242: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

214

The key aims of monitoring are, first, to ensure that results/conditions are as forecast

during the planning stage, and where they are not, to pinpoint the cause and

implement action to remedy the situation. A second objective is to verify the

evaluations made during the planning process, in particular in risk and impact

assessments and standard and target setting and to measure operational and

process efficiency. Monitoring will also be required to meet compliance with statutory

and corporate requirements.

6.3 OBJECTIVES OF MONITORING

The Objectives of monitoring are:

Verify effectiveness of planning decisions.

Measure effectiveness of operational procedures.

Confirm statutory and corporate compliance.

Identify unexpected changes.

6.4 MONITORING METHODS AND DATA ANALYSIS

All environmental monitoring and relevant operational data will be stored in a

relational database and linked MIS system. This will enable efficient retrieval and

storage and interpretation of the data. Regular data extracts and interpretive reports

will be sent to the regulator.

6.4.1 AIR QUALITY MONITORING

6.4.1.1 STACK MONITORING

The emissions from all the stacks will be monitored regularly. The exit gas

temperature, velocity and pollutant concentrations will be measured. Any

unacceptable deviation from the design values will be thoroughly examined and

appropriate action will be taken. Air blowers will be checked for any drop in exit gas

velocity.

6.4.1.2 WORK ZONE MONITORING

The concentration of air borne pollutants in the workspace / work zone environment

will be monitored periodically. If concentrations higher than threshold limit values are

observed, the source of fugitive emissions will be identified and necessary measures

Page 243: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

215

may be taken. Methane and non-methane hydrocarbons shall be monitored in work

zone. If the levels are high suitable measures as detailed in EMP shall be initiated.

6.4.1.3 AMBIENT AIR QUALITY MONITORING

The ambient concentrations of SPM, SO2, NOX, CO and HC in the ambient air will be

monitored at regular intervals. Any abnormal rise will be investigated to identify the

causes, and appropriate action will be initiated. Green belt shall be developed for

minimizing dust propagation. The ambient air quality data should be transferred and

processed in a centralized computer facility equipped with required software. Trend

and statistical analysis should be done.

6.4.2 NOISE LEVELS

Noise levels in the work zone environment such as storage terminal, power

generating locations, etc. shall be monitored. The frequency shall be once in three

months in the work zone. Similarly, ambient noise levels near habitations shall also

be monitored once in three months. Audiometric tests should be conducted

periodically for the employees working close to the high noise sources.

6. 4.3 WATER AND WASTEWATER QUALITY MONITORING

To ensure a strict control over the water consumption, flow meters shall be installed

for all major inlets. All leakages and excess shall be identified and rectified. In

addition, periodic water audits will be conducted to explore further possibilities for

water conservation.

Methods prescribed in “Standard Methods for Examination of water and Wastewater”

prepared and published jointly by American Public Health Association (APHA),

American Water Works Association (AWWA) and Water Pollution Control Federation

(WPCF); Manual on water and wastewater Analysis published by NEERI, Nagpur are

recommended.

6.4.3.1 MONITORING OF WASTEWATER

All the Wastewater streams in the project area shall be regularly monitored for flow

rate and physical and chemical characteristics. Such analysis is carried out for

wastewater at the source of generation, at the point of influent into the wastewater

treatment plant and at the effluent point for final discharge / injection into deep

Page 244: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

216

ground. These data are properly documented and compared against the design

values for any necessary corrective action.

6.4.3.2 MONITORING OF GROUNDWATER

In order to detect any contamination of the groundwater due to leakage from any

storage tanks and other associated activities, groundwater samples shall be taken

from representative locations periodically and analyzed for necessary corrective

actions, if any.

6.4.4 LAND ENVIRONMENT

The following parameters should be monitored for land environment.

The effectiveness and constant strengthening of green belt development should

be made in and around the project site and associated facilities.

6.4.5 BIOLOGICAL ENVIRONMENT

Development of green belt with carefully selected plant species is of prime

importance due to their capacity to reduce air and noise pollution impacts by

attenuation / assimilation and for providing food and habitat for local micro and

macro fauna. This not only overcomes the problem but also enhances the beauty

of area that will attract bird and insect species and by this way ecology of the area

will maintain to great extent.

The planting of evergreen species may have certain advantages that may reduce

the environmental pollution.

Survival rate of the planted trees should be closely monitored and the trees which

not survive should be counted. Equal number of trees should be replaced and

their survival should be replaced and their survival should be closely monitored.

Treated sewage and effluent in the best combination should be used for green

belt development. The rain water harvesting should be done. Water scarcity

should not be the reason for not expanding and strengthening green belt.

6.4.6 SOCIO-ECONOMIC ENVIRONMENT

In order to mitigate the impacts likely to arise out of the proposed project and also

to maintain goodwill of local people for the proposed project, it is necessary to

take steps for improving the social environment. Necessary social welfare

Page 245: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

217

measures by the industry shall be useful in gaining public confidence depending

on local requirement.

Some basic amenities, viz. education, safe drinking water supply, regular medical

check up in the villages may be taken up.

Formal and informal training to be provided to the employees of the effected

villages due to the project shall be taken up on priority basis. Job oriented skill

training, courses may be organized.

Personal protective facilities like helmets, safety (gas) mask / safety dress, shoes

etc. to be ensured for all workers, engaged in operation of process units within

terminal complex.

6.5 REPORTING SCHEDULES OF THE MONITORING DATA

It is proposed that voluntary reporting of environmental performance with reference to

the EMP should be undertaken. The environmental monitoring cell shall co-ordinate

all monitoring programmers at site and data thus generated shall be regularly

furnished to the state regulatory agencies. The frequency of reporting shall be on six

monthly basis to the local SPCB officials and to regional office of MoEF. The

Environmental Audit reports shall be prepared for the entire year of operations and

shall be regularly submitted to regulatory authorities. The frequency of monitoring and

the parameters to be analysis etc. is presented in Table- 6.1

6.6 INFRASTRUCTURE FOR MONITORING OF ENVIRONMENTAL PROTECTION

MEASURES

Monitoring of environmental components during operation phase is a part and parcel

of the environmental mitigation measures. Only frequent monitoring can assess the

functioning and efficiency of all pollution control equipment. Thus the project

proponent has to establish a separate full-fledged environmental laboratory to monitor

air, water, noise level in the plant. Monitoring activity is mainly envisaged for stack

emission, raw water quality, treated effluent quality to analyze the performance of

effluent treatment plant, noise level in the working areas. SLR Metaliks Ltd has

already established and managed environmental monitoring plan. This will be suitably

improved to include the additional scope defined due to the expansion project.

Page 246: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

218

A well-equipped laboratory with consumable items shall be provided for monitoring of

environmental parameters in the site. Alternatively, monitoring can be outsourced to a

recognized reputed laboratory. The following equipment and consumable items shall

be made available in the site for environmental monitoring.

Air quality and Meteorology

High volume samplers, Stack monitoring kit, Respirable Dust sampler, Central

Weather Monitoring Station, Spectrophotometer (Visible range), Single pan balance,

Flame photometer, Relevant chemicals as per IS:5182.

Water and Wastewater Quality

The sampling shall be done as per the standard procedures laid down by IS:2488.

The equipments and consumables required are:

BOD incubator, COD reflex set-up, Refrigerator, Oven, Stop watch, Thermometer, pH

meter, Distilled water plant, pipette sets, Titration set, Dissolved Oxygen Analyzer,

Relevant chemicals.

Noise Levels

Noise monitoring shall be done utilizing an integrating sound level meter to record

noise levels in different scales like A-weighting with slow and fast response options.

6.7 SAMPLING SCHEDULE AND LOCATIONS

Systematic monitoring of various environmental parameters is to be carried out on

regular basis to ascertain the following

i. Pollution status within the plant and in its vicinity.

ii. Generate data for predictive or corrective purpose in respect of pollution.

iii. Effectiveness of pollution control measures and control facilities.

iv. To assess environmental impacts.

v. To follow the trend of parameters which have been identified as critical;

The environmental quality monitoring program shall be carried out in the impact

zones with suitable sampling stations and frequency for the parameters identified. For

conventional pollutants the methods prescribed in “Standard methods for Water and

Wastewater Analysis” published by APHA, AWWA & WPCF should be strictly

adhered. Environmental monitoring schedules are prepared covering various phases

Page 247: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

219

of project advancement, such as constructional phase & regular operational phase.

Post Project Monitoring Plan with environmental attributes and schedule of monitoring

is given in Table 6.1.

Table 6.1: Post project monitoring schedule

Sl.

No. Particulars Location

Frequency &

Duration

Parameters

1 Metereology 1 No. at site

Continuous

using auto

weather

station

Max. & Min.

Temp., Rain

Fall, Rel.

Humidity, Atm.

Pr., Wind Dir. &

Speed,

2 AIR QUALITY

2.1 Ambient air quality

2 no.s downwind

direction and one

each in upward and

crosswind direction.

24 hr., 2

consecutive

working days

a week, ,

PM, SO2, NOX,

CO, HC

2.2 Stack emission Sampling port of

Stack

Once a

Month

PM, SO2, NOX ,

CO, HC (non

methane),

Temp. Velocity,

Temp.

2.3 Fugitive emissions

At specified locations

( crusher, screen,

loading, unloading)

Once a

Month

SPM

3 WATER QUALITY

3.1 Ground water 6 Locations Monthly

Physico-

chemical,

3.2 Ground water near

solid storage area Specified Locations Quarterly

Physico-

chemical with

heavy metals,

3.3 Surface water 2 location at each

source Monthly

Physic-

chemical, Org.,

Bacteriologic.

3.4

Surface water

(susceptible to

contamination)

At each source Quarterly

Physic-

chemical, Org.,

Bacteriologic.

& heavy metals

6 Effluent water At inlet and out let of

ETP Daily

Physic-

chemical, Org.

& heavy metals

and as

Page 248: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

220

specified by

KSPCB

5 Soil 6 Locations at &

around premise

Pre & post

monsoon

Physic-

chemical, Org.

& heavy metals

7

Noise level, work

zone

(hourly)

12 specified

locations (Crusher,

screen, Turbine

house, At fans &

compressors, Rolling

mill.)

Once a

month

Day & Night

noise level

8 Water utilization,

m3/d

For process,

domestic, cooling

and boiler

Daily

m3

9 Power utilization

For air pollution

control facility (ESP)

and for ETP

Daily

KWH

10 Health Check All plant personnel Yearly As specified by

authorities

11 Traffic density

12 Socio-economic

status

13 Ecological Green belt Seasonal Survival rate

6.8 COMPLIANCES TO ENVIRONMENTAL STATUTES

This industry is law-abiding and the Environmental Statutes are proposed to be

complied with letter and spirit.

1) Carrying out “Environmental Audit Statement” of various environmental aspects,

review the environmental policies with the help of experts and make the up

gradation /changes accordingly.

2) Submission of the “Environmental Statement” to the State Pollution Control Board

in Form V under Rule 14 of the Environment (Protection) Second Amendment

Rules 1992 of the Environment (Protection) Act, 1986.

3) Renewal of Consent to Operate under the Water and Air Acts.

4) Filing the Cess returns to the State PCB under the Water (Prevention and Control

of Pollution) Cess Act, 1977.

5) Renewal of the Hazardous Waste Authorization under sub-rule 3 of the

Hazardous Waste (Management and Handling) Rules, 1989.

6.9 MONITORING OF COMPLIANCES TO STATUTORY CONDITIONS

Environmental clearance from KSPCB and MOEF is always accompanied by the

specified terms and conditions. Necessary measures are taken to comply with these

Page 249: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

221

conditions. Environmental Cell and the associated staff will monitor the compliances

regularly.

6.10 FINANCIAL ALLOCATION FOR ENVIRONMENTAL ASPECTS

Table 6.2: Financial allocation/budgetary provisions for environmental management aspects

Sl.

No. Particulars

Amount,

Rs. in Lakhs

1

Capital Investment on EMP facilities

3174.00

Air pollution control

Water pollution control

Laboratory and monitoring

Green belt & greenery development, rain water

harvesting, landscape development, health chekup of

employees and contractors

Environment awareness programs 200.00

Total EMP cost 3374.00

2

Recurring Cost of Operation and Maintenance

318.00

Air pollution control

Water pollution control

Greenery, water harvesting and land scape

maintenance

Laboratory & Monitoring of Environmental Quality

Total recurring cost 318.00

6.11 SUCCESS INDICATORS The success of the sincere and honest efforts put in, will be judged by various

indicators, such as –

1. No complaint from the villagers regarding transfer of lands.

2. No complaint f rom the customers regarding quality of product and delivery

schedule.

3. No complaints from Government or Non-Government Authorities and Public.

4. Statistics of Health, Safety and Environment maintained.

5. Other Promoters come to seek our advice.

Demonstration to others for rainwater harvesting, environmental status report,

environmental statements (annually), cess returns (monthly), groundwater

recharging, sand-substitute ash, plastic-free packing, care for disabled etc.

Page 250: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 251: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

CHAPTER -7

ADDITIONAL STUDIES

Page 252: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 253: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

222

CHAPTER 7

ADDITIONAL STUDIES

7.1 PUBLIC HEARING AND CONSULTATION

M/s SLR Metaliks Ltd are presently, operating an iron making industry consisting of

one 262 cubic meter capacity Blast Furnace with 2, 00 ,000 TPA.pig iron production

along with a 33 m2 Sinter Plant with 3,31,000TPA. Surplus Blast Furnace Gas is

being utilized to produce 6 MW of electrical power. The industry is located at

Narayanadevarakere village, Hagaribommanahalli Taluk, Bellary District, Karnataka

State. All the units are fully operational. The plant at present produces pig iron for use

in steel making and foundries.

M/s SLR Metaliks propose to improve viability of the existing project by the addition of

facilities for the production of value added downstream products with ready market

opportunity such as alloy steel, rolled steel products, metallurgical coke, coke oven

gas based power producer gas plant pulverized coal injection and oxygen in the

existing steel industry.

Expert Appraisal Committee(Industry), MOEF, GOI, New Delhi during their meeting

held during 28-30th November, 2013 has specified TOR and scoping for EIA studies

and preparation of EIA report (vide F.No.J-11011/257/2013-IA-II(I)) . Further, they

have advised the company to approach KSPCB along with Draft EIA Report for

conduct of Public Hearing. Accordingly, the company has conducted EIA studies

and draft EIA report prepared and approached KSPCB, Bangalore with a request to

arrange the Public Hearing.

The Company will participate in the public hearing and make presentation of the

proposed project. The observations made by the public will be attended and

incorporating the same final EIA Report will be prepared for submission to MOEF

GOI New Delhi.

7.2 RISK ASSESSMENT 7.2.1 PURPOSE An industry with its complex nature of activities involving various plant machineries,

raw materials, products, operations, intermediates and environmental discharge has

a number of associated hazards. A minor failure can lead to major failure resulting

Page 254: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

223

into a disaster causing heavy losses to life, property and environment. Risk

assessment studies are being conducted to ensure safety and reliability of any new

plant, through systematic and scientific methods to identify possible failures and

prevent their occurrences before they actually cause disasters and production loss.

7.2.2 OBJECTIVES

The distillery involves storage and handling of large quantity of ethanol which is

flammable and explosive under unfavorable situations. To ensure safe operation of

the plant, it is proposed to carry out the Risk Analysis Study with the following

objectives

1. To identify the major hazards relating to fire, explosion and toxicity due to

storage and handling of hazardous chemicals.

2. To visualize maximum credible accident scenarios

3. To analyze and quantify primary and secondary effects and damage

potentials of the identified maximum credible accident scenarios using

standard procedure.

4. To study the nature of exposures, pathways and consequences of

maximum credible accident scenarios and characteristics of risk levels.

5. To provide guidelines for disaster management plan.

Risk assessment studies have been carried out to assess the worst case scenarios of

the plant operations to formulate an emergency management plan.

7.3 DISASTER MANAGEMENT PLAN (DMP)

A comprehensive DMP that will be implemented in the industry as presented below.

7.3.1 OBJECTIVES

• To localize the emergency

• To minimize the consequences

• To ensure that following concepts are considered, namely rescue, first aid,

evacuation, rehabilitation, spreading the information.

7.3.2 ELEMENTS OF ON-SITE EMERGENCY PLAN

• Assess the size of event

• Plan formulation and liason

Page 255: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

224

• Actions like: Raise alarm, communication within and outside

• Appoint key personnel and deploy. Appoint Controller.

• Emergency Control Center

• Action on site

• Action off-site.

• Alarm and visual signals at strategic points, first alert sent to Incidence

Controller.

7.3.3 ORGANIZATION

Table 7.1 Organization Chart

Chief Controller of Disasters (Factory General Manager)

Team-1 Team-2 Team-3 Team-4 Team-5 Team-6

Area Co-Ordinator

Medical Co-Ordinator

Material Co-Ordinator

Fire-Safety Co-Ordinator

PR Co-Odinator

Security Co-Ordinator

plant Manager

Chief Chemist

Civil Engineer

Power plant Manager

HR Manager

Security Officer

7.3.4 DUTY ALLOCATION

1. Chief Disaster Controller (Chief Operating Officer)

• Take control and declare emergency

• Be there

• Contact Authorities

2. Area Co-ordinator

• Take steps. Make emergency shut-down of activities. Put everything in

safe condition.

• Evacuate.

• Commence initial fire-fighting, till Fire Department comes to take up.

• Identify materials requirements and call Material Manager.

3. Medical Co-ordinator

• Establish Emergency Center, Treat affected persons, Transfer/Remove

Patients

• Assign and Deploy staff

• Contact Authorities

Page 256: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

225

4. Material Co-ordinator

• Dispatch necessary supplies

• Arrange purchases

5. Fire & Safety Co-ordinator

• Overall incharge for Fire and Safety.

• Coordinate with area coordinator and direct the operations

• Cordinate with City and other fire-tenderers.

6. PR & Security Co-ordinator

• Remove crowd

• Arrange gate security

• Contact Police

• Arrange evacuation

• Contact outside Agencies if asked.

• Handle news media

• Mobilize vehicles

• Arrange food, clothing to Officers inside.

7. Emergency Control Center

• Adequate Internal phones

• Adequate external phones

• Workers tally

• Map showing hazardous storages, fire horns, safety equipments, gates and

side gates, assembly points, list of persons.

8. Action on Site

• Evacuate. Non-essential people first at assembly point

• Persons accounting

• Record of next-of-kin

• Public relations

9. Post Disaster Analysis

• Why it happened?

• Whether on-site operations failed? In what respect?

• How to avoid such failure in future?

Page 257: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

226

• Report to be submitted in detail to Authorities.

• Compensation arrangements if any, commenced?

• Call suggestions on shortfalls observed.

• Give rewards openly, pull defaulters individually.

7.4 INDUSTRIAL HAZARDS AND SAFETY

Maintenance of occupational safety and health is very closely related to productivity

and good employer-employee relationship. The plant will be operated in compliance

with all applicable safety and health laws and regulations. For occupational safety

following measures will be incorporated in the proposed plant.

7.4.1 HAZARD IDENTIFICATION

Safety Audit will be conducted by qualified technical personnel to study the

installation and activities of the industry and to suggest measures to protect

personnel and property against the risks. The areas of possible hazardous incident

are given for follow up action:

i. Fire in coal & coke storage yard, and diesel storage tanks.

ii. Electric Short circuit and consequent fire accident.

iii. Any likely sort of explosion in Boiler area

iv. Puncture of Boiler tubes.

v. Bursting of pipeline joints.

vi. Fall from high level structures

i. Fire in Coal & Coke storage yard & Diesel storage tank

This may occur on account of external cause. Both coal & coke have very high flash

point and do not catch fire at normal temperatures. Coal/Coke fires are slow

progressive in nature and are controlled by simply by spraying plenty of water .

ii. Short circuit and consequent fire accident

The electrical short circuit may happen in any of the plant area due to poor insulation

of the equipments.

iii. Explosion Hazard

Page 258: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

227

Explosion is expected due to bursting of high pressure equipments like boiler, turbine

and pipe lines. The water required for Boiler is pumped and transferred to the boiler

by using high-pressure pumps. Also the high-pressure steam generated in the boiler

is sent to the turbine through the pipeline. This pipeline will have flanged joints, with

sandwich gaskets in between for better sealing. At times, due to water hammering

this gasket fails and leads to bursting of the flange joint.

7.4.2 FIRE FIGHTING FACILITIES

a. Water hydrant system

Fire hydrant system with hose pipe of 7 kg/cm2 pressure with hydrants are located

at in coke & coal storage yard and near diesel storage tank

A jockey pump and accessories. 50 m3/hr at 90 m head

Corrosion protected M.S. underground piping 150 mm dia. and 100 mm all

around the plant as closed loop

8 nos. single headed hydrants distributed around the plant at about 30 m

spacing to supply pressurized water for fire fighting.

10 nos. M.S. hydrant nose cabinet adjacent to each cabinet.

b. Fire extinguishers

Foam water : 2 each at main office and store.

CO2 type : 6 nos. one each at departmental office

and electrical installations.

DCP type : 8 nos. each at coke oven plant Sand buckets

: At different locations

c. Fire protective appliances

Two sets of fire safety appliances each consisting of following units are located at

store and alcohol storage, respectively.

Face masks & gas masks (2),

Face shield (2),

Helmet (6),

Safety belts (2),

Safety ladder (1)

Page 259: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

228

d. Fire brigade

Fire brigade facilities available at H.B Halli will be utilized whenever need arises.

7.5 ON-SITE MANAGEMENT PLAN

The On-Site emergency plan will be circulated to all concerned members of

emergency teams. It is essential that all concerned familiarize themselves with the

overall on-site emergency plan and their respective roles and responsibilities during

and in emergency. They should also participate regularly in the mock drills that will

be conducted so as to keep themselves and the emergency organization in a state

of perpetual preparedness at all times to meet any emergency.

7.5.1 OBJECTIVES, SCOPE AND CONTENTS OF ON-SITE EMERGENCY PLAN

Objectives of Emergency Planning are to maximize the resource utilization and

combined efforts towards emergency operations and would broadly cover the

following.

1. To localize the emergency and if possible eliminate it.

2. To minimize the effects of accidents on people and property.

3. To take remedial measures in the quickest possible time to contain the

incident and control it with minimum damage.

4. To mobilize the internal resources and utilize them in the most effective

way.

5. To get help from the local community and government officials to

supplement internal manpower and resources.

6. To minimize the damage in other sections.

7. To keep the required emergency equipment in stock at right places and

ensure that they are in working condition.

8. To keep the concerned personnel fully trained in the use of emergency

equipment.

9. To give immediate warning to the surrounding localities in case of an

emergency situation arising.

10. To mobilize transport and medical treatment of the injured.

11. To educate the public in the surrounding villages regarding hazards.

12. To arrange for rescue and treatment of casualties.

13. To safe guard the people.

Page 260: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

229

14. To identify the causalities and communicate to relatives.

15. To render necessary help to concerned.

16. To rehabilitate area affected.

17. To provide information to media & government agencies

7.5.2 SCOPE OF ONSITE EMERGENCY PLAN

The plan covers information regarding the properties of the Industry, type of

disasters and disaster/accident-prone zones, the actual disaster control plans

with authority delegation, controlling and other details. General details like

location, project layout, neighboring entities and the assistance they can render etc.,

are also provided.

The important elements considered in this plan are

Statutory requirements

Emergency organization

Roles and Responsibilities

Communications during emergency

Emergency shutdown & control of situation

Rescue & Rehabilitation

Emergency facilities

Important Information

The primary purpose of the on-site emergency plan or DMP is to control and contain

the incident and to prevent them from spreading. It is not possible to cover every

eventuality in the plan and the successful handling of the emergency will depend on

appropriate action and decisions being taken on the spot. Other important aspects

needing to be considered include the following:

7.6 EMERGENCY

A major emergency in any situation is one, which has the potential to cause

serious injury or loss of life, which may cause extensive damage to the structures in

the vicinity and environment and could result in serious disruption to normal

operation both inside and outside the industry premises. Depending on the

magnitude of the emergency, services of the outside agencies may also be required

for supplementing the internal effort to effectively handle the emergency and to

contain the damage.

Page 261: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

230

The Management has to take effective steps to assess, minimize and wherever

feasible eliminate the risks to a large extent. Accidents may still occur and it is

necessary to be fully prepared to tackle all such emergencies if and when they

occur.

It is likely that the consequences of such emergencies will be confined to the

units concerned or may affect outside. If the consequences are confined within the

plant boundary, it is then termed as On Site Emergency and will be controlled by

Chief Emergency Controller.

In order to generate the plans it is necessary to first determine the kinds of

accidents leading to an emergency that can occur in the industry. The most

widely used technique in practice is based on experience accumulated over many

years and safety audits.

7.6.1 METHODOLOGY

The considerations in an emergency planning include the following: -

1. Identification and assessment of hazards and risks

2. Hazard, consequence analysis

3. Alarm and communication procedures

4. Identifying, appointment of personnel & assignment of responsibilities

5. Identification and equipping Emergency control centre, Identifying Assembly,

Rescue points, Medical facilities.

6. Emergency preparedness plan, procedures, steps to be taken before, during

and after emergency.

7. Formulation of plan and emergency sources.

8. Training rehearsal, evaluation and updating the plan.

7.6.2 STRUCTURE OF EMERGENCY MANAGEMENT

a. Noticing the accidents

b. Informing declarer of emergency

c. Declaration of emergency

d. Functions of declarer

e. Interaction with outside agencies

Page 262: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

231

f. Emergency action plan & chart

g. Emergency action plan

h. In case of major emergency, the steps to be taken immediately by various

agencies are all follows.

Sl. No Step to be taken Agency

01 Noticing of emergency situation Operator / Supervisor

02 Assessment of Situation Section haed

03 Information to emergency Declarer HOD

04 Plant siren for declaring emergency depending on situation

Emergency Declarer

05 Shutdown of equipments /Plant Shop Head

06 Assessment of impact and organizing control measure

Incident / Site Controller

07 Proper function of control rooms Emergency controller

08 Co-ordination with outside agencies GM – HR

09 Control measures at site

(Rescue, evacuation, Fire Fighting etc.)

Incident Controller

10 Seeking help from outside, nearby factories.

Incident controller & safety Head

11 All clear Signal ( After controlling emergency situation)

Emergency Declarer

7.6.3 INFRASTRUCTURE AT EMERGENCY CONTROL CENTRE

Emergency control centers should therefore contain the following

An adequate number of external telephones; if possible, one should accept only

outgoing calls, in order to bypass jammed switchboards during an emergency.

An adequate number of internal telephones

Radio equipment

A plan of the works, to show:

Areas where there are large inventories of hazardous materials.

Sources of safety and first aid equipment.

The fire-fighting system and additional sources of water.

Site entrance and roadways, including up-to-date information on road Traffic.

Assembly points.

Page 263: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

232

Vehicle parking and rail sidings.

Additional work and layout plans detailing alternate routes and affected areas,

during an emergency.

Note pads, pens and pencils.

A nominal role of employees.

A list of key personnel, with addresses, telephone numbers, etc.

The emergency control center should be sited in an area of minimum risk.

Suitable location from where clear view of the plant is possible or the control room

can be designated as Emergency Control Center. All the Site Controller/ Incident

Controller Officers, Senior Personnel would be located here or have access to the

ECC.

7.6.4 EMERGENCY MEDICAL FACILITIES

Stretchers, gas masks and general first aid materials for dealing with chemical

burns, fire burns, etc., would be maintained in the medical center as well as in the

Emergency Control Room. A range of medicines should be maintained in the ECC/

Medical Center. Breathing apparatus and other emergency medical equipment

should be provided and maintained.

The Medical Center should display poster for treating burns and first aid. Some

medicines and facilities to be kept in the medical center are suggested. The list is

indicative and the qualified doctors of the medical center should use their

professional judgment for medical treatment.

7.7 IDENTIFICATION AND ASSESSMENT OF HAZARDS

This stage is crucial to both on-site and off-site emergency planning and requires

systematic identification of all possible emergencies that could arise in the plants.

These should range from small events, which can be dealt by plant personnel

without any help from external agencies to the largest event that would require

outside help. To tackle such emergencies effectively, it is essential to have clear-cut

action plan. Experience has shown that for every occasion that the full potential of

an accident is realized, there are many occasions when some lesser event

occurs or when developing incident is made safe before reaching full potential.

Page 264: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

233

Table 7.2 IDENTIFIED HAZARDS

Equipment Process Potential Hazard

Provision

BF Reduction of Iron Ore

Explosion, Gas leakage – air pollution

Gas leakage detection system, Strict follow up of Std Operating Practices

Blower House Generation of blast Noise Proper selection of machinery. Remote controlled, ear mufs

Stoves Pre heating of blast Gas leakage, Fire & Explosion

Safety inter-locking, gas detectors. Fire extinguishing cylinders

RMHS Raw material handling & transportation

Dust Closed system, dust extraction system / dry fog dust suppression system.

GCP – Dry type Cleaning of BF gas Dust & Gas leakage

Gas detector system, Fire extinguishing cylinders

Pump House Water pumping Noise Remote control system. Proper selection of m/c.

Compressor House Generation of compressed air.

Usage of compressed air for human body cleaning

Creation of awareness & training.

Pig casting machine

Pigging High ambient temperature . Spurting of HM.

Isolation, barricading, engg controls. Std operating practices.

Equipment Process Potential Hazard

Provision

Sinter Plant Crushing & Sintering Excess heat Isolation & unmanned operation

Power Plant Power generation Explosion, electric shocks. Steam leakage.

Safety inter locking, gas leakage detector system, Electrical safety gadgets & training. Insulation.

Page 265: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

234

Switch Yard Receiving SS for voltage step down

Fire, electric shock

All electrical fittings and cable are provided as per the specified standards. Barricading. Restricted entry. Protection sys. Earthing. Smoke detectors. Switch Yard control

room ---- Fire in cable

galleries and switch

Sinter Plant Crushing & Sintering Excess heat Isolation & unmanned operation

Power Plant Power generation Explosion, electric shocks. Steam leakage.

Safety inter locking, gas leakage detector system, Electrical safety gadgets & training. Insulation.

Switch Yard Receiving SS for voltage step down

Fire, electric shock

All electrical fittings and cable are provided as per the specified standards. Barricading. Restricted entry. Protection sys. Earthlings. Smoke detectors. Switch Yard control

room ---- Fire in cable

galleries and switch

Table 7.3 Identified Occupational Health Hazards

Type of Hazard

Areas Preventive / Mitigation measures

Dust Raw material

handling &

storage yard

Will be transported in the trucks with tarpaulin covers.

Envisaged to install a truck tippler. Water sprinklers in the

yard. Covered conveyor belts for RM feeding to RMHS

bunkers as well to BF. Pneumatic conveyor for dust

handling from Dry GCP to Sinter. Providing personnel

protective equipments like respirators, caps, and aprons.

Development of greenery all around the yard. Developing

Roads, asphalting etc.

Noise Blower house,

ID fan house,

Turbine hall, Air

compressor

house, DG &

Selection of equipments confirming to standards. i.e. <

90dBA at 1 mtr distance. All these areas will be unmanned

due to high level automation. Suitable Ear muffs will

provided to the workers during inspections.

Green belt corridor will be developed along the periphery

Page 266: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

235

Pump houses. of the plant.

Extreme

Heat

Cast house, Pig

Casting M/c,

Sintering plat

form,

Steam piping

Providing proper PPE like leg guards with shoes, Face

shield, leather hand gloves, Leather Aprons, helmets etc.

Thermal insulation for steam line. Providing fans,

personnel cooling devices, water showers etc.

BF Gas –

CO

BF Top, Stove,

GCP, Cast

house, Sinter

plat form, Boiler.

Online gas detector systems will be installed in addition to

portable CO monitors. O2 masks & kits will be provided.

7.8 RISK ANALYSIS

Steel plant being hazardous industry, it is expected to harbor major hazards which

warrant for a details Risk analysis study. Talking in to account the fact that the plant

is handling Toxic gases, molten metal, fuel oils & chemical the Risk analysis is made.

The Risk analysis is made both for existing plants & future projects.

Risk analysis purpose:

Risk analysis will help to identify & quantify the area of strengths & weakness &

provide actions for controlling risks & provide a basis for developing safety programs

& fire prevention & protection measures.

Risk analysis involves study of:

i) Identification of major hazards.

ii) Identifying failure scenario of release of gas or situations such as spillage of

chemicals or leakage of molten metal etc.

iii) Carrying out of effect and damage calculations.

Page 267: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

236

iv) Deciding who are at risk – employees, contractors, visitors etc.,

v) Evaluate the risk in terms of likelihood & severity.

vi) Deciding whether the existing precautions / measures are adequate.

Method of Risk assessment:

i) This includes studying various hazards and control measures adopted to prevent

accidents. Wherever possible the estimation of DOW Explosion and toxicity Index

were also done in addition to PHA and other studies.

ii) Maximum Credible Scenario (MCA) with a maximum damage potential is studied.

iii)Dow Fire and Explosion Index: Index helps to categorize the hazardous

substances into lower or higher hazard potential and help to design safety measures

for storing and handling.

For determination of Toxicity and Fire and Explosion Index, the various factors are

considered.

a) Material Factors :Fire load, Flash point, Flammability, heat of Combustion,

Vapor pressure

b) General Process Hazards: Exothermic, endothermic reactors, process involving

mixing, burning, charging etc.

c) Special process hazards: Process Temperature, Pressures, Operation, correction,

Erosion etc, Engineering Judgment, Analysis of past accidents are also taken into

consideration.

Risk identified in iron & steel plant:

The risks involved in operation & maintenance of an integrated steel plant are

broadly classified in to following categories.

1. Mechanical Risks.

2. Electrical Risks.

3. Fire & explosion Risks.

Page 268: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

237

4. High/low temperature exposure risks.

5. Toxic gases exposure risks.

6. Corrosive/reactive chemical exposure risks.

1. Mechanical & Electrical Risks

These two types of risks are of universal nature associated with any industrial activity

not specific to a particular plant & process.

Mechanical risks are generally encountered with injuries to head, limbs, eyes etc.

Usually as a result of negligence on the part of operating or maintenance personnel

in the use of improper tools, bypassing safety procedure, neglect of personal

protective wear & risk associated with rotating machinery.

Electrical risks which results in shock or burns are most of them a consequence of

poor maintenance, handling by unauthorized personnel & use of improper /

substandard electrical equipment for cables.

The above two types of risks normally do not cause Emergency situation.

2.Other types of Risks such as Fire & explosions, Toxic gas release, Chemical spills

involve the handling of molten metal, fuel oils, toxic gases & chemicals can create

emergency situations.

3.The details of materials involved, emergency scenario, consequence of incidents,

employee’s exposure & the level of risk associated with these activities are given in

summary of Risk analysis.

Table 7.4 Summary of Risk Analysis.

Sl. No

Scenario Envisaged Risk / causes Consequence Probability Of occurrence

1. Release of Toxic gas such as BF gas & coke oven gas

Inhalation of “CO”

Health Hazard (Unconsciousness etc.)

Occasional

2. Fire in fuel oil storage Ignition of Oil Major Fire Occasional

3. Catastrophic Rupture of LDO / FO storage Tank

Ignition of LDO / FO oil

Jet fire Remote

4. Chemical spills (HCl / FO storage Tank)

Ignition of LDO / FO oil

Exposure to corrosive Fumes of HCL & H2SO4 & chemical burns

Remote

5. Bursting / Explosion of LPG Ignition of gas Explosion & injuries to Remote

Page 269: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

238

/ Acetylene cylinder men working

6. Molten metal explosion in Blast furnace & SMS

Puncture of ladle / furnace shell

Explosion & injuries to men working

Remote

7. Fire in Underground Cable galleries

Insulation failure & short circuit

Major Fire Remote

8. Boiler Explosion Over pressure due to failure of safety devices

Pressure wave / missile effect of exploded pieces

Remote

9. Catastrophic rupture of steam line

Over pressure Burns to Personnel Remote

7.9 RISK MANAGEMENT MEASURES

The risk management measures for the proposed project activities require adoption

of best safety practice at the respective construction zones within the works

boundary. In addition, the design and engineering of the proposed facilities will

take into consideration of the proposed protection measures for air and water

environment. The detailed risk management measures are listed below;

7.9.1 FURNACE

1. PREVENTIVE MEASURES

If any job is to be undertaken in EOF & BOF areas where the EOF & BOF gases

are toxic, the following procedure has to be laid down to ensure safety of men and

the equipment.

a) Gas Safety man will accompany the team and will test the atmosphere for the

presence of CO, before starting the work.

b) If `CO' concentration is found exceeding the safe limit, the job will be

undertaken using necessary safety appliances viz., Oxygen Breathing

Apparatus/ Blower type Gas mask.

c) Any gas cutting/welding job will be undertaken with the clearance from Gas

Safety man.

2. GAS EXPLOSION, PREVENTION & PREVENTIVE MEASURES

The following actions will be taken to prevent any gas explosions in case of gas

leakage.

Page 270: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

239

1. For jobs on gas lines/equipment, non-sparking copper tools will used. If such

tools are not available, grease coated steel tools will be used. Electrical drill &

other electrical equipment will not be used as these can give rise to sparks.

2. The gas line will be thoroughly purged with steam before undertaking the job on

the same.

3. Naked lights will not be used near any de-pressurized gas main or equipment

unless the same has been thoroughly purged.

4. In case of profuse leakage of gas, action will be taken for water sealing and

isolating that portion.

5. The approach road to the gas line complex will be kept free from any

obstructions.

6. If gas catches fire due to some leakage, it will be extinguished with plastic clay,

steam or water. The portion of gas main affected will be cooled down with water.

The valve will not be closed when fire is still there and the pressure in the main

will be maintained at minimum 100 mm (WC).

7. Gas tapping points of flow or pressure measurement will be cleaned with

wooden stick or grease coated wire.

8. If lighting is necessary near gas line, portable spark proof electric lamps of low

voltage or explosion proof torchlight will be used for enclosed areas.

7.9.2 HOT METAL & SLAG

Sudden break out of molten metal & slag may result in heavy explosions, due to

their coming in contact with water, thereby causing serious burn injuries to persons

and damage to equipment.

1 PREVENTIVE MEASURES

1. Any accumulation of water will be prevented in such vulnerable areas.

2. In case of minor leakages, the flow of molten metal & slag will be controlled.

3. If there is major breakout, the area will be cut off and cordoned.

4. Vital connections e.g. water, gas, compressed air, oxygen etc. will be cut off or

regulated, as per requirement.

Fire water sump and its details are explained in the earlier chapters.

Page 271: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

240

7.9.3RESPIRATORY HAZARDS

1 DUST AND GASES

Dust generated in integrated pig iron complex includes iron and metallic dusts,

which are mainly present in BF, continuous casting buildings and sinter plants; and

mineral dusts which are mainly present in raw material storage, BF. In the former

case, workers may be exposed to iron oxide and silica dust that can be

contaminated with heavy metals such as chromium (Cr), nickel (Ni), lead (Pb), and

manganese (Mn), zinc (Zn), and mercury (Hg). The most significant is the dust

present in the melting and casting processes (e.g. BF, continuous casting), where

the dust, which is generated by high temperature operations, is finer and more

easily inhaled than in the rolling processes. In raw material storage, blast furnace

and coke oven plant, workers are exposed to mineral dust, which may contain heavy

metals. In addition, BF tapping results in graphite release.

In the melting and casting processes where high temperature operations are

conducted, workers may be exposed to gas inhalation hazards, which may

contain heavy metals. In the BF, workers may be exposed to gas inhalation hazards

of carbon monoxide. To prevent exposure to gas and dust, the steps taken

include the following:

Sources of dust and gases will be separated and enclosed;

Designing the facility ventilation to maximize air circulation. Outlet air will be

filtered before discharge to the atmosphere;

Exhaust ventilation will be installed at the significant point sources of dust and

gas emissions, particularly the BF topping area

Providing a sealed cabin with filtered air conditioning if an operator is needed

in a contaminated area;

Providing separated eating facilities that allow for washing before eating;

Providing facilities that allow work clothes to be separated from personal

clothes, and for washing / showering after work;

Implementing a policy for periodic health checks.

Respiratory hazard control technologies will be used when exposure cannot be

avoided with other means, such as manual operations such as grinding or use of

non-enclosed machine-tools; and during specific maintenance and repair operations.

Necessary steps/ precautions for respiratory protection include the following:

Page 272: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

241

Use of filter respirators when exposed to heavy dust (e.g. fettling works);

For light, metallic dust and gases, fresh-air supplied respirators will be used.

Alternatively, a complete facial gas mask (or an “overpressure” helmet) may

be used, equipped with electrical ventilation;

For carbon monoxide (CO) exposure, detection equipment will be installed to

alert control rooms and local personnel. In case of emergency intervention in

areas with high levels of CO, workers will be provided with portable CO

detectors, and fresh-air supplied respirators.

7.9.4 HEAT AND HOT LIQUID

High temperatures and direct infrared (IR) radiation are common hazards in pig iron

complexes. High temperatures can cause fatigue and dehydration. Direct IR

radiation also poses a risk to sight. Potential contact with hot metal or hot water may

occur from the cooling spray zone of continuous casting, from splashes of melted

metal, and from contact with hot surfaces. Precautionary measures for prevention

and control of exposure to heat and hot liquids / materials include the following:

Shielding the surfaces where close contact with hot equipment or

splashing from hot materials is expected (e.g. blast furnaces, BOF, continuous

casting and heating oven, and ladles);

Implementing safety buffer zones to separate areas where hot materials and

items (e.g. billets, thick slabs, or ladles) are handled or temporarily stored. Rail

guards around those areas will be provided, with interlocked gates to control

access to areas during operations;

Using appropriate PPE (e.g. insulated gloves and shoes, goggles to protect

against IR and ultraviolet radiation, and clothing to protect against heat radiation

and liquid metal splashes);

Installing cooling ventilation to control extreme temperatures;

Implementation of work rotations providing regular work breaks, access to a

cool rest area, and drinking water.

7.9.5 PHYSICAL HAZARDS

Precautions for the prevention and control of general physical hazards are

presented below.

Page 273: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

242

Potential physical hazards in pig iron complex operations are related to handling of

large and heavy raw materials and product (e.g. blast furnace and storage and

movement of billets and thick slabs, movement of large ladles containing molten

metal); heavy mechanical transport (e.g. trains, trucks and forklifts); grinding and

cutting activities (e.g. contact with scrap material ejected by machine-tools); and

work at heights (e.g. platforms, ladders, and stairs).

7.9.6 HEAVY LOADS / GRINDING & CUTTING / ROLLING

Lifting and moving heavy loads at elevated heights using hydraulic platforms and

cranes presents a significant occupational safety hazard in pig iron plant. Measures

taken to prevent and control potential worker injury include the following;

Clear signage in all transport corridors and working areas;

Appropriate design and layout of facilities to avoid crossover of different

activities and flow of processes;

Implementation of specific load handling and lifting procedures,

including:

o Description of load to be lifted (dimensions, weight, position of center of

gravity)

o Specifications of the lifting crane to be used (maximum lifted load, dimensions)

o Train staff in the handling of lifting equipments and driving mechanical

transport devices

The area of operation of fixed handling equipment (e.g. cranes, elevated

platforms) will not cross above worker and pre-assembly areas;

Material and product handling will remain within restricted zones under

supervision;

Regular maintenance and repair of lifting, electrical and transport equipment

will be conducted.

Prevention and control of injuries related to grinding and cutting activities, and use

of scrap, include the following:

Locating machine-tools at a safe distance from other work areas and from

walkways;

Conducting regular inspection and repair of machine-tools, in particular

protective shields and safety devices /equipment;

Page 274: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

243

Training staff to properly use machines-tools, and to use appropriate

personal protection equipment (PPE).

7.9.7 MUSCULOSKELETAL DISORDERS

Musculoskeletal disorders are injuries that affect muscles, tendons, ligaments

and nerves. These injuries can develop when the same muscles are used over and

over again or for a long time without taking time to rest. The chance of getting this

type of injury increases if the force exerted is high and/or the job requires an

awkward posture. Some examples of musculoskeletal disorders include back pain,

carpal tunnel syndrome, tendonitis and tenosynovitis.

Preventing musculoskeletal disorders requires recognition, assessment and

control of the hazards that cause them. Keep in mind that the most knowledgeable

person about problems with a job is usually the person doing it.

7.9.8 CONTROL HAZARDS, PREFERABLY AT THEIR SOURCE

Consider changes to

Mechanizing a repetitive task or process

Designing workstations and work processes using ergonomic principles

Using well maintained tools and equipment that decrease force or

awkward position

Providing lifting devices to eliminate heavy lifting

Ensuring that all employees receive comprehensive training on how to do their

job safely

Using ergonomic principles, to avoid

Awkward body positions

Overextended and awkward reaches

Repetitive or heavy bending, twisting, reaching, lifting, lowering, pushing and

pulling

Sustained or static exertions

7.9.9 NOISE

Noise is not a new hazard. It has been a constant threat since the industrial

revolution. Too much noise exposure may cause a temporary change in hearing

(your ears may feel stuffed up) or a temporary ringing in ears (tinnitus). These short-

Page 275: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

244

term problems usually go away within a few minutes or hours after leaving the noise.

However, repeated exposures to loud noise can lead to permanent, incurable

hearing loss or tinnitus. Removing hazardous noise from the workplace whenever

possible and using hearing protectors in those situations where dangerous noise

exposures have not yet been controlled or eliminated.

7.10 HEALTH AND SAFETY MEASURES FOR THE WORKERS

a. Buildings and structures: No walls, Chimneys, Galleries, Stairways, Floor,

Platform, Staging or structure whether of a permanent or temporary character will

be constructed in such manner as to cause risk or bodily injury.

b. Provision of crawling boards etc: No person will be required to stand to pass

over or work on or near by any roof of ceiling cover with fragile material through

which he is liable to fall, in case it breaks or gives away the distance for more

than 3 meters without use of sufficient number of suitable ladders, duck ladders

or crawling boards which are securely support.

c. Service platforms: Whenever practicable and demanded service

platforms and gangways will be provided for overhead shafting, and where

required by him these will be securely fence with guardrails and toe boards.

d. Belts, etc: All belts will be regularly examined to injure that the joints are safe

and the belts are proper tension.

e. Helmets: Helmets will be provided to the workers for safe guarding

themselves against any head injuries.

f. Machinery: No machineries are equipments will be Situated, Operated or

maintained in such a manner as to cause risk of bodily injury.

g. Methods of work: No process of work will be carried out in such a manner as

to cause risk of bodily injury.

h. Electricity: No electricity installation will be provided during construction so as to

be dangers to human life or safety.

i. Medical Check-up: Medical examination for every employee will be examined

by certified surgeon at least once in 3 months of a calendar.

j. Inspection and maintenance of pollution control systems only after getting official

shutdown or with permission of authorized officer.

Page 276: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

245

k. Regular cleaning of floors, road, rooftops, conveyer galleries and any other dusty

place.

l. Checking for availability of spray water system for moistening the coal

yard/dump. Heat insulation of hot surfaces

m. All pollution control systems will be interlocked with operation of process

equipment.

n. The workers exposed to noisy equipment will be provided with ear plugs.

If necessary, the duty hours will be rotated, so that noise exposure time is kept

within specified limits.

7.10.1 SAFETY OF PERSONNEL

All workmen employed in working conditions will be provided with adequate

personal safety equipments as applicable to the work like:

Industrial Safety Shoes

Industrial Helmets

Hand gloves

Ear Muffs

Welder’s screen

Aprons

Gas masks

Respirators

Safety Belts

Goggles

Page 277: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

246

Table 7.5: Health Register

Name of the Company: Address:

1.

Department Works

2 Name of worker

3

Sex

4

Age (at least birthday)

5

Date of employment on present work

6

Date of leaving or transfer to other work with reasons

for discharge or transfer

7.

Nature of job or occupation

8.

Raw materials products or by-products likely to be

exposed to

9.

Dates of medical examination

and results thereof

Dates

Result :

Fit or unfit

10.

Signs and symptoms observed during examination

11.

Nature of tests and results

thereof

1.Spirometry:

2.Pulse oxymetry

3.Lungs function test:

12.

If declared unfit for work state

period of suspension with

reasons in detail

13.

Whether certificate of unfitness

issued to the worker

14.

Re-certified fit to resume duty on

15. Signature of the certifying

surgeon with date

Page 278: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

247

7.11 FOLLOWING SAFETY SLOGANS WILL BE DISPLAYED

7.12 EMERGENCY ACTION PLANS

7.12.1 EMERGENCY ACTION PLAN FOR CYLINDER FIRE:

1. When filled container containing LPG is involved in fire, internal pressure if not

relieved, will build up above 70KG/SQ.CM and ultimately rupture the container.

Rupture weak by direct flame impingement. Ruptured containers can be

propelled at distance by jet action.

2. If container’s pressure is not raised up to 70KG/SQ.CM, leakage from

screwed valve joint can occur due to different expansion of steel and brass.

3. Ignition of the escaping gas would aggravate the fire but release of fire reduces

the possibility of rupture.

4. No attempt should be made to extinguish the burning gas but the container

under fire and other containers in vicinity should be kept cool by water spray.

5. If the gas leakage does not ignite, the container should be approached

from up and removed to the place of safety away from the source of ignition.

Page 279: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

248

7.12.2 EMERGENCY ACTION PLAN FOR ELECTRIC FIRE:

1. Disconnect the affected areas electric supply. 2. Attempt to extinguish fire with the help of CO2, DCP 3. If fire is not extinguished, extinguish by spraying water with fog nozzle

after ensuring complete isolation of electric circuit.

7.12.3 EMERGENCY ACTION PLAN FOR OFFICE FIRE:

1. Disconnected electric supply of the affected area. 2. Attempt to extinguish the fire with the help of CO2, DCP and sand. 3. If large fire, use hydrant system. 4. Attempt to save the record. 5. Attempt fire extinguisher.

7.12.4 EMERGENCY ACTION PLAN FOR OIL FIRE:

1. Attempt to extinguish small fire with the help of DCP

2. If the fire is not controlled, use water foam to blanket the fire and further

action is to be taken

The proposed project will provide elaborate arrangements for managing any

incidents of fire:

Water Tender

Foam Tender

Portable Pump

Wireless set

Water Hoses

Hot line Telephone etc.,

7.12.5 EMERGENCY ACTION PLAN FOR MEDICAL AID:

i. Emergency Action Plan for Electric Shock Casualties:

Electric shock results in:

Irreversible damage to brain cell begins followed by deterioration of the organs.

Rescue and first aid:

Do first aid quickly and without fuss and panic

Page 280: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

249

Switch off the supply if this can be done at once.

If not possible use a dry stick, dry cloth or other non-conductor to separate

the victim from electrical contact.

The rescuer must avoid receiving shock himself by wearing gloves or using a

jacket to pull the victim.

Always keep in mind that delay in rescue and resuscitation may be fatal.

Every sound counts.

ii. Artificial Respiration:

Give artificial respiration if breathing has stopped. There are several methods

of artificial respiration, if the victim is not injured over the face, try mouth to

mouth.

a) Mouth to Mouth Method:

If there is obstruction to breathing, remove it with your fingers if it in mouth.

Several sharp blows between shoulder blade may help to is lodge an obstruction.

Lay casually on his back, put something under his shoulder to raise them & allow

his head to fall backwards. The head should be, if possible be a little lower than

the trunk. Remember that speed is essential.

Kneel at the causalities head and grasp his arms at the wrists then cross them

firmly over the lower chest. This movement should force air out of his lungs.

Press with the hands crossed on the lower part of the chest and maintain

pressure for two seconds.

Release this pressure and pull out his arms with a sweeping movement upwards

and outwards above his head and backwards as far as possible.

This movement should cause air to be drawn in to his lungs. Retain the arm in

this position for three seconds.

Repeat these movements rhythmically about twelve times a minute checking the

mouth frequently for obstructions. Each cycle will thus take give seconds- two

seconds for chest pressure and three seconds for arm lift.

With the causality on his back there is danger of aspiration of vomit, mucus

or blood reentering the system. This risk can be reduced by keeping his head

extended and a little lower than the trunk.

Page 281: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

250

If an assistant is available, he can press the causality lower jaws so that the chin

is jutting out.

The assistant should also ensure that the mouth is kept open as far as possible

and head is tilted to one side.

When natural breathing begins, your movement should be adapted to

correspond to it.

If burns are present, cover them with a dry sterile dressing

Handle the causality gentle.

Do not allow people to crowd around and block fresh airflow.

Arrange to remove the injured to the care of a doctor as early as possible.

7.13 NATURAL HAZARDS

7.13.1 EMERGENCY ACTION PLAN FOR TORNADO/HIGH WINDS:

a. Weather reports will be monitored from broadcast warnings regarding threatening

conditions.

b. If the tornado has been sighted or effect is felt, following steps should be

taken by plant personnel.

Persons will be notified over public address system or through siren.

Emergency services will be alerted for assistance.

Plant personnel should be advised to assemble in the administration

building basement, staff room, recreation room and rest rooms.

All safety systems should be kept on alert and all nonessential utilities

should be put off.

c. After the status is restored, personnel should inspect all the facilities for

resource, first aid and damage control activities, damage assessment, and clean

up, restoration and recovery.

7.13.2 EMERGENCY ACTION PLAN FOR EARTHQUAKES

a. When first tremors are sensed during an earthquake, all personnel should

evacuate buildings and assemble at safe place away from structures, walls

and falling objects. Emergency shutdown should be declared.

b. Emergency services should be contacted for assistance.

Page 282: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

251

c. After the status is restored, personnel should inspect all the facilities for rescue,

first aid and damage control activities, damage assessment, cleanup, restoration

and recovery.

7.13.3 EMERGENCY ACTION PLAN FOR BOMB THREAT

When bomb threat call is received the following measures are to be taken.

Inform the message to the highest local police authority and seek their

assistance for patrolling and security need.

Inform Controller of Explosives the details and nature of the anonymous

message and read operations.

Request the Local Fire Brigade to position at least on fire tender at the

Location immediately.

Keep the Concerned Department at the Regional Level informed with the

developments at regular intervals.

Alert the Local Government / Private Hospitals and seek their help for providing

Ambulances if necessary

In The Location Premises:

Keep the Fire Hydrant System/all Fire Fighting and Personnel protective

Equipment in readiness.

Every one entering the Location must be frisked at the Gate/check all

Hand Bags, Parcels etc., for suspected explosive/dangerous objects.

Have thorough inspection of the Location for any suspected dangerous object.

Materials and other Boxes to be brought in to the Location must be

deposited at Gate for minimum curing period of 48 Hrs.

Organize Employees Vigilance cell for round the clock observation of industry

Premises.

If The Suspected object is found:

In case of finding of suspected Article, do not disturb its position, but the area

around it should be cordoned off to a distance of 100 meters and more

depending upon the gravity of situation.

Adequate Staff or Police Squad posted to prevent any unauthorized entry into

the enforced cordon.

Page 283: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

252

Contact Controller of Explosives immediately, who on reaching the Site will

decide suitable action for defusing and disposal of the suspected object.

Evolution of thick billowing smoke is an indication of impending explosion and in

such a case, with draw or evacuates all personnel from the spot, which has

been identified.

As a general measure regulate the movement of the outsiders inside our

Premises and restrict their entry with permits.

7.14 SOCIAL IMPACT ASSESSMENT, R & R ACTION PLAN

7.14.1 EXISTING SOCIAL STATUS

It is proposed to describe the existing social status in as to demography, amenities,

public health, agriculture, land-use pattern, employment and industries.

1. POPULATION

The decadal growth in the State is 15.67% which is comparable with general

corresponding national figures (17.64%). However Bellary district shows a

growth rate of 20.38%.

The male female ratio of H.B.Halli taluk is 975 females for 1000 males which

corresponds to the national average of 975 females for 1000 males.

Total literacy rate in Bellary district is 68%. However the literacy rate in

H.B.Halli taluk is only 58.58%%. The literacy rate is better in male than in

female.

2. TRANSPORTATION & COMMUNICATION

All villages in the study zone are connected by road network. However surfacing

needs to be improved. The establishment of this industry is catalytic to the road

development.

3. PUBLIC HEALTH

The villages in the study zone facilities are scanty. Few have some semblance of

health centre, in others visiting practitioners visit. A Government Hospital is present in

H.B Halli .

AMENITIES IN STUDY AREA

It is peculiar that all the villages are inhabitated. The information compiled by

record and interviews is as follows:

Page 284: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

253

In absence of any commensurate industrial development, agriculture is the

only source of livelihood.

Primary school education is available in all the villages.

Drinking water is available to all the villages, the source being open dug

well/borewell with or without pump/electricity.

It is encouraging to find that all the all the villages are connected by road

network, though it needs good surfacing. This is a good infra- structure for

bringing cane from the villagers and they will get benefited.

7.14.2 ECONOMIC STATUS IN THE REGION: LAND USE PATTERN

Agriculture:

The cropping pattern in the district reveals that food crops like paddy, maize, bajra and

sorghum among cereals, red gram, bengal gram and green gram among pulses are

major crops cultivated in the district. The major oilseed crops are sunflower, groundnut

and safflower. Horticulture crops like banana, mango, citrus, pomegranate, fig, grapes

are also grown. A recent trend shows that there is a low shift towards fruit crops like

pomegranate and grapes. Of the total area of 8,610 square kilometers covered during

2002-03 cereals occupy about 55.2% by oilseeds 24.5% pulse 15.6% and other

commercial crops like cotton and sugarcane about 4.8%. There is a slight shift

towards commercial crops like cotton and sugarcane over last 2 years.

Irrigation:

The individual land holding is small. Irrigation and communication facilities are

scanty. Only 17.3% of the net cultivable area is irrigated and the balance 82.7% of

the area has to depend on the monsoon. This tehsil is in Tungabhadra basin and

hence have a relatively better situation of support by man-made efforts of wells, river

impoundment or tank for irrigation, though only one crop is possible. In spite of this

difficult situation, a large percent are supported by cultivation.

Animal husbandry:

The people are turning to mechanical engineering means both for agriculture as well

as for transport. The cattle population density of the District is moderate to low and it

is reflected in the persons employed in this sector. It may be found that in Influence

zone area, the percent is less than 1% who are dependent on livestock.

All this leads to one conclusion that industrialization has to be stepped up

Page 285: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

254

To provide more livelihood.

To provide male employment with women participation, for economic

independence.

To improve agriculture by increasing the spending capacity of the people by

other avenues and diverting the gains.

To improve livestock census per sq. km by utilizing employment gains.

Employment & wages:

The information related to this is tabulated below:

Table 7.6: Comparative occupations

# Particulars District Level

Study Zone

1 Main workers to total population, % 26.06 43.18

2 Marginal workers to total population, % 2.52 8.21

3 Non-workers to total population, % 71.41 48.59

As would be seen from the table:

Maximum employment is in the agricultural sector only. Here there are two

classes, one who own the land and cultivate by themselves, and two who are

employed as workers on others’ fields.

In Agricultural sector women participation is insignificant in cultivators

class, which means women do not have much economic independence.

The number of people not having any source of revenue is substantially high.

The marginal workers too do not get satisfactory duration of employment in

the year.

Heritage:

The study zone does not have archaeological, monument, defense installation,

airport, hospitals, ports, national park, religious places, resorts or other historical

places within 10 km area.

7.14.2.1 REHABILITATION & RESETTLEMENT PLAN

The expansion project is proposed to be developed in an un-inhabited open barren

land. The vegetation in the area is scanty and is only bushes and shrubs. In view of

the above, the proposed expansion project does not involve any displacement of

persons and no rehabilitation or resettlements is necessary.

Page 286: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 287: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

CHAPTER -8

PROJECT BENEFITS

Page 288: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 289: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

255

CHAPTER 8

PROJECT BENEFITS

8.1 IMPROVEMENTS IN PHYSICAL INFRASTRUCTURE

The physical infrastructure of this area will improve due to various activities of the

proposed project as enumerated below.

8.2. SITE AREA IMPROVEMENT 190 acres of additional land adjacent to the existing project site is allocated through

KIADB for establishment of the proposed expansion project. The site area is

proposed to be extensively used for landscape development. Storm water gutter,

water reservoir and rain water harvesting will be provided in the premises. This will

improve water table in the area. The enhanced groundwater source will be useful to

the surrounding farmers who mainly depend on groundwater for irrigation.

Also nursery will be developed keeping the concept of bio-diversity in mind to meet

the tree plantation needs of the industry and surrounding villages. Greenery and green

belt covering 33 % of the total area will be developed. Lawns and associated

ornamental tree hedges will be developed around plants, buildings, parking and,

storage area. Line trees will be planted on either side of the roads present in the

premise and in the vicinity of the site.

The industry is dependent on roads for transportation of men and material. Road

connectivity will improve. Vehicular movement for raw materials and products and

also for the movement personnel in the roads of this area will considerably increase.

This will result in development and maintenance of roads. Automobile related activity

such as vehicle repair and maintenance garages, workshops and shops will be

started. The location is rural and economically backward. The industry will lead to

creation of new job opportunities and scope for transport and other petty business

activity.

This improved physical infrastructure will be an added facility to the community

for surface transport.

Page 290: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

256

8.2.1 INDUSTRIAL AREA (PROCESSING AREA)/ RESIDENTIAL AREA (NON

PROCESSING AREA)

The industrial processing premise will be provided with internal roads, road side

gutters, Storm water gutters, sewage lines, Street lights, Flood lights, Parking area.

Landscaping, lawn and greenery will be developed in the premise.

Rain water harvesting and rain water reservoir of adequate capacity will be

built.

Fire fighting and disaster management facility will be provided.

8.2.2 GREEN-BELT

Green belt and greenery will be developed in about 65 acres of land. The species

developed will be as per CPCB guide lines. Assistance and guidelines will also be

availed in development of greenery in the industry.

All the premise green belt of about 20 m will be developed. Trees will be developed

on either side of the internal roads as well on all approach roads to the industry,

Lawns will be developed around plant and administrative buildings. Green belt of 10

to 20 m will be developed around open bulk storage yards.

8.3 IMPROVEMENTS IN THE SOCIAL INFRASTRUCTURE

The location is rural and economically backward. Creation of job opportunity and

scope for transport, civil works and supply of material and services and other petty

business activity associated to the project will improve. With this the economic status

and purchasing power of public will improve. This will result in improved attitude of

the public towards education and health. This may cause in creation of education and

health care facilities in this rural area.

It will not disturb the existing pattern of social relations and democratic setup.

In rural areas much of the time and energy is wasted in reaching from one place to

another. This is due to lack of swift mode of transport. By the establishment of this

industry, movement of vehicles in this area will generally improve (both private and

public-owned).

With establishment of the In the study zone of 10 km radius, the purchasing power of

people is very less. The agricultural implements, agro-chemicals and vehicles will be

Page 291: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

257

in more demand as also village grown milk products, vegetables and agricultural

produce.

Present level of education and literacy (especially rural and women) is very poor and

it needs improvement. The establishment of this industry will play a catalytic role in

this. Education level will go up with flow of funds and avenue of livelihood. Likewise

the healthcare facilities are also said to improve.

Living in harmony is an important aspect of the society. This can happen only if all

the components are comfortably placed. Persons engaged in their respective

vocation and accruing job satisfaction leads to this. This will become possible by this

venture.

The improvements in social infrastructure are discussed below 8.3.1 CONNECTIVITY

A good quality tar road will be developed from the site to to S.H.Way-25. The S.H.-25

connected to N.H.-13 near Mariammanahalli in NE and N.H. 4 at Harihar in South.

Existing Tarred road to join the site to S.C. railway station at Vyasanakere. Will also

be up graded.

8.4 EMPLOYMENT POTENTIAL – SKILLED, SEMI-SKILLED AND UNSKILLED

The industry and its supporting activities need people from manual to managerial

strength. The production activities, transportation, maintenance of machineries and

civil works associated with the project will need unskilled and skilled workers. people

on tractors and tractor repairers as skilled ones. So in manufacturing activity all three

types i.e skilled, semi-skilled and unskilled people are required. The overall potential

including the garages, loading-unloading actions, eateries, small shop owners is

substantial. The local people can get a good share out of this. In the factory, science

and technology prevails and there some outsiders will have to be engaged at least for

the time being. If the second generation local people acquire that skill, they too will be

able to fill the gap and accrue benefit of higher jobs. If the activity of sugar and

alcohol manufacturing becomes stable by that time, perhaps expansion may become

possible further and then employment availability may further enhance.

Page 292: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

258

The total direct employment potential of the proposed industry is about 450 people.

However, the commencement of this industry will create direct and indirect

employment opportunities to more than 2,000 people in terms of factory employment,

transportation, vehicle maintenance, petty shops etc.

Category Existing

unit Proposed Expansion

Total

Managerial 20 25 45 Supervisory 40 50 90 Administration 30 30 60 Skilled 70 80 150 Semiskilled 180 215 395 Trainee 60 50 110 Total 400 450 850

8.5 OTHER TANGIBLE BENEFITS

Both tangible and non-tangible benefits will result from this activity and many of

those are described above. Apart from direct employment, other benefits are listed

below.

I. Time saving by quicker transport

II. Aesthetics improvement by general greening with emphasis on biodiversity

III. Availability of nursery facilitates

IV. Developed economy brings with it literacy and healthy living.

V. Improved safety-security in surrounding with better Law and Order.

VI. Symbiosis and sustainable development will be the ultimate objective.

The rural economy is found generally dwindling because they depend only on one

single source of livelihood namely conventional agriculture. With the activities of the

present industry the local population will become aware of alternative means for

livelihood and utilize such opportunities to improve their living standard.

8.6 CSR (CARPORATE SOCIAL RESPONSIBILITY) ACTIVITIES

The 5% of project cost is earmarked for CSR activity and the details of CSR spread in

5 years is given below

Page 293: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

259

Table – 8.1 Budget for Corporate Social Responsibility Activities

Sl.

No. Description

1st Year

(Amount

in

Lakhs)

2nd Year

(Amount

in

Lakhs)

3rd Year

(Amount

in

Lakhs)

4th Year

(Amount

in

Lakhs)

5th Year

(Amount

in

Lakhs)

Total

(Amount

in

Lakhs)

1

Training of Local eligible

unemployed youth through a

tie up with National Academy

of Construction

1.3 1.3 3 5 8 18.6

2

Providing training to

unemployed educated youth

in spoken English language

and personality development

to enable them to appear for

interviews

1.3 1.3 4 6 8 20.6

3 Sponsoring computers for

school childrens 1 1 1 1 1 5

4 Providing one well equipped

ambulance and maintenance

of the same

2.5 0.6 3 0.6 0.6 7.3

5

Sponsoring of selected talent

youth in sports in

consultation with District

authority

1.3 1.3 1.3 1.3 1.3 6.5

6 Setting up health center and

providing medical assistance

and medicines

2.5 2.5 2.5 2.5 2.5 12.5

7

Providing training to local

farming community in good

agricultural/ livestock and

horticultural practices

1.3 1.3 1.3 1.3 1.3 6.5

8

Providing support for self-

help groups especially

women and housewives for

training in employment

oriented schemes (DWCRA

model) in consultation with

District Authority

0.5 0.8 1.3 1.3 1.3 5.2

9 Sponsoring of Sports events,

activities in consultation with

District Authority

1.3 1.3 5 8 10 25.6

Page 294: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

260

10

Repair of School buildings /

Anganwadis, Bal vihars,

women and child welfare

centers

0

11 Provision of drinking water

supply and toilets in Schools 2.5 3.8 10 13 18 47.3

12 Providing furniture, black

board, teaching material,

stationery, etc. for schools

1.3 5 10 25 38 79.3

13 Repair/ Extension of existing

primary Health centers and

supply of Medical Equipment

2.5 2.5 2.5 2.5 2.5 12.5

14 Adoption of parks,

community playground and

other community areas

2.5 2.5 3.5 6.5 8.5 23.5

15

Providing Infrastructural

facilities like upgrading of

bus-shelters, village roads,

desilting of tanks, Providing

additional facilities

1.3 2.5 3.5 4.5 6.5 18.3

16 Development of park in

consultation with District

Authorities

6.3 2.5 10 25 45 88.8

17 Miscelanious 5 14 42 55 88 204

Total amount to be spend on CSR activity in lakhs 2490

Page 295: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

CHAPTER -9

ENVIRONMENTAL COST

BENEFIT ANALYSIS

Page 296: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 297: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

261

CHAPTER – 9

ENVIRONMENTAL COST BENEFIT ANALYSIS

M/s. SLR Metaliks Ltd. propose to improve the viability of the existing project by the

addition of facilities for the production of value added downstream products with

ready market opportunity such as alloy steel, rolled steel products, metallurgical coke,

coke oven gas based power and oxygen in the existing steel industry. The need and

benefits of the integrated steel industry are well established. During scoping stage the

authorities have not specified the requirement of environmental cost benefit analysis.

Hence, the environmental cost benefit analysis was not considered in the report.

Page 298: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 299: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

CHAPTER -10

ENVIRONMENTAL

MANAGEMENT PLAN

Page 300: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 301: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

262

Chapter - 10

ENVIRONMENTAL MANAGEMENT PLAN

10.1 INTRODUCTION

Environmental management plan (EMP) describes the administrative aspects of

ensuring that mitigation measures are implemented and their effectiveness

monitored, after approval of EIA. It consists of various policies, control measures

etc. for abatement of critical environmental impacts arising out of the proposed

project. Based on the impacts identified, mitigation measures are proposed and

these will be incorporated with the plant. Further a suitable environment

management plan will be introduced in the project to implement and practice

measures to protect and enhance the quality of environment. The EMP is only as

effective as its implementation. An appropriate environmental management strategy

is developed and presented in the form of an EMS.

The proposed project involves utilization of natural resources and generation of

waste and polluting substances. Depletion of natural resources will affect the

competitive users. The waste and polluting materials if discharged without control

and treatment is likely to have adverse consequence to the environment parameters

including water, air ,soil, flora and fauna. Further, it may exert stress to the existing

infrastructural and other facilities and also to the existing socio economic status of

the region. It is the responsibility of the project proponents to control the utilization

of resources and discharges of waste products by adopting suitable control

measures in the factory to avoid adverse consequence of industrial activities on the

environment and in turn to enhance the quality of the existing environment.

10.2 NEED

Environmental management is a crucial segment of Industrial Project.

Management of project, in view of the global concept of sustainable

development will do their best. Therefore, preparation of Environmental

Management Plan is a must to fulfill bifocal aspect of the statutory compliance as

well as that of social concern. Water needs of project may be reasonable, but

generally this resource is dwindling. Thus, on hand one should use it less and on

the other the source should not be left polluted for others. Air environment needs

to be continuously managed, because man needs inhalation every moment, so

also is Flora and Fauna dependent on it. The biological aspects, soil and ground

Page 302: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

263

water are all interdependent. Thus, a need of proper environmental management

and a conscious plan for it.

10.3 OBJECTIVES

1. To define the components of environmental management..

2. To prepare an environmental hierarchy.

3. To prepare a checklist for statutory compliance.

4. To prepare environmental organization.

5. To prepare a schedule for monitoring and compliance.

6. To establish a watchdog committee voluntarily with an ultimate aim to get ISO

14001 certification.

10.4 ENVIRONMENT COMPONENTS

10.4.1 Air Environment

1. Monitor the consented parameters at ambient air quality stations, regularly.

2. Monitor the work zone at various stations to satisfy the corporate

requirements for health and environment.

3. Monitor the stack.

4. 8 hourly average concentration of total suspended particulate matter in

ambient air shall be monitored at 40 meter distance from the primary vibratory

/ rotary / screen or the site boundary whichever lesser, using high volume

sampler instrument.

5. Use of low Sulphur coal

6. Covered storage for coal, wherever necessary

7. Water sprinklers

8. Smooth Roads. Covered Trucks

9. Green Belt development

10.4.2 Water Environment

1. Keep record of input water every day for quantity and quality.

2. Measures are taken to segregate the sub-streams of effluent as per their

characterization.

3. Water conservation is accorded high priority in every section of the activity.

4. Captive power plant Boiler blow down & cooling purging water reused after

treatment through PCT (Physico Chemical Treatment).

5. Keep record of wastewater returned back to boiler make up, process

Page 303: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

264

and to gardening, for both the quantity and quality details.

10.4.3 Solid waste

1. Monitor solid waste disposal zone environment. (Water, groundwater,

leachates, air, soil, up-gradient-down-gradient, upwind-downwind)Monitor

garden sweepings and dry leaves

2. Stored on raised platform

10.4.4 Aesthetic (Noise & Odour) Environment

The Project will generate noise from various locations like

1. Steam Generator

2. Rotary equipments like fans, blowers and compressors

3. Combustion Chamber Steam traps and leaking points The proponent note

that the Project will have the following facilities, which will reduce the overall

impact of noise pollution

4. Use of better acoustic systems to minimize noise generated by the

equipments

5. Regular maintenance of equipments to minimize noise pollution

6. Monitor the ambient noise level and work zone noise level to conform the

stipulated norms.

7. Creation of awareness for noise attenuation and mitigation program.

8. Monitor the ambient Odour level and work zone Odour level by sensing.

9. Creation of awareness for Odour attenuation and mitigation program

10.4.5 Biological Environment

1. Special attention is planned to maintain green belt in and around the

Amenities premises.

2. Adequate provisions are made to facilitate daily watering of all plants and

lawns.

3. Special attention provided during summer to ensure that the green belt

does not suffer from water shortage.

4. Development & maintenance of green belt to be considered as a priority issue.

5. Return water collection, treatment and reuse under watch.

Page 304: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

265

10.4.6 Work-zone Comfort Environment

1. Monitor the work zone temperature levels.

2. Monitor the work zone humidity.

3. Examine the health of staff workers and keep record.

10.4.7 Socio-Economic Environment

1. The operators and workers are trained in various aspects of ESH (Environment, Safety and Health).

2. The managers and officers involved in Environment Management Cell shall

undergo refresher workshop and up gradation of information on various environmental issues.

3. The industrial authority shall help in promoting the activities related to

environmental awareness in nearby villages and visitors.

4. The industrial authority shall help in promoting local people for livelihood

5. Commensurate with their will, skill and abilities

6. Health Statistics will be assembled, compiled and displayed.

7. Environmental status will be displayed. Figure 10.1: Structures for EMP

Page 305: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

266

10.5 ENVIRONMENT MANAGEMENT HIERARCHY

Developer is aware that environmental management is not a job, which can be handled

without a careful planning. The success lies if three components are simultaneously present viz.

(1) management support, (2) efficiency of the environment management cell and (3) acceptability

of resulting environmental quality, both by SPCB and by public. A structure of this plan and

hierarchy

of process flow for environmental management is prepared and enclosed as logics,

which is self-explanatory. Developers will adopt this structure and hierarchy, which

is akin to principles and practice.

10.6 CHECKLIST OF STATUTORY OBLIGATIONS

There are a number of environmental status required to be attended to by the

industries or projects. Industry has prepared a checklist of these obligations, which

facilitates the obedience of the laws of land. These are advised to industry as follows:

1 The Consents, whether under the Water Act or under the Air Act, are normally issued

for a fixed validity period. Please check whether the Consent is valid. If the same is

expiring, it is better to apply for a fresh renewal at least 120 days prior to the expiry

date.

2 The Consent normally describes the items of manufactured products with

quantity.One should see that, the described framework is not overstepped. In case,

there is any likely hood of such increase, it will be worthwhile to obtain permission

for the same. At least a letter to that effect be posted to the relevant board officer.

Page 306: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

267

3 The Consent lays down a condition as to the volume and rate of discharge of

effluents both for domestic as well as the industrial activity. By routine checks at

the measuring devices, this can be ascertained.

4 There should be a continuous performance evaluation of the treatment units like

STP, so as to always remain inside tolerance limits. Following measures can be

adopted,

a. Characterization of raw effluents/emissions.

b. Attempting in-plant controls.

c. Operation, maintenance, repairs and replacement of the STP,

d. Retrofit equipment to the existing plant.

5 Disposal is the last ditch battle. Disposal, dispersion, dilution, diversion,

therefore, has to be planned very methodically and operated efficiently. This is a

place where more reliable staff is required to be deployed.

6 The drainage network has been planned in such a way that, storm water

and effluents do not get mixed. Keep the terminal manhole clean and always

hospitable to facilitate taking of sample by the Board officials. Also check that no

effluent is admitted in the channel down-stream of the terminal manhole, which

means all the effluent, finally should pass via the terminal manhole only.

7 Monitoring aspects are always very crucial. For operating the plant,

certain parameters be constantly checked. However, it will be a good practice to

check monthly all the parameters through standard and approved laboratories.

In case there is a water body in the vicinity, it is advised to take periodically

samples from it. This applies both to the surface water as well as ground water.

The findings will either give you a confident satisfaction or may give you a timely

warning for improvement in the treatment or more so in the disposal system.

8 The environmental audit statement is required to be submitted on annual basis,.

9 The industry should device their own format for a daily log book recording of

the running of their STP. A printed format shows your conscious efforts towards the

goal of pollution control, whenever any inspection takes place.

10 An inspection book to note observations made by the visiting KSPCB field officer

is maintained. The compliance of the unsatisfactory remarks are shown during next

inspection.

11 In case, there is an unfortunate accident, unforeseen act or event by which

pollutants are excessively released into the environment, the same to be brought

immediately to the notice of the board and other concerned agencies. This will

Page 307: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

268

enable you to get experienced timely help from them. Your burden gets shared.

Synergistic effects can be predicted by an overview.

12 In case, you feel aggrieved by any conditions imposed in the Consent, approach

the board immediately for discussion, or thereafter prefer an appeal timely.

Therefore, read the Consent carefully as soon as you receive the same.

13 The Water Cess Act, 1977, is applicable to certain specified industries. In case

your industry is covered, the regular returns to be submitted. Water meters be

installed, whether the industry is covered or not under the Cess Act. Also check

from time to time whether the class of your industry, which may not be presently

specified, has since got covered under the Cess Act.

14 The Cess amount be paid as per assessment orders and record maintained.

15 In case you feel aggrieved by excessive cess assessment or non-sanction of

rebate, the appeal is preferred in time that is within 30 days. And in case, you

are late in doing this, at last submit with reasons for the delay.

16 The Government or Board while giving site clearance or Consent normally puts

a condition of plantation of trees. Otherwise also, planting trees within the

compound gives a good demonstration of your plant performance. A better practice

is to select about three varieties and species selected to be tough and tolerant for

existing type of environment.

17 An unsafe working and the environmental pollution generally goes hand-in-

hand.Therefore, the obligations under the Factories Act be scrupulously

followed and record maintained.

18 There are certain responsibilities regarding the hazardous waste. These can

be summarized as follows: a) Identification of quantity, constituents and

compatibility of hazardous waste, being generated during the activity.

a. Proper labeling and marking of containers, which are used for store, transport, or

disposal of hazardous waste.

b. Use of appropriate containers for storage and transport.

c. Furnishing of information regarding the waste, its nature, its hazards, antidotes, and

Page 308: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

269

non-compatibility etc. to the persons who either transport, treat, store or dispose off

the waste.

d. Use of authorized operator agency system to ensure the proper disposal of

hazardous wastes (i. e. used oil) and to streamline the treatment and disposal.

e. Training of personnel for handling and proper storage of such categorized waste.

f. Identify a transporter specialized in such wastes, and the practice of hexplicate

manifest (gate-pass) be followed.

g. Submission of reports to MOEF and KSPCB.

h. To provide safety measures for handling of hazardous waste.

i. In case of an unforeseen act or event in transit occurs, the transporter should

Immediately report to the nearest police station about The accident, and The

clean- up measures.

j. He should also report to SPCB on the Form prescribed by the Hazardous

Waste (Management and Handling) Rules, 2008 and the guidelines issued by the

Central Government.

k. A container be opened for a short duration while receiving the hazardous material

in it and while removing out from it, or otherwise it must always be kept

closed in storage yard.

l. A container be opened or handled so carefully and slowly as not to

rupture/damage the container. Always keep in spare some empty, clean and sturdy

containers handy and immediately available.

m. Inspect the filled and stored containers every day and if any found in bad

conditions transfer the contents to a good container immediately but carefully.

n. Keep a daily record of your custody.

o. Documentation is always a matter of evidential value. No job is complete unless

paper work is complete. Occupier/generator should carefully note this, and

following be developed.

p. Gate-pass when waste leaves the factory by a transport towards the treatment

facility. Keep the receipts.

q. A receipt of material as signed by the facility Operator as a manifested colour coded

copy is preserved for three years.

r. Analyze the out-going waste and keep the results for three years from the date of

dispatch.

Page 309: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

270

10.7 Records of Waste generation to be maintained as per following:

1. Quantity and points of generation.

2. Physical state and chemical constituents.

3. Hazardous waste category as per E. P. Rules of 2008.

4. Hazardous waste class, as per Motor Vehicle Rules of 1989.

5. Certify internally, the limit of 90 days and storage of ten tons.

Under the Manufacture, Storage and Import of Hazardous Chemicals Rules,

1989,the immediate duties can be summarized as:

a. To forecast the possible situations of major accidents.

b. To design steps in advance to avoid accidents and its consequences including cascading effect.

c. To educate the related workers to stand to such occurrence.

1. The occupier should not merely do the above job, but also make a show of his

work. Occupier is best advised to inform the concerned authorities and agencies, as to

his preparing documents like risk analysis, emergency plan, safety training, avoidance of

major accidents, health plan, etc.

2. Under the Public Liability Insurance Act, 1991 the industrial manager is advised to

check some important activities, such as:

a. Owner should take out one or more insurance policies.

b. He should take out such policies before he starts handling any hazardous substances.

c. The policies should always be kept renewed and alive.

d. The amount insured shall not be less than the paid capital. Check this from time

to time by taking a review of your position.

e. General Insurance Corporation or similar agencies may be able to throw more light, if approached.”

10.8 ENVIRONMENTAL ORGANIZATION

Environmental organization will have an environmental cell responsible for pollution

control and also for self-examination through monitoring.

Page 310: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

271

10.8.1 Environment Management Cell

Such massive work cannot be conceived unless a framework of men, material and

money is specially earmarked. This is done by establishing a Environment

Management Plan first and the an Environment Management Cell. The cell shall be

backed by the highest person of the Organization.

TABLE - 10.1 ENVIRONMENT MANAGEMENT CELL

SL.

NO.

LEVEL

DESIGNATION

PURPOSE

1

Highest Managing Director Policy making

2

Top Director & CEO ,COO

Policy making

& guidance

3

Overview

Steering Committee Monitoring

4 Manager Civil Engineer Job A

Environment Engineer * Job B

Safety In charge Chief Medical officer Job C 5 Executive Various Levels Implement

The Cell working under CEO is explained later in this section.

The Jobs are described below:

TABLE - 10.2 JOB OF ENVIRONMENT MANAGEMENT CELL

JOB OF FACET ASPECTS

1 Civil Engineer. Construction Phase

Material waste minimization, labor camp sanitation, Noise, oil-grease and vibration nuisance control, accident prevention.

Job A Post-construction Remediation of ugly sites

2 Environment Engineer.

Air Truck census, PUC control, ODS control, Noise & Odor mitigation, Dust control

Job B

Water Water budget, O & M of Water Purification and Wastewater Treatment Plants.

Solid waste Segregation, Collection, Composting, Carting

Greening Tree Census, Tree Planting, Lawn Development, Storm water, Recycle Water, Control use of pesticides, nursery

Page 311: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

272

JOB Of FACET ASPECTS

Monitoring Field observations, laboratory tests, interpretation & Reporting

Public relations & Press

Documentation, Updating, rehabilitation, training, Meetings, Rapport

3 Medical Officer. Job C

Occupational Health

Routine surveillance, prevention, accident relief, Snake bite remedies.

Bio-Medical waste Prevention, Abatement, Control and Disposal. Training.

Page 312: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

273

W

10.9 Environmental Monitoring Schedule

To measure the success of the cell, monitoring is a useful tool. The monitoring

schedule is decided as under:

TABLE – 10.3 MONITORING SCHEDUL

SUBJECT FROM FREQUENCY PARAMETERS

Water Drinking M Standard

Raw M

Wastewater Treated M

pH, BOD, COD, TSS, TDS, N, P, SS,TDS, Coli

Storm water

Raw Y

Treated Y

Stack M

BOD, N, P, SS, TDS, Coli

Air Ambient Air M SPM, SO2, NOx, CO.

Noise Ambient M dB(A)

Soil - Y C, N, P, K

Aesthetics Odour, comfort, Visual, Housekeeping, Roads.

Legend: W = Weekly, M = Monthly, Y = Yearly.

Marks: Severe, Tolerable, Average, Excellent.

Page 313: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

274

It is being considered to have a full-fledged laboratory, allotted to these facilities of

analysis. It is felt that, this arrangement will be adequate enough for

Environmental Protection. Monitoring is a technique of drawing a sample and

understanding from it the universe. The sampling station, the parameters and

frequency is of extreme importance as also the careful analysis, reporting and

interpretation.

10.10 SCHEDULES

There will be three facets to design and follow the schedules viz.: (A) for compliance

of responsibilities, (B) for day-to-day operation and management of WTP and ECE,

and (C) for routine environmental monitoring, to assess the impact and take timely

warning. The schedule:

10.10.1 Daily Compliance

1. Take the meter readings -initial and final, for checking the water

consumption.

2. Maintain the electricity consumption record for pollution control.

3. Monitor wastewater generation, treatment system & reuse of treated water.

10.10.2 Monthly Compliance

1. Monitor the emission sources through the competent authority and submit

the analysis reports to the board.

2. Monitor ambient/work zone noise levels & ensure conformance to

standards.

10.10.3 Quarterly Compliance

1. Monitor the ambient air quality at upwind and downwind locations of the factory.

2. Review the Water Reuse performance.

3. Monitor ambient air per quarterly.

10.10.4 Yearly Compliance

1. Carryout “Environmental Audit Statement” of various environmental

aspects,review the environmental policies with the help of experts and

make the up gradation/changes accordingly.

2. Submit the “Environmental Statement” to the State Pollution Control Board in

Form V under Rule 14 of the Environment (Protection) Second Amendment

Page 314: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

275

Rules 1992 of the Environment (Protection) Act, 1986.

3. Renew the Consent to Operate under the Water and Air Acts.

4. File the Cess returns to the State PCB under the Water (Prevention and

Control of Pollution) Cess Act, 1977.

5 Renew the Hazardous Waste Authorization under sub-rule 3 of the Hazardous

Waste (Management and Handling) Rules, 2008.

10.10.5 Consent Compliance

Project undertakes to comply the conditions prescribed by the Consent. In this

direction, the following discipline will be followed:

TABLE – 10.4 CONSENT COMPLIANCE

CONDITION REGARDING MODE OF COMPLIANCE Quantity of Effluent

To be measured daily and in-plant control. Not to exceed any time

Quantity of Sewage

To be measured periodically. Not to exceed the consent conditions.

Total water input To be measured daily. Repair meters. Not to exceed. Make breakup as per usages. Fill monthly Cess returns. Pay as per assessment Quality of Effluents By running ETP in correct fashion. Monitor. Report

Disposal Not over application. No percolation, no spillages. Monitor. Ambient Air Regular monitoring.

Noise levels Check foundation for vibrations, Tree plantation Solid Waste

Quantity to be measured & record kept..

Environ. Audit To be complied every year before 30th Sept., as also the ESR Environmental status report Inspections Inspection Book to be opened. Instructions given by KSPCB visiting officer to be complied and reported.

10.11 STEERING COMMITTEE

A high power steering committee is in place having a power of sudden spot

inspections, checking of documents and listening to complaints if any. This committee

will supervise over the monitoring and environmental management cell as may be

necessary, generally over the following facets of works:

Page 315: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

276

1. Permit management

2. Construction management

3. Treatment and emission management

4. Transport management

5. Disposal management

6. Monitoring

7. Documentation

8. Law enforcement

9. Customer and Third party audits

10. Following CII Model of excellence

10.12 CONSTRUCTION PHASE MANAGEMENT

In this particular case, this phase is very important. It will continue for a

long time, in the developmental stage. The component will commence from

site preparation.

1. Site Preparation:

The clearance of site may involve the movement of soil. No major leveling

operations are envisaged, though at places this will be encountered. During

dry weather conditions it is necessary to control dust nuisance created by

excavation and transportation activities. Else at some sensitive locations,

water sprinkling will be resorted to.

2.Sanitation:

a. Labour Camps:

The construction site shall be provided with sufficient and suitable toilet

facilities for construction workers to allow proper standards of personal

hygiene. These facilities shall be connected to a septic tank and maintained

to ensure minimum or no environmental impact. Water taps will be provided in

the labour camps, but it will be seen that spilled water will be directed towards

collection sump first and to the treatment scheme next.

b. Noise.

Though the noise effect on the nearest inhabitants due to construction

activity will be negligible (as at present there are no residents to begin with),

Page 316: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

277

it is advisable that on site workers using high noise equipment adopt noise

protection devices like earmuffs. Noise sources are heavy earth moving and

construction machineries, air compressors and D.G Sets. Proper oiling,

maintenance, non-vibrating sturdy foundations and closed rooms shall be

provided to minimize the effects.

c. Construction Equipment and Waste:

It shall be ensured that both gasoline and diesel powered construction

vehicles are properly maintained to minimize smoke in the exhaust emissions.

The vehicle maintenance area shall be located in such a manner to avoid

sources by accidental spillage of oil. Unauthorized dumping of waste oil

should be prohibited. Wastes shall be disposed off at an approved site.

d. Storage of Hazardous Material:

The following hazardous materials may be used for site preparation and

construction activity.

These shall be stored as per international standards.

1. Explosives for rock blasting (This is not proposed)

2. Petrol and diesel

3. LPG

4. Painting materials

5. Asbestos products are avoided.

e. Site Security:

Construction site is a potential hazardous environment. To ensure that the

local inhabitants and stray cattle are not exposed to these hazards, the site

shall be secured by fencing and manned entry points. It will be fully

illuminated.

f. Land Environment:

An inventory shall be prepared of standing trees and bushes of significance.

Page 317: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

278

To prevent unauthorized felling of trees by construction workers for their fuel

needs it will be ensured that the contractor provides fuel to them. The

construction workers will be educated on importance of maintaining the

existing tree.

Page 318: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 319: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

CHAPTER -11

SUMMARY AND CONCLUSIONS

Page 320: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 321: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

279

CHAPTER – 11

SUMMARY AND CONCLUSIONS

M/s. SLR Metaliks Ltd. propose to improve the viability of the existing project by the

addition of facilities for the production of value added downstream products with

ready market opportunity such as alloy steel, rolled steel products, metallurgical coke,

coke oven gas based power and oxygen in the existing Iron making industry. The

expansion does not require additional ore. The steel industries in general are on

priority list as they contribute in overall development of the country. Integrated steel

industries in particular will produce steel and steel products at economic cost and

also has export potential to earn/save foreign exchange.

i. Additional land needed to the project is already allotted by KIADB.

ii. The proposal is for manufacture of downstream and associated products. This

will reduce transportation and operation cost and result into overall economy

and viability of the industry. Coke oven off gases are advantageously utilized in

the power generation for captive use.

iii. The product mix includes Steel alloy from steel plant, TMT bars from rolling mill.

Based on market demand and pricing capacity utilization of these plants can be

varied.

iv. Metallurgical coke from coke oven plant will be utilized as captive source in the

existing BF plant. Coke oven off gases will be used in waste heat recovery

boiler for generation power. The power thus generated will be used in the

industry as a captive source.

v. Water requirement will be met within the available permissible limits from the

river source.

vi. This industry does not produce any toxic products and does not have significant

adverse effect on the quality of land, water and air. The industry has taken all

the necessary preventive measures to mitigate even the small effects which

might be caused by industrial activities.

vii. Gaseous emissions will be generated from furnaces, boiler, fume exhaust will be

treated in suitable APC system and vented through the stacks of adequate

height.

Page 322: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

280

viii. The concept of Reduce, Reuse and Recycle is also practiced in the industry as

per the eco-policy of Govt. of India. This will result in high performance, and

minimal resource utilization. With the addition of steel making units energy

savings of 405 KWH/ton of pig iron will be saved as it avoids re-melting of pig

iron.

ix. Wastewater generated in the industry will be treated and re used for industrial

purpose and green belt and greenery development in the factory premise.

x. The industry will adopt an effective environment management system and

environment management plan to protect the environment. Due priority will be

given for greenery development and rain water harvesting at the factory

premises.

xi. The site is connected to supply of raw material and product utilizers through

well laid national and state high ways and railway lines. The traffic on these lines

is with in the permissible limits.

Project Feasibility as a Sustainable Development Model

This project is very essential in-view of production of high value downstream

products.

The local people desire the setting up of the industry to create additional direct &

indirect job opportunities as well as business opportunities.

Water, power, Raw material and Market are available.

Adequate precautions will be taken for Pollution Control, Resource Conservation

and Environmental Protection.

This is cost effective and aims Sustainable Development.

The project is proposed in economically & industrially backward / rural area of

Karnataka State.

Page 323: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

CHAPTER -12

DISCLOSURE OF CONSULTANTS

Page 324: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11
Page 325: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

281

CHAPTER- 12

DISCLOSURE OF CONSULTANTS ENGAGED

12.1 THE NAMES OF THE CONSULTANTS ENGAGED WITH THEIR BRIEF RESUME & NATURE OF CONSULTANCY RENDERED

This EIA report is prepared on behalf of the proponents, taking inputs from proponent‟s

office staff, their R & D wing, Architects, Project Management Professionals etc. by

Environmental Consultants M/s. Ultra-Tech Environmental Consultancy & Laboratory,

Thane, Mumbai , who have been accredited by QCI-NABET vide official memorandum of

MoEF S.N. 93 of LIST „A‟ of MoEF - O.M. No. J 11013/77/2004/IA II(I) dated September

30, 2011. S.No.154 of list of Accredited Consultants of dated 5th April, 2014.

M/s Ultra-Tech Environmental Consultancy & Laboratory:

Ultra-Tech Environmental Consultancy & Laboratory [Lab Gazetted by MoEF – Govt. of

India] not only give environmental solutions for sustainable development, but make sure

that they are economically feasible. With innovative ideas and impact mitigation

measures offered, make them distinguished in environmental consulting business. The

completion of tasks in record time is the key feature of Ultra-Tech. A team of more than

hundred environmental brigadiers consists of engineers, experts, ecologists,

hydrologists, geologists, socio-economic experts, solid waste and hazard waste experts

apart from environmental media sampling and monitoring experts and management

experts , strive hard to serve clients with up to mark and best services.

Ultra-Tech offers environmental consultancy services to assist its clients to obtain

environmental clearance for their large buildings, construction, CRZ, SEZ, high rise

buildings, township projects and industries covering sugar and distilleries from respective

authorities. Ultra-Tech is in the process of getting QCI-NABET final accreditation for its

EIA organization.

Ultra-Tech also provide STP/ETP /WTP project consultancy on turn-key basis apart from

Operation and Maintenance of these projects on annual contract basis. Also, having

MoEF approved environmental laboratory, Ultra-Tech provide laboratory services for

Page 326: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

282

monitoring and analysis of various environmental media like air, water, waste water,

stack, noise and meteorological data to its clients all over India and abroad.

Functional area experts and assistance to FAE involved in the EIA study for “M/s. SLR

Metaliks Ltd.” at Narayanadevarakere Village, Hagaribommanahalli Taluk, Bellary

District in Karnataka State is as follows:

Table No. 12.1: List of Functional Area Experts FUNCTIONAL AREA EXPERTS INVOLVED IN THE EIA:

Sl. No.

NAME OF SECTOR

NAME OF PROJECT

NAME OF CLIENT NAME OF EIA COORDINATOR

FUNCTIONAL AREA EXPERTS INVOLVED

FA NAME/S

1. Metallurgical industries (Ferrous & nonferrous)

– both primary and Secondary (Sector-8)

Industrial Project

M/s. SLR Metaliks Limited,

Narayanadevarakere

Mr. Santosh Gupta

Team Member:

Dr. S. S. Hotanahalli

AP

Mr. Shekhar Tamhane

Team Member: Ms. Deeptee Samant

WP

Mrs. Deepa Tamhane – Karnik

Team Member: Ms. Sampada Shidid

EB

Dr. T. K. Ghosh Team Member: Ms. Bharati Khairnar

SE

Dr. V.G. Panwalkar Team Member: Dr. Kishore Wankhede

SHW

Mr. Santosh Gupta

Team Member: Dr. S. S.

Hotanahalli

LU

Mr. Swapnil Awaghade

Team Member: Mr. Ajay Kadam

Page 327: DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT EIA report.pdf · 2014-06-13 · DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT ... 1.4.4 Approvals available for the exiting industry 11

283

Sl. No.

NAME OF SECTOR

NAME OF PROJECT

NAME OF CLIENT NAME OF EIA COORDINATOR

FUNCTIONAL AREA EXPERTS INVOLVED

FA NAME/S

RH Dr. Ravindra Kode

Table No. 12.2: Laboratory Details

LABORATORY FOR ANALYSIS:

NAME OF LABORATORY SCOPE OF SERVICES ACCREDITATION STATUS

M/s. Bangalore Test House

#65, 20th Main,, Marenahalli,

Vijaynagar, Bangalore – 560

040

Monitoring and Analysis of: 1. Ambient Air Quality

Monitoring 2. Ground and Surface Water

Quality Monitoring 3. Noise Level Monitoring and 4. Soil Quality Monitoring 5. Metrological data collection

M/s. Bangalore Test House is a NABL certified laboratory