Doing Business Doing Business with the with the State University Construction State University Construction Fund Fund December 9, 2009 Chris Marcella Director of Design (518) 320-1701 chris.marcella@suny. edu Arthur R. Foo Director of Capital Procurement (518) 320-1637 [email protected]
17
Embed
Doing Business with the State University Construction Fund December 9, 2009 Chris Marcella Director of Design (518) 320-1701 [email protected] Arthur.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Doing BusinessDoing Business with the with the
State University Construction FundState University Construction Fund
State University Construction FundState University Construction Fund
Public Benefit Corporation established under Public Benefit Corporation established under Article 8-A of NYS Education Law Article 8-A of NYS Education Law
Provides funding, planning, design and Provides funding, planning, design and construction management for SUNYconstruction management for SUNY
Exempt from Wicks LawExempt from Wicks Law
State UniversityConstruction Fund
4
Mission StatementMission Statement
“…To provide academic buildings, dormitories and other facilities for the State-operated institutions and contract and statutory colleges under jurisdiction of the State University, to reduce the time lag between determination of need for such facilities and actual occupancy thereof, to expedite the construction, acquisition, reconstruction and rehabilitation or improvement of such facilities and to assure that the same are ready for the purposes intended when needed and when scheduled under the approved master plan of State University.”
State UniversityConstruction Fund
5
SUNY CampusesSUNY Campuses
State UniversityConstruction Fund
6
SUNY Capital Program SummarySUNY Capital Program Summary
# of# ofBldgsBldgs
Sq. Sq. FootFoot(1)(1)
AvgAvgAgeAge(2)(2)
2008-132008-13BudgetBudget(1)(1) Funded ByFunded By Projects Projects
NotesNotes:: (1) Square footage and funding expressed in millions.Square footage and funding expressed in millions. (2) Average age (expressed in years) represents a straight average with no consideration given to the size of buildings or Average age (expressed in years) represents a straight average with no consideration given to the size of buildings or
subsequent renovations.subsequent renovations.(3) Includes $1.650B in future appropriations for critical maintenance projects.Includes $1.650B in future appropriations for critical maintenance projects.
State UniversityConstruction Fund
7
Contract Opportunities Available Contract Opportunities Available from:from:
Complete set of documents can be obtained from Complete set of documents can be obtained from Architect/Engineer upon payment of a deposit Architect/Engineer upon payment of a deposit
Requirements for Bidding Requirements for Bidding Bid Deposit – 5% of Total Bid Bid Deposit – 5% of Total Bid
Bank draft, certified check, bid bondBank draft, certified check, bid bond Size of Projects previously completed Size of Projects previously completed
Successful completion of Successful completion of similar work not less than 50% of Total similar work not less than 50% of Total BidBid
Ample Financial Resources – Working Capital TestAmple Financial Resources – Working Capital Test
State UniversityConstruction Fund
10
Overview of Construction Contract Process Overview of Construction Contract Process (continued)(continued)
Bonding (within 24 hours of Notice of Award)Bonding (within 24 hours of Notice of Award) Performance Bond – 100% of Total ContractPerformance Bond – 100% of Total Contract Labor and Material Bond – 100% of Total Contract Labor and Material Bond – 100% of Total Contract
InsuranceInsurance Workers CompensationWorkers Compensation General Liability and Property DamageGeneral Liability and Property Damage Builders RiskBuilders Risk Owners Protective LiabilityOwners Protective Liability
Overview of Construction Contract Process Overview of Construction Contract Process (continued)(continued)
Within 48 Hours of Bid OpeningWithin 48 Hours of Bid Opening
Uniform Contractor Questionnaire (UCQ) Uniform Contractor Questionnaire (UCQ) Affidavit of No Change (if UCQ submitted within past year)Affidavit of No Change (if UCQ submitted within past year)
Proposed Major Subcontractors Proposed Major Subcontractors HVAC, Electrical, Plumbing and Asbestos AbatementHVAC, Electrical, Plumbing and Asbestos Abatement
Bid Breakdown by Trade or Section (Appendix A)Bid Breakdown by Trade or Section (Appendix A)
Within 7 Calendar Days of Bid OpeningWithin 7 Calendar Days of Bid Opening
UCQ’s for all proposed major subs (or Affidavit of No UCQ’s for all proposed major subs (or Affidavit of No Change)Change)
All Contracts Require Approval by: NY State Attorney General (AG) NY State Office of the State Comptroller (OSC)
State UniversityConstruction Fund
12
MWBE RequirementsMWBE Requirements Article 15-A of Executive LawArticle 15-A of Executive Law Good Faith EffortGood Faith Effort Fund GoalsFund Goals
Utilization PlanUtilization Plan
Submitted 7 days after bid openingSubmitted 7 days after bid opening Reviewed for goals and good faith effortReviewed for goals and good faith effort Identify issues; work with contractor on resolutionIdentify issues; work with contractor on resolution
MWBE firmsMWBE firms Must be New York State CertifiedMust be New York State Certified ESDC Directory website – http://nylovesmwbe.ny.govESDC Directory website – http://nylovesmwbe.ny.gov Lois McLaughlin, MWBE CoordinatorLois McLaughlin, MWBE Coordinator ([email protected]/518-([email protected]/518-320-1673320-1673))
No Contract awarded without an approved MWBE Utilization PlanNo Contract awarded without an approved MWBE Utilization Plan
MBEMBE WBEWBE
Upstate ProjectsUpstate Projects 8%8% 4%4%
Downstate Downstate ProjectsProjects
10%10% 4%4%
State UniversityConstruction Fund
13
Sampling of Construction Projects in 2010Sampling of Construction Projects in 2010
Region Campus Project TitleEst. Construction
$EstimatedBid Month
East System Admin Exterior Restorations R. I. G. $2,000,000 March
Albany Replace Windows – Downtown Campus
$2,300,000 May
Empire State Regional Center Rochester $9,400,000 June
ESF – Syracuse Gateway Building $18,000,000 August
Albany Construct New Business School $41,400,000 August
South Purchase Critical Maintenance Repairs – Exterior
$13,000,000 March
Maritime Replace Campus Steam Distribution $5,900,000 February
Stony Brook Rehab Old Chem Classroom Bldg #2 $33,400,000 April
Stony Brook ESS Building Exterior Rehab $5,000,000 May
Farmingdale Construct Student Center $24,400,000 May
Farmingdale Replace Roofs, Various Buildings $4,100,000 August
Optometry Multipurpose Space – 3rd Floor $3,000,000 September
Old Westbury Replace Campus Center Envelope $13,200,000 September
South/Central
Binghamton New HV Substation $4,700,000 January
Binghamton Rehab Elevators – Various Buildings $4,200,000 January
Alfred Ceramics Rehab 3rd Flr./North Wing – McMahon Hall
$3,600,000 February
State UniversityConstruction Fund
Sampling of Construction Projects in 2010Sampling of Construction Projects in 2010 (continued)(continued)
Region Campus Project Title Est. Construction $EstimatedBid Month
South/Central
Binghamton Central Campus Quad – Site Rehab $3,900,000 May
Binghamton Rehab Domestic Water Distribution Systems
$4,700,000 July
Geneva Ag Food Research Lab $28,000,000 September
Alfred State Rehab Allied Health Building $16,200,000 October
North/Central Plattsburgh Fine Arts Ventilation Upgrades $5,500,000 January
Cobleskill Dairy Complex Upgrades $1,000,000 January
Plattsburgh Reconstruct Roads & Parking Lots $3,500,000 January
Oneonta Replace Windows/Roof – Physical Ed. Bldg
$1,600,000 February
Plattsburgh Hudson Hall Rehab $19,800,000 April
Oswego Renovations/Additions to Science Building
$54,000,000 June
Cornell Ag Stocking Hall Rehab/System Upgrades $75,000,000 June
West Buffalo- North Cooling Tower Replacement $3,200,000 January
Brockport Rochester Educational Opportunity Center
$13,500,000 February
Fredonia Fenton Hall Exterior Rehabilitation $2,900,000 April
ElementsElements Authorization to do Business in NYSAuthorization to do Business in NYS FinancialFinancial IntegrityIntegrity Past PerformancePast Performance