Top Banner
CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Peer Review 25-29 June 2012, Hilton, Logan Airport No major changes in Cycle 14 13 topical panels, 1 BPP (LPs, XVPs) XVP Panel: Pundits: met Wed, voted and wrote reports Program as last year: Tues, Wed: topical panels (+XVP) Thurs, Frid: BPP (+ initial organizational session Wed evening) Reviewer Stats: 110 reviewers, including 6 pundits, 13 chairs 2 remote: Webex + telcon
12

CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Peer Review 25-29 June 2012, Hilton, Logan Airport No major changes in Cycle 14 13 topical.

Jan 04, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Peer Review   25-29 June 2012, Hilton, Logan Airport  No major changes in Cycle 14  13 topical.

CUC 10-11 Oct 2012 Chandra Director’s Office

Cycle 14 Peer Review 25-29 June 2012, Hilton, Logan Airport No major changes in Cycle 14 13 topical panels, 1 BPP (LPs, XVPs) XVP Panel:

Pundits: met Wed, voted and wrote reports Program as last year:

Tues, Wed: topical panels (+XVP) Thurs, Frid: BPP (+ initial organizational session

Wed evening) Reviewer Stats: 110 reviewers, including 6 pundits,

13 chairs 2 remote: Webex + telcon

Page 2: CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Peer Review   25-29 June 2012, Hilton, Logan Airport  No major changes in Cycle 14  13 topical.

CUC 10-11 Oct 2012 Chandra Director’s Office

Cycle 14: Final Proposal Statistics

672 proposals submitted:• GO 452• LP 78• XVP 17• Archive 72• Theory 53

185 approved

Oversubscription (time): 5.2

Time allocation: 23.3 Ms

Page 3: CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Peer Review   25-29 June 2012, Hilton, Logan Airport  No major changes in Cycle 14  13 topical.

CUC 10-11 Oct 2012 Chandra Director’s Office

Cycle 14 Proposal Statistics (cont)

Time allocation:

• Total Time: 23.3 Ms

• LP: 5.7 Ms (4.2Ms)

• XVP: 6.2 Ms (7.4Ms)

Page 4: CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Peer Review   25-29 June 2012, Hilton, Logan Airport  No major changes in Cycle 14  13 topical.

CUC 10-11 Oct 2012 Chandra Director’s Office

Archive/Theory Results Archive:

Budget: $1050K Allocated $1095K (17) Over-subscription: 4.2

Theory:• Budget: $600K• Allocated: $654K (8)• Over-subscription: 5.8

Page 5: CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Peer Review   25-29 June 2012, Hilton, Logan Airport  No major changes in Cycle 14  13 topical.

CUC 10-11 Oct 2012 Chandra Director’s Office

X-ray Visionary Projects (XVP)

17 proposals submitted, time range: 1-6 Ms Total request: 41.7 Ms (5.6* over-subscribed) 4 allocated, for 1-3 Ms, range of science topics:

• COSMOS sky survey expansion 1.7 sq.deg. To 160 ks: 2.8 Ms• Planck z<0.35 cluster survey, to complete 165: 1 Ms• SMC: deep study of low Z populations: 1.1 Ms• PWNe: deep observations of 3: 1.3 Ms

Process: XVP panel (6 pundits) discussed all proposals and brought

recommendations to BPP Topical panels discussed XVPs and LPs, as usual Final decisions made by BPP after discussion of highest-

ranked proposals BPP moved ~1.2Ms to LPs (+0.2Ms from TPs) Final over-subscription for both = 6.6

Page 6: CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Peer Review   25-29 June 2012, Hilton, Logan Airport  No major changes in Cycle 14  13 topical.

CUC 10-11 Oct 2012 Chandra Director’s Office

Multi-cycle Proposals

11 submitted for total 3.6, 2.3, 0.5 Ms in Cycles 14,15,16 (resp.)

5 approved for total 0.9, 0.6, 0.1 Ms (inc. 1 TOO) 1 of those approved included joint time w/HST

Page 7: CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Peer Review   25-29 June 2012, Hilton, Logan Airport  No major changes in Cycle 14  13 topical.

CUC 10-11 Oct 2012 Chandra Director’s Office

Cost Proposals in Cycle 14

• Deadline: 14 Sept 2012• 176 proposals received and processed • Confirmed: 5 not submitting (foreign PIs)• Currently 19 with incomplete documentation• No early observations this cycle, so all can be

processed together

Page 8: CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Peer Review   25-29 June 2012, Hilton, Logan Airport  No major changes in Cycle 14  13 topical.

CUC 10-11 Oct 2012 Chandra Director’s Office

GO Budget• GO budget: $10.5M

• Includes: Observing, Archive ($1.05M), Theory ($0.6M) • Cycle 14: overall decreasing budget projected ~$0.7M cut for

first time• Cycle 12-16: 15-25% increase in awarded time (orbit evolution)• Cycle 13 awards: median $42K, average $54K, decrease ~10%SR2012: • CXC requested GO budget augmentation to compensate

decrease in budget and $/time awarded• 50% of proposed augmentation was approved

• theory, archive funding at same level • increase in GO total budget

• Cycle 14 awards: median $46.4K, average $59K

Page 9: CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Peer Review   25-29 June 2012, Hilton, Logan Airport  No major changes in Cycle 14  13 topical.

CUC 10-11 Oct 2012 Chandra Director’s Office

NASA/China Restrictions and Chandra

NASA GIC 12-01, 9 Feb 2012: restricting bi-lateral collaboration with China or Chinese-government

owned entity

RJB+MSFC personnel met with NASA HQ personnel to discuss issue

China-US/China-only proposals considered bi-lateral and cannot be supported

No bi-lateral China-US proposals approved in Cycle 14 All Cost PIs required to sign a form: “Assurance of

Compliance” with this regulation This restriction will be explicitly included in the Cycle 15 CfP

Page 10: CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Peer Review   25-29 June 2012, Hilton, Logan Airport  No major changes in Cycle 14  13 topical.

CUC 10-11 Oct 2012 Chandra Director’s Office

Cycle 15: Planned Schedule

• CfP, POG etc. release: 13 Dec 2012• Proposal Deadline: 14 Mar 2013• Peer Review: 17-21 June 2013• Results: 12 July 2013• E-letters: by 16 August 2013• Cost Deadline: 17 Sept 2013

Page 11: CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Peer Review   25-29 June 2012, Hilton, Logan Airport  No major changes in Cycle 14  13 topical.

CUC 10-11 Oct 2012 Chandra Director’s Office

Cycle 15: X-ray Visionary Projects

Cycle 14: • 4 (of 17) proposals accepted• Over-subscription 6.6 (time)

Surveyed panel chairs: • Generally supported balance of time (~ on category)• Most did not feel XVPs were >> LPs, just larger • Supported continuation of XVP-level language

Cycle 15: plan to include a third XVP call Time available is significantly lower, 20 Ms (TBR):

• GO 11 Ms• LP 4 Ms• XVP 5 Ms

Propose to run peer review similarly

Page 12: CUC 10-11 Oct 2012 Chandra Director’s Office Cycle 14 Peer Review   25-29 June 2012, Hilton, Logan Airport  No major changes in Cycle 14  13 topical.

CUC 10-11 Oct 2012 Chandra Director’s Office

Cycle 15: Joint Programs

HST, Spitzer (reinstated), XMM-Newton, NOAO, NRAO, Suzaku

Possible new joint programs: NRAO/ALMA: discussions open with new

director (Beasley) for ALMA Cycle 2 NuSTAR: recently launched, contacted Harrison,

Stern to open discussion