Commercial Overview Ramesh koul DGM (Reading, billing & collection) Date – 4 th Sep 2017
Commercial Overview
Ramesh koul
DGM (Reading, billing & collection)
Date – 4th Sep 2017
TATA Power Delhi Distribution Ltd.
2
Joint Venture of Tata Power and Govt. of Delhi (51:49)
License Area: North and North West Delhi (510 sq km)
Annual Turnover: 6953 Crore
Consumer Base: 16.10 Lacs
Population Served : 70 Lacs
Peak Load Served: 1791 MW
Certifications : ISO 9001, 14001, 27001 ; SA 8000 ; OHSAS 18001UN Global Compact Reporting
Technical Activities
• Decentralized
• Empowerment at Field Level• Focus on Operations and Network Mgmt.
Commercial Activities
• Centralized Revenue Cycle Management• (9 Module BPR, from connection to enforcement)
• Consumer Segmentation• (Differentiated services delivery as per specific needs ofeach segment)
•Benchmarking for Consumer Service
Commercial Innovation / Interventions
(Business Process Re-engineering – A Strategic Approach)
Zones and Districts
THEY OWN THE CONSUMERS…
be it power supply or any commercial issue
Industry FIRST…
CCG – Consumer Care Group; CMG- Connection Management Group; MMG – Meter Management Group; MRG – Meter Reading Group; RBG – Revenue Billing Group; RCG – Revenue Collection Group; RRG – Revenue Recovery Group; RDG – Revenue Discipline Group; RAG – Revenue Assurance Group
Integrated Commercial Functions
CMG MMGMRG, AMI
RBG, HRB, KCG
RCG, RRG
SCG, RAG, CEG, EAC
Connection / Device Management
Reading & Billing Management
Revenue Assurance
Collection & Recovery
IT SYSTEM
Customer Services (ICC / CCG / CCAG)
- DEBS -Billing Engine
- SAMPARK -First CRM
- SAKSHAT -Viewing CRM / Billing
Information
- SAMBANDH - Integrated
CRM & Billing System
- SAP-ISU -Fully
integrated State of Art
Consumer Segment Wise Details
Consumer Segment
Sanctioned Load
Reading Type
Billing Type
Meter TypeNo of Active
Consumers##
Xpress Consumer > 499 KW AMR Monthly HT Meter 288
Key Consumer > 99 KW AMR Monthly HT Meter 1,653
HRB Consumer 11KW to 99 KW AMR MonthlyCT Meter/
Poly Phase Meter74,117
HCB Consumer 1KW to 10 KW SMRDOnce in 35
daysSingle Phase 13,33,743
G&I Consumer All Load AMR / SMRD
Monthly HT/CT MetersPrepaid Meters
**In respective segments
SCG ConsumerJJ Cluster
Up to 2 KW SMRD Monthly Single Phase 2,01,562
AMR: Automated Meter ReadingSMRD: Smart Meter Reading Device** No of consumers in G&I 15,281, including street light & prepaid## Consumer count as on 1st Sep 2017
Total 16,11,363
Chief (Commercial)
CMG
Head (Key Consumer &
Customer Service Group)
Head (Revenue Cycle
Management)
Head (Connection &
Meter Management)
MMG
MRG
RBG
AMI
RCG
RRG
SCG
KCG, HRB and G&I
Sampark Kendra
CSEG
PA & CCAG
CL & IB
HoD (Business Services Group)
AA&BEG
CCG
LSC
Consumer Relationship Management
Consumer Grievances
Services
Performance Assurance
Building Relationship Management
Voice of Consumer
7
Sensitizing all process owners across the organisation towards consumer centricity.
Dealing With Consumer Service
Access/Avenues – Convenience
Interaction - Courtesy/Respect
Listening
Resolution – Timely & Effective
Capturing stated, unstated, and anticipated customer requirements, expectations
Consumer Segment Meets - RWA / IWASocial Segment Meets –Srijan, Ujjwala, Yugantar, Yuva, UdhyamFacebook
Monitoring All Service Delivery Process
11/1/2017
8
Outbound Calling
Feedback Form
Website
Consumer ‘s Complaint Analysis
AAPKE ANUBHAV
Consumer Meets
Consumer Driven CRM
Mother of VoicesNDPL was the first
power utility in India to start
Consumer Satisfaction Survey
in 2004
11/1/2017
Consumer Satisfaction
Survey
Has been the founding principle of
TPDDL
TPDDL was the first power utility in
India to start Consumer
Satisfaction Survey in
2004
Enhancing Consumer Satisfaction
Segmented Service Delivery Mechanism
14 Fully networked consumer care centers for quick redressal of consumer complaints
Each consumer care center has a Consumer Relations officer who is a qualified to acts as the consumer’s Champion
Introduction of First Call Resolution & Queue Management System
24X7 Integrated Call Centre with 65 seats, integrated with OMS/SCADA for online outage information
Single Helpline Number for all commercial/supply related complaints
• Meetings with RWAs/IWAs on a monthly basis in all Districts
• Segmented meets
• Relationship Approacheso Client & Account Managers : Xpress, KCG,
HRB, G&Io Consumer Relationship Executives (CREs):
HCB o Special Consumer Group: JJ Clusters
• Automated Workflow (CRM)
• Performance Assurance Standards
Revamping Consumer Experience
11
CMG – MOST CRITICAL (Data Entry)
• Documentation for New Connection
• Documentation for Attribute Change– Name Change
– Load Change
– Category Change
MMG – Commercial Backbone, MAXIMUM MANPOWER
• Accurate Metering – Installation
– Replacement
– Testing
• Meter Removal (30000+ Request Annually)
• Cable Shifting (10000+ Request Annually)
• Meter Shifting (3000+ Request Annually)
• Modem Troubleshooting (30000+ Request Annually)
Connection & Meter Management
Load (KW) Meter Type Cable Size
0 to 5 KW Single Phase 10-60A 2*10MM
5 to 10KW 2*25MM
11 to 25KW 20-100A (Poly Phase Meter) 4*25 MM
26 to 57KW 100/5A – LT CT Meter 4*95 MM
58 to 99 KW 200/5A – LT CT Meter 4*150 MM
100 KW Above HT Meter
New Connection request
Document Collection, Completion of Commercial formalities
File Appraisal and
Dues Verification
Technical Feasibility
Demand Note Generation
of OK Cases
DN Payment
First Bill Generation
Area wise batch creation for Meter
Allotment
Random Meter allotment and
Protocol Printing
Physical Van wise Meter located ,
packaged & loaded
Site Verified by Engineer and
Meter Installed
Protocol uploadation
Connection & Meter Management
New Connection Process @ TPDDL
3 Days
+5 Days
+7 Days
+12 Days
15 Days to 12
Months
CD / SLD / Scheme Cost
150000+ New Connection Request110000+ DN Generation100000+ DN PaymentRs 8-10 Cr Dues Recovery
90000+ Meter InstallationCapitalization of Rs. 60 Cr
60000+ Attribute Change Req40000+ Processed
Structured Reading and Billing Process
AMR for High Revenue Consumers (>10 KW)- 5% of Consumer contributing 60% of Revenue (along with in house developed data analysis system)
Automatic System Based 4 Levels Reading and Bill Quality Checks Before Consumer Bill Generation
Meter reading through android based smart phones with GPS enablement.
Online Spot Billing for SCG (JJ) Consumers (monthly billing aligned with payment convenience)
Implementation of SAP-ISU
(most advanced integrated billing and CRM system)
Pre-paid Meters for Govt. Connections (up to 45 KW)
Industry FIRST…
Results: Billing Efficiency improved from 53 % to 91.36%.Provisional Billing reduced from 30% to <0.86%.
Installation Confirmation
and Consumer sequencing
Planning and Scheduling
Data Downloading in
SMRD from billing Server
Base Meter Reading through
SMRD:
1st Level Check
Reading Data uploaded in SAP
Server
Edit List for Pre-Audit of Billing-
RQC :
2nd Level Check
Exception handling &
Trouble shooting
Bill Generation
Billing Quality Check:
3rd Level Check
Invoice Printing
4th Level CheckBill Distribution
4 Levels of Reading and Bill Quality Checks
Before Consumer Bill Generation
Reading and Billing Process for Low End Consumers
On-line Route Sequence tracking through Smart Meter
Reading Device
15
Before SMRD Implementation reading sequencing was found erratic( Portion – MT03D)
After SMRD Implementation sequencing was corrected and optimized ( Portion – MT03D)
16
Improvement of Billing Efficiency
Elimination of non-genuine/coffee shop meter reading and remarks
Instant Reporting of theft Cases
Photographic evidence of low consumption cases
Instant photographic evidence of extra meters
GPS tracking enhancing reading accuracy
Benefits to Customers
Meter Reading with photographic evidence
On-site instant SMS to consumers in case of Premise found Locked Authenticated POD improving bill distribution efficiency & Reduction in consumer complaints
Benefit to Business Associates (BA)
Wireless transfer of data saving commuting time of BA staff
Reduction in repeated follow-up visits.
GPS tracking and proper route sequencing improving meter reading efficiency
BA Satisfaction-Levying lesser penalty on BAs.
Cost of SMRD is comparatively lesser than the HHD
Benefit to Environment
Paper Saving (50 papers /MR in Base & 2 papers/MR in follow-up)
Reduction of Carbon Footprints
Benefits
Central NOCBilling Server
Communication Servers for Data Acquisitions
Modem + SIM Card
GSM Network
AMR Deployed for High End Consumers
First Indian utility to implement AMR for all connections above 10 KW
70,000 LT-CT, HT and DT meters contributing 60-70% to TPDDL’s revenue
Indigenously developed AMRDA carries out seamless reading and analysis
Success Rate: More than 98% per month
PRI Lines
18
AMR/AMI Downloaded Meter Data
Sets of Logics are run on raw data
Exceptional cases are analyzed
Theft/ Doubtful cases are
referred to Enforcement
Raids are conducted &
cases are booked
THEFT DETECTION IN AMR CONSUMERS
VOLTAGE RELATED VOLTAGE FAILURE NEUTRAL DISTURBANCE POWER FAILURE
CURRENT RELATED CURRENT REVERSAL CT OPEN LOAD UNBALANCE/ CT SHORT
“AMR/AMI Logics”Identifying Suspected Cases based on Data Analysis (High Revenue Consumer)
OTHERS LOW POWER FACTOR NVM FAILURE POOR BATTERY DROP IN CONSUMPTION CT OVERLOAD MAGNET MANUAL RESET METER CONSTANTS CHANGE
Theft Reduction- Detection Process in AMR
1000
9100
45100
67300
22200
8600 6700 6000
17700
31160
9100
1632
-10000
0
10000
20000
30000
40000
50000
60000
70000
80000
2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14
Load Booked in KW One make of meter procured prone to Theft
/ Faulty
AMR Analysis logics Updated
21.6
16.1 16.4
20
13
19
6 7
17.23
25.2
16.1
4.82
0
5
10
15
20
25
30
2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14
Amount Raised in Cr.
Pre AMR Post AMR
AMR Analysis system Established
Impact of Electronic data analysis on Loss Reduction
Enhancing Collection Avenues
State of art Collection Centres – Automated Any Time Payment Machines
Payment touch points increased from 20 at the time of takeover to >5000 now. Own collection counter every 3 KM radius in Urban Area.
Door Step Payment Collection through Mobile Cash Collection Centre in JJ Clusters
E Payment of Energy Bills through TPDDL Website / Credit & Debit Cards
Cheque Collection Drop Box at RWAs Office, Apartments and Banks
Cell Phone based payment application Introduced.
Centralized system control recovery activities.
In house developed predictive model for defaulters for focused approach of recovery.
Industry FIRST…
Results: Payment Collection avenues increased from 20 to 5148.Collection Efficiency improved to 100.06%.
Revenue Recovery Process
Disconnection Notice gets issued after 15 days from expiry of
due date
Calling and follow up for recovery
Disconnection order gets generated after 15
days from DN generation if arrears still remain unpaid
Disconnection order execution, connection
status is updated.
Meter Removal request gets generated after 15
days
Meter removed, Final bill processed and
transfer of dues
Recovery Process
Automated the Process of Disconnection Notice (along Bills) and Disconnection Order.
Ensuring Meter Removal of Disconnected Cases within 15 Days
Recovery for Old Dues at the time of New Connection
Surveillance of Disconnected Cases for Dues Transfer
Personal Hearing Forums / Mega Lok Adalats
(liquidation of billing dispute cases / old disconnected dues)
Privilege Scheme and Pay N Win Schemes for Recovery of Arrears
Industry FIRST…
Results: Amount Receivables reduced from > One Year sale to 7.9 Days sale.Collection Efficiency improved to 100.06%.
23
“Focused Approach from 2012-13 onwards towards Digital payments”
Introduction of new platforms like Net banking, Debit & Credit Card, ITZ, Oxizen on TPDDL website etc.
Introduction of NEFT/RTGS, Wallets like Airtel money, MMPL, PayU money.
Acceptance of non-energy payments through website. (Demand note, theft assessment)
Debit/Credit Card acceptance on Kiosks.
Abha Members (Special women representatives appointed in JJ clusters)
Special Pay & Win Schemes for Digital Payments.
Rebate to consumers opting for E-Bill and E payments both.
Introduction of wallets like PAYTM, Mobikwik, Freecharge etc.
Introduction of TPDDL mobile App.
Increase of PoS machines from 20 to 88.
Introduction of Phonepe.
Idea Money, Vodafone Mpaisa etc.
FY-12-13 & Before
FY-14-15
FY-15-16
FY-16-17
FY-13-14
24
Graphical Journey of online payments in Tata-Power-DDL from FY-2004-05
to July’17
0.4 1.1 3.0
4.3 6.0
7.7 7.1
12.2 13.9
18.1
26.2
35.9 37.3
0.2 0.6
2.9
5.2 3.4 3.8
3.0
10.8 10.4
23.2
27.6
36.3
38.6
-
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18(Till Jul)
Online Payment Trend
% Count % Amount
25
Unique Effort appreciated
nationally and internationally
Front runner in Technology Implementation to improve efficiency and consumer service delivery
AT&C Losses Reduction journey
Initiatives which helped to reduce AT&C losses from 53 % to 15 % in 7
years up to 2009.
Losses in JJ Clusters(Slums)
remained 89% even after achieving overall
AT&C losses of 15 %
26
Formation of Special Consumer Segment – focus on JJ Clusters
Making Metering & Billing affordable Reducing the cost of new connection Offering door step customized services. Advocated for subsidy in electricity charges for consumer
CSR initiative’s for : Improving socio economic condition Building the capacity to pay Improving Quality of life
Generating Smiles
Special Consumer Group
Corporate Social Responsibility
TPPDL started Initiatives for• Health Care• Employment • Employability• Education• Entrepreneurship
Our Innovation in SCG segment
Special Consumer Group CSR Deptt.
Challenges Identified
27
No Property Ownership Record/Document
High hooking and High Theft Practices
Low Paying Capacity
Non Affordable Bill and delivery of bills
Trust /Relationship Building and Facilitation
Indexing of JJ Cluster
Door to door indexing & marking SCG
Jhuggi’ s Nos.
Indexed 1,90,000 consumers
SCG Sequence Number : functional address for
servicing the consumers.
GIS map from the indexed data.
Affidavit in Place of Ownership Proof
28
Challenge : No Property Ownership Records
Technological solutions for Safe Electrification and Metering
Safe Electrification using
LT ABC & Armored cables.
Customized Metering:
Individual Meter
Regular removal of hooking.
Challenge : High Theft & High Hooking Practices
Making New Connection affordable for the Slum Cluster(SCG) consumers
Instant camps held for same day Meter installation.
Reduced New connection charges : From Rs 4200 to Rs 1550.
Upfront payment Rs 350/- balance 24 EMI of Rs 50/-
Incentive of Accidental insurance cover of
Rs 1 Lac.
for metered connection for which premium is being paid by TPDDL.
30
Challenge : Low Paying Capacity of Consumer
Billing for SCG Consumer
Introduced Monthly Billing to make amount affordable
Due dates matching with salary/wage dates
Advocacy with DERC for Subsidy
Challenge : Affordability and Delivery of Bills
JJ clusters as the key focus area of CSR activities
Appointing local Pradhan's / Leaders as franchisee
Facilitating payment & improving collection
efficiency
Pay & win scheme
Pradhan Meets
Brand Ambassador/Earn While Learn (EWL)
Rs. 1 Lac Accidental Insurance Scheme
32
Challenge : Trust/ Relationship Building and Facilitation
Need Assessment of JJ Clusters
33
In order to plan the type of CSR activity, Needs Assessment was done in 2009-10with the help of Koreth Consulting (Leading Bhagidari Consultant) and threeareas identified for support :-
Education efforts
Healthcare
Vocational Training
34
Impact: Consumer and Demand Growth
0
30000
60000
90000
120000
150000
180000
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 FY 16-17
93012
120000140000
150000 165000175000 184000 196000
SCG Consumer Growth (Numbers – Active Connections)
10
30
50
70
90
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 FY 16-17
3042
60
82
100 116 132 155
SCG Demand Billed (Amt. in Crores)
35
Impact: Collection Efficiency (%)
10
30
50
70
90
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 FY 16-17
67
81 82 8492
96 98 98.31
10
30
50
70
90
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 FY 15-16 FY 16-17
20
34
54
71
94114 131 153
Revenue Collected (Amt. in Crores)
Am
ou
nt
(Crs
)
36
Impact: Billing Efficiency (%)
5
25
45
65
85
FY 12-13 FY 13-14 FY 14-15 FY 15-16 FY 16-17
64
7080
8386
Go Green initiatives cum Social Linkage
Visiting Slum area
Taking Feedbacks Experience of Volunteers
Listening their issues
Visit of world bank to understand the scg model
47.79%
45.35%
40.85%
35.35%
31.10%
22.00%20.35%
18.68%
17.00%
13.00% 12.50% 12.00% 11.50% 11.00%10.50%
47.60%
44.86%
33.79%
26.52%
23.73%
18.56%16.74%
15.16%13.75%
11.49%10.78% 10.50%
9.87%8.88% 8.59%
0
10
20
30
40
50
60
FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17
Target Actual
AT&C Loss Trajectory
Parameter Unit Jul-02 Mar-17
Billing Efficiency % 53 91.36
Collection Efficiency % 97 100.06
Consumer Satisfaction Index % - 90
New Connection Energization Time Days 51.8 5
Meter Replacement Time Days 25 5
Reading to Billing Time Days 45 2
Provisional Billing % 30 0.86
Bill Complaint Resolution Days 45 3
Payment Collection Avenues Nos. 20 5148
Online Payments % - 36
Turnaround - Performance Parameters
As on Mar 2017