Top Banner
Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture
16

Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

Mar 27, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

Charles R. Drew High School

Riverdale, GANew Construction

High SchoolPerkins + Will

2011 Exhibition of School Planning and Architecture

Page 2: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

Charles R. Drew High School

Page 3: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

Charles R. Drew High School

Main Site Diagram

Page 4: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

Project OverviewPerkins+Will was asked to design a new high school for Clayton County Public Schools which would house 1850 students, the school’s students would come from 5 surrounding high schools in order to alleviate overcrowding at those facilities. The climate in which Drew High School was designed posed many challenges, the biggest of which was the school system was in the midst of losing its accreditation due to poor leadership at various administrative levels. In addition to unstable leadership at the administrative level, the academic performance of the students in the district was below the state levels and well below national levels. These factors combined with a district whose population has a very high poverty rate made for a complex project within a district that is facing significant challenges. Responsive planning and design was a necessity and therefore the incorporation of several large scale educational planning concepts was the clear strategy moving forward. The academy structure, smaller learning communities and a focus on career paths have become the signature planning and design features of Drew High School.

Page 5: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

9th Grade AcademyResearch shows that the majority of high school students who drop out do so after their 9th grade year. The design of a small academy within a larger school creates increased interaction between students and faculty that will positively affect student engagement and achievement. Drew High School has a ninth grade academy with its own administrative offices and its own dining commons. These ninth grade students only leave their house for art, music and physical education.

Page 6: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

Learning CommunitiesSmaller Learning Communities, the school within a school concept applied to a large high school has proven to have great results on student success. By dividing the school into academic houses, students and faculty create stronger relationships, more mentoring occurs, and academics excel. Outside the 9th Grade Academy remainder of the building is divided into three smaller learning communities which can be used for career focused academies or to support various magnet programs. Assistant principals and counselors are distributed throughout these learning communities making supervision and support readily available.

Page 7: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

Career Technology LabsHistorically career or vocational education has been relegated to the back of house areas in high schools. In a district where 60% of the graduates go directly into the workforce, these programs are essential and therefore are highlighted along the main circulation spine at Drew HS. The career technology labs are located at the front of each learning community and showcase a curriculum that has previously been dismissed in educational planning. The placement of the five career technology labs on the main circulation spine creates exposure to every student walking the halls. These labs are places where hands on, project based learning is taking place. Students who are not inspired by the traditional classroom often shine in these environments. Project based learning is how the working world works, working in teams on assignments and then presenting your work to a group. Each lab has several working areas which challenge the students and develop cognitive skills, social skills, and academic skills all of which contribute to a culture of lifelong learning.

Page 8: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

Career Technology LabsCareer technology labs in this building include culinary arts, engineering, health occupations and law and justice. The school has strong relationships with local businesses to promote graduates who can enter the workforce with skills and training. Most notable of these partnerships is with Southern Regional Hospital which is located at the end of the street which serves the school. This strong alliance is the reason that Drew High School has dedicated two of its five career labs to health occupations.

Page 9: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

Planning and ArchitectureAll of the educational planning decisions have corresponding architectural features which help to reinforce and enliven the role of planning in the facility. At the intersection of each academy to the main circulation spine many events occur, architecturally the roof line shifts providing clerestory light into a terrific 3 story space, educationally the career tech labs participate through generous glazing, and bold colors identify a sense of place. At each these intersections there is also a monumental stair that provides a gathering place for students to meet, study, and work as groups.

Page 10: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

IMAGE

Page 11: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

Gymnasium

IMAGE

Page 12: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

First Floor Plan

Insert large format floor planNote: Please add additional slides for additional floors

Page 13: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

Second Floor Plan

Insert large format floor planNote: Please add additional slides for additional floors

Page 14: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

Exhibition of School Planning and Architecture 2010 Project Data

Submitting Firm : Perkins + WillProject Role ArchitectProject Contact Barbara CrumTitle Principal in ChargeAddress 1315 Peachtree StreetCity, State or Province, Country Atlanta, GA 30316Phone 404-873-2300

Joint Partner Firm: Not ApplicableProject RoleProject ContactTitleAddressCity, State or Province, CountryPhone

Other Firm:Project RoleProject ContactTitleAddressCity, State or Province, CountryPhone

Construction Firm: Winter ConstructionProject Role General ContractorProject ContactTitleAddressCity, State or Province, CountryPhone

Page 15: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

Exhibition of School Planning and Architecture 2010 Project Details

Project Name  Charles R. Drew High School

City  Riverdale

State  GA

District Name  Clayton County Public Schools

Supt/President  Dr. Stephanie Phillips

Occupancy Date  7/15/2009

Grades Housed  9 through 12

 

Capacity(Students)  1850

Site Size (acres)  155 - total site; 67 - high school site

Gross Area (sq. ft.)  309100

Per Occupant(pupil)  167

gross/net please indicate  309,100sf / 216,100sf (1.43 grossing factor)

 

Design and Build?  No

If yes, Total Cost:  

Includes:  

 

If no,  

Site Development:  $7,866,000

Building Construction:  $49,770,580

Fixed Equipment:  $1,520,250

Other:  $765,689 (technology)

 

Total:  $54,677,350

Page 16: Charles R. Drew High School Riverdale, GA New Construction High School Perkins + Will 2011 Exhibition of School Planning and Architecture.

Charles R. Drew High School