Carborex ® MS Options • Biogas pre-treatment • Gatekeeper for grid injection • CNG fuel station Standard system for biogas upgrading for Gas-2-Grid or CNG quality Why use DMT Carborex ® MS? • 0-100% flow flexibility • Up-to 50% oxygen removal • Plug and Play installation • Single button control • 1 min start-stop • Modular and compact system The Basic Process Plug and play. That´s how easy it is to upgrade your biogas using DMT´s Carborex ® MS, a containerized solution for biogas upgrading. No columns, no water and no chemicals are needed. A simple compression step combined with a multi- stage membrane configuration purifies the biogas up to 99% bio methane. This upgraded biogas can be used for grid injection or compressed to 250 bar for use as vehicle fuel (CNG). The ease of installation and operations assures the highest up time. Due to the 100% flow flexibility and quick control, the system guarantees a continues operation and thereby gives you the highest ROI. The simplicity of the design guarantees an uptime of >98%. Your plant can be monitored remotely 24 hours a day 7 days a week. Biogas upgrading with the highest gas-2-grid time Our challenge: A Green and Prosperous Future
2
Embed
Carborex MS - Methane Sysmethanesys.com/wp-content/uploads/CarborexMS-USAFlyer.pdfCarborex® MS DMT Environmental Technology P.O. Box 231, 8440 AE Heerenveen Yndustrywei 3, 8501 SN
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Carborex® MS
Options• Biogas pre-treatment
• Gatekeeper for grid injection
• CNG fuel station
Standard system for biogas upgrading for Gas-2-Grid or CNG quality
Why use DMT Carborex® MS?• 0-100% flow flexibility
• Up-to 50% oxygen removal
• Plug and Play installation
• Single button control
• 1 min start-stop
• Modular and compact system
The Basic ProcessPlug and play. That´s how easy it is to upgrade
your biogas using DMT´s Carborex® MS, a
containerized solution for biogas upgrading. No
columns, no water and no chemicals are needed.
A simple compression step combined with a multi-
stage membrane configuration purifies the biogas
up to 99% bio methane. This upgraded biogas can
be used for grid injection or compressed to 250
bar for use as vehicle fuel (CNG).
The ease of installation and operations assures
the highest up time. Due to the 100% flow
flexibility and quick control, the system guarantees
a continues operation and thereby gives you
the highest ROI. The simplicity of the design
guarantees an uptime of >98%. Your plant can be
monitored remotely 24 hours a day 7 days a week.
Biogas upgrading with the highest gas-2-grid time
Our challenge: A Green and Prosperous Future
Membrane separation is based on the diffusion of CO2 through a polymer film. Methane
diffuses at a much slower rate, which results in a methane rich gas at the outlet of the
membrane. The membrane is molded into tubes about the size of a hair (see picture at
the right). A few thousand of these tubes are grouped together in modules. Inside the
module the biogas is split into a CO2 rich and a CH
4 rich gas stream.
Both the CO2 and CH
4 rich phases are further treated by using a multi step membrane
configuration. In this way a methane recovery of more then 99% can be achieved.
As water permeates faster than CO2 the gas is dried at the same time. Also O
2 is
removed by about 65%.
This result in an almost pure upgraded methane stream with <1% CO2 and a dew point
of -90°C. The CO2 rich stream is of the highest purity with over 99% CO
2.
DMT Carborex® MS biogas upgrading performance
Principle of gas separation using the DMT Carborex® MS, multi-stage, high selective membrane system
Selection DMT Carborex® MS Selection table
DMT Carborex® MS Dimensions
Main Raw Flow Inlet (SCFM)
Types 100 200 350 500 650 800 1000 1500
Type HS-100 HS-200 HS-350 HS-500 HS-650 HS-800 HS-1000 HS-1500