Kurva SPROYEK PEMBANGUNAN JALAN SUKAMEKAR-SUKARAJAPemberi Tugas
: DEPARTEMEN PEKERJAAN UMUM, KOTAMADYA SUKABUMITAHUN ANGGARAN
2011Kontraktor Pelaksana : PT. WINDLIGHT CONSTRUCTION
NOURAIAN PEKERJAANDurasi (hari) BiayaBobot (%)BULANJUNI 2015JULI
2015Aug-1542248.0No vember
2015(Rp)31123456789101112131415161718192021222324252627282930123456789101112131415161718192021222324252627282930311234567891011121314151617181920212223242526272829303112345678910111213141516171819202122232425262728293012345678910111213141516171819201Pekerjaan
Persiapan100%1.1Mobilisasi dan
Demobilisasi425,000,0000.0770.0190.0190.0190.0191.2Pengadaan Air
Kerja43,700,0000.0110.0030.0030.0030.0031.3Pengadaan
Sanitasi410,000,0000.0310.0080.0080.0080.0081.4Pengadaan
Penerangan43,500,0000.0110.0030.0030.0030.0031.5Pembersihan lokasi
dan pembuatan akses
jalan3034,182,3340.1050.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0041.6Surveying
(Pengukuran dan
pematokan)847,922,5990.1470.0180.0180.0180.0180.0180.0180.0180.0181.7Papan
Nama Proyek1315,3930.0010.0011.8Pembuatan Direksi
Keet24,590,7500.0140.0070.0071.9Pembuatan
Gudang31,963,9200.0060.0020.0020.0021.10Pembuatan Barak
Pekerja25,518,4850.0170.0080.0081.11Pembuatan Bengkel
Kerja27,573,4400.0230.0120.0121.12Pos
Keamanan1384,3630.0010.0011.14Pengujian
Bahan25,100,0000.0160.0080.0081.15Foto
Dokumentasi3,050,7030.0092Pekerjaan Tanah2.1Pekerjaan Stripping
(t=0.3m)8177,429,4710.5460.0680.0680.0680.0680.0680.0680.0680.0680.0682.2Pekerjaan
Galian14126,462,0290.3890.0280.0280.0280.0280.0280.0280.0280.0280.0280.0280.0280.0280.0280.02875%2.3Pekerjaan
Timbunan2354,496,8310.1680.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0072.4Pemadatan
Tanah162,951,9460.0090.0010.0010.0010.0010.0010.0010.0010.0010.0010.0010.0010.0010.0012.5Perataan
Tanah8938,6200.0030.0000.0000.0000.0000.0000.0000.0000.0000.0003Pekerjaan
Konstruksi Jalan3.1Lapisan Pondasi Bawah SIRTU3.1.1 Pengadaan
Material
Sirtu151,108,986,3863.4100.2270.2270.2270.2270.2270.2270.2270.2270.2270.2270.2270.2270.2270.2270.2273.1.2
Penghamparan Material
Sirtu95,106,7700.0160.0020.0020.0020.0020.0020.0020.0020.0020.0023.1.3
Pemadatan Pondasi
Bawah910,381,7230.0320.0040.0040.0040.0040.0040.0040.0040.0040.0043.1.4
Perataan Pondasi
Bawah1113,140,6750.0400.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0043.2Lapisan
Pondasi Atas Batu Pecah3.2.1 Pengadaan Material Batu
Pecah13540,608,8611.6620.1280.1280.1280.1280.1280.1280.1280.1280.1280.1280.1280.1280.1283.2.2
Penghamparan Material Batu
Pecah63,095,0120.0100.0010.0010.0010.0010.0010.0013.2.3 Pemadatan
Pondasi
Atas725,238,3100.0780.0110.0110.0110.0110.0110.0110.0113.2.4
Perataan Pondasi
Atas1131,945,4130.0980.0090.0090.0090.0090.0090.0090.0090.0090.0090.0090.0093.3Lapis
Atas, Laston (t=10 cm)3.3.1 Penghamparan Prime
Coat21885,738,5992.7230.1300.1300.1300.1300.1300.1300.1300.1300.1300.1300.1300.1300.1300.1300.1300.1300.1300.1300.1300.1300.1303.3.2
Penghamparan
aspal428,610,524,85487.97221.99321.99321.99321.9933.3.3 Pemadatan
aspal913,343,7730.0410.0050.0050.0050.0050.0050.0050.0050.0050.0054Pekerjaan
Drainase50%4.1Pekerjaan Galian
Drainase724,702,2280.0760.0110.0110.0110.0110.0110.0110.0115Pekerjaan
Utilitas5.1Pekerjaan Gorong-gorong5.1.1 Pemasangan
gorong-gorong23,212,5250.0100.0050.0056Pemasangan
Kanstin20284,953,9000.8760.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0447Pekerjaan
Lain-lain7.1Pemasangan
Rambu68,520,7500.0260.0040.0040.0040.0040.0040.0047.2Pemasangan
Lampu
Penerangan25359,299,3131.1050.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0447.3Tiang
Sandaran7.3.1 Blok Beton31,140,7500.0040.0010.0010.0017.3.2 Pipa
Relling D-5cm210,022,6350.0310.0150.0157.3.3 Pipa Relling
D-3cm554,454,6130.1670.0330.0330.0330.0330.0338Pekerjaan
Finishing8.1Pembersihan Lokasi kerja8.1.1 Pembongkaran Site
Instalation32,904,4790.0090.0030.0030.0038.1.2 Pembersihan sisa
pekerjaan55,228,8920.0160.0030.0030.0030.0030.0038.2Pembuatan Marka
Jalan8.2.1 Garis
Marka124,761,8910.0150.0010.0010.0010.0010.0010.0010.0010.0010.0010.0010.0010.001TOTAL13832,522,393,232100.00.07870.07770.05760.13620.10380.09010.09010.09010.10680.10680.10680.10680.03860.03860.03860.03860.03860.03860.03860.03860.03860.03860.01110.01110.01110.01110.23850.23850.23850.23850.23500.22730.22950.22950.22790.22790.22950.22950.22790.22790.22950.00210.00060.00060.00210.00160.00160.00350.00350.00350.00350.00350.00350.00720.00720.13510.13150.13150.13150.13250.13250.1454ERROR:#REF!0.14640.14880.27850.27850.27760.14970.14970.14970.13860.13860.12970.12970.12970.12970.12970.12970.12970.12970.12970.12970.12970.12970.129721.992921.992921.992921.99290.00460.00460.00460.00460.00460.0046-0.48460.01540.01540.05470.05470.05470.05470.04380.04380.04380.04380.09390.13810.12270.12150.12150.0880-0.08160.09240.09240.09240.28640.09240.04420.04420.04420.04420.04420.04420.04420.34540.04540.04540.04540.04540.04540.04540.20120.00120.00120.00120.00120.00320.00320.00620.00620.00620.0790.1560.2140.3500.4540.5440.6340.7240.8310.9381.0451.1511.1901.2291.2671.3061.3441.3831.4211.4601.4981.5371.5481.5591.5701.5821.8202.0592.2972.5362.7712.9983.2273.4573.6853.9134.1424.3714.5994.8275.0575.0595.0595.0605.0625.0645.0655.0695.0725.0765.0795.0835.0875.0945.1015.2365.3685.4995.6315.7635.8966.041ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Jakarta, Juni 2011Project Manager,Konsultant PerencanaKonsultan
Pengawas
PT WINDLIGHT CONSTRUCTIONPT INDO KARYAPT PRAAMA KARYA
alat berat&pertalatanPROYEK PEMBANGUNAN JALAN
SUKAMEKAR-SUKARAJAKOTAMADYA SUKABUMITAHUN ANGGARAN 2011
NoAlat Yang DigunakanAKTIFITAS ALATMinggu Ke
-1234567891011121314151617181Theodolite2Buldozer3Excavator4Wheel
loader 5Dump truck6Vibrator Roller7Motor Grader8Pompa &
Genset9Molen10Asphalt Sprayer 11Aspal Finisher
NoTenaga KerjaAKTIFITAS TENAGA KERJAMinggu Ke
-1234567891011121314151617181Mandor2Kepala Tukang3Tenaga
Ahli4Tukang5Operator6Asisten Operator
NoBahan Yang Digunakan BAHANMinggu Ke
-1234567891011121314151617181Air 2Tanah Galian3Tanah
Urugan4Sirtu5Batu Pecah6Aspal Semprot7Laston8Papan &
Kayu9Paku10Pasir11Semen12Gorong-gorong13Kanstin14Rambu15Lampu16Pipa
relling 5cm17Pipa relling 3cm18Cat
Daftar HargaDAFTAR HARGA SATUAN
NOJENIS UPAHHARGA UPAHSATUANIndex kotaHARGA
REALREFERENSIRp.Rp.JakartaRp.
1Mandor70,000OH170,000Jurnal Of Material
2Pekerja48,500OH148,500Jurnal Of Material 3Tukang
batu65,000OH165,000Jurnal Of Material 4Kepala tukang
batu68,000OH168,000Jurnal Of Material 5Tukang
kayu65,000OH165,000Jurnal Of Material 6Kepala tukang
kayu68,000OH168,000Jurnal Of Material 7Tukang besi
65,000OH165,000Jurnal Of Material 8Kepala tukang besi
68,000OH168,000Jurnal Of Material 9Tukang las65,000OH165,000Jurnal
Of Material 10Teknisi0.0OH1Jurnal Of Material 11Kepala
Teknisi0.0OH1Jurnal Of Material 12Operator alat
berat70,000OH170,000Jurnal Of Material 13Pembantu operator alat
berat65,000OH165,000Jurnal Of Material 14Tukang
cat65,000OH165,000Jurnal Of Material 15Kepala Tukang
Cat68,000OH168,000Jurnal Of Material 16Supir
Truk63,600OH163,600Jurnal Of Material 17Kenek
Truk35,900OH135,900Jurnal Of Material 0.01Jurnal Of Material
0.01Jurnal Of Material 0.01Jurnal Of Material 0.01Jurnal Of
Material
NOJENIS BAHANSPESIFIKASIHARGA BAHANSATUANIndex kotaHARGA
REALREFERENSIRp.Rp.Jakarta
Seng gelombang 180 x 90 x 0,0560,200lbr160,200Jurnal Of Material
Building Construction & InteriorSheet
pile426,800m'1426,800Jurnal Of Material Building Construction &
InteriorTulangan 0.01Jurnal Of Material Building Construction &
InteriorScafolding0.01Jurnal Of Material Building Construction
& InteriorKaso 4/6. 5/70.01Jurnal Of Material Building
Construction & InteriorTriplek0.01Jurnal Of Material Building
Construction & InteriorPaku 53,870kg13,870Jurnal Of Material
Building Construction & InteriorPaku 76,450kg16,450Jurnal Of
Material Building Construction & InteriorPaku
109,675kg19,675Jurnal Of Material Building Construction &
InteriorPaku 1210,320kg110,320Jurnal Of Material Building
Construction & InteriorKawat bendrat12,000kg112,000Jurnal Of
Material Building Construction & InteriorBeton Ready
Mix0.01Jurnal Of Material Building Construction & InteriorPasir
urug 110,000m31135,000Jurnal Of Material Building Construction
& InteriorBatu kali137,000m31220,500Jurnal Of Material Building
Construction & InteriorProfil WF14,200kg114,200Jurnal Of
Material Building Construction & InteriorBondex0.01Jurnal Of
Material Building Construction & InteriorPipa besi 3"0.01Jurnal
Of Material Building Construction & InteriorLampu
penerangan0.01Jurnal Of Material Building Construction &
InteriorAsphalt0.01Jurnal Of Material Building Construction &
InteriorDjabes gelombang Kecil 300 cm x 105 cm x 4
mm74,623.50buah174,624Jurnal Of Material Building Construction
& InteriorTiang pancang253,000m'1253,000Jurnal Of Material
Building Construction & Interior0.011
NOSEWA ALAT/TESTSEWA ALATSATUANIndex kotaHARGA
REALREFERENSIRp.Rp.Jakarta1Generator set0.01Jurnal Of Material
Building Construction & Interior2Crawler Craine0.01Jurnal Of
Material Building Construction & Interior3Pompa0.01Jurnal Of
Material Building Construction & Interior4Tiang
pancang0.01Jurnal Of Material Building Construction &
Interior5Excavator143,0001143,000Jurnal Of Material Building
Construction & Interior6Dump truck0.01Jurnal Of Material
Building Construction & Interior7Mesin las 400 Amp0.01Jurnal Of
Material Building Construction & Interior8Concrete
Pump0.01Jurnal Of Material Building Construction &
Interior9Vibrator0.01Jurnal Of Material Building Construction &
Interior100.01110.01120.01130.01140.01150.01160.01170.01
HG BAHANDAFTAR HARGA UPAH KERJA, MATERIAL DAN PERALATANDAFTAR
HARGA UPAH KERJA, MATERIAL DAN PERALATANTAHUN 2014LAMPUNG, TAHUN
2014
NO.U R A I A NSATUANHARGA ( Rp )KETNO.U R A I A NSATUANHARGA (
Rp )KET
UPAH KERJA UPAH KERJA1 mandorHari70,000.001 mandorHari73,500.002
Kepala tukangHari68,000.002 Kepala tukangHari71,400.003 Tukang
kayuHari65,000.003 Tukang kayuHari68,250.004 Tukang
besiHari65,000.004 Tukang besiHari68,250.005 Tukang
batuHari65,000.005 Tukang batuHari68,250.006 Operator
terlatihHari68,000.006 Operator terlatihHari71,400.007 Operator
kurang terlatihHari65,000.007 Operator kurang
terlatihHari68,250.008 Pembantu operatorHari35,900.008 Asisten
operatorHari37,695.009 Supir trukHari63,600.009 Supir
trukHari66,780.0010 Pembantu supirHari35,900.0010 Pembantu
supirHari37,695.0011 Buruh lapangan tak terlatihHari30,900.0011
Buruh lapangan tak terlatihHari32,445.0012 Buruh lapangan kurang
terlatihHari35,900.0012 Buruh lapangan kurang
terlatihHari37,695.0013 Buruh lapangan terlatihHari40,900.0013
Buruh lapangan terlatihHari42,945.0014 Pembantu
tukangHari35,900.0014 Pembantu tukangHari37,695.0015 P e k e r j
aHari48,500.0015 P e k e r j aHari50,925.00
MATERIAL MATERIAL1 Abu batum3164,000.001 Abu batum3164,000.002
Alat bantu set55,000.002 Alat bantu set55,000.003 Aspal
curahkg4,500.003 Aspal curahkg4,500.004 Aspal bitumenkg6,000.004
Aspal bitumenkg6,000.005 Atras (tanah urug)m368,000.005 Atras
(tanah urug)m368,000.006 Bata merah bh350.006 Bata merah bh350.007
Batu belah ukuran 10-15 cmm3137,000.007 Batu belah ukuran 10-15
cmm3137,000.008 Batu belah ukuran 15-20 cmm3137,000.008 Batu belah
ukuran 15-20 cmm3137,000.009 Batu pecah mesin ukuran 3 - 5
cmm3180,000.009 Batu pecah mesin ukuran 3 - 5 cmm3180,000.0010 Batu
pecah mesin ukuran 2 - 3 cm m3197,500.0010 Batu pecah mesin ukuran
2 - 3 cm m3197,500.0011 Batu pecah mesin ukuran 1 - 2 cm
m3197,500.0011 Batu pecah mesin ukuran 1 - 2 cm m3197,500.0012 Batu
pecah mesin ukuran 0,5 - 1 cmm3200,000.0012 Batu pecah mesin ukuran
0,5 - 1 cmm3200,000.0013 Batu pecah tangan ukuran 5 - 7
cmm3147,000.0013 Batu pecah tangan ukuran 5 - 7 cmm3147,000.0014
Batu pecah tangan ukuran 3 - 5 cmm3156,000.0014 Batu pecah tangan
ukuran 3 - 5 cmm3156,000.0015 Batu pecah tangan ukuran 2 - 3
cmm3175,000.0015 Batu pecah tangan ukuran 2 - 3 cmm3175,000.0016
Besi betonkg17,500.0016 Besi betonkg17,500.0017 Cat dasar / menie
kg30,000.0017 Cat dasar / menie kg30,000.0018 Cat kayu
kg45,000.0018 Cat kayu kg45,000.0019 Cat tembok kg36,800.0019 Cat
tembok kg36,800.0020 Cat sinkromatkg41,300.0020 Cat
sinkromatkg41,300.0021 Cat jembatan / sinkromatkg55,000.0021 Cat
jembatan / sinkromatkg55,000.0022 Gorong-gorong beton D 40 cm - 1
mbh82,000.0022 Gorong-gorong beton D 40 cm - 1 mbh82,000.0023
Gorong-gorong beton D 60 cm - 1 mbh95,000.0023 Gorong-gorong beton
D 60 cm - 1 mbh95,000.0024 Gorong-gorong beton D 80 cm - 1
mbh105,000.0024 Gorong-gorong beton D 80 cm - 1 mbh105,000.0025
Gorong-gorong beton D 100 cm - 1,5 mbh110,000.0025 Gorong-gorong
beton D 100 cm - 1,5 mbh110,000.0026 Glass beatkg40,000.0026 Glass
beatkg40,000.0027 Gas elpijikg7,000.0027 Gas elpijikg7,000.0028 I j
u kkg7,000.0028 I j u kkg7,000.0029 Kayu dolken dia 8 -10/4
m'btg33,125.0029 Kayu dolken dia 8 -10/4 m'btg33,125.0030 Kayu
dolken dia 12 -15/4 m'btg45,000.0030 Kayu dolken dia 12 -15/4
m'btg45,000.0031 Kayu hutanm32,645,000.0031 Kayu kaso
4/6m32,645,000.0032 Kayu kaso 5/7 marantim34,255,000.0032 Kayu kaso
5/7 marantim34,255,000.0033 Kapur bakarm3214,000.0033 Kapur
bakarm3214,000.0034 Kawat bronjong 4 mmkg9,000.0034 Kawat bronjong
4 mmkg9,000.0035 Kawat baja (bindstaal)/kawat betonkg22,000.0035
Kawat baja (bindstaal)/kawat betonkg22,000.0036 Kayu
perancah/acuanm32,645,000.0036 Kayu perancah/acuanm32,645,000.0037
Minyak tanahlt8,000.0037 Minyak tanahlt8,000.0038 Minyak
diesel/solarlt4,500.0038 Minyak diesel/solarlt4,500.0039 Minyak
pelumaslt30,000.0039 Minyak pelumaslt30,000.0040 Minyak
aspalkg8,000.0040 Minyak aspalkg8,000.0041 Paku biasa 2" -
5"kg18,000.0041 Paku biasa 2" - 5"kg18,000.0042 Pasir
pasangm3115,000.0042 Pasir pasangm3115,000.0043 Paving
blockbh2,100.0043 Paving blockbh2,100.0044 Kanstinbh18,500.0044
Kanstinbh18,500.0045 Rumput tanamm28,500.0045 Rumput
tanamm28,500.0046 Plamir tembok sejenis Vinilexkg7,500.0046 Plamir
tembok sejenis Vinilexkg7,500.0047 Pasir
urug/timbunanm3110,000.0047 Pasir urug/timbunanm3110,000.0048 Pasir
beton/kasarm3208,000.0048 Pasir beton/kasarm3208,000.0049 Portland
cement (PC)zak76,000.0049 Portland cement (PC)zak76,000.0050
Portland cement (PC)kg1,520.0050 Portland cement (PC)kg1,520.0051
Pipa galvanis O 3 cmm15,000.0051 Pipa galvanis O 3 cmm15,000.0051
Pipa galvanis O 5 cmm43,750.0051 Pipa galvanis O 5 cmm43,750.0052
Premiumlt7,600.0052 Premiumlt7,600.0053 Pasir aspalm3150,000.0053
Pasir aspalm3150,000.0054 Seng gelombang 3" - 6" BJLS
30lbr50,000.0054 Seng gelombang 3" - 6" BJLS 30lbr50,000.0055 S i r
t um3195,000.0055 S i r t um3195,000.0056 Sirtu tersaring (pecah
bergradasi)m3135,000.0056 Sirtu tersaring (pecah
bergradasi)m3135,000.0057 Triplek 6 mmlbr60,600.0057 Triplek 6
mmlbr60,600.0058 Tanah timbunan terpilih (tanah lokal)m378,000.0058
Tanah timbunan terpilih (tanah lokal)m378,000.0059 Thermoplastic
glass beatkg46,000.0059 Thermoplastic glass beatkg46,000.0060 Upah
penulisanbh50,000.0060 Upah penulisanbh50,000.0061 Kunci
Gembokbh8,700.0061 Kunci Gembokbh8,700.0062 Engsel
PintuSet25,000.0062 Engsel PintuSet25,000.0063 Triplek 3
mmlbr45,000.0063 Triplek 3 mmlbr45,000.00920064 Ram
Kawatm210,250.0064 Ram Kawatm210,250.0065 Tanah urug
biasam356,000.0065 Tanah urug biasam356,000.0066 Pipa besi
2"btg44,000.0066 Pipa besi 2"btg44,000.0067 Socket besi
3"bh37,000.0067 Socket besi 3"bh37,000.0068 Besi Profil /
WFkg10,500.0068 Besi Profil / WFkg10,500.0069 Plat Bajakg9,500.0069
Plat Bajakg9,500.0070 Besi Stripkg7,000.0070 Besi Stripkg7,000.0071
Elastomerbh490,000.0071 Elastomerbh490,000.0072 Ruber
Jointbh160,000.0072 Ruber Jointbh160,000.0073 Scafholdingbh908.0073
Scafholdingbh908.0074 Rambubh240,000.0074 Rambubh240,000.0075 Lampu
peneranganbh1,055,000.0075 Lampu peneranganbh1,055,000.00
PERALATAN
PERALATANHarga/hariProduktivitassatuanHarga/satuan1Penyemprot Aspal
350 literjam20,720.001Penyemprot Aspal 350 literjam20,720.001 hari=
7 jam145,040.0079.680m2/jam260.0402Mesin Penyampur Aspal 30 Ton /
Jamjam157,193.202Mesin Penyampur Aspal 30 Ton / Jamjam157,193.201
hari= 7 jam3Mesin Penyampur Aspal 10 Ton / Jamjam206,272.903Aspal
Finisherjam206,272.901 hari= 7
jam1,443,910.301512.000m2/jam136.4244Mesin Penghampar 30
HPjam387,811.004Mesin Penghampar 30 HPjam387,811.001 hari= 7
jam5Compresor 150 M3 / Jamjam34,974.005Compresor 150 M3 /
Jamjam34,974.001 hari= 7 jam6Bulldozer D6D 160
HPjam144,700.006Bulldozer D6D 160 HPjam144,700.001 hari= 7
jam1,012,900.00189.626Lm3/jam763.0817Bulldozer 65
HPjam115,110.007Bulldozer 65 HPjam115,110.001 hari= 7 jam8Excavator
PC 300jam120,900.008Excavator PC 300jam120,900.001 hari= 7
jam846,300.00205.425Lm3/jam588.5369Excavator PC
220jam100,500.009Excavator PC 220jam100,500.001 hari= 7
jam703,500.00114.125Lm3/jam880.61312Alat Penggetar Beton 4
HPjam6,930.0012Alat Penggetar Beton 4 HPjam6,930.001 hari= 7
jam14Pengaduk Beton 125 - 500 Lt 6 HPjam14,670.0014Pengaduk Beton
125 - 500 Lt 6 HPjam14,670.001 hari= 7
jam102,690.003.571m3/jam4108.09315Dump Truck 3,5 Ton 115
HPjam112,374.0015Dump Truck 3,5 Ton 115 HPjam112,374.001 hari= 7
jam16Dump Truck 5 Tonjam151,506.4016Dump Truck 5 Tonjam151,506.401
hari= 7 jam1,060,544.8035.000m3/jam4328.75417Truk Bak Terbuka 3,5
Ton - 4 Tonjam91,800.0017Truk Bak Terbuka 3,5 Ton - 4
Tonjam91,800.001 hari= 7 jam18Truk Bak Terbuka 5
Tonjam101,635.0018Truk Bak Terbuka 5 Tonjam101,635.001 hari= 7
jam711,445.0020Whell Loader 115 HPjam130,826.8020Whell Loader CAT
930 115 HPjam130,826.801 hari= 7
jam915,787.60342.968Lm3/jam381.45522Motor grader 100
HPjam153,000.0022Motor graderGD-31 110 HPjam153,000.001 hari= 7
jam1,071,000.00469.174m2/jam326.10523Tamper 4
HPjam10,890.0023Tamper 4 HPjam10,890.001 hari= 7 jam24Mesin Gilas
Roda Karet 8 - 15 Tonjam113,796.0024Mesin Gilas Roda Karet 8 - 15
Tonjam113,796.001 hari= 7 jam25Mesin Gilas Tiga Roda 8 - 10
Tonjam64,350.0025Mesin Gilas Tiga Roda 8 - 10 Tonjam64,350.001
hari= 7 jam29Mesin Gilas Tandem 6 - 10 Tonjam54,450.0029Mesin Gilas
Tandem 6 - 10 Tonjam54,450.001 hari= 7
jam381,150.0068.910m2/jam790.16132Mesin Gilas Bergetar 1
Tonjam13,410.0032Mesin Gilas Bergetar 1 Tonjam13,410.001 hari= 7
jam33Truk Tangki Air 115 HPjam120,474.0033Truk Tangki Air 115
HPjam120,474.001 hari= 7 jam34Truk Tangki Airjam127,548.0034Truk
Tangki Airjam127,548.001 hari= 7 jam35Pompa Air 50 mm 30 m3 /
Jamjam13,230.0035Pompa Air 50 mm 30 m3 / Jamjam13,230.001 hari= 7
jam36Pompa Air 100 mm 30 m3 / Jamjam16,560.0036Pompa Air 100 mm 30
m3 / Jamjam16,560.001 hari= 7
jam37Extruderjam8,000.0037Extruderjam8,000.001 hari= 7
jam38Gerobakjam800.0038Pick Upjam800.001 hari= 7
jam5,600.0039Theodolitejam10,000.0039Theodolitejam10,000.001 hari=
7 jam70,000.00
8.158.15
HSPPROYEK PEMBANGUNAN JALAN SUKAMEKAR-SUKARAJAKOTAMADYA
SUKABUMITAHUN ANGGARAN 2011
PERHITUNGAN HARGA SATUAN PEKERJAAN
NoUraian PekerjaanKoefisienSatuanHarga
SatuanJumlahTotalRpRpRp
1Pekerjaan Persiapan1.1Mobilisasi dan
Demobilisasi1LS25,000,000.0025,000,000.00Total25,000,000.001.2Pengadaan
Air Kerja1Unit3,700,000.003,700,000.00Total3,700,000.001.3Pengadaan
Sanitasi2Unit2,500,000.005,000,000.00Total5,000,000.001.4Pengadaan
Penerangan1LS3,500,000.003,500,000.00Total3,500,000.001.5Pembersihan
Lokasi (Land Clearing)Untuk 1
m1Alat/BahanBuldozer0.00046buah1,012,900.00465.93UpahOperator0.00046OH71,400.0032.84Asisten
Operator0.00046OH37,695.0017.34Pekerja0.00092OH50,925.0046.85Total562.971.6Surveying
(Pengukuran dan pematokan)Untuk 1 m1Alat/BahanTheodolite &
Perlengkapan ukur0.0067buah70,000.00469.00Kayu Kaso
4/60.0048m32,645,000.0012,696.00Cat
0.2kg27,500.005,500.00UpahSurveyor0.0067OH71,400.00478.38Asisten
Surveyor/Pekerja0.02OH37,695.00753.90Total19,897.281.7Papan Nama
ProyekUntuk 1 buah papan namaAlat/BahanPlat baja 2
mm5.13kg9,500.0048,735.00Pipa besi dia. 2
"2batang44,000.0088,000.00Cat besi0.3kg41,300.0012,390.00Semen
Cor1m31,520.001,556.48Amplas0.375lembar5,500.002,062.50Las0.3unit345,000.00103,500.00UpahMandor0.0334OH73,500.002,454.90Tukang0.333OH68,250.0022,727.25Pekerja0.667OH50,925.0033,966.98Total315,393.111.8Pembuatan
Direksi KeetUntuk 1
unitAlat/BahanContainer1buah2,100,000.002,100,000.00Mortar (1 PC :
3
PS)0.5m3123,000.0061,500.00UpahMandor0.2OH73,500.0014,700.00Tukang1OH68,250.0068,250.00Pekerja1OH50,925.0050,925.00Total2,295,375.001.9Pembuatan
GudangUntuk 1 m2Alat/BahanPasir0.3m3110,000.0033,000.00Mortar (1 PC
: 3 PS)0.03m3123,000.003,690.00Kayu Kaso
4/60.0048m32,645,000.0012,696.00Triplek 6
mm0.35lembar60,600.0021,210.00Paku
5"0.25kg18,000.004,500.00UpahMandor0.025OH73,500.001,837.50Tukang0.125OH68,250.008,531.25Pekerja0.25OH50,925.0012,731.25Total98,196.001.10Pembuatan
Barak PekerjaUntuk 1
m2Alat/BahanPasir0.3m2110,000.0033,000.00Mortar (1 PC : 3
PS)0.03m3123,000.003,690.00Kayu Kaso
4/60.0048m32,645,000.0012,696.00Triplek 6
mm0.35lembar60,600.0021,210.00Paku
5"0.25kg18,000.004,500.00UpahMandor0.01OH73,500.00735.00Tukang0.05OH68,250.003,412.50Pekerja0.25OH50,925.0012,731.25Total91,974.751.11Pembuatan
Bengkel dan Penyimpanan ListrikUntuk 1
m2Alat/BahanPasir0.3m2110,000.0033,000.00Mortar (1 PC : 3
PS)0.03m3123,000.003,690.00Kayu Kaso
4/60.0048m32,645,000.0012,696.00Triplek 6
mm0.35lembar60,600.0021,210.00Paku
5"0.25kg18,000.004,500.00UpahMandor0.016OH73,500.001,176.00Tukang0.083OH68,250.005,664.75Pekerja0.25OH50,925.0012,731.25Total94,668.001.12Pos
KeamananUntuk 1 m2Alat/BahanPasir0.3m2110,000.0033,000.00Mortar (1
PC : 3 PS)0.03m3123,000.003,690.00Kayu Kaso
4/60.0048m32,645,000.0012,696.00Triplek 6
mm0.35lembar60,600.0021,210.00Paku
5"0.25kg18,000.004,500.00UpahMandor0.025OH73,500.001,837.50Tukang0.25OH68,250.0017,062.50Pekerja0.5OH68,250.0034,125.00Total128,121.001.14Pengujian
Bahan1LS5,100,000.005,100,000.00Total5,100,000.00
1.15Foto DokumentasiAlat/BahanCamera
digital0.00725buah/hr3,050,000.0022,101.45UpahPekerja0.0001OH50,925.005.09Total22,106.542Pekerjaan
Tanah2.1Pekerjaan Stripping (t=0.3m)Untuk 1 m1Alat/BahanBuldozer
D6D, 160 HP0.00075buah1,012,900.00759.68Wheel Loader
C-9300.00042buah915,787.60384.63Dump Truck HD
3250.00362buah1,060,544.803,839.17UpahOperator
(B)0.00075OH71,400.0053.55Asisten Operator
(B)0.00075OH37,695.0028.27Pekerja
(B)0.0015OH50,925.0076.3875Operator
(L)0.00042OH71,400.0029.99Asisten Operator
(L)0.00042OH37,695.0015.83Pekerja
(L)0.00084OH50,925.0042.78Operator
(DT)0.00362OH71,400.00258.47Asisten Operator
(DT)0.0362OH37,695.001,364.56Total6,853.312.2Pekerjaan GalianUntuk
1 m3Alat/BahanExcavator PC 3000.00069buah846,300.00583.95Dump Truck
HD 3250.0037buah1,060,544.803,924.02UpahOperator
(E)0.00069OH71,400.0049.27Asisten Operator
(E)0.00069OH37,695.0026.01Pekerja
(E)0.00138OH50,925.0070.28Operator
(DT)0.0037OH71,400.00264.18Asisten Operator
(DT)0.0037OH37,695.00139.47Total5,057.172.3Pekerjaan TimbunanUntuk
1 m3Alat/BahanDump Truck HD
3250.0037buah1,060,544.803,924.02UpahOperator
(DT)0.0037OH71,400.00264.18Asisten Operator
(DT)0.0037OH37,695.00139.47Total4,327.672.4Pemadatan TanahUntuk 1
m2Alat/BahanTandem Roller0.00207buah381,150.00788.98UpahOperator
(TR)0.00207OH71,400.00147.80Asisten Operator
(TR)0.00207OH37,695.0078.03Pekerja0.00414OH50,925.00210.83Total1,225.642.5Perataan
TanahUntuk 1 m2Alat/BahanMotor Grader GD 31, 110
HP0.000304buah1,071,000.00325.58UpahOperator
(MG)0.000304OH71,400.0021.71Asisten Operator
(MG)0.000304OH37,695.0011.46Pekerja
(MG)0.000608OH50,925.0030.96Total389.713Pekerjaan Konstruksi
Jalan3.1Lapisan Pondasi Bawah SIRTU 3.1.1 Pengadaan Material
SirtuUntuk 1 m3Alat/BahanDump Truck HD
3250.0037buah1,060,544.803,924.02SIRTU1m3195,000.00195,000.00UpahOperator
(DT)0.0037OH71,400.00264.18Asisten Operator
(DT)0.0037OH37,695.00139.47Total199,327.673.1.2 Penghamparan
Material SirtuUntuk 1 m3Alat/BahanBuldozer D6D, 160
HP0.00075buah1,012,900.00759.68UpahOperator
(B)0.00075OH71,400.0053.55Asisten Operator
(B)0.00075OH37,695.0028.27Pekerja
(B)0.0015OH50,925.0076.39Total917.883.1.3 Pemadatan Pondasi
BawahUntuk 1 m2Alat/BahanTandem
Roller0.00052buah381,150.00198.20UpahOperator
(TR)0.00052OH71,400.0037.13Asisten Operator
(TR)0.00052OH37,695.0019.60Pekerja
(TR)0.00104OH50,925.0052.96Total307.893.1.4 Perataan Pondasi
BawahUntuk 1 m2Alat/BahanMotor Grader GD 31, 110
HP0.000304buah1,071,000.00325.58UpahOperator
(MG)0.000304OH71,400.0021.71Asisten Operator
(MG)0.000304OH37,695.0011.46Pekerja
(MG)0.000608OH50,925.0030.96Total389.713.2Lapisan Pondasi Atas Batu
Pecah 3.2.1 Pengadaan MaterialUntuk 1 m3Alat/BahanDump Truck HD
3250.0037buah1,060,544.803,924.02Batu
Pecah1m3156,000.00156,000.00UpahOperator
(DT)0.0037OH71,400.00264.18Asisten Operator
(DT)0.0037OH37,695.00139.47Total160,327.673.2.2 Penghamparan
Material SirtuUntuk 1 m3Alat/BahanBuldozer D6D, 160
HP0.00075buah1,012,900.00759.68UpahOperator
(B)0.00075OH71,400.0053.55Asisten Operator
(B)0.00075OH37,695.0028.27Pekerja
(B)0.0015OH50,925.0076.39Total917.883.2.3 Pemadatan Pondasi
BawahUntuk 1 m2Alat/BahanTandem
Roller0.00052buah381,150.00198.20UpahOperator
(TR)0.00052OH71,400.0037.13Asisten Operator
(TR)0.00052OH37,695.0019.60Pekerja
(TR)0.00104OH50,925.0052.96Total307.893.2.4 Perataan Pondasi
BawahUntuk 1 m2Alat/BahanMotor Grader GD 31, 110
HP0.000304buah1,071,000.00325.58UpahOperator
(MG)0.000304OH71,400.0021.71Asisten Operator
(MG)0.000304OH37,695.0011.46Pekerja
(MG)0.000608OH50,925.0030.96Total389.713.3Lapis Atas, Laston 3.3.1
Penghamparan Prime CoatUntuk 1 m2Alat/BahanAsphalt Sprayer
0.00179buah145,040.00259.62Prime
coat4.40m24,500.0019,800.00UpahOperator
(AS)0.00179OH71,400.00127.81Asisten Operator
(AS)0.00179OH37,695.0067.47Pekerja
(AS)0.00358OH50,925.00182.31Total20,437.213.3.2 Penghamparan
aspalUntuk 1 m2Alat/BahanAsphalt Finisher
0.00009buah1,443,910.30129.95Aspal110kg6,000.00660,000UpahOperator
(AF)0.00009OH71,400.006.43Asisten Operator
(AF)0.00009OH37,695.003.39Pekerja
(AF)0.00018OH50,925.009.17Total660,148.943.3.3 Pemadatan aspalUntuk
1 m2Alat/BahanTandem Roller 0.00052buah381,150.00198.20UpahOperator
(TR)0.00052OH71,400.0037.13Asisten Operator
(TR)0.00052OH37,695.0019.60Pekerja
(TR)0.00104OH50,925.0052.96Total307.894Pekerjaan
Drainase4.1Pekerjaan Galian Tanah DrainaseUntuk 1
m3Alat/BahanExcavator PC 2200.00125buah703,500.00879.38Dump Truck
HD 3250.00424buah1,060,544.804,496.71UpahOperator
(E)0.00125OH71,400.0089.25Asisten Operator
(E)0.00125OH37,695.0047.12Pekerja
(E)0.0025OH50,925.00127.31Operator
(DT)0.00424OH71,400.00302.74Asisten Operator
(DT)0.00424OH37,695.00159.83Total6,102.335Pekerjaan
Utilitas5.1Pekerjaan Gorong-gorong5.1.1 Pemasangan
gorong-gorongUntuk 1
m1Alat/BahanGorong-gorong0.25buah110,000.0027,500.00Upah0.025OH78,750.001,968.750.0416OH52,500.002,184.000.01OH47,250.00472.5032,125.256Pekerjaan
Kanstin6.1Pemasangan KanstinUntuk 1
m1Alat/BahanKanstin3.5buah18,500.0064,750.00UpahMandor0.005OH78,750.00393.75Tukang0.01OH52,500.00525.00Pekerja0.1OH47,250.004,725.00Total70,393.757Pekerjaan
Lain-lain7.1Pemasangan RambuUntuk 1
unitAlat/BahanRambu1buah240,000.00240,000.00UpahMandor0.05OH78,750.003,937.50Tukang0.25OH52,500.0013,125.00Pekerja1OH47,250.0047,250.00Total304,312.507.2Pemasangan
Lampu PeneranganUntuk 1 unitAlat/BahanLampu
Penerangan1buah1,055,000.001,055,000.00UpahMandor0.05OH78,750.003,937.50Tukang0.25OH52,500.0013,125.00Pekerja1OH47,250.0047,250.00Total1,119,312.507.3Tiang
Sandaran7.3.1 Blok BetonUntuk 1 m3Alat/BahanMortar
cor1m3123,000.00123,000.00UpahMandor0.2OH78,750.0015,750.00Tukang1OH52,500.0052,500.00Pekerja4OH47,250.00189,000.00Total380,250.007.3.2
Pipa Relling D-5cmUntuk 1 m1Alat/BahanPipa Relling
D-5cm1m143,750.0043,750.00UpahMandor0.004OH78,750.00315.00Tukang0.02OH78,750.001,575.00Pekerja0.1OH47,250.004,725.00Total50,365.007.3.3
Pipa Relling D-3cmUntuk 1 m1Alat/BahanPipa Relling
D-3cm1m115,000.0015,000.00UpahMandor0.0025OH78,750.00196.88Tukang0.005OH47,250.00236.25Pekerja0.05OH47,250.002,362.50Total17,795.638Pekerjaan
Finishing8.1Pembersihan Lokasi kerja8.1.1 Pembongkaran Site
InstalationUntuk 1 m2Alat/BahanTruk bak
terbuka0.0001buah711,445.0071.14Gerobak0.01buah5,600.0056.00UpahMandor0.00555OH78,750.00437.06Pekerja0.111OH47,250.005,244.75Total5,808.968.1.2
Pembersihan sisa pekerjaanUntuk 1 m1Alat/BahanTruk bak
terbuka0.00005buah711,445.0035.57Gerobak0.005buah5,600.0028.00UpahMandor0.002OH78,750.00157.50Pekerja0.05OH47,250.002,362.50Total2,583.578.2Pembuatan
Marka Jalan8.2.1 Garis LurusUntuk 1
m1Alat/BahanCat0.04kg36,800.001,472.00UpahMandor0.001OH78,750.0078.75Pekerja0.02OH47,250.00945.00Total2,495.75
Project Manager,Pembangunan Jalan Sukamekar-Sukaraja
Ok Taecyeon, MT
BQPROYEK PEMBANGUNAN JALAN SUKAMEKAR-SUKARAJAPROYEK PEMBANGUNAN
JALAN SUKAMEKAR-SUKARAJAKOTAMADYA SUKABUMIKOTAMADYA SUKABUMITAHUN
ANGGARAN 2011TAHUN ANGGARAN 2011
Rencana Anggaran Biaya (RAB) Rekapitulasi Biaya
NOURAIAN PEKERJAANkuantitassatuanHSPBIAYANOURAIAN PEKERJAANTOTAL
BIAYA (Rp)BOBOT %
1Pekerjaan Persiapan1Pekerjaan
Persiapan152,801,986.280.471.1Mobilisasi dan
Demobilisasi1LS25,000,000.0025,000,000.002Pekerjaan
Tanah362,278,895.971.111.2Pengadaan Air
Kerja1unit3,700,000.003,700,000.003Pekerjaan Konstruksi
Jalan31,248,110,375.9996.081.3Pengadaan
Sanitasi2unit5,000,000.0010,000,000.004Pekerjaan
Drainase24,702,227.800.081.4Pengadaan
Penerangan1LS3,500,000.003,500,000.005Pekerjaan
Utilitas3,212,525.000.011.5Pembersihan Lokasi (Land
Clearing)60718m1562.9734,182,333.536Pekerjaan
Trotoar284,953,900.000.881.6Surveying (Pengukuran dan
pematokan)2408.5m119,897.2847,922,598.887Pekerjaan
Lain-lain433,438,060.001.331.7Papan Nama
Proyek1buah315,393.11315,393.118Pekerjaan
Finishing12,895,261.380.041.8Pembuatan Direksi
Keet2unit2,295,375.004,590,750.001.9Pembuatan Bengkel
20m298,196.001,963,920.00JUMLAH32,522,393,232.41100.001.10Pembuatan
Barak Pekerja60m291,974.755,518,485.001.11Pembuatan Gudang dan
ME80m294,668.007,573,440.00PAJAK4,878,358,984.861.12Pos
Keamanan3m2128,121.00384,363.001.14Pengujian
Bahan1LS5,100,000.005,100,000.00JUMLAH37,400,752,217.281.15Foto
Dokumentasi138hari22,106.543,050,702.77Sub total
152,801,986.28PROFIT3,740,075,221.732Pekerjaan Tanah2.1Pekerjaan
Stripping (t=0.3m)25890m36,853.31177,429,470.58TOTAL
KESELURUHAN41,140,827,4392.2Pekerjaan
Galian25007m35,057.17126,462,029.332.3Pekerjaan
Timbunan44464m31,225.6454,496,830.572.4Pemadatan
Tanah2409m21,225.642,951,945.872.5Perataan
Tanah2409m2389.71938,619.62Sub total 362,278,895.97Project
Manager,3Pekerjaan Konstruksi JalanPembangunan Jalan
Sukamekar-Sukaraja3.1Lapisan Pondasi Bawah SIRTU CBR 70 %3.1.1
Pengadaan Material Sirtu5564m3199,327.671,108,986,386.043.1.2
Penghamparan Material Sirtu5564m3917.885,106,770.163.1.3 Pemadatan
Pondasi Bawah33719m2307.8910,381,722.683.1.4 Perataan Pondasi
Bawah33719m2389.7113,140,674.653.2Lapisan Pondasi Atas Batu Pecah
CBR 100 % 3.2.1 Pengadaan Material Batu
Pecah3372m3160,327.67540,608,861.23Ok Taecyeon, MT3.2.2
Penghamparan Material Batu Pecah3372m3917.883,095,012.223.2.3
Pemadatan Pondasi Atas81972m2307.8925,238,309.903.2.4 Perataan
Pondasi Atas81972m2389.7131,945,413.043.3Lapis Atas, Laston (t=10
cm)3.3.1 Penghamparan Prime Coat43340m220,437.21885,738,599.313.3.2
Penghamparan aspal43340m2660,148.9428,610,524,854.113.3.3 Pemadatan
aspal43340m3307.8913,343,772.65Sub total
31,248,110,375.994Pekerjaan Drainase4.1Pekerjaan Galian
Drainase4048m36,102.3324,702,227.80Sub total
24,702,227.805Pekerjaan Utilitas5.1Pekerjaan Gorong-gorong5.1.1
Pemasangan gorong-gorong100m132,125.253,212,525.00Sub total
3,212,525.006Pekerjaan Trotoar6.3Pemasangan
Kanstin4048m170,393.75284,953,900.00Sub total 284,953,900.00
8Pekerjaan Lain-lain8.1Pemasangan
Rambu28buah304,312.508,520,750.008.2Pemasangan Lampu
Penerangan321buah1,119,312.50359,299,312.508.3Tiang Sandaran8.3.1
Blok Beton3m3380,250.001,140,750.008.3.2 Pipa Relling
D-5cm199m150,365.0010,022,635.008.3.3 Pipa Relling
D-3cm3060m117,795.6354,454,612.50Sub total 433,438,060.009Pekerjaan
Finishing9.1Pembersihan Lokasi kerja9.1.1 Pembongkaran Site
Instalastion500m25,808.962,904,478.509.1.2 Pembersihan sisa
pekerjaan2023.9m12,583.575,228,891.889.3Pembuatan Marka Jalan9.3.1
Garis Lurus1908m12,495.754,761,891.00Sub total 12,895,261.38
Project Manager,Pembangunan Jalan Sukamekar-Sukaraja
Ok Taecyeon, MT
harga prnt
DAFTAR HARGA UPAH KERJA, MATERIAL DAN PERALATANBOGOR, TAHUN
2010
NO.U R A I A NSATUANHARGA ( Rp )KET
UPAH KERJA1 mandorHari73,500.002 Kepala tukangHari71,400.003
Tukang kayuHari68,250.004 Tukang besiHari68,250.005 Tukang
batuHari68,250.006 Operator terlatihHari71,400.007 Operator kurang
terlatihHari68,250.008 Asisten operatorHari37,695.009 Supir
trukHari66,780.0010 Pembantu supirHari37,695.0011 Buruh lapangan
tak terlatihHari32,445.0012 Buruh lapangan kurang
terlatihHari37,695.0013 Buruh lapangan terlatihHari42,945.0014
Pembantu tukangHari37,695.0015 P e k e r j aHari50,925.00
MATERIAL1 Abu batum3164,000.002 Alat bantu set55,000.003 Aspal
curahkg4,500.004 Aspal bitumenkg6,000.005 Atras (tanah
urug)m368,000.006 Bata merah bh350.007 Batu belah ukuran 10-15
cmm3137,000.008 Batu belah ukuran 15-20 cmm3137,000.009 Batu pecah
mesin ukuran 3 - 5 cmm3180,000.0010 Batu pecah mesin ukuran 2 - 3
cm m3197,500.0011 Batu pecah mesin ukuran 1 - 2 cm m3197,500.0012
Batu pecah mesin ukuran 0,5 - 1 cmm3200,000.0013 Batu pecah tangan
ukuran 5 - 7 cmm3147,000.0014 Batu pecah tangan ukuran 3 - 5
cmm3156,000.0015 Batu pecah tangan ukuran 2 - 3 cmm3175,000.0016
Besi betonkg17,500.0017 Cat dasar / menie kg30,000.0018 Cat kayu
kg45,000.0019 Cat tembok kg36,800.0020 Cat sinkromatkg41,300.0021
Cat jembatan / sinkromatkg55,000.0022 Gorong-gorong beton D 40 cm -
1 mbh82,000.0023 Gorong-gorong beton D 60 cm - 1 mbh95,000.0024
Gorong-gorong beton D 80 cm - 1 mbh105,000.0025 Gorong-gorong beton
D 100 cm - 1,5 mbh110,000.0026 Glass beatkg40,000.0027 Gas
elpijikg7,000.0028 I j u kkg7,000.0029 Kayu dolken dia 8 -10/4
m'btg33,125.0030 Kayu dolken dia 12 -15/4 m'btg45,000.0031 Kayu
kaso 4/6m32,645,000.0032 Kayu kaso 5/7 marantim34,255,000.0033
Kapur bakarm3214,000.0034 Kawat bronjong 4 mmkg9,000.0035 Kawat
baja (bindstaal)/kawat betonkg22,000.0036 Kayu
perancah/acuanm32,645,000.0037 Minyak tanahlt8,000.0038 Minyak
diesel/solarlt4,500.0039 Minyak pelumaslt30,000.0040 Minyak
aspalkg8,000.0041 Paku biasa 2" - 5"kg18,000.0042 Pasir
pasangm3115,000.0043 Paving blockbh2,100.0044 Kanstinbh18,500.0045
Rumput tanamm28,500.0046 Plamir tembok sejenis Vinilexkg7,500.0047
Pasir urug/timbunanm3110,000.0048 Pasir beton/kasarm3208,000.0049
Portland cement (PC)zak76,000.0050 Portland cement (PC)kg1,520.0051
Pipa galvanis O 3 cmm15,000.0051 Pipa galvanis O 5 cmm43,750.0052
Premiumlt7,600.0053 Pasir aspalm3150,000.0054 Seng gelombang 3" -
6" BJLS 30lbr50,000.0055 S i r t um3195,000.0056 Sirtu tersaring
(pecah bergradasi)m3135,000.0057 Triplek 6 mmlbr60,600.0058 Tanah
timbunan terpilih (tanah lokal)m378,000.0059 Thermoplastic glass
beatkg46,000.0060 Upah penulisanbh50,000.0061 Kunci
Gembokbh8,700.0062 Engsel PintuSet25,000.0063 Triplek 3
mmlbr45,000.0064 Ram Kawatm210,250.0065 Tanah urug
biasam356,000.0066 Pipa besi 2"btg44,000.0067 Socket besi
3"bh37,000.0068 Besi Profil / WFkg10,500.0069 Plat Bajakg9,500.0070
Besi Stripkg7,000.0071 Elastomerbh490,000.0072 Ruber
Jointbh160,000.0073 Scafholdingbh908.0074 Rambubh240,000.0075 Lampu
peneranganbh1,055,000.00
PERALATANHarga/hari1Penyemprot Aspal 350 literjam20,720.001
hari= 7 jam145,040.002Mesin Penyampur Aspal 30 Ton /
Jamjam157,193.201 hari= 7 jam1,100,352.403Aspal
Finisherjam206,272.901 hari= 7 jam1,443,910.304Mesin Penghampar 30
HPjam387,811.001 hari= 7 jam2,714,677.005Compresor 150 M3 /
Jamjam34,974.001 hari= 7 jam244,818.006Bulldozer D6D 160
HPjam144,700.001 hari= 7 jam1,012,900.007Bulldozer 65
HPjam115,110.001 hari= 7 jam805,770.008Excavator PC
300jam120,900.001 hari= 7 jam846,300.009Excavator PC
220jam100,500.001 hari= 7 jam703,500.0012Alat Penggetar Beton 4
HPjam6,930.001 hari= 7 jam48,510.0014Pengaduk Beton 125 - 500 Lt 6
HPjam14,670.001 hari= 7 jam102,690.0015Dump Truck 3,5 Ton 115
HPjam112,374.001 hari= 7 jam786,618.0016Dump Truck 5
Tonjam151,506.401 hari= 7 jam1,060,544.8017Truk Bak Terbuka 3,5 Ton
- 4 Tonjam91,800.001 hari= 7 jam642,600.0018Truk Bak Terbuka 5
Tonjam101,635.001 hari= 7 jam711,445.0020Whell Loader CAT 930 115
HPjam130,826.801 hari= 7 jam915,787.6022Motor graderGD-31 110
HPjam153,000.001 hari= 7 jam1,071,000.0023Tamper 4 HPjam10,890.001
hari= 7 jam76,230.0024Mesin Gilas Roda Karet 8 - 15
Tonjam113,796.001 hari= 7 jam796,572.0025Mesin Gilas Tiga Roda 8 -
10 Tonjam64,350.001 hari= 7 jam450,450.0029Mesin Gilas Tandem 6 -
10 Tonjam54,450.001 hari= 7 jam381,150.0032Mesin Gilas Bergetar 1
Tonjam13,410.001 hari= 7 jam93,870.0033Truk Tangki Air 115
HPjam120,474.001 hari= 7 jam843,318.0034Truk Tangki
Airjam127,548.001 hari= 7 jam892,836.0035Pompa Air 50 mm 30 m3 /
Jamjam13,230.001 hari= 7 jam92,610.0036Pompa Air 100 mm 30 m3 /
Jamjam16,560.001 hari= 7 jam115,920.0037Extruderjam8,000.001 hari=
7 jam56,000.0038Pick Upjam800.001 hari= 7
jam5,600.0039Theodolitejam10,000.001 hari= 7 jam70,000.00