PHILIPPINE RED CROSS IN WATER AN REGION NAME OF SCHOOL 6 LANJAGAN PRIMARY SCHOOL BUDGET ALLOCATION: NO DESCRIPTION 1 Expenses 1A Insurances 1B Bonds and Guarantees 2 Mobilization 2A General Project Mobilisation/Demob, Safety & Health 3 Construction of Toilet Detached & Hand washing facilities 3A Earthworks 3B Concrete Works 3C Steel Works 3D Formworks 3E Masonry Works 3F Doors and Windows 3G Roofing Works 3H Carpentry Works 3I Electrical Works 3J Plumbing Works 3K Sanitary Works 3L Painting Works 3M Tile Works 3N Hardwares 4 Construction of Septic Vault 4A Earthworks 4B Concrete Works 4C Steel Works 4D Formworks 4E Masonry Works 5 Provision/Rehabilitation of pipe connections 5A Installation of 3/4" PVC Pipe and water network 6 Water Source, water tank and electric pump 6A Provision of water tank, stand and electric pump Direct Cost: SUBTOTAL Indirect Cost (19% of total direct cost): S Tax (12%) ESTIMATED TOTAL CO
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
REGION NAME OF SCHOOL
6 LANJAGAN PRIMARY SCHOOL
BUDGET ALLOCATION:DIRECT COST
NO DESCRIPTION1 Expenses
1A Insurances
1B Bonds and Guarantees
2 Mobilization
2A General Project Mobilisation/Demob, Safety & Health
3 Construction of Toilet Detached & Hand washing facilities
3A Earthworks
3B Concrete Works
3C Steel Works
3D Formworks
3E Masonry Works
3F Doors and Windows
3G Roofing Works
3H Carpentry Works
3I Electrical Works
3J Plumbing Works
3K Sanitary Works
3L Painting Works
3M Tile Works
3N Hardwares
4 Construction of Septic Vault
4A Earthworks
4B Concrete Works
4C Steel Works
4D Formworks
4E Masonry Works
5 Provision/Rehabilitation of pipe connections
5A Installation of 3/4" PVC Pipe and water network
6 Water Source, water tank and electric pump
6A Provision of water tank, stand and electric pump
Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)
ESTIMATED TOTAL COST (PHP)
Prepared by:Ardhe D. Sicad Wash TPA
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
PROJECT TITLE
CONSTRUCTION OF 3-SEATER TOILET DETACHED WITH HANDWASHING FACILITIES
APPROVED BUDGET FOR CONTRACT:DIRECT COST
UNIT QTY
location 1
location 1
location 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)
ESTIMATED TOTAL COST (PHP)
Noted by:
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
PROJECT TITLE
CONSTRUCTION OF 3-SEATER TOILET DETACHED WITH HANDWASHING FACILITIES
COMPLETION PERIOD: 2 MONTHSDIRECT COST
TOTAL COST
- -
TAX EXEMPT -
Daphnie S. Dela CruzField Operations Head
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
REGION NAME OF SCHOOL
6 TAGUBANHAN ELEMENTARY SCHOOL
BUDGET ALLOCATION:DIRECT COST
NO DESCRIPTION1 Expenses
1A Insurances
1B Bonds and Guarantees
2 Mobilization
2A General Project Mobilisation/Demob, Safety & Health
3 Construction of Toilet Detached & Hand washing facilities
3A Earthworks
3B Concrete Works
3C Steel Works
3D Formworks
3E Masonry Works
3F Doors and Windows
3G Roofing Works
3H Carpentry Works
3I Electrical Works
3J Plumbing Works
3K Sanitary Works
3L Painting Works
3M Tile Works
3N Hardwares
4 Construction of Septic Vault
4A Earthworks
4B Concrete Works
4C Steel Works
4D Formworks
4E Masonry Works
5 Provision/Rehabilitation of pipe connections
5A Installation of 3/4" PVC Pipe and water network
6 Water Source, water tank and electric pump
6A Provision of water tank, stand and electric pump
Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)
ESTIMATED TOTAL COST (PHP)
Prepared by:Ardhe D. Sicad Wash TPA
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
PROJECT TITLE
CONSTRUCTION OF 3-SEATER TOILET DETACHED WITH HANDWASHING FACILITIES
APPROVED BUDGET FOR CONTRACT:DIRECT COST
UNIT QTY
location 1
location 1
location 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)
ESTIMATED TOTAL COST (PHP)
Noted by:
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
PROJECT TITLE
CONSTRUCTION OF 3-SEATER TOILET DETACHED WITH HANDWASHING FACILITIES
COMPLETION PERIOD: 2 MONTHSDIRECT COST
TOTAL COST
- -
TAX EXEMPT -
Daphnie S. Dela CruzField Operations Head
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
REGION NAME OF SCHOOL
6 PINAY ESPINOSA ELEMENTARY SCHOOL
BUDGET ALLOCATION:DIRECT COST
NO DESCRIPTION1 Expenses
1A Insurances
1B Bonds and Guarantees
2 Mobilization
2A General Project Mobilisation/Demob, Safety & Health
3 Construction of Toilet Detached & Hand washing facilities
3A Earthworks
3B Concrete Works
3C Steel Works
3D Formworks
3E Masonry Works
3F Doors and Windows
3G Roofing Works
3H Carpentry Works
3I Electrical Works
3J Plumbing Works
3K Sanitary Works
3L Painting Works
3M Tile Works
3N Hardwares
4 Construction of Septic Vault
4A Earthworks
4B Concrete Works
4C Steel Works
4D Formworks
4E Masonry Works
5 Provision/Rehabilitation of pipe connections
5A Installation of 3/4" PVC Pipe and water network
6 Water Source, water tank and electric pump
6A Provision of water tank, stand and electric pump
Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)
ESTIMATED TOTAL COST (PHP)
Prepared by:Ardhe D. Sicad Wash TPA
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
PROJECT TITLE
CONSTRUCTION OF 4-SEATER TOILET DETACHED WITH HANDWASHING FACILITIES
APPROVED BUDGET FOR CONTRACT:DIRECT COST
UNIT QTY
location 1
location 1
location 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)
ESTIMATED TOTAL COST (PHP)
Noted by:
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
PROJECT TITLE
CONSTRUCTION OF 4-SEATER TOILET DETACHED WITH HANDWASHING FACILITIES
COMPLETION PERIOD: 2 MONTHSDIRECT COST
TOTAL COST
- -
TAX EXEMPT -
Daphnie S. Dela CruzField Operations Head
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
REGION NAME OF SCHOOL
6 PINAY ESPINOSA ELEMENTARY SCHOOL
BUDGET ALLOCATION: DIRECT COST
NO DESCRIPTION1 Expenses
1A Insurances
1B Bonds and Guarantees
2 Mobilization
2A General Project Mobilisation/Demob, Safety & Health
3 Rehabiltation of Concrete Tank and WASH Facilities
3A Earthworks
3B Concrete Works
3C Steel Works
3D Formworks
3E Masonry Works
3F Doors and Windows
3G Roofing Works
3H Carpentry Works
3I Electrical Works
3J Plumbing Works
3K Sanitary Works
3L Painting Works
3M Tile Works
3N Hardwares
Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)
ESTIMATED TOTAL COST (PHP)
Prepared by:Ardhe D. Sicad Wash TPA
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
PROJECT TITLE
REHABILITATION OF SCHOOL WASH FACILITIES
APPROVED BUDGET FOR CONTRACT:DIRECT COST
UNIT QTY
location 1
location 1
location 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)
ESTIMATED TOTAL COST (PHP)
Noted by:
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
PROJECT TITLE
REHABILITATION OF SCHOOL WASH FACILITIES
COMPLETION PERIOD: 2 MONTHSDIRECT COST
TOTAL COST
- -
TAX EXEMPT -
Daphnie S. Dela CruzField Operations Head
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
REGION NAME OF HEALTH UNIT
6 AJUY RURAL HEALTH UNIT
BUDGET ALLOCATION: DIRECT COST
NO DESCRIPTION1 Expenses
1A Insurances
1B Bonds and Guarantees
2 Mobilization
2A General Project Mobilisation/Demob, Safety & Health
3
3A Earthworks
3B Concrete Works
3C Steel Works
3D Formworks
3E Masonry Works
3F Carpentry Works
3G Plumbing Works
3H Sanitary Works
3I Painting Works
3J Tile Works
3K Hardwares
4 Provision/Rehabilitation of pipe connections
5A Installation of 3/4" PVC Pipe and water network
4 Water Source, water tank and electric pump
5A Provision of water tank, stand and electric pump
Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)
ESTIMATED TOTAL COST (PHP)
Prepared by:Ardhe D. Sicad Wash TPA
Construction of Placenta Pit with Sharps and Rehabilitation of WASH Faciliies
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
PROJECT TITLE
CONSTRUCTION OF PLACENTA PIT WITH SHARPS AND REHABILITATION OF WASH FACILITIES
APPROVED BUDGET FOR CONTRACT:DIRECT COST
UNIT QTY
location 1
location 1
location 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)
ESTIMATED TOTAL COST (PHP)
Noted by:
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
PROJECT TITLE
CONSTRUCTION OF PLACENTA PIT WITH SHARPS AND REHABILITATION OF WASH FACILITIES
COMPLETION PERIOD: 2 MONTHSDIRECT COST
TOTAL COST
- -
TAX EXEMPT -
Daphnie S. Dela CruzField Operations Head
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
REGION NAME OF HEALTH UNIT
6 BAY-ANG BARANGAY HEALTH CENTER
BUDGET ALLOCATION: DIRECT COST
NO DESCRIPTION1 Expenses
1A Insurances
1B Bonds and Guarantees
2 Mobilization
2A General Project Mobilisation/Demob, Safety & Health
3
3A Earthworks
3B Concrete Works
3C Steel Works
3D Formworks
3E Masonry Works
3F Carpentry Works
3G Plumbing Works
3H Sanitary Works
3I Painting Works
3J Tile Works
3K Hardwares
4 Provision/Rehabilitation of pipe connections
4A Installation of 3/4" PVC Pipe and water network
Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)
ESTIMATED TOTAL COST (PHP)
Prepared by:Ardhe D. Sicad Wash TPA
Construction of Placenta Pit with Sharps and Rehabilitation of WASH Faciliies
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
PROJECT TITLE
CONSTRUCTION OF PLACENTA PIT WITH SHARPS AND REHABILITATION OF WASH FACILITIES
APPROVED BUDGET FOR CONTRACT:DIRECT COST
UNIT QTY
location 1
location 1
location 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)
ESTIMATED TOTAL COST (PHP)
Noted by:
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
PROJECT TITLE
CONSTRUCTION OF PLACENTA PIT WITH SHARPS AND REHABILITATION OF WASH FACILITIES
COMPLETION PERIOD: 2 MONTHSDIRECT COST
TOTAL COST
- -
TAX EXEMPT -
Daphnie S. Dela CruzField Operations Head
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
REGION NAME OF HEALTH UNIT
6 LANJAGAN BARANGAY HEALTH CENTER
BUDGET ALLOCATION: DIRECT COST
NO DESCRIPTION1 Expenses
1A Insurances
1B Bonds and Guarantees
2 Mobilization
2A General Project Mobilisation/Demob, Safety & Health
3
3A Earthworks
3B Concrete Works
3C Steel Works
3D Formworks
3E Masonry Works
3F Carpentry Works
3G Plumbing Works
3H Sanitary Works
3I Painting Works
3J Tile Works
3K Hardwares
4 Provision/Rehabilitation of pipe connections
4A Installation of 3/4" PVC Pipe and water network
5 Water Source, water tank and electric pump
5A Provision of water tank, stand and electric pump
Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)
ESTIMATED TOTAL COST (PHP)
Prepared by:Ardhe D. Sicad Wash TPA
Construction of Placenta Pit with Sharps and Rehabilitation of WASH Faciliies
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
PROJECT TITLE
CONSTRUCTION OF PLACENTA PIT WITH SHARPS AND REHABILITATION OF WASH FACILITIES
APPROVED BUDGET FOR CONTRACT:DIRECT COST
UNIT QTY
location 1
location 1
location 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
each 1
Direct Cost: SUBTOTALIndirect Cost (19% of total direct cost): SUBTOTALTax (12%)
ESTIMATED TOTAL COST (PHP)
Noted by:
PHILIPPINE RED CROSS IN PARTNERSHIP WITH BRITISH RED CROSSILOILO CHAPTER
WATER AND SANITATION IN SCHOOL PROJECTPROGRAM OF WORKS
PROJECT TITLE
CONSTRUCTION OF PLACENTA PIT WITH SHARPS AND REHABILITATION OF WASH FACILITIES